CN203066082U - 锚杆支护式基坑边缘的临时栈桥 - Google Patents
锚杆支护式基坑边缘的临时栈桥 Download PDFInfo
- Publication number
- CN203066082U CN203066082U CN 201320101782 CN201320101782U CN203066082U CN 203066082 U CN203066082 U CN 203066082U CN 201320101782 CN201320101782 CN 201320101782 CN 201320101782 U CN201320101782 U CN 201320101782U CN 203066082 U CN203066082 U CN 203066082U
- Authority
- CN
- China
- Prior art keywords
- support
- girder
- edge
- capping beam
- trestle
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Expired - Fee Related
Links
Images
Abstract
本实用新型公开了一种锚杆支护式基坑边缘的临时栈桥,它包括一排支撑立柱(1),该排的各个支撑立柱(1)顶端设有一根支撑主梁(2),支撑主梁(2)与基坑的一根压顶梁(3)平行,支撑主梁(2)与该压顶梁(3)之间每隔一定距离设有一根支撑副梁(4),支撑主梁(2)、支撑副梁(4)和该压顶梁(3)构成了整体的支撑框架(5),支撑框架(5)顶端浇注有混凝土栈桥板(6)。该锚杆支护式基坑边缘的临时栈桥安全、不破坏不干扰周边建筑物、能用于重车行走、材料堆积。
Description
技术领域
本实用新型涉及建筑领域,具体讲是一种位于锚杆支护式基坑的边缘的临时栈桥结构。
背景技术
随着建筑技术的发展,地下室面积和深度逐步增大,锚杆支护式基坑的应用越来越广泛。锚杆支护式基坑与普通基坑一样沿基坑边缘设置一圈支护桩,各个支护桩的桩顶也设置有压顶梁,与普通基坑不同的是,锚杆支护式基坑不再设有内支撑和围檩等结构,而是设置从压顶梁向土体延伸的锚杆,利用锚杆与土体摩擦产生的抗拔承载力来对抗基坑侧壁的土体侧压力,以此对基坑提供支护,锚杆的上端锚固在压顶梁内,锚杆的主体部分倾斜向下延伸且位于土体内。
随着经济的发展,城市用地的逐步紧张,基坑边缘与用地规划红线之间的施工临时用地越来越少,这就迫使施工单位在基坑的边缘临时堆积大量施工材料、堆积挖出的土体或供重车行走,而坑边堆积或重车行走对土体的扰动很大,而锚杆的抗拔承载力正是与土体作用产生的,土体扰动会大幅度衰减锚杆的抗拔承载力,加大锚杆的蠕变,使得锚杆支护体系失效,严重时甚至出现基坑坍塌等重大安全事故。
为避免上述状况,有人提出加大锚杆的外径和延长锚杆的长度,但这样做的效果并不理想,一是始终不存在一个精确可量化的公式来计算到底要多粗、多长的锚杆能提供多大的车辆承载重量或堆积重量,只能通过经验去估计,这样,与实际情况存在一定的偏差,仍然存在一定风险;而且,更重要的是,加长锚杆,很容易使得锚杆越过规划用地红线,伸入到别的建筑物或市政道路的下方,对周边建筑物的基础造成干扰和破坏。
发明内容
本实用新型要解决的技术问题是,提供一种安全、不破坏不干扰周边建筑物的供重车行走、材料堆积的锚杆支护式基坑边缘的临时栈桥。
本实用新型的技术解决方案是,提供一种锚杆支护式基坑边缘的临时栈桥,它包括一排支撑立柱,该排的各个支撑立柱顶端设有一根支撑主梁,支撑主梁与基坑的一根压顶梁平行,支撑主梁与该压顶梁之间每隔一定距离设有一根支撑副梁,支撑主梁、支撑副梁和该压顶梁构成了整体的支撑框架,支撑框架顶端浇注有混凝土栈桥板。
本实用新型锚杆支护式基坑边缘的临时栈桥与现有技术相比,具有以下显著优点和有益效果:
该混凝土栈桥板用以堆积施工材料或挖出的土体,并供重车行走,该混凝土栈桥板受到的承载力由整体的支撑框架承载,并最终由一排的支撑立柱和压顶梁下方的各个支护桩承担,这样,不会扰动基坑边缘的土体,自然不会衰减锚杆的抗拔承载力,杜绝了锚杆支护体系失效导致的坍塌等一系列安全隐患,故安全性好;而且,该结构不用加粗加长锚杆,避免了锚杆加长后伸出用地规划红线对周边建筑物的不良影响。
附图说明
图1是本实用新型锚杆支护式基坑边缘的临时栈桥的俯视结构示意图。
图2是本实用新型锚杆支护式基坑边缘的临时栈桥的侧视结构示意图。
图中所示 1、支撑立柱,2、支撑主梁,3、压顶梁,4、支撑副梁,5、支撑框架,6、混凝土栈桥板,7、支护桩,8、锚杆。
具体实施方式
下面结合附图和具体实施例对本实用新型作进一步说明。
如图1、图2所示,本实用新型锚杆支护式基坑边缘的临时栈桥,它包括一排支撑立柱1,该排的各个支撑立柱1顶端设有一根支撑主梁2。支撑主梁2与基坑的一个侧边的一根压顶梁3平行。支撑主梁2和与支撑主梁2平行的压顶梁3之间每隔一定距离如5米设有一根支撑副梁4。该支撑主梁2、多根支撑副梁4和与该支撑主梁2平行的压顶梁3构成了整体的支撑框架5。支撑框架5顶端浇注有混凝土栈桥板6。
该基坑的支护结构与现有技术相同,即沿基坑边缘设置有一圈支护桩7,各个支护桩7的桩顶设有压顶梁3,压顶梁3内锚固有锚杆8的上端,锚杆8的主体即除了位于压顶梁3中的上端外的中段、下端均位于土体内。
混凝土栈桥板6由支撑主梁2、各根支撑副梁4、与支撑主梁2平行的压顶梁3、该压顶梁3下方的各根支护桩7和支撑主梁2下方的各根支撑立柱1共同承载。
Claims (1)
1.一种锚杆支护式基坑边缘的临时栈桥,其特征在于:它包括一排支撑立柱(1),该排的各个支撑立柱(1)顶端设有一根支撑主梁(2),支撑主梁(2)与基坑的一根压顶梁(3)平行,支撑主梁(2)与该压顶梁(3)之间每隔一定距离设有一根支撑副梁(4),支撑主梁(2)、支撑副梁(4)和该压顶梁(3)构成了整体的支撑框架(5),支撑框架(5)顶端浇注有混凝土栈桥板(6)。
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN 201320101782 CN203066082U (zh) | 2013-03-06 | 2013-03-06 | 锚杆支护式基坑边缘的临时栈桥 |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN 201320101782 CN203066082U (zh) | 2013-03-06 | 2013-03-06 | 锚杆支护式基坑边缘的临时栈桥 |
Publications (1)
Publication Number | Publication Date |
---|---|
CN203066082U true CN203066082U (zh) | 2013-07-17 |
Family
ID=48764893
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN 201320101782 Expired - Fee Related CN203066082U (zh) | 2013-03-06 | 2013-03-06 | 锚杆支护式基坑边缘的临时栈桥 |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN203066082U (zh) |
Cited By (2)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN104963344A (zh) * | 2015-07-17 | 2015-10-07 | 江苏江都建设集团有限公司 | 砼支撑拆除和结构同步进行的深基坑地下施工方法 |
CN107642165A (zh) * | 2017-09-29 | 2018-01-30 | 中国能源建设集团广东省电力设计研究院有限公司 | 主体结构及连接节点结构 |
-
2013
- 2013-03-06 CN CN 201320101782 patent/CN203066082U/zh not_active Expired - Fee Related
Cited By (3)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN104963344A (zh) * | 2015-07-17 | 2015-10-07 | 江苏江都建设集团有限公司 | 砼支撑拆除和结构同步进行的深基坑地下施工方法 |
CN107642165A (zh) * | 2017-09-29 | 2018-01-30 | 中国能源建设集团广东省电力设计研究院有限公司 | 主体结构及连接节点结构 |
CN107642165B (zh) * | 2017-09-29 | 2019-09-13 | 中国能源建设集团广东省电力设计研究院有限公司 | 连接节点结构 |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN100465386C (zh) | 桩加锚基坑支护工法 | |
CN103485363B (zh) | 立体连续框架式钢筋混凝土结构挡土墙 | |
CN105569674A (zh) | 用于软弱破碎高温含水地层中的隧道结构 | |
CN104532868B (zh) | 高陡变形斜坡区桥梁锚拉式高承台群桩基础修建方法 | |
CN205975658U (zh) | 钢平台塔吊基础 | |
CN205557537U (zh) | 一种基坑支护结构 | |
CN103306296B (zh) | 基于土拱效应的路堑边坡框架锚杆墙施工方法 | |
CN203066082U (zh) | 锚杆支护式基坑边缘的临时栈桥 | |
CN206828906U (zh) | 一种用于地铁深基坑的临时路面铺盖结构 | |
CN204151798U (zh) | 一种钢骨混凝土抗滑桩结构 | |
CN107227741B (zh) | 地下室支护结构 | |
CN212129160U (zh) | 一种桩顶斜拉基坑支护结构 | |
CN112575789A (zh) | 斜拉式空间桁架基坑内支撑体系 | |
CN204753656U (zh) | 斜直交替群桩-土-结构相互作用实验模型 | |
CN104234063A (zh) | 一种钢骨混凝土抗滑桩结构 | |
CN209779666U (zh) | 一种岩锥体斜坡上的桥梁基础空间防护结构 | |
CN103981799B (zh) | 一种钢管混凝土张弦劲性梁及其施工方法 | |
CN203821248U (zh) | 一种钢管拱主拱拼装支撑体系 | |
CN203625911U (zh) | 一种深基坑内设坑中坑城门洞式出土施工结构 | |
CN203498863U (zh) | 立体连续框架式钢筋混凝土结构挡土墙 | |
CN202989942U (zh) | 一种针对于软弱土或高回填土区围墙基础构造 | |
CN206337566U (zh) | 基坑竖向预应力锚杆支撑结构 | |
CN201169781Y (zh) | 一种盖挖基坑结构 | |
CN205276289U (zh) | 预应力混凝土梁式双排桩支护体系 | |
CN208884359U (zh) | 一种适合于陡峭边坡上桥塔的塔柱基础构造 |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
C14 | Grant of patent or utility model | ||
GR01 | Patent grant | ||
C41 | Transfer of patent application or patent right or utility model | ||
TR01 | Transfer of patent right |
Effective date of registration: 20160505 Address after: 315020, No. 40, Pagoda Road, Jiangbei District, Zhejiang, Ningbo Patentee after: Ningbo civil building design and Research Institute Co Ltd Address before: 315020, No. 40, Pagoda Road, Jiangbei District, Zhejiang, Ningbo Patentee before: Xiong Chuyan |
|
CF01 | Termination of patent right due to non-payment of annual fee |
Granted publication date: 20130717 Termination date: 20190306 |
|
CF01 | Termination of patent right due to non-payment of annual fee |