CN203025343U - Compound type intelligent terminal junction device - Google Patents

Compound type intelligent terminal junction device Download PDF

Info

Publication number
CN203025343U
CN203025343U CN 201220731931 CN201220731931U CN203025343U CN 203025343 U CN203025343 U CN 203025343U CN 201220731931 CN201220731931 CN 201220731931 CN 201220731931 U CN201220731931 U CN 201220731931U CN 203025343 U CN203025343 U CN 203025343U
Authority
CN
China
Prior art keywords
intelligent terminal
composite
plug
junction box
socket
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Fee Related
Application number
CN 201220731931
Other languages
Chinese (zh)
Inventor
陆俊
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Shanghai Radium Ray Precision Instrument Co ltd
Electric Power Research Institute of State Grid Chongqing Electric Power Co Ltd
State Grid Corp of China SGCC
Original Assignee
RADIUM (SHANGHAI) PRECISE INSTRUMENT CO Ltd
Electric Power Research Institute of State Grid Chongqing Electric Power Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by RADIUM (SHANGHAI) PRECISE INSTRUMENT CO Ltd, Electric Power Research Institute of State Grid Chongqing Electric Power Co Ltd filed Critical RADIUM (SHANGHAI) PRECISE INSTRUMENT CO Ltd
Priority to CN 201220731931 priority Critical patent/CN203025343U/en
Application granted granted Critical
Publication of CN203025343U publication Critical patent/CN203025343U/en
Priority to US14/385,099 priority patent/US9385445B2/en
Priority to PCT/CN2013/083186 priority patent/WO2014040523A2/en
Anticipated expiration legal-status Critical
Expired - Fee Related legal-status Critical Current

Links

Images

Landscapes

  • Measurement Of Resistance Or Impedance (AREA)

Abstract

本实用新型公开了一种电力系统二次回路电能表计量校验用复合型智能终端接线装置,该装置安装于变电站计量屏柜中,由复合型智能终端接线盒、一体式智能接线插头和安全型换表插头组成,复合型智能终端接线盒安装于变电站计量屏柜中,顶部端子与计费关口电能表相连,底部端子与变电站二次计量回路相连,中间的复合插座与一体式智能接线插头和安全型换表插头相连接,一体式智能接线插头用于电度表的现场校验,安全型换表插头用于电度表的更换,复合型智能终端接线盒采用电流二次回路测量校验用快速连接器结构的复合插座,复合型智能终端接线盒中间的复合插座由10个分路插座组合而成。本实用新型具有操作安全、工作效率高和节省作业时间等优点。

Figure 201220731931

The utility model discloses a composite intelligent terminal wiring device for measuring and verifying electric energy meters in secondary circuits of electric power systems. The composite intelligent terminal junction box is installed in the metering screen cabinet of the substation, the top terminal is connected to the electric energy meter of the billing gateway, the bottom terminal is connected to the secondary metering circuit of the substation, and the composite socket in the middle is connected to the integrated intelligent wiring plug. It is connected with the safe meter changing plug, the integrated intelligent wiring plug is used for on-site calibration of the watt-hour meter, the safe meter changing plug is used for the replacement of the watt-hour meter, and the composite intelligent terminal junction box adopts the current secondary circuit measurement calibration. A composite socket with a quick connector structure is used in the test, and the composite socket in the middle of the composite intelligent terminal junction box is composed of 10 shunt sockets. The utility model has the advantages of safe operation, high working efficiency, saving working time and the like.

Figure 201220731931

Description

复合型智能终端接线装置Composite intelligent terminal wiring device

技术领域 technical field

本实用新型涉及电力系统的一种接线装置,更具体地说,本实用新型是一种用于电流二次回路测量校验用终端接线装置。 The utility model relates to a wiring device of a power system, more specifically, the utility model is a terminal wiring device used for measuring and checking a secondary circuit of a current.

技术背景 technical background

    在电力输配电站都安装有各种计量检测用仪表,这些仪表均连接在电气二次回路上,目前作为法定计量仪表的电度表大都采用联合端子接线盒与变电站二次计量回路相连接来传递电压和电流信号,所采用的连接方式为螺丝和金属滑片式连接,作为法定计量仪表的电度表必须定期进行年检校验,传统的测试校验办法是用巳校验合格的电度表到现场替换下需校验的电度表,将换下的电度表带回测试所,分期分批校验,待完成校验测试后,第二次返回现场,将电度表装回原处。在更换过程中为保证电流回路始终处于短路状态(不开路),需严格按照相关规程操作,对操作人员有一定的要求,但仍然有出错的案例发生。而且金属端子裸露,需要人工拨动,存在较大的安全隐患,过去曾多次发生过安全事故。为从更本上解决上述问题,实现在不影响电路正常运行的前提下,实现现场校验或在保证设备及人员安全的前提下使换表操作简单、迅速和高效是本领域的技术人员所要解决的技术课题。 Various measuring and testing instruments are installed in power transmission and distribution stations, and these instruments are connected to the electrical secondary circuit. At present, most of the watt-hour meters used as legal measuring instruments are connected with the secondary measuring circuit of the substation by using a joint terminal junction box to transmit The voltage and current signals are connected by screws and metal slides. The watt-hour meter as a legal measuring instrument must be regularly inspected and calibrated. The traditional test and calibration method is to use a calibrated watt-hour meter. Go to the site to replace the watt-hour meter that needs to be calibrated, bring the replaced watt-hour meter back to the testing station, and calibrate it in stages and batches. After the calibration test is completed, return to the site for the second time and put the watt-hour meter back to the original place . During the replacement process, in order to ensure that the current loop is always in a short-circuit state (not open), it is necessary to strictly follow the relevant regulations, and there are certain requirements for the operator, but there are still cases of errors. Moreover, the metal terminals are exposed and need to be manually toggled, which poses a large safety hazard. There have been many safety accidents in the past. In order to fundamentally solve the above problems, it is necessary for those skilled in the art to realize on-site verification without affecting the normal operation of the circuit or to make the operation of meter replacement simple, rapid and efficient under the premise of ensuring the safety of equipment and personnel. Technical issues to be solved.

实用新型内容 Utility model content

     本实用新型发明的目的是克服现有技术的不足,提高劳动生产效率,为电度表实现现场测试校验或更换而设计的一种复合型智能终端接线装置,可有效避免可能发生的设备与人身的不安全因素。 The purpose of this utility model invention is to overcome the deficiencies of the prior art, improve labor production efficiency, and design a composite intelligent terminal wiring device for on-site test verification or replacement of electric meters, which can effectively avoid possible equipment and Personal insecurity.

  本实用新型发明的目的是通过以下技术方案实现的: The purpose of the utility model invention is achieved through the following technical solutions:

一种安装于变电站计量屏柜中的复合型智能终端接线装置,由复合型智能终端接线盒、一体式智能接线插头和安全型换表插头组成,复合型智能终端接线盒安装于变电站计量屏柜中,顶部端子与计费关口电能表相连,底部端子与变电站二次计量回路相连,中间的复合插座与一体式智能接线插头和安全型换表插头相连接,一体式智能接线插头用于电度表的现场校验,安全型换表插头用于电度表的更换,复合型智能终端接线盒采用电流二次回路测量校验用快速连接器结构的复合插座,复合型智能终端接线盒中间的复合插座由10个分路插座组合而成,各分路插座间互相绝缘,复合型智能终端接线盒的复合插座中共有10组双簧片,复合插座的双簧片分上下两片,分别折弯成前后两个接触面,上下簧片通过前后两个接触面导通,在现场电度表校验时,插头插入采取先分流后串入的接入方式,当插头插入前一排簧片时,被测回路仍在正常运行,此时的标准电表已经串入了电路,形成了一个分流支路,当插头继续插入至后一排簧片时,标准表完全接入被测回路,可避免由于插入时接触不稳定,而形成的触发间隙电流回路开路现象。一体式智能接线插头由10个分路插头组合而成,各分路插头间互相绝缘,一体式智能接线插头的前端为三层平面结构,上下层分别为导电金属片,中间为绝缘层,插头的前端与复合型智能终端接线装置上的插座相匹配,使用时将插头插入插座内,接线端通过导线与外部校验仪器相连接。 A composite intelligent terminal wiring device installed in the metering panel cabinet of a substation, which is composed of a composite intelligent terminal junction box, an integrated intelligent wiring plug and a safety meter changing plug. The composite intelligent terminal junction box is installed in the substation metering panel cabinet In the middle, the top terminal is connected to the electric energy meter at the billing gateway, the bottom terminal is connected to the secondary metering circuit of the substation, and the composite socket in the middle is connected to the integrated intelligent wiring plug and the safety meter replacement plug. The integrated intelligent wiring plug is used for electricity The on-site calibration of the meter, the safety-type meter replacement plug is used for the replacement of the watt-hour meter, the composite intelligent terminal junction box adopts a composite socket with a quick connector structure for current secondary circuit measurement and verification, and the middle of the composite intelligent terminal junction box The composite socket is composed of 10 shunt sockets, each of which is insulated from each other. There are 10 sets of double reeds in the composite socket of the composite intelligent terminal junction box. The double reeds of the composite socket are divided into upper and lower pieces, which are respectively bent into The front and rear contact surfaces, the upper and lower reeds conduct through the front and rear contact surfaces. When the on-site watt-hour meter is calibrated, the plug is inserted in the way of shunting first and then connecting in series. When the plug is inserted into the previous row of reeds, The circuit under test is still running normally. At this time, the standard meter has been connected in series to form a shunt branch. When the plug continues to be inserted to the last row of reeds, the standard meter is completely connected to the circuit under test, which can avoid The contact is unstable when inserted, and the current circuit of the trigger gap formed is open circuit. The integrated smart wiring plug is composed of 10 shunt plugs, each shunt plug is insulated from each other. The front end of the terminal matches the socket on the composite intelligent terminal wiring device. When in use, the plug is inserted into the socket, and the terminal is connected to the external calibration instrument through a wire.

与现有技术相比,本实用新型具有以下有益效果: Compared with the prior art, the utility model has the following beneficial effects:

1.操作安全可靠; 1. Safe and reliable operation;

2.工作效率高,节省作业时间。 2. High work efficiency, saving operation time.

附图说明 Description of drawings

图1为复合型智能终端接线盒外形图 Figure 1 is the outline drawing of the compound intelligent terminal junction box

图2为一体式智能接线插头外形图 Figure 2 Outline drawing of integrated smart wiring plug

图3为复合型智能终端接线盒插座结构示意图 Figure 3 is a schematic diagram of the composite intelligent terminal junction box socket structure

图中:顶部接线端1、底部接线端2、复合插座3、上簧片4、下簧片5、插头6、接线端7和安全罩8。 Among the figure: top terminal 1, bottom terminal 2, composite socket 3, upper reed 4, lower reed 5, plug 6, terminal 7 and safety cover 8.

具体实施方式 Detailed ways

   下面将结合附图和实施例对本实用新型的的内容做进一步的详细描述: Below in conjunction with accompanying drawing and embodiment the content of the present utility model is described in further detail:

如图1和图2为复合型智能终端接线盒和一体式智能接线插头的外形图,复合型智能终端接线装置由复合型智能终端接线盒、一体式智能接线插头和安全型换表插头组成,复合型智能终端接线盒安装于变电站计量屏柜中,顶部接线端1与计费关口电能表相连,读取电压、电流、脉冲、通讯等信号,底部接线端2与变电站二次计量回路相连,传递电压、电流信号,中间为与插头连接的复合插座3。复合型智能终端接线盒的复合插座3中共有10组双簧片,复合插座的双簧片分上下两片,分别折弯成前后两个接触面,上下簧片通过前后两个接触面导通,一体式智能接线插头包括插头6、接线端7和安全罩8,一体式智能接线插头的接线端通过电缆连接至现校装置,插头插入至接线盒时完成电压、电流回路的转换,保证电压回路不短路,电流回路不断路,并且接线盒顶部端子全部失电,可使设备安全并进行现场校验,以保证设备安全以及进行换表操作的人员安全。复合型智能终端接线盒中共有10组双簧触片,在正常工作状态中每组触片的上下两部分均处于导通状态,来自二次计量回路中的电压电流信号可以直接经过触片流向三相关口电能表。 Figure 1 and Figure 2 are the appearance diagrams of the composite intelligent terminal junction box and the integrated intelligent wiring plug. The composite intelligent terminal wiring device is composed of a composite intelligent terminal junction box, an integrated intelligent wiring plug and a safe meter-changing plug. The composite intelligent terminal junction box is installed in the metering cabinet of the substation. The top terminal 1 is connected to the electric energy meter of the billing gateway to read signals such as voltage, current, pulse, and communication. The bottom terminal 2 is connected to the secondary metering circuit of the substation. The voltage and current signals are transmitted, and the composite socket 3 connected with the plug is in the middle. There are 10 sets of double reeds in the composite socket 3 of the compound intelligent terminal junction box. The integrated smart wiring plug includes a plug 6, a terminal 7 and a safety cover 8. The terminal of the integrated smart wiring plug is connected to the current school device through a cable. When the plug is inserted into the junction box, the conversion of the voltage and current loops is completed to ensure that the voltage loop Short circuit, the current loop is not broken, and all the terminals on the top of the junction box are de-energized, which can make the equipment safe and carry out on-site verification to ensure the safety of the equipment and the safety of the personnel who perform the meter replacement operation. There are 10 groups of double spring contacts in the junction box of the compound intelligent terminal. In the normal working state, the upper and lower parts of each group of contacts are in the conduction state, and the voltage and current signals from the secondary metering circuit can directly flow through the contacts to the three. Related port electric energy meter.

下面将通过实例进一步说明复合型智能终端接线装置的工作原理: The following will further illustrate the working principle of the composite intelligent terminal wiring device through examples:

对三相关口电能表进行现场校验时: When performing on-site calibration of the three-correlation watt-hour meter:

a) 电压信号的传递 a) Transmission of voltage signal

电压信号的现场校验采集采用并联方式,将电压信号并联至现场校验装置的电压输入端子,一体式智能接线插头的端子在插入过程中,上、下两铜片通过电压短接线并联,并传递至现校装置的电压输入端子,同时先后顶开前、后双簧片结构,这种结构使得电压信号始终传递至关口电能表,也使得现场校验装置可以采集到电压信号。整个过程电压信号始终处于连接状态(电压不短路)。 The on-site verification acquisition of the voltage signal adopts a parallel connection method, and the voltage signal is connected in parallel to the voltage input terminal of the on-site verification device. During the insertion process of the terminal of the integrated intelligent wiring plug, the upper and lower two copper sheets are connected in parallel through the voltage short wiring, and paralleled. It is transmitted to the voltage input terminal of the current calibration device, and at the same time, the front and rear double reed structures are opened successively. This structure makes the voltage signal always transmitted to the gate electric energy meter, and also enables the on-site calibration device to collect the voltage signal. The voltage signal is always connected during the whole process (the voltage is not short-circuited).

b) 电流信号的传递 b) Transmission of current signal

电压信号的现场校验采集采用串联方式,将电压信号串联至现场校验装置的电压输入端子。一体式智能接线插头的端子在插入过程中,上、下两铜片分别通过导线连接至现场校验装置的电流输入、输出端子,其中:铜片顶开第一组双簧片时,电流信号分流至现场校验装置,第二组双簧片保持接触,保持关口电能表正常获取电流信号;插头继续往前插入,铜片顶开第二组双簧片,此时电流信号全部切换至现场校验装置,然后流向关口电能表,关口电能表和现场校验装置仍始终保持获取电流信号。整个过程电流信号始终处于连接状态(电流不断路)。 The on-site verification acquisition of the voltage signal adopts a series connection method, and the voltage signal is connected in series to the voltage input terminal of the on-site verification device. During the insertion process of the terminal of the integrated intelligent wiring plug, the upper and lower copper pieces are respectively connected to the current input and output terminals of the on-site calibration device through wires, wherein: when the copper piece pushes against the first set of double reeds, the current signal shunts To the on-site calibration device, the second set of double reeds keeps in contact, and the electric energy meter at the gate is kept to obtain the current signal normally; the plug continues to be inserted forward, and the copper piece pushes away the second set of double reeds, at this time all the current signals are switched to the on-site calibration device , and then flow to the gate energy meter, the gate energy meter and the on-site calibration device still keep obtaining the current signal. The current signal is always connected during the whole process (the current is not broken).

对三相关口电能表做换表操作时: When changing the meter of the three-correlation port electric energy meter:

电压信号的传递安全型换表插头中无电压短接线,上、下两铜片件处于绝缘、断开状态,插头插入复合型智能终端接线盒后,只有下铜片与前后双簧片的下端接触,保持有来自二次计量回路的电压信号,而上铜片至三相关口电能表端处于断开状态,无任何电压信号,保证了操作人员在装卸关口电能表需要拧金属螺丝时不会有任何触电风险,保证了人员的生命安全。安全型换表插头中的电流回路有电流短接线,其作用是切换电流回路。正常工作是来自二次计量回路的电流信号从复合型智能终端接线盒的电流输入端子流入,至三相关口电能表的电流输入端子,然后从关口电能表的输出端子经复合型终端智能接线盒流回至二次计量回路,整个回路是一个完整的电流环。因此在进行换表操作时,电流信号不再流经三相关口电能表,只从复合型智能终端接线盒内部流过,所以安全性换表插头的电流输入输出端子下铜片使用电流短路线连接,使来自二次计量会路的电流信号从此处通过,上部至关口电能表的部分全部断开。整个过程中二次计量回路电流信号始终处于连接状态(电流不断路)。 Transmission of voltage signals There is no voltage short connection in the safe meter changing plug. The upper and lower copper pieces are insulated and disconnected. After the plug is inserted into the composite intelligent terminal junction box, only the lower copper piece contacts the lower ends of the front and rear double reeds. , the voltage signal from the secondary metering circuit is kept, and the upper copper sheet to the three-correlation port electric energy meter is in a disconnected state without any voltage signal, which ensures that the operator will not have any problems when the electric energy meter at the loading and unloading gate needs to be screwed. Any risk of electric shock ensures the safety of personnel. The current loop in the safety-type meter changing plug has a current short connection, and its function is to switch the current loop. Normal operation is that the current signal from the secondary metering circuit flows in from the current input terminal of the compound intelligent terminal junction box to the current input terminal of the three-correlation watt-hour meter, and then passes through the compound terminal intelligent junction box from the output terminal of the pass watt-hour meter. Flow back to the secondary metering circuit, the whole circuit is a complete current loop. Therefore, when the meter is changed, the current signal no longer flows through the three-correlation port electric energy meter, but only flows through the junction box of the composite intelligent terminal. Therefore, the copper piece under the current input and output terminals of the safe meter changer plug uses a current short circuit. Connect, so that the current signal from the secondary metering circuit passes through here, and all the parts from the upper part to the gateway electric energy meter are disconnected. During the whole process, the current signal of the secondary metering circuit is always connected (the current is not disconnected).

Claims (4)

1.一种复合型智能终端接线装置,由复合型智能终端接线盒、一体式智能接线插头和安全型换表插头组成,复合型智能终端接线盒安装于变电站计量屏柜中,顶部端子与计费关口电能表相连,底部端子与变电站二次计量回路相连,中间的复合插座与一体式智能接线插头和安全型换表插头相连接,其特征在于:复合型智能终端接线盒采用电流二次回路测量校验用快速连接器结构的复合插座,复合型智能终端接线盒中间的复合插座由10个分路插座组合而成,各分路插座间互相绝缘。 1. A composite intelligent terminal wiring device, which is composed of a composite intelligent terminal junction box, an integrated intelligent wiring plug and a safety meter changing plug. The composite intelligent terminal junction box is installed in the metering cabinet of the substation. The electric energy meter at the fee gate is connected, the bottom terminal is connected with the secondary metering circuit of the substation, and the composite socket in the middle is connected with the integrated intelligent wiring plug and the safety meter changing plug. It is characterized in that: the composite intelligent terminal junction box adopts the current secondary circuit A composite socket with a quick connector structure for measurement and verification. The composite socket in the middle of the compound intelligent terminal junction box is composed of 10 shunt sockets, and each shunt socket is insulated from each other. 2.根据权利要求1所述的一种复合型智能终端接线装置,其特征在于:复合型智能终端接线盒的复合插座中共有10组双簧片,复合插座的双簧片分上下两片,分别折弯成前后两个接触面,上下簧片通过前后两个接触面导通。 2. A compound intelligent terminal wiring device according to claim 1, characterized in that: there are 10 sets of double reeds in the composite socket of the compound intelligent terminal junction box, and the double reeds of the composite socket are divided into two pieces, which are folded separately. It is bent into two front and rear contact surfaces, and the upper and lower reeds are conducted through the front and rear contact surfaces. 3.根据权利要求1所述的一种复合型智能终端接线装置,其特征在于:一体式智能接线插头由10个分路插头组合而成,各分路插头间互相绝缘。 3. A composite intelligent terminal wiring device according to claim 1, wherein the integrated intelligent terminal plug is composed of 10 branch plugs, and the branch plugs are insulated from each other. 4.根据权利要求1所述的一种复合型智能终端接线装置,其特征在于:一体式智能接线插头的前端为三层平面结构,上下层分别为导电金属片,中间为绝缘层。 4. A compound intelligent terminal wiring device according to claim 1, characterized in that: the front end of the integrated intelligent terminal plug has a three-layer planar structure, the upper and lower layers are respectively conductive metal sheets, and the middle is an insulating layer.
CN 201220731931 2012-09-13 2012-12-27 Compound type intelligent terminal junction device Expired - Fee Related CN203025343U (en)

Priority Applications (3)

Application Number Priority Date Filing Date Title
CN 201220731931 CN203025343U (en) 2012-12-27 2012-12-27 Compound type intelligent terminal junction device
US14/385,099 US9385445B2 (en) 2012-09-13 2013-09-10 Composite intelligent terminal wiring device and plug device
PCT/CN2013/083186 WO2014040523A2 (en) 2012-09-13 2013-09-10 Composite intelligent terminal wiring device and plug device

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN 201220731931 CN203025343U (en) 2012-12-27 2012-12-27 Compound type intelligent terminal junction device

Publications (1)

Publication Number Publication Date
CN203025343U true CN203025343U (en) 2013-06-26

Family

ID=48649322

Family Applications (1)

Application Number Title Priority Date Filing Date
CN 201220731931 Expired - Fee Related CN203025343U (en) 2012-09-13 2012-12-27 Compound type intelligent terminal junction device

Country Status (1)

Country Link
CN (1) CN203025343U (en)

Cited By (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN103698736A (en) * 2013-11-27 2014-04-02 国家电网公司 Automatic combined wiring instrument
CN103698733A (en) * 2013-09-18 2014-04-02 国家电网公司 Test wiring terminal component for metering electric energy
CN103887617A (en) * 2014-04-21 2014-06-25 国家电网公司 Novel multi-cable socket
CN106405175A (en) * 2016-10-19 2017-02-15 国网山东省电力公司威海供电公司 Electric energy meter and negative control terminal joint wiring device
CN111650411A (en) * 2020-07-16 2020-09-11 广东电网有限责任公司 A combined junction box and electric energy metering device
CN113687120A (en) * 2021-07-28 2021-11-23 杭州中电天恒电力科技有限公司 Lossless meter changing device and meter changing method

Cited By (9)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN103698733A (en) * 2013-09-18 2014-04-02 国家电网公司 Test wiring terminal component for metering electric energy
CN103698733B (en) * 2013-09-18 2016-08-17 国家电网公司 A kind of test connection terminal assemblies for electric energy metrical
CN103698736A (en) * 2013-11-27 2014-04-02 国家电网公司 Automatic combined wiring instrument
CN103887617A (en) * 2014-04-21 2014-06-25 国家电网公司 Novel multi-cable socket
CN103887617B (en) * 2014-04-21 2016-09-28 国家电网公司 Multi-cable socket
CN106405175A (en) * 2016-10-19 2017-02-15 国网山东省电力公司威海供电公司 Electric energy meter and negative control terminal joint wiring device
CN106405175B (en) * 2016-10-19 2023-08-01 国网山东省电力公司威海供电公司 A combination wiring device of electric energy meter and negative control terminal
CN111650411A (en) * 2020-07-16 2020-09-11 广东电网有限责任公司 A combined junction box and electric energy metering device
CN113687120A (en) * 2021-07-28 2021-11-23 杭州中电天恒电力科技有限公司 Lossless meter changing device and meter changing method

Similar Documents

Publication Publication Date Title
CN102097717B (en) Automatic detection switchover system for cable
CN203025343U (en) Compound type intelligent terminal junction device
CN201060217Y (en) Electric energy meter multi-function junction box
CN202854191U (en) Composite-type intelligent terminal wiring device
US9385445B2 (en) Composite intelligent terminal wiring device and plug device
CN105182173A (en) Novel combined-type mutual inductor polarity tester
CN209120178U (en) A wideband HPLC communication unit anti-attenuation performance testing system
CN202995025U (en) Composite type intelligent terminal junction box
CN204832412U (en) Novel combined instrument transformer polarity test appearance
CN206193035U (en) Terminal box is united to integral type of measurement smart meter and acquisition terminal sharing
CN103969618A (en) Detecting device and detecting method of smart sockets
CN207516534U (en) A kind of transformer station direct current system punching current transformer, which does not have a power failure, replaces capacity checking device
CN108152786A (en) Electric energy meter field examines voltage sampling method and device
CN202794504U (en) Pull-plug type electric energy meter field verifying safe connecting box
CN203216999U (en) Capacitive equipment dielectric loss live line measurement sampling device
CN206573673U (en) Investigate the specific purpose tool of secondary circuit failure
CN203405482U (en) Test wire switching device
CN205301429U (en) Intelligent substation presses and becomes automatic nuclear phase ware of secondary
CN104965135B (en) A voltage sampling board testing device
CN108490231A (en) One kind dividing rod-type electric energy metering combined wiring box
CN208623043U (en) Maintenance and debugging pinboard
CN208188307U (en) A substation DC system insulation line selection tester
CN205263159U (en) Electric energy meter part that quality reliability is high
CN203025342U (en) Integrated smart connecting plug for checkout
CN204666728U (en) With inlet wire cable, transformer is carried out to the device of dielectric loss and electric capacity measuring

Legal Events

Date Code Title Description
C14 Grant of patent or utility model
GR01 Patent grant
C53 Correction of patent of invention or patent application
CB03 Change of inventor or designer information

Inventor after: Hou Xingzhe

Inventor after: Cheng Yingying

Inventor after: Yang Huaxiao

Inventor after: Xiao Ji

Inventor after: Lu Jun

Inventor before: Lu Jun

COR Change of bibliographic data

Free format text: CORRECT: INVENTOR; FROM: LU JUN TO: HOU XINGZHE CHENG YINGYING YANG HUAXIAO XIAO JI LU JUN

ASS Succession or assignment of patent right

Owner name: ELECTRIC POWER RESEARCH INSTITUTE, STATE GRID CHON

Free format text: FORMER OWNER: SHANGHAI LEIRUI PRECISION INSTRUMENT CO., LTD.

Effective date: 20140305

Owner name: STATE GRID CORPORATION OF CHINA

Free format text: FORMER OWNER: ELECTRIC POWER RESEARCH INSTITUTE, STATE GRID CHONGQING ELECTRIC POWER COMPANY

Effective date: 20140305

C56 Change in the name or address of the patentee

Owner name: ELECTRIC POWER RESEARCH INSTITUTE, STATE GRID CHON

Free format text: FORMER NAME: ELECTRIC POWER RESEARCH INSTITUTE OF CHONGQING ELECTRIC POWER CO., LTD.

CB03 Change of inventor or designer information

Inventor after: He Guojun

Inventor after: Liu Jing

Inventor after: Lu Jun

Inventor after: Hou Xingzhe

Inventor after: Cheng Yingying

Inventor after: Yang Huaxiao

Inventor after: Xiao Ji

Inventor after: Hu Jianming

Inventor after: Zheng Ke

Inventor after: Hu Xiaorui

Inventor after: Ou Xiyang

Inventor before: Hou Xingzhe

Inventor before: Cheng Yingying

Inventor before: Yang Huaxiao

Inventor before: Xiao Ji

Inventor before: Lu Jun

CB03 Change of inventor or designer information
COR Change of bibliographic data

Free format text: CORRECT: ADDRESS; FROM: 401123 YUBEI, CHONGQING TO: 100031 XICHENG, BEIJING

Free format text: CORRECT: INVENTOR; FROM: HOU XINGZHE CHENG YINGYING YANG HUAXIAO XIAO JI LU JUN TO: HE GUOJUN HOU XINGZHE CHENG YINGYING YANG HUAXIAO XIAO JI HU JIANMING ZHENG KE HU XIAORUI OU XIYANG LIU JING LU JUN

CP03 Change of name, title or address

Address after: 401123 No. 80, Mount Huangshan Avenue, Yubei District, Chongqing

Patentee after: STATE GRID CHONGQING ELECTRIC POWER CO. ELECTRIC POWER Research Institute

Patentee after: Shanghai Radium Ray Precision Instrument Co.,Ltd.

Address before: 401121 office complex, No. 80, Mount Huangshan Avenue, North New District, Chongqing, Yubei District

Patentee before: CHONGQING ELECTRIC POWER Research Institute

Patentee before: Shanghai Radium Ray Precision Instrument Co.,Ltd.

CP03 Change of name, title or address
TR01 Transfer of patent right
TR01 Transfer of patent right

Effective date of registration: 20140305

Address after: 100031 Xicheng District West Chang'an Avenue, No. 86, Beijing

Patentee after: State Grid Corporation of China

Patentee after: STATE GRID CHONGQING ELECTRIC POWER CO. ELECTRIC POWER Research Institute

Patentee after: Shanghai Radium Ray Precision Instrument Co.,Ltd.

Address before: 401123 No. 80, Mount Huangshan Avenue, Yubei District, Chongqing

Patentee before: STATE GRID CHONGQING ELECTRIC POWER CO. ELECTRIC POWER Research Institute

Patentee before: Shanghai Radium Ray Precision Instrument Co.,Ltd.

C17 Cessation of patent right
CF01 Termination of patent right due to non-payment of annual fee

Granted publication date: 20130626

Termination date: 20131227