CN107271942A - Great current mutual inductor site error verification mobile laboratory - Google Patents
Great current mutual inductor site error verification mobile laboratory Download PDFInfo
- Publication number
- CN107271942A CN107271942A CN201710399869.1A CN201710399869A CN107271942A CN 107271942 A CN107271942 A CN 107271942A CN 201710399869 A CN201710399869 A CN 201710399869A CN 107271942 A CN107271942 A CN 107271942A
- Authority
- CN
- China
- Prior art keywords
- mobile laboratory
- mutual inductor
- current
- power supply
- current mutual
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Pending
Links
- 238000012795 verification Methods 0.000 title claims abstract description 32
- 238000012544 monitoring process Methods 0.000 claims abstract description 28
- 238000002474 experimental method Methods 0.000 claims description 16
- 238000012360 testing method Methods 0.000 claims description 13
- 238000005259 measurement Methods 0.000 claims description 9
- 230000005611 electricity Effects 0.000 claims description 7
- 230000003993 interaction Effects 0.000 claims description 7
- VYPSYNLAJGMNEJ-UHFFFAOYSA-N Silicium dioxide Chemical compound O=[Si]=O VYPSYNLAJGMNEJ-UHFFFAOYSA-N 0.000 claims description 4
- 229910002027 silica gel Inorganic materials 0.000 claims description 4
- 239000000741 silica gel Substances 0.000 claims description 4
- 229960001866 silicon dioxide Drugs 0.000 claims description 4
- 238000004804 winding Methods 0.000 claims description 4
- 238000013016 damping Methods 0.000 claims description 3
- 230000007613 environmental effect Effects 0.000 claims 1
- 230000008901 benefit Effects 0.000 abstract description 3
- 230000010354 integration Effects 0.000 abstract description 3
- 230000005540 biological transmission Effects 0.000 abstract description 2
- 238000000034 method Methods 0.000 abstract 1
- 239000000203 mixture Substances 0.000 description 3
- 238000012986 modification Methods 0.000 description 3
- 230000004048 modification Effects 0.000 description 3
- 238000005516 engineering process Methods 0.000 description 2
- 230000033001 locomotion Effects 0.000 description 2
- 238000004378 air conditioning Methods 0.000 description 1
- 230000008859 change Effects 0.000 description 1
- 230000007547 defect Effects 0.000 description 1
- 238000013461 design Methods 0.000 description 1
- 238000010586 diagram Methods 0.000 description 1
- 238000009413 insulation Methods 0.000 description 1
- 238000011031 large-scale manufacturing process Methods 0.000 description 1
- 230000006855 networking Effects 0.000 description 1
- 239000000725 suspension Substances 0.000 description 1
Classifications
-
- G—PHYSICS
- G01—MEASURING; TESTING
- G01R—MEASURING ELECTRIC VARIABLES; MEASURING MAGNETIC VARIABLES
- G01R35/00—Testing or calibrating of apparatus covered by the other groups of this subclass
- G01R35/02—Testing or calibrating of apparatus covered by the other groups of this subclass of auxiliary devices, e.g. of instrument transformers according to prescribed transformation ratio, phase angle, or wattage rating
-
- E—FIXED CONSTRUCTIONS
- E04—BUILDING
- E04H—BUILDINGS OR LIKE STRUCTURES FOR PARTICULAR PURPOSES; SWIMMING OR SPLASH BATHS OR POOLS; MASTS; FENCING; TENTS OR CANOPIES, IN GENERAL
- E04H1/00—Buildings or groups of buildings for dwelling or office purposes; General layout, e.g. modular co-ordination or staggered storeys
- E04H1/12—Small buildings or other erections for limited occupation, erected in the open air or arranged in buildings, e.g. kiosks, waiting shelters for bus stops or for filling stations, roofs for railway platforms, watchmen's huts or dressing cubicles
- E04H1/1205—Small buildings erected in the open air
- E04H1/1238—Shelters for engines, e.g. electrical meter housings
Landscapes
- Engineering & Computer Science (AREA)
- Architecture (AREA)
- Civil Engineering (AREA)
- Structural Engineering (AREA)
- Power Engineering (AREA)
- Physics & Mathematics (AREA)
- General Physics & Mathematics (AREA)
- Testing Electric Properties And Detecting Electric Faults (AREA)
Abstract
The invention discloses a kind of great current mutual inductor site error verification mobile laboratory.The mobile laboratory of the present invention includes current mutual inductor on site verification complexes, integrated form operating system, experimental enviroment monitoring system and safety monitoring system, and the current mutual inductor on site verification complexes and integrated form operating system are arranged in mobile laboratory.The present invention solve in great current mutual inductor site error checking procedure because labor intensity is big, the cumbersome operating efficiency caused of equipment operation is low, the problem of level of security is low, it is high with device integration, operating efficiency is high, in power plant, equipment is without getting off when substation field carries out large current transducer check, it is not used in on-site hoisting, without building pilot system temporarily, advantage easy to operate, so that it is guaranteed that current mutual inductor on site verifying work is safe and orderly, error check result is reproducible, the degree of accuracy is high, ensure the accuracy and reliability of national transmission of quantity value.
Description
Technical field
The present invention relates to power equipment error checking arrangement field, specifically a kind of great current mutual inductor site error
Verification mobile laboratory.
Background technology
Because the large-scale production and exchange of electric energy in power system are related to the tremendous economic interests of all departments, power plant and electricity
Be intended to settle accounts by electric energy tariff between net, between networking lines, between power network and large user, high-voltage electric-energy meter it is accurate
Property and reliability also turn into each side be concerned about focal issue.Electric power meter is by high-tension current, voltage transformer, electric energy meter
With secondary circuit composition.Wherein, current transformer and voltage transformer are to undertake the work(such as measurement, metering, protection in power system
The power equipment of energy, quantity is more, influences big to power grid security economical operation.In order to ensure transformer equipment is in serviceable condition,
Except requiring that its insulation can be outer, it is necessary to ensure that measurement error meets its accurate rank, its accuracy directly influences electric power
Market it is fair and just.According to JJG1021-2007《Electric power mutual-inductor》National metrological verification regulations provide, except need into
Row examines and determine outer first, also periodically should carry out on-site proving to transformer and be traced to the source with national standard to ensure its accuracy.
Existing great current mutual inductor on-site calibration device is generally separate structure, there is problems with:
(1)Testing equipment volume is big, weight weight, equipment are scattered, and it is big to transport and build pilot system workload, frequently entrucking,
Unload, lift and certain damage is easily caused to testing equipment;
(2)Wiring workload is big, complicated during experiment, and operating efficiency is not high, requires high to testing crew;
(3)Testing equipment is put and safe spacing requirement test site is big, and experiment security risk is big;Pilot system is built in lifting
Add the risk of experiment;
(4)Experiment automatized degree is relatively low.
The content of the invention
The technical problems to be solved by the invention are that there is provided a kind of high current is mutual for the defect that overcomes above-mentioned prior art to exist
Sensor site error verification mobile laboratory, its device integration is high, and operating efficiency is high, is opened in power plant, substation field
Equipment is without getting off, being not used in on-site hoisting and without building pilot system temporarily when opening up large current transducer check, with simplicity
Operation, improves security and the degree of accuracy.
Therefore, the present invention is adopted the following technical scheme that:A kind of great current mutual inductor site error verification is tested with mobile
Room, the mobile laboratory includes current mutual inductor on site verification complexes, integrated form operating system, experimental enviroment monitoring system
System and safety monitoring system, the current mutual inductor on site verification complexes and integrated form operating system are arranged in mobile experiment
It is indoor.
The present invention is in use, the mobile laboratory is placed on truck.
On the basis of above-mentioned technical proposal, the current mutual inductor on site verification complexes include current lifting device, standard
Current transformer, Intelligent transformator tester, switch board, disconnecting link cabinet, electronic power supply and multiple accessory cases;
Layering sets electrician's power supply, capacitive compensation device and current loading case successively in the switch board;
The multiple accessory case includes power wire coil cabinet, high current wire case and Tool Cabinet;
The standard current transformer, current loading case and Intelligent transformator tester composition current transformer error of measurement system;
The unlatching of the disconnecting link cabinet control electronic power supply and electrician's power supply, the capacitive compensation device, current lifting device and Current Mutual Inductance
Device error of measurement system is sequentially connected, and the current lifting device and standard current transformer are connected by high current wire.
On the basis of above-mentioned technical proposal, the integrated form operating system includes integrated form operating desk and is embedded in integrated form
Man-machine interaction giant-screen on operating desk.
On the basis of above-mentioned technical proposal, the experimental enviroment monitoring system includes being separately positioned on mobile laboratory
The warm and humid supervising device in inside and outside portion, the temperature-humidity signal of warm and humid supervising device is sent to man-machine interaction giant-screen.
On the basis of above-mentioned technical proposal, the safety monitoring system include laboratory illuminator, monitoring system and
Acoustooptic alarm system, the laboratory illuminator, monitoring system and acoustooptic alarm system are connected with disconnecting link cabinet.
On the basis of above-mentioned technical proposal, the laboratory illuminator includes being arranged on the field at the top of mobile laboratory
Interior illuminator inside ground lighting device and mobile laboratory.
On the basis of above-mentioned technical proposal, the monitoring system includes being arranged on four open airs at the top of mobile laboratory
Type high-definition camera, the monitoring signal of the high-definition camera is sent to the real-time display platform of four split screens, and four split screen is real-time
Display platform hangs on the top of integrated form operating desk.
On the basis of above-mentioned technical proposal, the acoustooptic alarm system includes being arranged on the warning at the top of mobile laboratory
The caution bell of lamp and mobile laboratory's exterior lateral sides, the control line of the acoustooptic alarm system is connected with integrated form operating desk.
On the basis of above-mentioned technical proposal, the both sides of the mobile laboratory are respectively provided with wiring window;
The wiring window includes external power supply input, experiment power supply output end, current lifting device output end and the secondary company of transformer
Line incoming end;
The external power supply input connects disconnecting link cabinet, the output end and electrician's power supply of experiment power supply output end connection electronic power supply
Output end, current lifting device output end connection current lifting device first winding, transformer secondary line incoming end connection Intelligent transformator school
Test instrument and current loading case.
On the basis of above-mentioned technical proposal, damping and slide-prevention silicagel pad is laid in the mobile laboratory bottom.
Compared with prior art, the device have the advantages that as follows:
All devices are not required to get off during present invention verification, are built without the assembling for carrying out pilot system, it is only necessary to outdoor in experiment
After simple wiring, operating personnel can complete all verifying works in mobile laboratory, improve operating efficiency, ensure behaviour
Make the personal safety of personnel;Meanwhile, the present invention is provided with supervising device and acoustic-optic alarm, has ensured the safety of experiment;Moreover,
Whole movable detecting platform is safe and reliable without hydraulic machinery motion.In addition, requirement of the present invention to haulage vehicle and driver
Not high, management cost is low, is adapted to promote the use of in great current mutual inductor field-checking.
Therefore, the present invention has device integration high, and operating efficiency is high, and high current is carried out in power plant, substation field
Equipment is without getting off, being not used in on-site hoisting, without building pilot system, easy to operate, security temporarily during transducer check
The high, advantage that error check result is reproducible, the degree of accuracy is high.
Brief description of the drawings
Fig. 1 is the inside top figure of great current mutual inductor site error verification of embodiment of the present invention mobile laboratory;
Fig. 2 is the dimensional structure diagram of great current mutual inductor site error verification of embodiment of the present invention mobile laboratory;
Fig. 3 is the front view of the great current mutual inductor site error verification mobile laboratory of the embodiment of the present invention;
Fig. 4 is the structured flowchart of the great current mutual inductor site error verification of the embodiment of the present invention.
Reference:1- switch boards, 2- integrated form operating desks, 3- man-machine interaction giant-screens, 4- current lifting devices, 5- normalized currents
Transformer, 6- Intelligent transformator testers, 7- disconnecting link cabinets, 8- power wire coil cabinets, 9- high current wire casees, 10- electronic power supplies,
11- Tool Cabinets, 12- warning lamps, 13- high-definition cameras, 14- caution bells, 15- field lightings device, 16- wiring windows, 17- subtracts
Shake anti-skidding silicagel pad, 18- electrician's power supply, 19- capacitive compensation devices, 20- current loading casees, 21- current transformer error of measurement systems,
22- laboratories illuminator, 23- monitoring systems, 24- acoustooptic alarm systems.
Embodiment
With reference to Figure of description and embodiment, the present invention is described in further detail.
The embodiment of the present invention provides a kind of great current mutual inductor site error verification mobile laboratory, and mobile laboratory is put
Put on truck, mobile laboratory includes current mutual inductor on site verification complexes, integrated form operating system, proving ring
Border monitoring system and safety monitoring system, current mutual inductor on site verification complexes and integrated form operating system are arranged in movement
In laboratory.
As shown in figure 1, current mutual inductor on site verification complexes include current lifting device 4, standard current transformer 5, intelligence
Mutual-inductor tester 6, switch board 1, disconnecting link cabinet 7, electronic power supply 10 and multiple accessory cases;Wherein, layering is set successively in switch board 1
Put electrician's power supply 18, capacitive compensation device 19 and current loading case 20;Multiple accessory cases, which include power wire coil cabinet 8, high current, leads
Line case 9 and Tool Cabinet 11.Current lifting device 4 is placed on the lower section of integrated form operating desk 2, and Intelligent transformator tester 6 is placed on current lifting device 4
On.Integrated form operating system includes integrated form operating desk 2 and the man-machine interaction giant-screen 3 being embedded on integrated form operating desk 2.
Wherein, experimental enviroment monitoring system includes being separately positioned on the warm and humid supervising device in inside and outside portion of mobile laboratory, temperature
The temperature-humidity signal of wet supervising device is sent to man-machine interaction giant-screen 3, is easy to monitoring and record experimental enviroment situation, such as tests
Environment can suspend experiment in time when being unsatisfactory for vertification regulation regulation.
As shown in Figure 2 and Figure 3, safety monitoring system includes laboratory illuminator 22, monitoring system 23 and sound and light alarm system
System 24, laboratory illuminator 22, monitoring system 23 and acoustooptic alarm system 24 are connected with disconnecting link cabinet 7.
Laboratory illuminator 22 includes being arranged on field lighting device 15 and the mobile laboratory at the top of mobile laboratory
Internal interior illuminator.
Monitoring system 23 includes being arranged on four outdoor type high-definition cameras 13 at the top of mobile laboratory, high-definition camera
13 monitoring signal is sent to the real-time display platform of four split screens, is easy to viewing test environment, the real-time display platform suspension of four split screens
In the top of integrated form operating desk 2.
Acoustooptic alarm system 24 includes being arranged on the warning lamp 12 and mobile laboratory's exterior lateral sides at the top of mobile laboratory
Caution bell 14, the control line of acoustooptic alarm system 24 is connected with integrated form operating desk 2.
In the present embodiment, the both sides of mobile laboratory are respectively provided with wiring window 16;Wiring window 16 includes external power supply
Input, experiment power supply output end, current lifting device output end and the secondary line incoming end of transformer;External power supply input connects knife
Lock cabinet 7, the output end of experiment power supply output end connection electronic power supply 10 and the output end of electrician's power supply 18, current lifting device output end connect
Connect the first winding of current lifting device 4, the secondary line incoming end connection Intelligent transformator tester 6 of transformer and current loading case 20.Move
Dynamic laboratory bottom laying damping and slide-prevention silicagel pad 17.In order to easy to use, mobile laboratory is using passageway and three-side door-opening
Design.
As shown in figure 4, disconnecting link cabinet 7 connects power supply, electronic power supply 10 or electrician's power supply 18, mark are opened according to experiment demand selection
Quasi- current transformer 5, current loading case 20 and the composition current transformer error of measurement of Intelligent transformator tester 6 system 21;Capacitive is mended
Repay device 19, the summation current transformer error of measurement system 21 of current lifting device 4 to be sequentially connected in series, current lifting device 4 and standard current transformer 5 are by big
Ampere wires are connected, and current lifting device 4 and the connection current lifting device output end of standard current transformer 5, current lifting device 4 are once mutual with normalized current
Sensor 5 has once been fixedly connected, so without changing the primary connection of standard current transformer 5 again.Wherein, the He of electronic power supply 10
Each before and after electrician's power supply 18 to set one plug-in strip, electronic power supply 10 is used to connect electricity with the anterior plug-in strip set of electrician's power supply 18
Source;Electronic power supply 10 and the rear portion of electrician's power supply 18 set plug-in strip to be used to prevent voltage from pouring in down a chimney, because electronic power supply 10 and electrician's electricity
The output end intercommunication in source 18, when electronic power supply 10 works, electrician's power supply 18 has the electricity poured in down a chimney into from the output end of electronic power supply 10
Pressure, easily causes the short circuit of electrician's power supply 18, when similarly electrician's power supply 18 works, electronic power supply 10 can also pour in down a chimney voltage, therefore set
Put the connection of plug-in strip cut-out electronic power supply 10 and the output end of electrician's power supply 18.
In practical operation, when carrying out great current mutual inductor field-checking, the transport of mobile laboratory first will be loaded with
Car, drives to subject current transformer, opens window, the current lifting device output end of the external power supply input of wiring window 16
Window, the window of the secondary line incoming end of transformer, high current wire, secondary line, ground wire, letter are taken out from Tool Cabinet 11
Number line etc., is first grounded to be tested current transformer with high current wire again and once hold and is connected with current lifting device output end, by standard electric
The secondary winding of current transformer 5 and subject current transformer is connected according to error of measurement principle with the secondary line incoming end of transformer,
Transformer station's power supply is connected with external power supply input.After checkout facility wiring is errorless, power transmission simultaneously opens monitoring system 23, opens
The power switch of integrated form operating desk 2, jingle bell once, to show on-test, selects current testing, selection power supply and corresponding people
Machine interacts giant-screen 3, starts automatic up-flow verification, and generate test report.
In actual applications, fire extinguisher can be set in mobile laboratory, be easy to handle fiery residence dangerous situation.Meanwhile, mobile experiment
The side of room, which can be set, can arrange mobile folding table/chair in window, mobile laboratory, air-conditioning can be set in the top of mobile laboratory,
Improve the comfortableness of mobile laboratory.
Those skilled in the art can carry out various modifications and variations to the embodiment of the present invention, if these modifications and change
Type is within the scope of the claims in the present invention and its equivalent technologies, then these modifications and variations are also in protection scope of the present invention
Within.
The prior art that the content not being described in detail in specification is known to the skilled person.
Claims (10)
1. great current mutual inductor site error verification mobile laboratory, it is characterised in that:Described mobile laboratory includes electricity
Current transformer field-checking complexes, integrated form operating system, experimental enviroment monitoring system and safety monitoring system, the electricity
Current transformer field-checking complexes and integrated form operating system are arranged in mobile laboratory.
2. great current mutual inductor site error verification mobile laboratory as claimed in claim 1, it is characterised in that:The electricity
Current transformer field-checking complexes include current lifting device(4), standard current transformer(5), Intelligent transformator tester(6)、
Switch board(1), disconnecting link cabinet(7), electronic power supply(10)And multiple accessory cases;
The switch board(1)Inside layering sets electrician's power supply successively(18), capacitive compensation device(19)With current loading case(20);
The multiple accessory case includes power wire coil cabinet(8), high current wire case(9)And Tool Cabinet(11);
The standard current transformer(5), current loading case(20)With Intelligent transformator tester(6)Current transformer is constituted to survey
Poor system(21);
The disconnecting link cabinet(7)Control electronic power supply(10)With electrician's power supply(18)Unlatching, the capacitive compensation device(19), rise
Flow device(4)Summation current transformer error of measurement system(21)It is sequentially connected, the current lifting device(4)And standard current transformer(5)Pass through
High current wire is connected.
3. great current mutual inductor site error verification mobile laboratory as claimed in claim 2, it is characterised in that:The collection
Accepted way of doing sth operating system includes integrated form operating desk(2)Be embedded in integrated form operating desk(2)On man-machine interaction giant-screen(3).
4. great current mutual inductor site error verification mobile laboratory as claimed in claim 3, it is characterised in that:The examination
Test the warm and humid supervising device that environmental monitoring system includes being separately positioned on inside and outside portion of mobile laboratory, the temperature of warm and humid supervising device
Moisture signal is sent to man-machine interaction giant-screen(3).
5. great current mutual inductor site error verification mobile laboratory as claimed in claim 3, it is characterised in that:The peace
Full monitoring system includes laboratory illuminator(22), monitoring system(23)And acoustooptic alarm system(24), the laboratory is shone
Bright system(22), monitoring system(23)And acoustooptic alarm system(24)With disconnecting link cabinet(7)Connection.
6. great current mutual inductor site error verification mobile laboratory as claimed in claim 5, it is characterised in that:The reality
Test room illuminator(22)Including the field lighting device being arranged at the top of mobile laboratory(15)Inside mobile laboratory
Interior illuminator.
7. great current mutual inductor site error verification mobile laboratory as claimed in claim 5, it is characterised in that:The prison
Control system(23)Including four outdoor type high-definition cameras being arranged at the top of mobile laboratory(13), the high-definition camera
(13)Monitoring signal be sent to the real-time display platform of four split screens, the real-time display platform of four split screens hangs on integrated form operation
Platform(2)Top.
8. great current mutual inductor site error verification mobile laboratory as claimed in claim 5, it is characterised in that:The sound
Light alarm system(24)Including the warning lamp being arranged at the top of mobile laboratory(12)With the warning of mobile laboratory's exterior lateral sides
Bell(14), the acoustooptic alarm system(24)Control line and integrated form operating desk(2)Connection.
9. the great current mutual inductor site error verification mobile laboratory as any one of claim 1-8, its feature
It is:The both sides of the mobile laboratory are respectively provided with wiring window(16);
The wiring window(16)Including external power supply input, experiment power supply output end, current lifting device output end and transformer two
Secondary line incoming end;
The external power supply input connects disconnecting link cabinet(7), experiment power supply output end connection electronic power supply(10)Output end and
Electrician's power supply(18)Output end, current lifting device output end connection current lifting device(4)First winding, the secondary line incoming end of transformer connects
Connect Intelligent transformator tester(6)With current loading case(20).
10. the great current mutual inductor site error verification mobile laboratory as any one of claim 1-8, its feature
It is:Lay damping and slide-prevention silicagel pad in the mobile laboratory bottom(17).
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201710399869.1A CN107271942A (en) | 2017-05-31 | 2017-05-31 | Great current mutual inductor site error verification mobile laboratory |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201710399869.1A CN107271942A (en) | 2017-05-31 | 2017-05-31 | Great current mutual inductor site error verification mobile laboratory |
Publications (1)
Publication Number | Publication Date |
---|---|
CN107271942A true CN107271942A (en) | 2017-10-20 |
Family
ID=60064273
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN201710399869.1A Pending CN107271942A (en) | 2017-05-31 | 2017-05-31 | Great current mutual inductor site error verification mobile laboratory |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN107271942A (en) |
Cited By (3)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN108414964A (en) * | 2018-06-05 | 2018-08-17 | 国家电网有限公司 | A kind of digitalized electric energy metering movable detecting platform and in-situ check and test method |
CN108957049A (en) * | 2018-08-29 | 2018-12-07 | 北斗航天汽车(北京)有限公司 | Car electrics life test apparatus |
CN111443323A (en) * | 2020-04-26 | 2020-07-24 | 国网福建省电力有限公司 | 30000A current transformer field mobile calibration system |
Citations (7)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN202911610U (en) * | 2012-09-21 | 2013-05-01 | 云南电网公司普洱供电局 | Mutual inductor moving check trolley |
CN203032515U (en) * | 2013-01-08 | 2013-07-03 | 国网电力科学研究院武汉南瑞有限责任公司 | On-site measurement verification vehicle for transformer |
CN203178461U (en) * | 2013-03-29 | 2013-09-04 | 国家电网公司 | 220kV high-voltage transformer mobile testing system |
CN204462366U (en) * | 2015-01-07 | 2015-07-08 | 中国南方电网有限责任公司超高压输电公司检修试验中心 | A kind of electric power mutual-inductor measurement verification car intellectual monitoring control box |
CN105425193A (en) * | 2016-01-12 | 2016-03-23 | 江苏省电力公司电力科学研究院 | Extra-high-voltage current transformer verification system |
CN205581286U (en) * | 2016-05-09 | 2016-09-14 | 国网四川省电力公司电力科学研究院 | Portable current transformer examination laboratory |
CN206906569U (en) * | 2017-05-31 | 2018-01-19 | 国网浙江省电力公司电力科学研究院 | Great current mutual inductor site error verification mobile laboratory |
-
2017
- 2017-05-31 CN CN201710399869.1A patent/CN107271942A/en active Pending
Patent Citations (7)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN202911610U (en) * | 2012-09-21 | 2013-05-01 | 云南电网公司普洱供电局 | Mutual inductor moving check trolley |
CN203032515U (en) * | 2013-01-08 | 2013-07-03 | 国网电力科学研究院武汉南瑞有限责任公司 | On-site measurement verification vehicle for transformer |
CN203178461U (en) * | 2013-03-29 | 2013-09-04 | 国家电网公司 | 220kV high-voltage transformer mobile testing system |
CN204462366U (en) * | 2015-01-07 | 2015-07-08 | 中国南方电网有限责任公司超高压输电公司检修试验中心 | A kind of electric power mutual-inductor measurement verification car intellectual monitoring control box |
CN105425193A (en) * | 2016-01-12 | 2016-03-23 | 江苏省电力公司电力科学研究院 | Extra-high-voltage current transformer verification system |
CN205581286U (en) * | 2016-05-09 | 2016-09-14 | 国网四川省电力公司电力科学研究院 | Portable current transformer examination laboratory |
CN206906569U (en) * | 2017-05-31 | 2018-01-19 | 国网浙江省电力公司电力科学研究院 | Great current mutual inductor site error verification mobile laboratory |
Cited By (3)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN108414964A (en) * | 2018-06-05 | 2018-08-17 | 国家电网有限公司 | A kind of digitalized electric energy metering movable detecting platform and in-situ check and test method |
CN108957049A (en) * | 2018-08-29 | 2018-12-07 | 北斗航天汽车(北京)有限公司 | Car electrics life test apparatus |
CN111443323A (en) * | 2020-04-26 | 2020-07-24 | 国网福建省电力有限公司 | 30000A current transformer field mobile calibration system |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN207938972U (en) | A kind of intelligent monitor system applied to box-type substation | |
CN102955081B (en) | A kind of status of electric power detects mobile laboratory | |
CN202393840U (en) | Mobile laboratory for detecting power equipment state | |
CN107271942A (en) | Great current mutual inductor site error verification mobile laboratory | |
CN202569230U (en) | Internet of things type fire-fighting emergency lighting evacuation indicator escape and maintenance system | |
CN206710585U (en) | The control system of great current mutual inductor site error verification | |
CN205581232U (en) | Portable arc light protection testing arrangement | |
CN108198476A (en) | Simulation Training System of High Voltage Electric Experiment | |
CN205068942U (en) | Experimental hybrid simulation system of high -voltage electrical | |
CN206906569U (en) | Great current mutual inductor site error verification mobile laboratory | |
CN104071715A (en) | Near-to-high-voltage safety prewarning method for construction hoist | |
CN106960619A (en) | Integrate electrical practice training and the training set and application method of low-voltage collecting meter reading failure | |
CN110514239A (en) | A kind of oil-immersed transformer fire early warning device | |
CN108198477A (en) | Electrical test of transformer simulation teaching system | |
CN108597291B (en) | Distribution network line loss simulation training system | |
CN106683527A (en) | Multifunctional installation and wiring training device for electric energy meter and mutual inductor | |
CN102582495A (en) | Vehicle-mounted comprehensive test system used for condition based maintenance for electrical equipment | |
CN205829450U (en) | A kind of high voltage transducer power unit and cascaded high-voltage frequency converter | |
CN202501904U (en) | Oil level monitoring system of oil-immersed transformer | |
CN203013117U (en) | Training system for checking and evaluating electric installation and adjustment of simulation elevator in teaching | |
CN115367644B (en) | Crane monitoring method and system based on simulation | |
CN204488603U (en) | A kind of combined power inspection vehicle of height integrated modular | |
CN202443641U (en) | Electronic barrel and examination site assessment system for special operation examinations | |
CN204101720U (en) | Ammeter detection device | |
CN106023748A (en) | Low-voltage metering training device |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
PB01 | Publication | ||
PB01 | Publication | ||
SE01 | Entry into force of request for substantive examination | ||
SE01 | Entry into force of request for substantive examination | ||
RJ01 | Rejection of invention patent application after publication |
Application publication date: 20171020 |
|
RJ01 | Rejection of invention patent application after publication |