CN203034473U - 钢结构插入式柱脚 - Google Patents

钢结构插入式柱脚 Download PDF

Info

Publication number
CN203034473U
CN203034473U CN 201220623787 CN201220623787U CN203034473U CN 203034473 U CN203034473 U CN 203034473U CN 201220623787 CN201220623787 CN 201220623787 CN 201220623787 U CN201220623787 U CN 201220623787U CN 203034473 U CN203034473 U CN 203034473U
Authority
CN
China
Prior art keywords
column
steel
steel column
cup
rim
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Fee Related
Application number
CN 201220623787
Other languages
English (en)
Inventor
王勇
宋向东
赵宏善
李海涛
张允川
徐玉森
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
SHANDONG HANGXIAO STEEL STRUCTURE CO Ltd
Original Assignee
SHANDONG HANGXIAO STEEL STRUCTURE CO Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by SHANDONG HANGXIAO STEEL STRUCTURE CO Ltd filed Critical SHANDONG HANGXIAO STEEL STRUCTURE CO Ltd
Priority to CN 201220623787 priority Critical patent/CN203034473U/zh
Application granted granted Critical
Publication of CN203034473U publication Critical patent/CN203034473U/zh
Anticipated expiration legal-status Critical
Expired - Fee Related legal-status Critical Current

Links

Images

Abstract

本实用新型公开了一种钢结构插入式柱脚,它包括与钢柱配合的建筑基础,所述钢柱一端设有固定件,建筑基础顶部设有杯口,设有固定件的钢柱端插嵌在建筑基础的杯口内,在杯口与钢柱连接的空隙内注满细实混凝土灌实,所述钢柱插入杯口内的深度为大于钢柱总长度的1/20,钢柱底端至建筑基础杯口底部距离为50—200mm,杯口底部距离建筑基础底部的高度大于100mm。该钢结构插入式柱脚加工简便,用钢量少,节省成本,施工简单,连接刚度大。

Description

钢结构插入式柱脚
技术领域
本实用新型属于钢结构刚接装置,具体涉及一种钢结构插入式柱脚。 
背景技术
工业化进程的大发展,促使生产制造车间的跨度和重工业厂房的行车吨位越来越大,厂房檐口越来越高。为了达到经济环保的目标,钢结构厂房已经日益受到业主的认可,目前钢结构刚接形式一般采用平板式柱脚或靴梁式柱脚,在建筑基础顶面设置混凝土短柱,通过锚栓将柱子固定在混凝土短柱,加工工艺复杂,对于较大的柱底荷载,靴梁式柱脚连接刚度不够,不够经济实用。 
发明内容
为了克服现有技术领域存在的上述问题,本实用新型的目的在于,提供一种钢结构插入式柱脚,解决现有的钢结构刚接形式加工工艺复杂,连接刚度低的问题。 
本实用新型提供的钢结构插入式柱脚,它包括与钢柱配合的建筑基础,其所述钢柱一端设有固定件,建筑基础顶部设有杯口,设有固定件的钢柱端插嵌在建筑基础的杯口内,在杯口与钢柱连接的空隙内注满细实混凝土灌实。所述钢柱插入杯口内的深度为大于钢柱总长度的1/20,钢柱底端至建筑基础杯口底部距离为50—200mm,杯口底部距离建筑基础底部的高度大于100mm。所述设置在钢柱一端的固定件为栓钉或短钢筋或柱底板,所述栓钉或短钢筋设置在插入杯口内的钢柱外侧壁上,所述柱底板设置在插入杯口内的钢柱底端。 
所述钢结构插入式柱脚是实腹式柱脚,所述实腹式柱脚的钢柱数量为1根,钢柱插入到与钢柱配合的建筑基础的杯口内。 
所述钢结构插入式柱脚是格构式柱脚,所述格构式柱脚的钢柱数量为2根或2根以上,钢柱插入到与钢柱配合的建筑基础的杯口内,钢柱在杯口上方处设有水平连杆,水平连杆两端分别与钢柱连接。 
本实用新型提供的钢结构插入式柱脚,其有益效果在于,该钢结构插入式柱脚加工简便,用钢量少,节省成本,施工简单,连接刚度大。 
附图说明
图1是本实用新型实施例一的整体结构主视图; 
图2是本实用新型实施例一的整体结构俯视图;
图3是本实用新型实施例二的整体结构主视图;
图4是本实用新型实施例二的整体结构俯视图。
图中标注: 
1.钢柱;2.建筑基础;3.杯口;4.混凝土;5.水平连杆。
具体实施方式
下面参照附图,结合实施例,对本实用新型提供的钢结构插入式柱脚,进行详细的说明。 
实施例一 
参照图1-图2,本实施例的钢结构插入式柱脚,它包括与钢柱1配合的建筑基础2,其所述钢柱1一端设有固定件,建筑基础2顶部设有杯口3,设有固定件的钢柱1端插嵌在建筑基础2的杯口3内,在杯口3与钢柱1连接的空隙内注满细实混凝土4灌实。所述钢柱1插入杯口3内的深度为大于钢柱1总长度的1/20,钢柱1底端至建筑基础2杯口3底部距离为50—200mm,杯口3底部距离建筑基础2底部的高度大于100mm。所述设置在钢柱1一端的固定件为栓钉或短钢筋或柱底板,所述栓钉或短钢筋设置在插入杯口3内的钢柱1外侧壁上,所述柱底板设置在插入杯口3内的钢柱1底端。
所述钢结构插入式柱脚是实腹式柱脚,所述实腹式柱脚的钢柱1数量为1根,钢柱1插入到与钢柱1配合的建筑基础2的杯口3内。 
浇筑建筑基础2时根据钢柱1的规格在顶部预留杯口3,为增强嵌固刚度,在钢柱1加工时,可在其翼缘内侧焊接栓钉或短钢筋或在柱底设置柱底板,将钢柱1一端放入杯口3内,并采用垫板或楔铁等方式调整就位和临时固定,在杯口3内注入比基础混凝土高一等级的细实混凝土4,二次浇灌,保证插入式建筑基础2正常工作的关键。 
实施例二 
参照图3—4,本实施例的钢结构插入式柱脚,与实施例一的结构及工作原理基本相同,其不同之处在于,所述钢结构插入式柱脚是格构式柱脚,所述格构式柱脚的钢柱1数量为2根或2根以上,钢柱1插入到与钢柱1配合的建筑基础2的杯口3内,钢柱1在杯口3上方处设有水平连杆5,水平连杆5两端分别与钢柱1连接。

Claims (5)

1.一种钢结构插入式柱脚,它包括与钢柱配合的建筑基础,其特征在于:所述钢柱一端设有固定件,建筑基础顶部设有杯口,设有固定件的钢柱端插嵌在建筑基础的杯口内,在杯口与钢柱连接的空隙内注满细实混凝土灌实。
2.根据权利要求1所述的钢结构插入式柱脚,其特征在于:所述钢柱插入杯口内的深度为大于钢柱总长度的1/20,钢柱底端至建筑基础杯口底部距离为50—200mm,杯口底部距离建筑基础底部的高度大于100mm。
3.根据权利要求1所述的钢结构插入式柱脚,其特征在于:所述设置在钢柱一端的固定件为栓钉或短钢筋或柱底板,所述栓钉或短钢筋设置在插入杯口内的钢柱外侧壁上,所述柱底板设置在插入杯口内的钢柱底端。
4.根据权利要求1所述的钢结构插入式柱脚,其特征在于:所述钢结构插入式柱脚是实腹式柱脚,所述实腹式柱脚的钢柱数量为1根,钢柱插入到与钢柱配合的建筑基础的杯口内。
5.根据权利要求1所述的钢结构插入式柱脚,其特征在于:所述钢结构插入式柱脚是格构式柱脚,所述格构式柱脚的钢柱数量为2根或2根以上,钢柱插入到与钢柱配合的建筑基础的杯口内,钢柱在杯口上方处设有水平连杆,水平连杆两端分别与钢柱连接。
CN 201220623787 2012-11-23 2012-11-23 钢结构插入式柱脚 Expired - Fee Related CN203034473U (zh)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN 201220623787 CN203034473U (zh) 2012-11-23 2012-11-23 钢结构插入式柱脚

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN 201220623787 CN203034473U (zh) 2012-11-23 2012-11-23 钢结构插入式柱脚

Publications (1)

Publication Number Publication Date
CN203034473U true CN203034473U (zh) 2013-07-03

Family

ID=48686608

Family Applications (1)

Application Number Title Priority Date Filing Date
CN 201220623787 Expired - Fee Related CN203034473U (zh) 2012-11-23 2012-11-23 钢结构插入式柱脚

Country Status (1)

Country Link
CN (1) CN203034473U (zh)

Cited By (8)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN103628495A (zh) * 2013-12-09 2014-03-12 中国科学院武汉岩土力学研究所 一种带桩锚的斜坡掏挖基础
CN103643694A (zh) * 2013-12-09 2014-03-19 湖北省电力勘测设计院 一种预制鱼腹型栏栅式翼板基础
CN103643693A (zh) * 2013-12-09 2014-03-19 中国科学院武汉岩土力学研究所 一种预制十字型嵌套式翼板基础
CN103643695A (zh) * 2013-12-09 2014-03-19 中国科学院武汉岩土力学研究所 一种预制鱼腹型嵌套式翼板基础
CN104234070A (zh) * 2014-07-23 2014-12-24 冠鲁建设股份有限公司 一种钢结构与基础预埋连接结构及施工方法
CN105484282A (zh) * 2014-09-18 2016-04-13 沈阳铝镁设计研究院有限公司 一种管道钢支架的杯口基础内的调平装置及其使用方法
CN113668415A (zh) * 2021-08-27 2021-11-19 中铁第四勘察设计院集团有限公司 一种新型装配式铝合金地面车站及其施工方法
CN116950118A (zh) * 2023-09-21 2023-10-27 华侨大学 一种装配式双柱独立基础结构及其施工方法

Cited By (15)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN103643695B (zh) * 2013-12-09 2015-12-02 中国科学院武汉岩土力学研究所 一种预制鱼腹型嵌套式翼板基础
CN103628495A (zh) * 2013-12-09 2014-03-12 中国科学院武汉岩土力学研究所 一种带桩锚的斜坡掏挖基础
CN103643693A (zh) * 2013-12-09 2014-03-19 中国科学院武汉岩土力学研究所 一种预制十字型嵌套式翼板基础
CN103643695A (zh) * 2013-12-09 2014-03-19 中国科学院武汉岩土力学研究所 一种预制鱼腹型嵌套式翼板基础
CN103643694B (zh) * 2013-12-09 2015-12-09 湖北省电力勘测设计院 一种预制鱼腹型栏栅式翼板基础
CN103628495B (zh) * 2013-12-09 2015-12-02 中国科学院武汉岩土力学研究所 一种带桩锚的斜坡掏挖基础
CN103643694A (zh) * 2013-12-09 2014-03-19 湖北省电力勘测设计院 一种预制鱼腹型栏栅式翼板基础
CN103643693B (zh) * 2013-12-09 2016-01-20 中国科学院武汉岩土力学研究所 一种预制十字型嵌套式翼板基础
CN104234070A (zh) * 2014-07-23 2014-12-24 冠鲁建设股份有限公司 一种钢结构与基础预埋连接结构及施工方法
CN104234070B (zh) * 2014-07-23 2016-08-17 杭州江润科技有限公司 一种钢结构与基础预埋连接结构及施工方法
CN105484282A (zh) * 2014-09-18 2016-04-13 沈阳铝镁设计研究院有限公司 一种管道钢支架的杯口基础内的调平装置及其使用方法
CN105484282B (zh) * 2014-09-18 2017-11-10 沈阳铝镁设计研究院有限公司 一种管道钢支架的杯口基础内的调平装置及其使用方法
CN113668415A (zh) * 2021-08-27 2021-11-19 中铁第四勘察设计院集团有限公司 一种新型装配式铝合金地面车站及其施工方法
CN116950118A (zh) * 2023-09-21 2023-10-27 华侨大学 一种装配式双柱独立基础结构及其施工方法
CN116950118B (zh) * 2023-09-21 2023-12-05 华侨大学 一种装配式双柱独立基础结构及其施工方法

Similar Documents

Publication Publication Date Title
CN203034473U (zh) 钢结构插入式柱脚
CN103015450A (zh) 钢结构插入式柱脚
CN103255853B (zh) 装配式剪力墙上下层内墙板齿槽式连接结构
CN203834739U (zh) 端部钢板连接定位装配式剪力墙结构
CN206467788U (zh) 一种混凝土楼板磁性栓接连接结构
CN202830954U (zh) 岩溶区轻型框架路基桩板结构构造
CN204456159U (zh) 一种钢柱脚混凝土锚栓定位结构
CN203626055U (zh) 一种超高层大截面半埋入式密集锚筋钢柱脚定位支架
CN202744951U (zh) 轻型锚碇结构
CN203096730U (zh) 混凝土预制方桩接头
CN201786081U (zh) 一种预制工程围墙
CN202533068U (zh) 巷道表面距离测量装置
CN202298629U (zh) 一种设有竖向锚杆的双排桩结构
CN103967208B (zh) Z形截面轻钢-小径木材组合承重柱及制作方法
CN103967332A (zh) 一种建筑工地围挡的施工方法
CN201695406U (zh) 预制构件的拼装基础
CN204455872U (zh) 桩基式植筋构造
CN203129011U (zh) 一种桥头过渡板
CN203271203U (zh) 全装配式停车棚架
CN206071152U (zh) 低层高的立体停车库
CN202865849U (zh) 框架逆作法中一柱一桩垂直度的反导向控制装置
CN201704979U (zh) 锯齿防滑坡道
CN203924897U (zh) 用于建筑工地的围挡结构
CN202248530U (zh) 木结构建筑用门廊立柱
CN204675637U (zh) 一种水泥梁上行车道轨的固定装置

Legal Events

Date Code Title Description
C14 Grant of patent or utility model
GR01 Patent grant
CF01 Termination of patent right due to non-payment of annual fee

Granted publication date: 20130703

Termination date: 20151123