CN203025343U - Compound type intelligent terminal junction device - Google Patents

Compound type intelligent terminal junction device Download PDF

Info

Publication number
CN203025343U
CN203025343U CN 201220731931 CN201220731931U CN203025343U CN 203025343 U CN203025343 U CN 203025343U CN 201220731931 CN201220731931 CN 201220731931 CN 201220731931 U CN201220731931 U CN 201220731931U CN 203025343 U CN203025343 U CN 203025343U
Authority
CN
China
Prior art keywords
intelligent terminal
plug
terminal connection
combined intelligent
meter
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Fee Related
Application number
CN 201220731931
Other languages
Chinese (zh)
Inventor
陆俊
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Shanghai Radium Ray Precision Instrument Co ltd
Electric Power Research Institute of State Grid Chongqing Electric Power Co Ltd
State Grid Corp of China SGCC
Original Assignee
RADIUM (SHANGHAI) PRECISE INSTRUMENT CO Ltd
Electric Power Research Institute of State Grid Chongqing Electric Power Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by RADIUM (SHANGHAI) PRECISE INSTRUMENT CO Ltd, Electric Power Research Institute of State Grid Chongqing Electric Power Co Ltd filed Critical RADIUM (SHANGHAI) PRECISE INSTRUMENT CO Ltd
Priority to CN 201220731931 priority Critical patent/CN203025343U/en
Application granted granted Critical
Publication of CN203025343U publication Critical patent/CN203025343U/en
Priority to PCT/CN2013/083186 priority patent/WO2014040523A2/en
Priority to US14/385,099 priority patent/US9385445B2/en
Anticipated expiration legal-status Critical
Expired - Fee Related legal-status Critical Current

Links

Images

Abstract

The utility model discloses a compound type intelligent terminal junction device which is used for measuring and checking a secondary circuit electric energy meter of a power system. The device is mounted in a transformer substation measurement panel cabinet, and is formed by a compound type intelligent terminal junction box, an integrated intelligent junction plug and a safety type meter-changing plug; the compound type intelligent terminal junction box is mounted in the transformer substation measurement panel cabinet; a top terminal is connected with a charging gate electric energy meter and a bottom terminal is connected with a transformer substation secondary measuring circuit; a middle compound socket is connected with the integrated intelligent junction plug and the safety type meter-changing plug; the integrated intelligent junction plug is used for field checking of a watt hour meter; the safety type meter-changing plug is used for replacing the watt hour meter; the compound type intelligent terminal junction box utilizes a current secondary circuit to measure and check the compound socket using a rapid connector structure; and the compound socket in the middle of the compound type intelligent terminal junction box is formed by 10 shunting sockets. The compound type intelligent terminal junction device disclosed by the utility model has the advantages of safety in operation, high working efficiency, working time saving and the like.

Description

Combined intelligent terminal connection device
Technical field
The utility model relates to a kind of termination of electric system, and more particularly, the utility model is a kind of for electric current secondary loop measurement verification terminal connection device.
Technical background
various meterings all are installed at the power transmission and distribution station to be detected and uses instrument, these instrument all are connected on electric secondary circuit, present watt-hour meter as legal measuring instrument mostly adopts the associating terminal junction box to be connected with the substation secondary measurement loop and fetches transfer overvoltage and current signal, the connected mode that adopts is that screw is connected with the metal slide sheet type, watt-hour meter as legal measuring instrument must regularly carry out the annual test verification, traditional test verification way is to displace with the qualified watt-hour meter of verification in the sixth of the twelve Earthly Branches the watt-hour meter that needs verification to the scene, the watt-hour meter of changing is taken back tested institute, verification by stages and in groups, after completing check test, return to for the second time the scene, watt-hour meter is reinstalled the original place.For guaranteeing that current return is in short-circuit condition (not opening a way) all the time, needing has certain requirement in strict accordance with relevant rules operation to operating personnel, but still has the case of makeing mistakes to occur in Renewal process.And metal terminal is exposed, need to manually stir, and has larger potential safety hazard, and security incident repeatedly occured past attempts.For from more this address the above problem, realization realizes field-checking or makes under the prerequisite of assurance equipment and personal security that to change table handling be simply, rapidly and efficiently those skilled in the art's technical task to be solved under the prerequisite that does not affect normal operation circuit.
The utility model content
The purpose of the present utility model is to overcome the deficiencies in the prior art, improve labor productivity, realize for watt-hour meter a kind of combined intelligent terminal connection device that on-the-spot test verification or replacing design, can effectively avoid the unsafe factor of contingent equipment and the person.
The purpose of the present utility model is achieved through the following technical solutions:
a kind of combined intelligent terminal connection device that is installed in transformer station's measuring screen cabinet, by combined intelligent terminal connection box, integral and intelligent connection plug and safety-type change the table plug and form, combined intelligent terminal connection box is installed in transformer station's measuring screen cabinet, top terminal is connected with the charging gate energy meter, bottom terminals is connected with the substation secondary measurement loop, middle multi-cable socket changes the table plug with integral and intelligent connection plug and safety-type and is connected, the integral and intelligent connection plug is used for the field-checking of watt-hour meter, safety-type changes the replacing that the table plug is used for watt-hour meter, combined intelligent terminal connection box adopts electric current secondary loop to measure the multi-cable socket that the quick coupler structure is used in verification, multi-cable socket in the middle of combined intelligent terminal connection box is formed by 10 shunt receptacle combinations, each is mutual insulating between socket along separate routes, have 10 groups of double-reed in the multi-cable socket of combined intelligent terminal connection box, the double-reed of multi-cable socket divides two of up and down, be bent into respectively former and later two surface of contact, the up and down reed is by former and later two surface of contact conductings, at the scene during the watt-hour meter verification, plug inserts takes first to shunt the access way that seals in afterwards, when plug inserts last row's reed, tested loop is still in normal operation, the master meter of this moment has sealed in circuit, formed a diverter branch, when plug continues to be inserted into rear row's reed, standard scale accesses tested loop fully, in the time of can avoiding due to insertion, contact is unstable, and the triggered gap current return that forms open circuit phenomenon.The integral and intelligent connection plug is formed by 10 shunt plug combination, each is mutual insulating between plug along separate routes, the front end of integral and intelligent connection plug is three layer plane structures, levels is respectively conductive metal sheet, the centre is insulation course, socket on the front end of plug and combined intelligent terminal connection device is complementary, and during use, with in plug insertion socket, terminals are connected with outside tester by wire.
Compared with prior art, the utlity model has following beneficial effect:
1. handling safety is reliable;
2. high efficiency, save the activity duration.
Description of drawings
Fig. 1 is combined intelligent terminal connection box outside drawing
Fig. 2 is integral type intelligence connection plug outside drawing
Fig. 3 is combined intelligent terminal connection box socket schematic diagram
In figure: top terminals 1, bottom terminals 2, multi-cable socket 3, upper reed plate 4, lower reed 5, plug 6, terminals 7 and safety screen 8.
Embodiment
Below in conjunction with drawings and Examples, content of the present utility model is described in further detail:
Be the outside drawing of combined intelligent terminal connection box and integral and intelligent connection plug as Fig. 1 and Fig. 2, combined intelligent terminal connection device changes the table plug by combined intelligent terminal connection box, integral and intelligent connection plug and safety-type and forms, combined intelligent terminal connection box is installed in transformer station's measuring screen cabinet, top terminals 1 are connected with the charging gate energy meter, read the signals such as voltage, electric current, pulse, communication, bottom terminals 2 are connected with the substation secondary measurement loop, transfer overvoltage, current signal, the centre is the multi-cable socket 3 that is connected with plug.have 10 groups of double-reed in the multi-cable socket 3 of combined intelligent terminal connection box, the double-reed of multi-cable socket divides two of up and down, be bent into respectively former and later two surface of contact, the up and down reed is by former and later two surface of contact conductings, the integral and intelligent connection plug comprises plug 6, terminals 7 and safety screen 8, the terminals of integral and intelligent connection plug are connected to existing calibration device by cable, when being inserted into terminal box, completes by plug voltage, the conversion of current return, guarantee not short circuit of voltage circuit, current return does not open circuit, and the whole dead electricity of terminal box top terminal, can make device security and carry out field-checking, to guarantee device security and the personal security of changing table handling.Have 10 groups of two-man act contacts in combined intelligent terminal connection box, two parts up and down of every group of contact all are in conducting state in normal operating conditions, can directly flow to the three-phase gate energy meter through contact from the voltage and current signal in the secondary measurement loop.
The below will further illustrate by example the principle of work of combined intelligent terminal connection device:
When the three-phase gate energy meter is carried out field-checking:
A) transmission of voltage signal
Parallel way is adopted in the field-checking collection of voltage signal, voltage signal is connected in parallel to voltage input end of on-site calibration device, the terminal of integral and intelligent connection plug during insertion, upper and lower two copper sheets are in parallel by the voltage shorting stub, and the voltage input end that is passed to existing calibration device is sub, successively back down forward and backward double reed sheet structure simultaneously, this structure makes voltage signal be passed to all the time gate energy meter, also makes on-site calibration device can collect voltage signal.Whole process voltage signal is in connection status (not short circuit of voltage) all the time.
B) transmission of current signal
Series system is adopted in the field-checking collection of voltage signal, voltage signal is connected serially to voltage input end of on-site calibration device.The terminal of integral and intelligent connection plug during insertion, upper and lower two copper sheets are connected to respectively electric current input, the lead-out terminal of on-site calibration device by wire, wherein: when copper sheet backs down first group of double-reed, current signal branches to on-site calibration device, second group of double-reed keeps in touch, and keeps gate energy meter normally to obtain current signal; Plug continues to insert forward, and copper sheet backs down second group of double-reed, and this moment, current signal all switched to on-site calibration device, then flowed to gate energy meter, and gate energy meter and on-site calibration device still remain and obtain current signal.Whole process current signal is in connection status (electric current does not open circuit) all the time.
The three-phase gate energy meter is done when changing table handling:
The transmission safety-type of voltage signal changes no-voltage shorting stub in the table plug, upper and lower two copper sheet spares are in insulation, off-state, after plug inserts combined intelligent terminal connection box, the lower end in contact of only having lower copper sheet and front and back double-reed, maintain the voltage signal from the secondary measurement loop, and upper copper sheet to three-phase gate energy meter end is in off-state, without any voltage signal, guaranteed that operating personnel do not have any electric shock risk when the loading and unloading gate energy meter need to be twisted the metal screw, guaranteed personnel's life security.The current return that safety-type changes in the table plug has the electric current shorting stub, and its effect is the switch current loop.Normal operation is to enter from the current signal in the secondary measurement loop current input terminal subflow from combined intelligent terminal connection box, current input terminal to the three-phase gate energy meter, then flow back into the secondary measurement loop from the lead-out terminal of gate energy meter through the compound terminal Intelligent wiring box, whole loop is a complete electric current loop.Therefore when changing table handling, the current signal three-phase gate energy meter of no longer flowing through, only flow through from combined intelligent terminal connection box inside, under the electric current input and output terminal of showing plug, copper sheet uses the short circuit current line to connect so security is changed, make can the road from secondary measurement current signal pass through from here, top to the part of gate energy meter all disconnects.In whole process, the secondary measurement loop current signals is in connection status (electric current does not open circuit) all the time.

Claims (4)

1. combined intelligent terminal connection device, by combined intelligent terminal connection box, integral and intelligent connection plug and safety-type change the table plug and form, combined intelligent terminal connection box is installed in transformer station's measuring screen cabinet, top terminal is connected with the charging gate energy meter, bottom terminals is connected with the substation secondary measurement loop, middle multi-cable socket changes the table plug with integral and intelligent connection plug and safety-type and is connected, it is characterized in that: combined intelligent terminal connection box adopts electric current secondary loop to measure the multi-cable socket that the quick coupler structure is used in verification, multi-cable socket in the middle of combined intelligent terminal connection box is formed by 10 shunt receptacle combinations, each is mutual insulating between socket along separate routes.
2. a kind of combined intelligent terminal connection device according to claim 1, it is characterized in that: have 10 groups of double-reed in the multi-cable socket of combined intelligent terminal connection box, the double-reed of multi-cable socket divides two of up and down, be bent into respectively former and later two surface of contact, the up and down reed is by former and later two surface of contact conductings.
3. a kind of combined intelligent terminal connection device according to claim 1 is characterized in that: the integral and intelligent connection plug by 10 along separate routes plug combination form, each is mutual insulating between plug along separate routes.
4. a kind of combined intelligent terminal connection device according to claim 1, it is characterized in that: the front end of integral and intelligent connection plug is three layer plane structures, and levels is respectively conductive metal sheet, the centre is insulation course.
CN 201220731931 2012-09-13 2012-12-27 Compound type intelligent terminal junction device Expired - Fee Related CN203025343U (en)

Priority Applications (3)

Application Number Priority Date Filing Date Title
CN 201220731931 CN203025343U (en) 2012-12-27 2012-12-27 Compound type intelligent terminal junction device
PCT/CN2013/083186 WO2014040523A2 (en) 2012-09-13 2013-09-10 Composite intelligent terminal wiring device and plug device
US14/385,099 US9385445B2 (en) 2012-09-13 2013-09-10 Composite intelligent terminal wiring device and plug device

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN 201220731931 CN203025343U (en) 2012-12-27 2012-12-27 Compound type intelligent terminal junction device

Publications (1)

Publication Number Publication Date
CN203025343U true CN203025343U (en) 2013-06-26

Family

ID=48649322

Family Applications (1)

Application Number Title Priority Date Filing Date
CN 201220731931 Expired - Fee Related CN203025343U (en) 2012-09-13 2012-12-27 Compound type intelligent terminal junction device

Country Status (1)

Country Link
CN (1) CN203025343U (en)

Cited By (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN103698733A (en) * 2013-09-18 2014-04-02 国家电网公司 Test wiring terminal component for metering electric energy
CN103698736A (en) * 2013-11-27 2014-04-02 国家电网公司 Automatic combined wiring instrument
CN103887617A (en) * 2014-04-21 2014-06-25 国家电网公司 Novel multi-cable socket
CN106405175A (en) * 2016-10-19 2017-02-15 国网山东省电力公司威海供电公司 Electric energy meter and negative control terminal joint wiring device
CN111650411A (en) * 2020-07-16 2020-09-11 广东电网有限责任公司 Joint junction box and electric energy metering device

Cited By (8)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN103698733A (en) * 2013-09-18 2014-04-02 国家电网公司 Test wiring terminal component for metering electric energy
CN103698733B (en) * 2013-09-18 2016-08-17 国家电网公司 A kind of test connection terminal assemblies for electric energy metrical
CN103698736A (en) * 2013-11-27 2014-04-02 国家电网公司 Automatic combined wiring instrument
CN103887617A (en) * 2014-04-21 2014-06-25 国家电网公司 Novel multi-cable socket
CN103887617B (en) * 2014-04-21 2016-09-28 国家电网公司 Multi-cable socket
CN106405175A (en) * 2016-10-19 2017-02-15 国网山东省电力公司威海供电公司 Electric energy meter and negative control terminal joint wiring device
CN106405175B (en) * 2016-10-19 2023-08-01 国网山东省电力公司威海供电公司 Electric energy meter and negative control terminal joint wiring device
CN111650411A (en) * 2020-07-16 2020-09-11 广东电网有限责任公司 Joint junction box and electric energy metering device

Similar Documents

Publication Publication Date Title
CN203025343U (en) Compound type intelligent terminal junction device
CN201955421U (en) Wiring detector for multifunctional electric energy metering device
CN203981788U (en) A kind of photovoltaic combining inverter automatic detection device
CN204666788U (en) A kind of relay checking seat
CN102323461A (en) Unit multi-user intelligent electric energy meter box
CN202854191U (en) Composite-type intelligent terminal wiring device
CN202903924U (en) On-line metering device with carrier communication function
CN204832412U (en) Novel combined instrument transformer polarity test appearance
CN206193035U (en) Terminal box is united to integral type of measurement smart meter and acquisition terminal sharing
CN203054118U (en) Short-circuit protection test apparatus for IGBT power unit
CN202976623U (en) Simulation demonstration device used for training remote electrical load control
CN105182173B (en) Novel composite mutual inductor polarity tester
CN202995025U (en) Composite type intelligent terminal junction box
CN203658435U (en) AC/DC voltage transformer
CN209327417U (en) A kind of three-phase electric energy meter compact does not have a power failure more changing device
CN205720637U (en) A kind of check standard device for electric energy meter Withstand test device
CN107192909A (en) A kind of inverter function test system and method for testing
CN209471189U (en) A kind of lightning arrester live-line test three-phase voltage current phase sequence selector
CN103884886B (en) New type compound terminal connection box
CN203787584U (en) Novel composite socket
CN203069751U (en) Circuit breaker state monitoring device
CN203025342U (en) Integrated smart connecting plug for checkout
CN203786170U (en) Novel composite terminal junction box
CN109917215A (en) A kind of New-energy electric vehicle charging assembly ageing tester
CN204614204U (en) A kind of expansion stops powering on the multi-functional communications proving installation of test function

Legal Events

Date Code Title Description
C14 Grant of patent or utility model
GR01 Patent grant
C53 Correction of patent of invention or patent application
CB03 Change of inventor or designer information

Inventor after: Hou Xingzhe

Inventor after: Cheng Yingying

Inventor after: Yang Huaxiao

Inventor after: Xiao Ji

Inventor after: Lu Jun

Inventor before: Lu Jun

COR Change of bibliographic data

Free format text: CORRECT: INVENTOR; FROM: LU JUN TO: HOU XINGZHE CHENG YINGYING YANG HUAXIAO XIAO JI LU JUN

ASS Succession or assignment of patent right

Owner name: ELECTRIC POWER RESEARCH INSTITUTE, STATE GRID CHON

Free format text: FORMER OWNER: SHANGHAI LEIRUI PRECISION INSTRUMENT CO., LTD.

Effective date: 20140305

Owner name: STATE GRID CORPORATION OF CHINA

Free format text: FORMER OWNER: ELECTRIC POWER RESEARCH INSTITUTE, STATE GRID CHONGQING ELECTRIC POWER COMPANY

Effective date: 20140305

C56 Change in the name or address of the patentee

Owner name: ELECTRIC POWER RESEARCH INSTITUTE, STATE GRID CHON

Free format text: FORMER NAME: ELECTRIC POWER RESEARCH INSTITUTE OF CHONGQING ELECTRIC POWER CO., LTD.

CB03 Change of inventor or designer information

Inventor after: He Guojun

Inventor after: Liu Jing

Inventor after: Lu Jun

Inventor after: Hou Xingzhe

Inventor after: Cheng Yingying

Inventor after: Yang Huaxiao

Inventor after: Xiao Ji

Inventor after: Hu Jianming

Inventor after: Zheng Ke

Inventor after: Hu Xiaorui

Inventor after: Ou Xiyang

Inventor before: Hou Xingzhe

Inventor before: Cheng Yingying

Inventor before: Yang Huaxiao

Inventor before: Xiao Ji

Inventor before: Lu Jun

CB03 Change of inventor or designer information
COR Change of bibliographic data

Free format text: CORRECT: ADDRESS; FROM: 401123 YUBEI, CHONGQING TO: 100031 XICHENG, BEIJING

Free format text: CORRECT: INVENTOR; FROM: HOU XINGZHE CHENG YINGYING YANG HUAXIAO XIAO JI LU JUN TO: HE GUOJUN HOU XINGZHE CHENG YINGYING YANG HUAXIAO XIAO JI HU JIANMING ZHENG KE HU XIAORUI OU XIYANG LIU JING LU JUN

CP03 Change of name, title or address

Address after: 401123 No. 80, Mount Huangshan Avenue, Yubei District, Chongqing

Patentee after: STATE GRID CHONGQING ELECTRIC POWER CO. ELECTRIC POWER Research Institute

Patentee after: Shanghai Radium Ray Precision Instrument Co.,Ltd.

Address before: 401121 office complex, No. 80, Mount Huangshan Avenue, North New District, Chongqing, Yubei District

Patentee before: CHONGQING ELECTRIC POWER Research Institute

Patentee before: Shanghai Radium Ray Precision Instrument Co.,Ltd.

CP03 Change of name, title or address
TR01 Transfer of patent right
TR01 Transfer of patent right

Effective date of registration: 20140305

Address after: 100031 Xicheng District West Chang'an Avenue, No. 86, Beijing

Patentee after: State Grid Corporation of China

Patentee after: STATE GRID CHONGQING ELECTRIC POWER CO. ELECTRIC POWER Research Institute

Patentee after: Shanghai Radium Ray Precision Instrument Co.,Ltd.

Address before: 401123 No. 80, Mount Huangshan Avenue, Yubei District, Chongqing

Patentee before: STATE GRID CHONGQING ELECTRIC POWER CO. ELECTRIC POWER Research Institute

Patentee before: Shanghai Radium Ray Precision Instrument Co.,Ltd.

C17 Cessation of patent right
CF01 Termination of patent right due to non-payment of annual fee

Granted publication date: 20130626

Termination date: 20131227