CN204614204U - A kind of expansion stops powering on the multi-functional communications proving installation of test function - Google Patents

A kind of expansion stops powering on the multi-functional communications proving installation of test function Download PDF

Info

Publication number
CN204614204U
CN204614204U CN201520244740.XU CN201520244740U CN204614204U CN 204614204 U CN204614204 U CN 204614204U CN 201520244740 U CN201520244740 U CN 201520244740U CN 204614204 U CN204614204 U CN 204614204U
Authority
CN
China
Prior art keywords
test
gauge tap
ammeter
insulating stand
concentrator
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN201520244740.XU
Other languages
Chinese (zh)
Inventor
崔迎宾
李祯祥
张卫欣
刘卿
王维光
刘紫熠
葛嘉辉
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
State Grid Corp of China SGCC
State Grid Tianjin Electric Power Co Ltd
Original Assignee
State Grid Corp of China SGCC
State Grid Tianjin Electric Power Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by State Grid Corp of China SGCC, State Grid Tianjin Electric Power Co Ltd filed Critical State Grid Corp of China SGCC
Priority to CN201520244740.XU priority Critical patent/CN204614204U/en
Application granted granted Critical
Publication of CN204614204U publication Critical patent/CN204614204U/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Landscapes

  • Measurement Of Resistance Or Impedance (AREA)

Abstract

A kind of expansion of the utility model stops powering on the multi-functional communications proving installation of test function, comprise insulating stand, crimping unit, crimping handle, gauge tap, combination gauge tap, output control switch and output interface, be horizontally arranged at interval in insulating stand upper end three test ammeter positions, the insulating stand that lower end, each test ammeter position is corresponding is all fixed with a crimping unit, all be provided with a crimping handle above each test ammeter position, crimping handle presses down fixing ammeter to be detected; On insulating stand below three test ammeter positions, equal correspondence is provided with a gauge tap.The utility model concentrator to communicate with electric energy meter uniting and adjustment test fixture basis on carry out pattern improvement, expansion stops the test function that powers on, not only ensure the communication of concentrator public network, carrier meter reading test, achieve the test gathering and stop the event of powering on simultaneously, and the carrier communication of electric energy meter can be tested separately, achieve multiple using function.

Description

A kind of expansion stops powering on the multi-functional communications proving installation of test function
Technical field
The utility model belongs to power consumer electricity consumption information and gathers field, and especially a kind of expansion stops powering on the multi-functional communications proving installation of test function.
Background technology
In recent years, in order to coordinate the construction of Electric Power Quality On-line Monitor System, require concentrator to possess to stop the accurate acquisition function of the event of powering on.Therefore in order to stop at laboratory simulation scene the event of powering on, exploitation one is needed can to test the device that concentrator collection stops the accuracy of the event of powering on.
The simple frock of the concentrator in the past adopted and the test of electric energy meter communication function, may be used for concentrator to communicate with electric energy meter the frock of uniting and adjustment test, ensure that main website communicates with concentrator public network by this frock, reliability that concentrator and electric energy meter carrier communication are tested.But this frock does not possess the test function to stopping the event of powering on.
Utility model content
The purpose of this utility model is to overcome the deficiencies in the prior art part, the multi-functional communications proving installation that a kind of expansion stops powering on test function is provided, the communication of concentrator public network, carrier meter reading can be tested, test concentrator collection simultaneously and stop the Event Function that powers on, the carrier communication of electric energy meter can be tested separately again.
The utility model solves its technical matters and takes following technical scheme to realize:
A kind of expansion stops powering on the multi-functional communications proving installation of test function, it is characterized in that: comprise insulating stand, crimping unit, crimping handle, gauge tap, combination gauge tap, output control switch and output interface, be horizontally arranged at interval in insulating stand upper end three test ammeter positions, the insulating stand that lower end, each test ammeter position is corresponding is all fixed with a crimping unit, all be provided with a crimping handle above each test ammeter position, crimping handle presses down fixing ammeter to be detected; On insulating stand below three test ammeter positions, equal correspondence is provided with a gauge tap, and these three gauge tap control the power supply open and close of three corresponding test ammeter positions respectively.
And three pairs of output interfaces in left side connect three pieces of electric energy meters by external connection.
Advantage of the present utility model and good effect are:
1, this device can control the power on/off of concentrator, single-phase meter, three-phase meter respectively by gauge tap, needs the classification (single-phase or three-phase) of the electric energy meter selecting concentrator to connect according to test, easy to operate.
2, this device not only can test the communication function of concentrator, can test the carrier communication function of electric energy meter simultaneously.
3, three pairs of output interfaces on the left of this application of installation stage body connect three pieces of electric energy meters by external connection, can simulate with the use of gauge tap, output control switch, combination gauge tap that concentrator electric energy meter stops to power on, concentrator power failure electric energy meter does not have a power failure two kinds of situations simultaneously, use flexibly.
4, after the public network of the complete concentrator of this device to test, carrier communication function, without the need to disassemblerassembler, connected after three pieces of electric energy meters power on by three pairs of output interfaces and directly can test the function that concentrator collection stops the event of powering on, time saving and energy saving, improve work efficiency.
5, the utility model concentrator to communicate with electric energy meter uniting and adjustment test fixture basis on carry out pattern improvement, expansion stops the test function that powers on, not only ensure the communication of concentrator public network, carrier meter reading test, achieve the test gathering and stop the event of powering on simultaneously, and the carrier communication of electric energy meter can be tested separately, achieve multiple using function.
Accompanying drawing explanation
Fig. 1 is utility model works face structural representation.
Reference numeral: 1 insulating stand; 2 crimping handles; 3 three-phase meters; 4 crimping unit; 5 single-phase meters; 6 concentrators; 7 gauge tap; 8 combination gauge tap; 9 output control switch; 10 output interfaces.
Embodiment
Below in conjunction with accompanying drawing, also by specific embodiment, the utility model is described in further detail, and following examples are descriptive, are not determinate, can not limit protection domain of the present utility model with this.
A kind of expansion stops powering on the multi-functional communications proving installation of test function, comprise insulating stand 1, crimping unit 4, crimping handle 2, gauge tap 7, combination gauge tap 8, output control switch 9 and output interface 10, be horizontally arranged at interval in insulating stand upper end three test ammeter positions, the concentrator 6 that these three test ammeter positions are corresponding general respectively, single-phase meter 5 and three-phase meter 3 size, shown in accompanying drawing, the insulating stand that lower end, each test ammeter position is corresponding is all fixed with a crimping unit, above each test ammeter position, a crimping handle is all installed, crimping handle presses down fixing ammeter to be detected, on insulating stand below three test ammeter positions, equal correspondence is provided with a gauge tap, and these three gauge tap control the power supply open and close of three corresponding test ammeter positions respectively.
Insulating stand on the left of three gauge tap is also provided with a combination gauge tap, this combination simultaneously gauge tap controls three test ammeter positions, be provided with an output control switch at insulating stand left lower, on the insulating stand above this output control switch, longitudinal separation is provided with three pairs of output interfaces.
Three pairs of output interfaces in left side connect three pieces of electric energy meters by external connection, can simulate with the use of gauge tap, output control switch, combination gauge tap that concentrator electric energy meter stops to power on, concentrator power failure electric energy meter does not have a power failure two kinds of situations simultaneously, use flexibly.
Insulating stand input of the present utility model and output circuit adopt conventional connections, are not described in detail in present patent application.
The using method of this device is as follows:
The first step, the communication of test concentrator public network, (electric energy meter) carrier communication function.
First check that combination gauge tap is in " conjunction " state, output control switch and three corresponding gauge tap in test ammeter position are all in "On" state, then having the concentrator of same carrier wave scheme module, single-phase meter, three-phase meter be crimped onto on voltage link post by crimping handle, to close the corresponding gauge tap in three test ammeter positions, after concentrator, single-phase meter, three-phase meter power on and stablize, concentrator messaging parameter is set and logs in main website by GPRS, manually issue the communication function that task tests concentrator item by item.
If test the carrier communication function of certain electric energy meter, the concentrator of same carrier wave scheme only need be selected to be articulated on insulation stage body, the gauge tap of correspondence of closing, arrange concentrator messaging parameter and log in main website by GPRS, the task that manually issues tests the carrier communication function of electric energy meter and concentrator item by item.
Second step, the collection of test concentrator stops the Event Function that powers on.
Close three gauge tap, connect three pieces of electric energy meters respectively by three groups of external connections and export terminal with the expansion on insulation stage body.Then to close the gauge tap of output control switch and concentrator, until concentrator and external three pieces of electric energy meters power on simultaneously stable after, close combination gauge tap, wait for that concentrator reports power-off event, open combination gauge tap after minute, thus achieve simulation concentrator and electric energy meter stops the event that powers on simultaneously.
Close the gauge tap of concentrator, only concentrator is had a power failure, the gauge tap of the concentrator that closes again after 5 minutes, thus achieve the event that simulation concentrator and electric energy meter do not have a power failure.
Although disclose embodiment of the present utility model and accompanying drawing for the purpose of illustration, but it will be appreciated by those skilled in the art that: in the spirit and scope not departing from the utility model and claims, various replacement, change and amendment are all possible, therefore, scope of the present utility model is not limited to the content disclosed in embodiment and accompanying drawing.

Claims (2)

1. an expansion stops powering on the multi-functional communications proving installation of test function, it is characterized in that: comprise insulating stand, crimping unit, crimping handle, gauge tap, combination gauge tap, output control switch and output interface, be horizontally arranged at interval in insulating stand upper end three test ammeter positions, the insulating stand that lower end, each test ammeter position is corresponding is all fixed with a crimping unit, all be provided with a crimping handle above each test ammeter position, crimping handle presses down fixing ammeter to be detected; On insulating stand below three test ammeter positions, equal correspondence is provided with a gauge tap, and these three gauge tap control the power supply open and close of three corresponding test ammeter positions respectively.
2. expansion according to claim 1 stops powering on the multi-functional communications proving installation of test function, it is characterized in that: three pairs of output interfaces in left side connect three pieces of electric energy meters by external connection.
CN201520244740.XU 2015-04-21 2015-04-21 A kind of expansion stops powering on the multi-functional communications proving installation of test function Active CN204614204U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201520244740.XU CN204614204U (en) 2015-04-21 2015-04-21 A kind of expansion stops powering on the multi-functional communications proving installation of test function

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201520244740.XU CN204614204U (en) 2015-04-21 2015-04-21 A kind of expansion stops powering on the multi-functional communications proving installation of test function

Publications (1)

Publication Number Publication Date
CN204614204U true CN204614204U (en) 2015-09-02

Family

ID=53966739

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201520244740.XU Active CN204614204U (en) 2015-04-21 2015-04-21 A kind of expansion stops powering on the multi-functional communications proving installation of test function

Country Status (1)

Country Link
CN (1) CN204614204U (en)

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN110750403A (en) * 2019-10-25 2020-02-04 宁波三星智能电气有限公司 Power-off test method based on power terminal and related device

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN110750403A (en) * 2019-10-25 2020-02-04 宁波三星智能电气有限公司 Power-off test method based on power terminal and related device
CN110750403B (en) * 2019-10-25 2023-10-24 宁波三星智能电气有限公司 Power-on-off electric measurement method based on power terminal and related device

Similar Documents

Publication Publication Date Title
CN203673005U (en) Direct current insulation monitor
CN204242390U (en) A kind of M-BUS main frame receiving and dispatching mechanism module
CN203491973U (en) System for measuring generation power of photovoltaic assemblies
CN105116278A (en) Electric energy meter missort line tracker
CN201732472U (en) Automatic testing device of concentrated electric energy meter reading equipment
CN204065685U (en) A kind of light digital relay protection tester time response verifying attachment
CN102497126B (en) Fan converter power unit driving circuit
CN202903924U (en) On-line metering device with carrier communication function
CN105405281A (en) Detection method for carrier communication failures of smart electric meter
CN208952991U (en) A kind of multiple-in-one acquisition terminal comprehensive detection device
CN204389602U (en) Battery balanced module automatic checkout system
CN108759924A (en) Wireless internet of things switch and wireless internet of things manage system
CN204614204U (en) A kind of expansion stops powering on the multi-functional communications proving installation of test function
CN204882853U (en) Electric energy meter pressure resistance test installation
CN204008899U (en) A kind of interchangeability proving installation of power information acquisition terminal communication interface
CN204009049U (en) A kind of test fixture for concentrator and electric energy meter communication function
CN201247311Y (en) Electric meter tester
CN106019202A (en) Multi-channel digital standard electric energy meter
CN203673037U (en) Automatic circuit board detection tool of intelligent electric energy meter
CN201919002U (en) Carrier communication test instrument
CN206348400U (en) Multichannel small-sized household inverter efficiency detecting system
CN213637736U (en) Remote online broadband carrier communication detection device and power line carrier operation and maintenance system
CN204964670U (en) Electric energy strapping table inspection of a line appearance of visiting one house after another
CN205139329U (en) Module lithium cell testing arrangement
CN204789952U (en) Special UPS power output power characteristic's of electric power testing arrangement

Legal Events

Date Code Title Description
C14 Grant of patent or utility model
GR01 Patent grant