CN203014282U - An overhead ground wire lifting device in a power transmission line - Google Patents

An overhead ground wire lifting device in a power transmission line Download PDF

Info

Publication number
CN203014282U
CN203014282U CN 201320018004 CN201320018004U CN203014282U CN 203014282 U CN203014282 U CN 203014282U CN 201320018004 CN201320018004 CN 201320018004 CN 201320018004 U CN201320018004 U CN 201320018004U CN 203014282 U CN203014282 U CN 203014282U
Authority
CN
China
Prior art keywords
installing hole
power transmission
transmission line
ground wire
lifting device
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Lifetime
Application number
CN 201320018004
Other languages
Chinese (zh)
Inventor
艾洪军
王玲
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
State Grid Corp of China SGCC
Benxi Power Supply Co of Liaoning Electric Power Co Ltd
Original Assignee
State Grid Corp of China SGCC
Benxi Power Supply Co of Liaoning Electric Power Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by State Grid Corp of China SGCC, Benxi Power Supply Co of Liaoning Electric Power Co Ltd filed Critical State Grid Corp of China SGCC
Priority to CN 201320018004 priority Critical patent/CN203014282U/en
Application granted granted Critical
Publication of CN203014282U publication Critical patent/CN203014282U/en
Anticipated expiration legal-status Critical
Expired - Lifetime legal-status Critical Current

Links

Images

Landscapes

  • Electric Cable Installation (AREA)

Abstract

Provided is an overhead ground wire lifting device in a power transmission line. The overhead ground wire lifting device in a power transmission line is characterized by comprising a triangular double-layer framework, an intermediate pulley, an end portion pulley, an installation connecting piece, an end portion installing hole, and a top installing hole. The integral shape of the triangular double-layer framework is an obtuse-angle isosceles triangular structure. The intermediate pulley is mounted on middle part of the long side of the triangular double-layer framework through a shaft. The end portion pulley is mounted on one acute angle position of the triangular double-layer framework through a shaft. The installation connecting piece is welded on the long side of the triangular double-layer framework. The end portion installing hole is arranged on the other acute angle position of the triangular double-layer framework. The top installing hole is arranged on the obtuse angle position of the triangular double-layer framework. A rope tied with a suspension hook is wound on the intermediate pulley and the end portion pulley. The overhead ground wire lifting device in a power transmission line has advantages of a simple principle structure, light weight, high intensity, easy production and construction, reduced manpower consumption, and high work efficiency.

Description

A kind of power transmission line overhead ground wire lifting device
Technical field
The utility model relates to power equipment stringing instrument, particularly a kind of power transmission line overhead ground wire lifting device.
Background technology
At present, electric power line pole tower shifts the old-fashioned wooden pole of the many employings of overhead ground wire load.Hoist load poor because of wooden pole corrosion resistance and that can bear also is difficult to calculate, wood pole weight is heavier is about 15 kilograms, because the shaft tower many places are at the high mountain place, so increased operating personnel's labour intensity in the course of work, these reasons cause to safety in production and large hidden danger.
The utility model content
The purpose of this utility model is that the spy provides a kind of power transmission line overhead ground wire lifting device in order to ensure intensity weight reduction simultaneously.
The utility model provides a kind of power transmission line overhead ground wire lifting device, it is characterized in that: described power transmission line overhead ground wire lifting device comprises triangle double-layer frame 1, intermediate pulley 2, end pulley 3, installation connecting element 4, end installing hole 5, top installing hole 6;
Wherein: the global shape of triangle double-layer frame 1 is the obtuse angle isosceles triangular structure, and intermediate pulley 2 is arranged on the medium position on long limit by axle, and end pulley 3 is arranged on an acute angle position of triangle double-layer frame 1 by axle;
Installation connecting element 4 is welded on the long limit of triangle double-layer frame 1, and end installing hole 5 is positioned at another acute angle position of triangle double-layer frame 1, and top installing hole 6 is positioned at the position, obtuse angle of triangle double-layer frame 1; Bolt has the hawser of suspension hook to be entangled on intermediate pulley 2 and end pulley 3.
Described installation connecting element 4 be two with the brace structure of installing hole.
Utilize end installing hole 5 and top installing hole 6, by bolt, that whole power transmission line overhead ground wire lifting device is rack-mount, by the suspension hook on hawser, mention cable.
Advantage of the present utility model:
Power transmission line overhead ground wire lifting device described in the utility model, theory structure is simple, and is lightweight, and intensity is large, is convenient to make and construction, reduces the manpower consumption, high efficiency.
Description of drawings
Below in conjunction with drawings and the embodiments, the utility model is described in further detail:
Fig. 1 is power transmission line overhead ground wire lifting device theory structure schematic diagram.
Embodiment
Embodiment 1
The present embodiment provides a kind of power transmission line overhead ground wire lifting device, it is characterized in that: described power transmission line overhead ground wire lifting device comprises triangle double-layer frame 1, intermediate pulley 2, end pulley 3, installation connecting element 4, end installing hole 5, top installing hole 6;
Wherein: the global shape of triangle double-layer frame 1 is the obtuse angle isosceles triangular structure, and intermediate pulley 2 is arranged on the medium position on long limit by axle, and end pulley 3 is arranged on an acute angle position of triangle double-layer frame 1 by axle; Installation connecting element 4 is welded on the long limit of triangle double-layer frame 1, and end installing hole 5 is positioned at another acute angle position of triangle double-layer frame 1, and top installing hole 6 is positioned at the position, obtuse angle of triangle double-layer frame 1; Bolt has the hawser of suspension hook to be entangled on intermediate pulley 2 and end pulley 3.Described installation connecting element 4 be two with the brace structure of installing hole.
Utilize end installing hole 5 and top installing hole 6, by bolt, that whole power transmission line overhead ground wire lifting device is rack-mount, by the suspension hook on hawser, mention cable.

Claims (2)

1. power transmission line overhead ground wire lifting device, it is characterized in that: described power transmission line overhead ground wire lifting device comprises triangle double-layer frame (1), intermediate pulley (2), end pulley (3), installation connecting element (4), end installing hole (5), top installing hole (6);
Wherein: the global shape of triangle double-layer frame (1) is the obtuse angle isosceles triangular structure, and intermediate pulley (2) is arranged on the medium position on long limit by axle, and end pulley (3) is arranged on an acute angle position of triangle double-layer frame (1) by axle;
Installation connecting element (4) is welded on the long limit of triangle double-layer frame (1), and end installing hole (5) is positioned at another acute angle position of triangle double-layer frame (1), and top installing hole (6) is positioned at the position, obtuse angle of triangle double-layer frame (1); Bolt has the hawser of suspension hook to be entangled on intermediate pulley (2) and end pulley (3).
2. according to power transmission line overhead ground wire lifting device claimed in claim 1, it is characterized in that: described installation connecting element (4) be two with the brace structure of installing hole.
CN 201320018004 2013-01-14 2013-01-14 An overhead ground wire lifting device in a power transmission line Expired - Lifetime CN203014282U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN 201320018004 CN203014282U (en) 2013-01-14 2013-01-14 An overhead ground wire lifting device in a power transmission line

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN 201320018004 CN203014282U (en) 2013-01-14 2013-01-14 An overhead ground wire lifting device in a power transmission line

Publications (1)

Publication Number Publication Date
CN203014282U true CN203014282U (en) 2013-06-19

Family

ID=48605839

Family Applications (1)

Application Number Title Priority Date Filing Date
CN 201320018004 Expired - Lifetime CN203014282U (en) 2013-01-14 2013-01-14 An overhead ground wire lifting device in a power transmission line

Country Status (1)

Country Link
CN (1) CN203014282U (en)

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN103545751A (en) * 2013-10-16 2014-01-29 国家电网公司 Overhead power transmission line ground-wire optical-cable fitting replacement bracket
CN104362544A (en) * 2014-11-17 2015-02-18 国家电网公司 Pulley type tower head clamp

Cited By (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN103545751A (en) * 2013-10-16 2014-01-29 国家电网公司 Overhead power transmission line ground-wire optical-cable fitting replacement bracket
CN103545751B (en) * 2013-10-16 2015-11-04 国家电网公司 Overhead transmission line ground wire optical fiber cable fitting changes support
CN104362544A (en) * 2014-11-17 2015-02-18 国家电网公司 Pulley type tower head clamp

Similar Documents

Publication Publication Date Title
CN202231327U (en) Heavy component hoisting tool in electrical cabinet
CN203014282U (en) An overhead ground wire lifting device in a power transmission line
CN203808580U (en) Hoist driving steel wire rope lifting and fixing device
CN202488034U (en) Lifting device for electric transmission line of angle iron tower
CN205132955U (en) Hoist and mount operation of electric power industry low latitude is with hoist and mount frame
CN204179569U (en) A kind of sister block wire grip of electric transmission line erection
CN203050218U (en) Standard knot hoisting support for jacking
CN202917897U (en) Cable hoisting horizontal pulley
CN203289011U (en) Tension cross arm hoisting device
CN202488041U (en) 500 kilovolt hot-line work electric-field-entering ladder
CN203607750U (en) Suspension ring device for loosening-tightening line pulley
CN204967142U (en) Join in marriage comprehensive electrified maintenance of net and carry lineman's utensil
CN202175522U (en) Device for hoisting concrete pole
CN203626372U (en) Multifunctional hoop device for assembling mounting mast
CN202488035U (en) Hoisting device for maintenance of power transmission line above concrete poles
CN203699783U (en) Hanging bracket fixed with wire pole
CN202444204U (en) Traction lifting device for high-altitude circuit tools and appliances
CN203653193U (en) Internal inclined type hanging basket device
CN203119388U (en) Multifunctional mounting rack for changing tension-resistant crossarm
CN203707659U (en) Rapid installation suspender for distribution grid cross arms
CN202832172U (en) Combined ladder for climbing up and down electric transmission line steel tube tower
CN203553771U (en) Pulley fixing plate applied to overhead line stringing
CN202564892U (en) High voltage line insulator chain horizontal hoisting stretcher
CN205901172U (en) Nearly pole of transmission line overhauls corridor hanger device
CN204858412U (en) Distribution lines cable and wire tied in a bundle set up and pass through ware with sharp pole

Legal Events

Date Code Title Description
C14 Grant of patent or utility model
GR01 Patent grant
CX01 Expiry of patent term
CX01 Expiry of patent term

Granted publication date: 20130619