CN203034481U - Rapid drainage structure for cable pit - Google Patents

Rapid drainage structure for cable pit Download PDF

Info

Publication number
CN203034481U
CN203034481U CN 201220747009 CN201220747009U CN203034481U CN 203034481 U CN203034481 U CN 203034481U CN 201220747009 CN201220747009 CN 201220747009 CN 201220747009 U CN201220747009 U CN 201220747009U CN 203034481 U CN203034481 U CN 203034481U
Authority
CN
China
Prior art keywords
cable
well
basin
catch
well body
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Lifetime
Application number
CN 201220747009
Other languages
Chinese (zh)
Inventor
付卫东
顾敏龙
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Zhongheng Design Group Co ltd
Original Assignee
Suzhou Industrial Park Design and Research Institute Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Suzhou Industrial Park Design and Research Institute Co Ltd filed Critical Suzhou Industrial Park Design and Research Institute Co Ltd
Priority to CN 201220747009 priority Critical patent/CN203034481U/en
Application granted granted Critical
Publication of CN203034481U publication Critical patent/CN203034481U/en
Anticipated expiration legal-status Critical
Expired - Lifetime legal-status Critical Current

Links

Images

Landscapes

  • Laying Of Electric Cables Or Lines Outside (AREA)

Abstract

A rapid drainage structure for a cable pit comprises a pit body, a cable pit cover, and a threading pipe. The cable pit cover is positioned at the upper end of the pit body, the threading pipe is positioned in the middle of the pit body, the drainage structure comprises a catch basin, and the lower portion of the pit body is connected with a drain pipe which is communicated with the catch basin. The depth of the catch basin is larger than that of the pit body relative to the ground plane. The rapid drainage structure for the cable pit is convenient to drain and high in drainage speed.

Description

The quick discharge structure of cable shaft
Technical field
The utility model relates to a kind of cable shaft.
Background technology
In urban construction and engineering construction for attractive in appearance and safe requirement, a large amount of electric wirings need be in underground laying, except few sub-fraction can solve with the form of direct-burried and cable trench, the overwhelming majority needed to adopt cable duct bank to add that the form of hand hole well or manhole shaft realizes.Hand hole well or the making of manhole shaft generally are to construct according to the related content among the national standard atlas 07SD101-8 " design of power cable well and installation ".
Lack effective drainage measure in the existing cable shaft way, only in well, be provided with a little sump or infiltration hole.Cover well lid or cause ponding in the well in case run into heavy rain, ponding can't be drained naturally by sump, and infiltration hole scheme also can be blocked very fast ineffective because of mud.Accumulate over a long period, ponding is more and more in the well, has a strong impact on the safety of electric wiring in the well.If think thoroughly to remove ponding in the well, can only open well lid one by one and realize by the form of temporary drainage pump drainage, and the cable shaft in city is thousands of, getting rid of the interior ponding of cable shaft by manual type is a great engineering that wastes time and energy.
Summary of the invention
In order to overcome the slow deficiency of draining trouble, drainage speed of existing cable shaft, the utility model provides a kind of draining convenience, the fast quick discharge structure of cable shaft of drainage speed.
The technical scheme that its technical problem that solves the utility model adopts is:
The quick discharge structure of a kind of cable shaft, comprise well body, cable well lid and penetration pipe, described cable well lid is positioned at the upper end of well body, described penetration pipe is positioned at the middle part of well body, described discharge structure comprises catch-basin, and the bottom of described well body connects gutter, and described gutter is communicated with described catch-basin, for ground line, the degree of depth of the described well body of the depth ratio of described catch-basin is big.
Further, be communicated with by communicating pipe between the bottom of at least two adjacent well bodies, the bottom of the well body of close described catch-basin is communicated with described catch-basin.
Technical conceive of the present utility model is: increased by two UPVC gutters in existing cable shaft structure, this gutter is along with cable duct bank is constructed together, with each independently cable shaft interconnect final the access in the catch-basin adjacent with electric hand hole well, manhole shaft in the bottom.
The beneficial effects of the utility model mainly show:
(1) do not need to get rid of one by one ponding in the cable shaft, ponding will compile the unified eliminating automatically in back automatically in interior all cable shafts in zone.
(2) drainage speed is fast, and the ponding mass rate of emission is equal to the urban rainwater mass rate of emission.
(3) need later maintenance hardly, save a large amount of later maintenance manpower and materials.
Simplified the structure of former cable shaft when (4) implementing this scheme simultaneously.The collecting well that no longer needs the bottom has reduced the cost of cable shaft.
Description of drawings
Fig. 1 is the schematic diagram of existing cable well.
Fig. 2 is the schematic diagram of the quick discharge structure of cable shaft.
The specific embodiment
Below in conjunction with accompanying drawing the utility model is further described.
With reference to Fig. 2, the quick discharge structure of a kind of cable shaft, comprise well body 1, cable well lid 4 and penetration pipe 2, described cable well lid 4 is positioned at the upper end of well body 1, and described penetration pipe 2 is positioned at the middle part of well body 1, and described discharge structure comprises catch-basin 7, the bottom of described well body 1 connects gutter 6, described gutter 6 is communicated with described catch-basin 7, and for ground line, the degree of depth of the described well body 1 of the depth ratio of described catch-basin 7 is big.
Further, be communicated with by communicating pipe between the bottom of at least two adjacent well bodies, the bottom of the well body of close described catch-basin is communicated with described catch-basin.
Cable well lid 4 is positioned at the below of grade 5.
In the present embodiment, the construction sequence of the quick discharge structure of cable shaft is:
1. during earth excavation except normal electric comb, be excavated to the cable shaft bottom degree of depth downwards, stayed the position of two DN150 UPVC gutters.
2. lay electric comb and UPVC gutter in a conventional manner.
3. build cable shaft, bottom horizontal well wall has stayed two DN150 gutter openings.
4. after advising that per 6 ~ 7 cable shafts bottom UPVC gutter is communicated with, insert nearby in the contiguous catch-basin, the gutter position of inserting catch-basin should be as far as possible in the position of catch-basin near the bottom.

Claims (2)

1. quick discharge structure of cable shaft, comprise well body, cable well lid and penetration pipe, described cable well lid is positioned at the upper end of well body, described penetration pipe is positioned at the middle part of well body, it is characterized in that: described discharge structure comprises catch-basin, and the bottom of described well body connects gutter, and described gutter is communicated with described catch-basin, for ground line, the degree of depth of the described well body of the depth ratio of described catch-basin is big.
2. the quick discharge structure of cable shaft as claimed in claim 1 is characterized in that: be communicated with by communicating pipe between the bottom of at least two adjacent well bodies, the bottom of the well body of close described catch-basin is communicated with described catch-basin.
CN 201220747009 2012-12-29 2012-12-29 Rapid drainage structure for cable pit Expired - Lifetime CN203034481U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN 201220747009 CN203034481U (en) 2012-12-29 2012-12-29 Rapid drainage structure for cable pit

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN 201220747009 CN203034481U (en) 2012-12-29 2012-12-29 Rapid drainage structure for cable pit

Publications (1)

Publication Number Publication Date
CN203034481U true CN203034481U (en) 2013-07-03

Family

ID=48686616

Family Applications (1)

Application Number Title Priority Date Filing Date
CN 201220747009 Expired - Lifetime CN203034481U (en) 2012-12-29 2012-12-29 Rapid drainage structure for cable pit

Country Status (1)

Country Link
CN (1) CN203034481U (en)

Cited By (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN103603423A (en) * 2013-11-27 2014-02-26 国家电网公司 Water accumulation prevention system
CN104153452A (en) * 2014-07-30 2014-11-19 国家电网公司 Cable trench drainage structure and cable trench construction method
CN104278733A (en) * 2014-10-16 2015-01-14 问荣先 Automatic cable pit draining system
CN107227752A (en) * 2017-06-12 2017-10-03 国网浙江省电力公司丽水供电公司 A kind of cable well construction

Cited By (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN103603423A (en) * 2013-11-27 2014-02-26 国家电网公司 Water accumulation prevention system
CN104153452A (en) * 2014-07-30 2014-11-19 国家电网公司 Cable trench drainage structure and cable trench construction method
CN104278733A (en) * 2014-10-16 2015-01-14 问荣先 Automatic cable pit draining system
CN107227752A (en) * 2017-06-12 2017-10-03 国网浙江省电力公司丽水供电公司 A kind of cable well construction

Similar Documents

Publication Publication Date Title
CN102418347B (en) Drainage construction method for blind drain and sump wells in deep foundation pit
CN203034481U (en) Rapid drainage structure for cable pit
CN107542107A (en) The dome type piping lane built using the pavement underground space
CN1657712A (en) Drainage and anti-float method for underground building and its used device
CN102383437A (en) Well point positioned pumping tubular well and well point positioned pumping method
CN202247920U (en) Construction structure for water drainage of blind ditch and water collecting wells in deep foundation pit
CN103866841A (en) Ground rainwater floor storage and seepage device
CN204919661U (en) Structure is collected to rainwater
CN206328765U (en) A kind of water drainage of deep foundation pit structure
CN203878608U (en) Underground utility tunnel structure
CN107542152B (en) A kind of pavement comprehensive pipe network drainage system
CN204551510U (en) A kind of filled-up ground catchments pressure reduction well drop and drainage structure
CN108798775A (en) A kind of jacking construction active well
CN204059460U (en) The interior river intake structure of electric power plant circulating water system
CN206346222U (en) The pipe gallery built using the pavement underground space
CN206346221U (en) The left and right combined type piping lane built using the pavement underground space
CN202500608U (en) Underground water collecting and draining system
CN204435529U (en) United villa subsurface stormwater concentrates discharge structure
CN203320576U (en) Waterproof and drainage system for basement external wall of super high-rise buildings
CN204298837U (en) Bright, dark drainage system
CN203114340U (en) Drainage device for constructing inclined shaft
CN205134332U (en) Municipal administration delivery pipeline hole groove supporting construction
CN205242593U (en) Collection oozes to stagnate and holds integral type finished product inlet for stom water of clean row of rainwater
CN103306299A (en) Comprehensive waterproof and drainage construction method of basement exterior wall of super-high-rise building
CN203701256U (en) Ground rainwater flood storage seepage device

Legal Events

Date Code Title Description
C14 Grant of patent or utility model
GR01 Patent grant
C56 Change in the name or address of the patentee
CP03 Change of name, title or address

Address after: Suzhou City, Jiangsu province 215028 Industrial Park Suzhou Bada Street No. 111

Patentee after: Zhongheng Design Group Co.,Ltd.

Address before: Suzhou Industrial Park Suzhou City, Jiangsu province 215126 Sheng Pu Zhen Jin Sheng Lu No. 12

Patentee before: SUZHOU INDUSTRIAL PARK DESIGN & RESEARCH INSTITUTE Co.,Ltd.

CX01 Expiry of patent term
CX01 Expiry of patent term

Granted publication date: 20130703