CN203022030U - 一种地下室侧壁后浇带的挡土结构 - Google Patents
一种地下室侧壁后浇带的挡土结构 Download PDFInfo
- Publication number
- CN203022030U CN203022030U CN2012206702358U CN201220670235U CN203022030U CN 203022030 U CN203022030 U CN 203022030U CN 2012206702358 U CN2012206702358 U CN 2012206702358U CN 201220670235 U CN201220670235 U CN 201220670235U CN 203022030 U CN203022030 U CN 203022030U
- Authority
- CN
- China
- Prior art keywords
- ater
- wall
- casting
- sides
- post
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Expired - Fee Related
Links
Images
Landscapes
- Underground Structures, Protecting, Testing And Restoring Foundations (AREA)
Abstract
本实用新型公开了一种地下室侧壁后浇带的挡土结构。包括后浇带两侧的墙体,后浇带两侧墙体(1)的内外墙面均经钢筋网连接;在后浇带两侧墙体端部设有暗柱(2),在后浇带两侧墙体的外墙面设有挡土钢板(3),挡土钢板内侧经一组拉结钢筋(4)与后浇带两侧墙体之间外露的钢筋网焊接。本实用新型通过挡土钢板阻挡回填土不能进入后浇带内,便于以后后浇带的浇筑。同时在后浇带两侧墙体的端部设有暗柱。提高了后浇带两侧墙体承受侧压的能力,防止后浇带两侧墙体在回填土的侧压力下造成墙体垮塌或其它损坏。本实用新型主要适用于地下室后浇带的施工。
Description
技术领域
本实用新型涉及一种地下室侧壁后浇带的挡土结构,属于井下仪器技术领域。
背景技术
后浇带是在建筑施工中为防止现浇钢筋混凝土结构受到温度或基础下沉不均匀等因素影响,通常将整体结构的墙体分成两段,在两段墙体之间留置临时施工缝,待两段墙体经过热胀冷缩或沉降后基本稳定之后,再将两段墙体在临时施工缝处浇筑成一整体,该临时施工缝称为后浇带。地下室的后浇带一般都位于回填土层以下。按常规施工工序,后浇带两侧的两段混凝土墙体浇筑完成后,不能马上将两段墙体浇筑在一起,需要有个稳定时限(一般需要60天左右),待后浇带两侧的墙体经过冷热交替变化和沉降变化基本稳定后才能进行后浇带的浇筑。浇筑之后还要做完防水才能进行土方回填。这样漫长的等待时间,势必会对施工总工期产生极大的影响。如果不对后浇带进行保护,直接进行回填施工,回填土会进入后浇带的缝隙,为以后的浇筑带来困难,在结构上存在一定的隐患。另外由于后浇带两侧的墙体没有固联在一起,承受压力作用较小,在回填土的侧压力下,很可能会造成墙体垮塌或其它损坏。
发明内容
本实用新型的目的在于,提供一种地下室侧壁后浇带的挡土结构。既可以不必等待后浇带的稳定时限再进行回填施工,也可以防止后浇带两侧墙体在回填土的侧压力下造成较大损坏,当后浇带的稳定时限完成后还可以再进行后浇带混凝土浇筑,消除结构隐患,保证工程质量。
本实用新型的技术方案:
一种地下室侧壁后浇带的挡土结构,包括后浇带两侧的墙体,后浇带两侧墙体的内外墙面均经钢筋网连接;在后浇带两侧墙体端部设有暗柱,在后浇带两侧墙体的外墙面设有挡土钢板,挡土钢板内侧经一组拉结钢筋与后浇带两侧墙体之间外露的钢筋网焊接。
前述地下室侧壁后浇带的挡土结构中,所述暗柱内设有一组箍筋,箍筋箍在构成钢筋网的竖筋上。
前述地下室侧壁后浇带的挡土结构中,所述拉结钢筋与后浇带两侧墙体之间外露的内墙面钢筋网和外墙面钢筋网焊接。
前述地下室侧壁后浇带的挡土结构中,所述挡土钢板外设有防水层。
前述地下室侧壁后浇带的挡土结构中,所述防水层外设有防水保护层。
前述地下室侧壁后浇带的挡土结构中,所述防水层与挡土钢板之间设有附加防水层,附加防水层的宽度大于挡土钢板的宽度。
与现有技术相比,本实用新型由于在形成后浇带的两侧墙体之间增加了挡土钢板,通过挡土钢板搭接在后浇带两侧墙体的端部,阻挡回填土不能进入后浇带内,便于以后后浇带的浇筑。同时在后浇带两侧墙体的端部设有暗柱。提高了后浇带两侧墙体承受侧压的能力,防止后浇带两侧墙体在回填土的侧压力下造成墙体垮塌或其它损坏。为了确保挡土钢板在回填过程中不发生偏移,挡土钢板通过拉筋与后浇带内的钢筋网焊接在一起。由于回填之后就无法再对外墙进行防水处理,所以在进行回填施工之前就预先对外墙进行防水施工。当外墙防水施工完毕后就可以进行回填施工了,不需要再等待60天的稳定时限。大大的提高了施工进度。回填时,可以对后浇带顶部进行遮挡,以防止回填土进入后浇带,以后浇筑时清理起来比较麻烦。本实用新型主要适用于地下室后浇带的施工。
附图说明
图1是本实用新型的结构示意图。
图中的标记为:1-后浇带两侧墙体、2-暗柱、3-挡土钢板、4-拉结钢筋、5-内墙面钢筋网、6-外墙面钢筋网、7-防水层、8-防水保护层、9-附加防水层、10-箍筋、11-后浇带。
具体实施方式
下面结合附图对本实用新型作进一步的详细说明,但不作为对本实用新型的任何限制。
一种地下室侧壁后浇带的挡土结构,如图1所示。包括后浇带11两侧的墙体,后浇带两侧墙体1的内外墙面均经钢筋网连接;在后浇带两侧墙体端部设有暗柱2,暗柱2内设有一组箍筋10,箍筋10箍在构成钢筋网的竖筋上。在后浇带11两侧墙体的外墙面设有挡土钢板3,挡土钢板内侧经一组拉结钢筋4与后浇带两侧墙体之间外露的钢筋网焊接。拉结钢筋4与后浇带两侧墙体1之间外露的内墙面钢筋网5和外墙面钢筋网6焊接。所述挡土钢板3外设有防水层7。防水层7外设有防水保护层8。防水层7与挡土钢板3之间设有附加防水层9,附加防水层的宽度大于挡土钢板的宽度
实施例
具体施工时,如图1所示。可以在焊接或绑扎地下室墙体侧壁钢筋时焊接或绑扎好暗柱箍筋,暗柱箍筋是矩形钢筋,套在构成钢筋网的垂直钢筋上,然后在从上至下的箍筋中浇筑混凝土形成暗柱。待暗柱固结后将阻挡回填土用的挡土钢板用塔吊吊装在后浇带外侧,两端搭在暗柱一侧,然后将拉结钢筋一端焊接在挡土钢板背面,拉结钢筋的另一端和中部焊接在后浇带内的钢筋网上,将挡土钢板紧贴在后浇带处固定好。然后再挡土钢板外侧进行附加防水层、防水层和防水保护层的施工,最后再进行回填土施工。
Claims (6)
1.一种地下室侧壁后浇带的挡土结构,包括后浇带两侧的墙体,后浇带两侧墙体(1)的内外墙面均经钢筋网连接;其特征在于:在后浇带两侧墙体端部设有暗柱(2),在后浇带两侧墙体的外墙面设有挡土钢板(3),挡土钢板内侧经一组拉结钢筋(4)与后浇带两侧墙体之间外露的钢筋网焊接。
2.根据权利要求1所述地下室侧壁后浇带的挡土结构,其特征在于:所述暗柱(2)内设有一组箍筋(10),箍筋(10)箍在构成钢筋网的竖筋上。
3.根据权利要求1所述地下室侧壁后浇带的挡土结构,其特征在于:所述拉结钢筋(4)与后浇带两侧墙体(1)之间外露的内墙面钢筋网(5)和外墙面钢筋网(6)焊接。
4.根据权利要求1所述地下室侧壁后浇带的挡土结构,其特征在于:所述挡土钢板(3)外设有防水层(7)。
5.根据权利要求4所述地下室侧壁后浇带的挡土结构,其特征在于:所述防水层(7)外设有防水保护层(8)。
6.根据权利要求4所述地下室侧壁后浇带的挡土结构,其特征在于:所述防水层(7)与挡土钢板(3)之间设有附加防水层(9),附加防水层的宽度大于挡土钢板的宽度。
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN2012206702358U CN203022030U (zh) | 2012-12-07 | 2012-12-07 | 一种地下室侧壁后浇带的挡土结构 |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN2012206702358U CN203022030U (zh) | 2012-12-07 | 2012-12-07 | 一种地下室侧壁后浇带的挡土结构 |
Publications (1)
Publication Number | Publication Date |
---|---|
CN203022030U true CN203022030U (zh) | 2013-06-26 |
Family
ID=48646024
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN2012206702358U Expired - Fee Related CN203022030U (zh) | 2012-12-07 | 2012-12-07 | 一种地下室侧壁后浇带的挡土结构 |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN203022030U (zh) |
Cited By (5)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN103437376A (zh) * | 2013-09-04 | 2013-12-11 | 苏州罗兰机电设备有限公司 | 一种地下室侧壁挡土结构 |
CN104264714A (zh) * | 2014-10-20 | 2015-01-07 | 青岛一建集团有限公司 | 一种地下室外墙防水施工缝构造 |
CN106120871A (zh) * | 2016-08-24 | 2016-11-16 | 中国人民解放军63926部队 | 一种地下室外墙后浇带外侧模板及其施工方法 |
CN109763518A (zh) * | 2019-01-30 | 2019-05-17 | 成都建工第四建筑工程有限公司 | 一种地下室后浇带的施工方法 |
CN110206070A (zh) * | 2019-05-27 | 2019-09-06 | 中国十七冶集团有限公司 | 一种地下室墙壁后浇带保护墙施工方法 |
-
2012
- 2012-12-07 CN CN2012206702358U patent/CN203022030U/zh not_active Expired - Fee Related
Cited By (5)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN103437376A (zh) * | 2013-09-04 | 2013-12-11 | 苏州罗兰机电设备有限公司 | 一种地下室侧壁挡土结构 |
CN104264714A (zh) * | 2014-10-20 | 2015-01-07 | 青岛一建集团有限公司 | 一种地下室外墙防水施工缝构造 |
CN106120871A (zh) * | 2016-08-24 | 2016-11-16 | 中国人民解放军63926部队 | 一种地下室外墙后浇带外侧模板及其施工方法 |
CN109763518A (zh) * | 2019-01-30 | 2019-05-17 | 成都建工第四建筑工程有限公司 | 一种地下室后浇带的施工方法 |
CN110206070A (zh) * | 2019-05-27 | 2019-09-06 | 中国十七冶集团有限公司 | 一种地下室墙壁后浇带保护墙施工方法 |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
WO2017045425A1 (zh) | 钢-混凝土复合式隧道衬砌支护结构及其制作与施工方法 | |
CN106869172B (zh) | 现浇预制拼装组合式地铁地下车站施工方法 | |
CN106351670B (zh) | 一种封闭的预支护隧道结构 | |
CN203022030U (zh) | 一种地下室侧壁后浇带的挡土结构 | |
CN107268807B (zh) | 一种预制钢管混凝土叠合柱 | |
CN103437791B (zh) | 一种隧道衬砌台车端头中埋式止水带的安装方法 | |
CN101614125A (zh) | V级围岩隧道施工方法 | |
CN104831818B (zh) | 预制钢筋混凝土梁和叠合柱的连接节点 | |
CN202645584U (zh) | 复合式隧道衬砌结构 | |
CN103982188A (zh) | 岩质地层大断面深竖井的支护结构体系及其施工方法 | |
CN203879506U (zh) | 一种岩质地层大断面深竖井的支护结构体系 | |
CN103821523A (zh) | 一种既有单洞两车道隧道扩建为四车道隧道的开挖方法 | |
CN203559904U (zh) | 一种倒挂井壁竖井侧墙开马头门的加强支护结构 | |
CN103375171A (zh) | 一种盾构洞内始发反力架 | |
CN109356183A (zh) | 一种沉井预留洞口封堵结构及其施工方法 | |
CN204753836U (zh) | 预制钢筋混凝土梁和叠合柱的连接节点 | |
CN103590841A (zh) | 一种暗挖地下洞室初期支护的支撑方法 | |
CN105626098A (zh) | 组合式隧道衬砌、涵洞或地下综合管廊 | |
CN106677795B (zh) | 临海高水压隧道单层钢板混凝土组合衬砌结构及安装工艺 | |
CN105625198A (zh) | 加固刚架拱桥 | |
CN205025475U (zh) | 钢-混凝土复合式隧道衬砌支护结构 | |
CN102776955B (zh) | 一种新增钢筋混凝土抗震墙与套加固梁连接节点 | |
CN102562098B (zh) | 隧道钢制快速拆装临时仰拱 | |
CN206144569U (zh) | 一种封闭的预支护隧道结构 | |
CN209293051U (zh) | 一种沉井预留洞口封堵结构 |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
C14 | Grant of patent or utility model | ||
GR01 | Patent grant | ||
CF01 | Termination of patent right due to non-payment of annual fee | ||
CF01 | Termination of patent right due to non-payment of annual fee |
Granted publication date: 20130626 Termination date: 20201207 |