CN203056430U - Intelligent ground wire managing device - Google Patents

Intelligent ground wire managing device Download PDF

Info

Publication number
CN203056430U
CN203056430U CN 201220727632 CN201220727632U CN203056430U CN 203056430 U CN203056430 U CN 203056430U CN 201220727632 CN201220727632 CN 201220727632 CN 201220727632 U CN201220727632 U CN 201220727632U CN 203056430 U CN203056430 U CN 203056430U
Authority
CN
China
Prior art keywords
earth connection
hook
module
plate
alarm
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Fee Related
Application number
CN 201220727632
Other languages
Chinese (zh)
Inventor
赵国强
秦志国
安俊虎
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Xinle power supply Co
State Grid Corp of China SGCC
State Grid Hebei Electric Power Co Ltd
Original Assignee
Xinle power supply Co
State Grid Corp of China SGCC
State Grid Hebei Electric Power Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Xinle power supply Co, State Grid Corp of China SGCC, State Grid Hebei Electric Power Co Ltd filed Critical Xinle power supply Co
Priority to CN 201220727632 priority Critical patent/CN203056430U/en
Application granted granted Critical
Publication of CN203056430U publication Critical patent/CN203056430U/en
Anticipated expiration legal-status Critical
Expired - Fee Related legal-status Critical Current

Links

Images

Landscapes

  • Emergency Alarm Devices (AREA)

Abstract

The utility model discloses an intelligent ground wire managing device including a storage support. The storage support includes a pedestal and a storage board that is perpendicular to the ground and used for storing ground wires. The storage board is installed on the upper part of the pedestal through a support. The front face of the storage board is provided with a plurality of hooks. The storage support is also provided with a detection mechanism, a display module, an alarm module and a control module. An output terminal of the detection mechanism is connected with an input terminal of the control module. An output terminal of the control module is connected with the display module and the alarm module respectively. The detection mechanism is corresponding to the hooks and is controlled by the hooks. By using the intelligent ground wire managing device provided by the utility model, the number and serial numbers of the ground wires before a task and after the task carried out by a maintainer can be monitored effectively, so that a fact that no ground wires exists in an operation process of power devices in a power system can be guaranteed and the personal safety of the onsite maintainer and the equipment safety of a transformer substation can be guaranteed.

Description

Intelligence earth connection management devices
Technical field
The utility model relates to electric power system operation auxiliary equipment, particularly a kind of earth connection management devices that is applied in the transformer station.
Background technology
In the operation order workflow in the electric power system, need the dispatcher at the scene the transformer station of administering to be carried out practical operation, need operator and guardian to reach the spot simultaneously in the operating process, one man operation one people monitoring.Along with after each transformer station carries out unattended station administration, each operation utensil all has been placed on base station, and when there was service work in transformer station, operating personnel were carried into required utensil transformer station again and use.Earth connection in the operation utensil is one of the utensil that must use in the maintenance repair process of operating personnel, but because operation field does not have the special-purpose storage facilities of earth connection, causes earth connection to leave about everywhere, the inconvenience of taking during use; After upkeep operation is finished, also can exist because the maintainer neglects and leak the phenomenon of tearing ground wire open in addition, cause the power equipment band ground wire in the electric power system to send electricity, cause great potential safety hazard.
The utility model content
The utility model technical issues that need to address provide a kind of can the monitoring grounding wire operating position, guarantee the earth connection management devices of maintainer and device security.
For solving the problems of the technologies described above, the technical scheme that the utility model adopts is as follows.
Intelligence earth connection management devices, comprise for the storage rack of depositing earth connection temporarily, described storage rack comprises base and is used for depositing the plate of depositing of earth connection perpendicular to ground, deposit plate and be installed in base top by support, described front of depositing plate is provided with several hooks that is used for hanging earth connection; Also be provided with the testing agency of whether hanging for detection of earth connection, the display module that is used for showing earth connection use state on the storage rack, reclaim the not full-time alarm module that gives the alarm and be used for sending the control module that controlling alarm is instructed for working as earth connection, the output of described testing agency is connected with the input of control module, and the output of control module is connected with alarm module with display module respectively; Described testing agency is corresponding with described hook and by hook control.
The concrete structure of described testing agency is: described testing agency is arranged on the back side of depositing plate and links up with corresponding position, hanging handle end, and testing agency is used for monitoring to link up with the displacement transducer of end position variation or/and for detection of the torque sensor of linking up with stress; When described testing agency is displacement transducer, the hanging handle of hook and deposit the spring that is provided with between the through hole that plate is used for passing hanging handle be used to the hook that resets.
The concrete structure of described display module is: described display module comprises the charactron that is arranged on the display screen of depositing the plate front and lays respectively at each hook top.
The concrete structure of described alarm module is: described alarm module comprises and is arranged on the phonetic alarm of depositing the plate front or/and lay respectively at each charactron top and the corresponding indicator light of hook.
The concrete structure of described control module is: described control module comprises the Industry Control single board computer, the input of described Industry Control single board computer connects the signal end of displacement transducer and torque sensor, and the output of Industry Control single board computer is connected with display screen, charactron, phonetic alarm and indicator light respectively.
Because the technological progress of having adopted technique scheme, the utility model to obtain is as follows.
The utility model can effectively be monitored in maintainer's operation tandem docking ground wire quantity and numbering, after operation is finished, when earth connection is not regained fully, numbering corresponding alarm bell with earth connection begins to report to the police, remind the operating personnel to still have earth connection not regain, after regaining, this earth connection is suspended on the relevant position, report to the police and just eliminated, thereby guaranteed that each power equipment in the electric power system does not have the existence of earth connection when putting into operation, guarantee personal safety and the device security of transformer station's field service personnel.
Storage rack in the utility model is used for depositing earth connection, storage rack adopts base and deposits the combining structure of plate, guaranteeing that the maintainer picks and places and observe easily on the basis, for the installation of testing agency, display module, alarm module and control module provides the foundation.
When testing agency adopts torque sensor, can judge whether to be hung with ground wire according to the stress of hook hanging handle, when hook was hung with earth connection, the hook hanging handle was subjected to downward power, when torque sensor has detected the moment generation signal was passed to control module; When not having earth connection, torque sensor detects less than torque signals on hook, and control module then can be judged and do not hang earth connection on the hook.Testing agency can also adopt displacement transducer to detect the location status of the hook that hangs earth connection, when being hung with earth connection on the hook, hook moves down under the effect of earth connection gravity, displacement transducer passes to control module after detecting downward displacement, can judge and be hung with ground wire on the hook; When not having earth connection, the hanging handle of hook will be linked up with hanging handle and reset under the effect of back-moving spring on hook, and displacement transducer detects shifting signal not in place, and control module then can be judged and do not hang earth connection on the hook.
The display screen of display module be used for to show whole deposit service work begins before, prepare altogether on the plate to have how many bar earth connections, service work begin total how many bar earth connections in back use and service work finish after information such as how many bar earth connections of withdrawal; Certainly can also show information such as the temperature of earth connection storage environment and humidity on the display screen.The charactron of display module is used for showing the numbering of earth connection that hook hangs correspondingly, so that the maintainer can find earth connection correspondingly fast in operation process.
Phonetic alarm in the alarm module is used for reporting other unreclaimed earth connections when article one earth connection is regained, and to guarantee the maintainer all earth connections is regained.Whether the earth connection that the indicator light in the alarm module is used to indicate on correspondingly the hook is regained, and when not regaining after earth connection uses, indicator light can be lighted always, reminds earth connection that the maintainer should link up with less than withdrawal.
The Industry Control single board computer of control module is used for the information according to displacement transducer and torque sensor detection, operating position and withdrawal situation to earth connection judge, and control display screen in real time, the show state of charactron, phonetic alarm and indicator light.
Description of drawings
Fig. 1 is control circuit block diagram of the present utility model.
Fig. 2 is the interim storage rack structural representation of the utility model earth connection.
Fig. 3 is the end view of Fig. 2.
Fig. 4 is the partial enlarged drawing of Fig. 3.
Wherein: 1. storage rack, 11. bases, 12. supports, 13. deposit plate, 14. hooks, 141. hanging handles, 2. testing agency, 21. springs, 22. displacement transducers, 23. torque sensor, 3. display module, 31. display screens, 32. charactron, 4. alarm module, 41. phonetic alarms, 42. indicator light, 5. control module, 51. Industry Control single board computers.
Embodiment
Below in conjunction with the drawings and specific embodiments the utility model is described in further details.
Intelligence earth connection management devices comprises storage rack 1, testing agency 2, display module 3, alarm module 4 and control module 5.Testing agency 2, display module 3, alarm module 4 and control module 5 are installed on the storage rack; Storage rack 1 is used for depositing earth connection temporarily; Whether testing agency 2 is suspended on the storage rack for detection of earth connection, and signal is passed to control module in real time; Display module is used for showing according to the instruction of control module the use state of earth connection; Alarm module is used for working as earth connection according to the instruction of control module and reclaims not full-time giving the alarm, and reminds the maintainer in time to regain the earth connection of use.
The structure of storage rack 1 comprises base 11 and deposits plate 13 as shown in Figure 2, deposits plate 13 and is fixedly connected on the base by support 12, deposits plate and arranges perpendicular to ground.The front of depositing plate 13 in the present embodiment is provided with two row totally two ten hooks 14, is used for hanging earth connection.Deposit the position that plate arranges hook and be provided with through hole, the hanging handle 141 of hook stretches out the back side of depositing plate after passing through hole.
Testing agency 2 can be displacement transducer 22 or torque sensor 23 for detection of whether being mounted with earth connection on the hook, also can be both combinations.Testing agency only adopts displacement transducer in the present embodiment, displacement transducer is fixedly installed on deposits plate 13 back sides and hook corresponding position, 14 hanging handle ends, the situation of change that is used for monitoring hook end position, the hanging handle of hook is provided with spring 21 with depositing between the through hole of plate, is used for leaving the hook that resets when linking up with at earth connection.The installation site of testing agency as shown in Figure 3 and Figure 4.
Display module 3 comprises display screen 31 and 20 charactrons 32 as shown in Figure 2.Display screen 31 is installed in the upper left corner of depositing plate, and the easy access personnel observe; Display screen is mainly used in showing the whole earth connection quantity of regaining after employed earth connection quantity in the process that the earth connection quantity before service work begins, service work are carried out on the plate and service work are finished of depositing in the present embodiment.Charactron also is installed in the front of depositing plate, lays respectively at the top of 20 hooks, is used for showing the numbering of earth connection that hook hangs correspondingly.
Alarm module 4 comprises phonetic alarm 41 and 20 indicator lights 42.Phonetic alarm 41 is installed in the upper right corner of depositing plate, is used for reporting other unreclaimed earth connections when article one earth connection is regained, and to guarantee the maintainer all earth connections is regained.Indicator light also is installed in the front of depositing plate, lays respectively at the top of 20 charactrons, so be used to indicate the situation of the corresponding hook earth connection that hangs.
Control module 5 is installed in the upper rear portion of depositing plate, mainly comprises Industry Control single board computer 51 and signal processing circuit.The input of Industry Control single board computer 51 connects the signal end of displacement transducer 22 and torque sensor 23, and the output of Industry Control single board computer 51 is connected with display screen 31, charactron 32, phonetic alarm 41 and indicator light 42 respectively; Be used for to gather hook and hang the ground wire situation, and judge and send indication and alarm command according to the signal of gathering.Control circuit block diagram of the present utility model as shown in Figure 1.
Operation principle of the present utility model is as described below.
When maintainer's manual working ticket and earth connection arrival transformer station, be suspended on the earth connection that will use on the hook of depositing plate according to numbering; This moment, displacement transducer detected the downward displacement of hanging handle generation of hook, and the signal processing circuit that signal passes to control module is carried out signal handle, signal after the processing is transferred to the Industry Control single board computer and carries out analysis and judgement, the Industry Control single board computer is judged when being mounted with ground wire on the hook, send idsplay order to linking up with corresponding charactron with this, show the numbering of this earth connection; After all earth connections suspensions finish, can demonstrate the earth connection quantity in this subjob preparation on the display screen, preparation is finished.
During the beginning upkeep operation, the maintainer takes off earth connection from hook one by one, this moment, the hanging handle of hook resetted under the effect of back-moving spring, the hanging handle displacement that displacement transducer detects is zero, and the signal processing circuit that signal passes to control module is carried out signal handle, signal after the processing is transferred to the Industry Control single board computer and carries out analysis and judgement, and the earth connection that the Industry Control single board computer is judged on the hook is taken away, then shows by display screen and uses earth connection quantity in the operation process; Meanwhile, the Industry Control single board computer can send and lights instruction to linking up with corresponding indicator light with this, illustrates that the earth connection of this hook has entered job state, waits for and regaining.
After upkeep operation is finished, the maintainer is suspended on earth connection on the corresponding hook according to the earth connection numbering more one by one, after displacement transducer receives signal, pass to the Industry Control single board computer again, the Industry Control single board computer shows at display screen according to the earth connection situation of regaining, show after using earth connection quantity to successively decrease in the operation process that namely using earth connection quantity in showing operation process is zero; Meanwhile, the Industry Control single board computer can send out code to linking up with corresponding indicator light with this, illustrates that the earth connection of this hook is regained.
In the withdrawal process of earth connection, regain beginning from article one earth connection, if certain hour still has indicator light to light at interval, then explanation is still unrecovered with the earth connection on the corresponding hook of this indicator light, the Industry Control single board computer then sends instruction to phonetic alarm, carries out voice broadcast, reports content and comprises contents such as earth connection numbering, after earth connection was regained, the Industry Control single board computer was controlled phonetic alarm again and is stopped to report to the police.

Claims (5)

1. intelligent earth connection management devices, it is characterized in that: comprise for the storage rack of depositing earth connection (1) temporarily, described storage rack (1) comprises base (11) and deposits plate (13) perpendicular to what ground was used for depositing earth connection, deposit plate (13) and be installed in base (11) top by support (12), described front of depositing plate (13) is provided with several hooks (14) that is used for hanging earth connection; Also be provided with the testing agency (2) of whether hanging for detection of earth connection, the display module (3) that is used for showing earth connection use state on the storage rack (1), reclaim the not full-time alarm module that gives the alarm (4) and be used for sending the control module (5) that controlling alarm is instructed for working as earth connection, the output of described testing agency (2) is connected with the input of control module (5), and the output of control module (5) is connected with alarm module (4) with display module (3) respectively; Described testing agency (2) corresponding with described hook (14) and by the hook (14) control.
2. intelligent earth connection management devices according to claim 1, it is characterized in that: described testing agency (2) is arranged on the corresponding position in the back side and hook (14) hanging handle end of depositing plate (13), and testing agency is used for the displacement transducer (22) of monitoring hook end position variation or/and for detection of the torque sensor (23) of linking up with stress; When described testing agency is displacement transducer, the hanging handle of hook and deposit the spring (21) that is provided with between the through hole that plate is used for passing hanging handle be used to the hook that resets.
3. intelligent earth connection management devices according to claim 2 is characterized in that: described display module (3) comprises and is arranged on the charactron (32) of depositing the positive display screen (31) of plate (13) and laying respectively at each hook (14) top.
4. intelligent earth connection management devices according to claim 3 is characterized in that: described alarm module (4) comprises being arranged on deposits the positive phonetic alarm (41) of plate (13) or/and lay respectively at each charactron top and hook corresponding indicator light (42).
5. intelligent earth connection management devices according to claim 4, it is characterized in that: described control module (5) comprises Industry Control single board computer (51), the input of described Industry Control single board computer (51) connects the signal end of displacement transducer (22) and torque sensor (23), and the output of Industry Control single board computer (51) is connected with display screen (31), charactron (32), phonetic alarm (41) and indicator light (42) respectively.
CN 201220727632 2012-12-26 2012-12-26 Intelligent ground wire managing device Expired - Fee Related CN203056430U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN 201220727632 CN203056430U (en) 2012-12-26 2012-12-26 Intelligent ground wire managing device

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN 201220727632 CN203056430U (en) 2012-12-26 2012-12-26 Intelligent ground wire managing device

Publications (1)

Publication Number Publication Date
CN203056430U true CN203056430U (en) 2013-07-10

Family

ID=48739350

Family Applications (1)

Application Number Title Priority Date Filing Date
CN 201220727632 Expired - Fee Related CN203056430U (en) 2012-12-26 2012-12-26 Intelligent ground wire managing device

Country Status (1)

Country Link
CN (1) CN203056430U (en)

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN103001132A (en) * 2012-12-26 2013-03-27 新乐市供电公司 Intelligent grounding wire management device
CN105551785A (en) * 2015-12-08 2016-05-04 国网上海市电力公司 Method for preventing transformer from hanging to ground wire in electrified mode

Cited By (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN103001132A (en) * 2012-12-26 2013-03-27 新乐市供电公司 Intelligent grounding wire management device
CN103001132B (en) * 2012-12-26 2015-12-02 新乐市供电公司 Smart grounding wire management device
CN105551785A (en) * 2015-12-08 2016-05-04 国网上海市电力公司 Method for preventing transformer from hanging to ground wire in electrified mode

Similar Documents

Publication Publication Date Title
CN103001132B (en) Smart grounding wire management device
CN101077756B (en) Erecting equipment remote actual time safety monitoring system and its control method
CN102023253B (en) Lightning-proof monitoring warning system
CN104457902B (en) A kind of reservoir water rain regime automatic measure and forecast system
CN206524538U (en) A kind of high-tension switch cabinet of automatic failure alarm
CN202625675U (en) Safety monitoring system of tower crane based on tilt monitoring of tower body
CN104071715A (en) Near-to-high-voltage safety prewarning method for construction hoist
CN203056430U (en) Intelligent ground wire managing device
CN106647566A (en) Electromagnetic security and protection integrated monitoring system
CN110504753A (en) Smart grounding linear system system and working method
CN203445023U (en) Horizontal rotary isolating switch opening and closing position online detector
CN206894064U (en) A kind of novel integrated cable collection matches somebody with somebody case
CN205596111U (en) Online identification system of platform district's circuit
CN206312323U (en) A kind of long distance electric fire alarm monitoring system
CN103376191A (en) Intelligent multi-channel leakage and breakage detection system
CN206209378U (en) A kind of electromagnetism security protection comprehensive monitor system
CN103950701A (en) Stay wire flash detection system for belt conveyor control loop
CN107271942A (en) Great current mutual inductor site error verification mobile laboratory
CN206906569U (en) Great current mutual inductor site error verification mobile laboratory
CN204116974U (en) External boiler water level measuring and controlling device
CN204989907U (en) Fire control device power monitoring device
CN209704637U (en) A kind of pernicious gas real-time monitoring device of shield tunnel construction
CN202795698U (en) Distributed monitoring and alarming system for engine room for ship
CN2872382Y (en) Distributed galvanic-battery on-line monitor
CN203324758U (en) Rail weighbridge state online monitoring system

Legal Events

Date Code Title Description
C14 Grant of patent or utility model
GR01 Patent grant
CF01 Termination of patent right due to non-payment of annual fee
CF01 Termination of patent right due to non-payment of annual fee

Granted publication date: 20130710

Termination date: 20171226