CN203010587U - Boiler returning device - Google Patents

Boiler returning device Download PDF

Info

Publication number
CN203010587U
CN203010587U CN 201220622382 CN201220622382U CN203010587U CN 203010587 U CN203010587 U CN 203010587U CN 201220622382 CN201220622382 CN 201220622382 CN 201220622382 U CN201220622382 U CN 201220622382U CN 203010587 U CN203010587 U CN 203010587U
Authority
CN
China
Prior art keywords
tube
returning
boiler
pipe
vertical water
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Fee Related
Application number
CN 201220622382
Other languages
Chinese (zh)
Inventor
王玉峰
胡延民
陈泰安
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
China National Petroleum Corp
Liaohe Petroleum Exploration Bureau
Original Assignee
China National Petroleum Corp
Liaohe Petroleum Exploration Bureau
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by China National Petroleum Corp, Liaohe Petroleum Exploration Bureau filed Critical China National Petroleum Corp
Priority to CN 201220622382 priority Critical patent/CN203010587U/en
Application granted granted Critical
Publication of CN203010587U publication Critical patent/CN203010587U/en
Anticipated expiration legal-status Critical
Expired - Fee Related legal-status Critical Current

Links

Images

Abstract

The utility model relates to an oilfield circulating fluidized bed boiler, and in particular relates to a boiler returning device. A stainless steel metallic bellow expansion joint is arranged between a returning inclined pipe of the device and a vertical water-cooled wall pipe of a hearth; the included angle between the returning inclined pipe and the vertical water-cooled wall pipe of the hearth is 55-60 degrees, and the included angle between the stainless steel metallic bellow expansion joint and the vertical water-cooled wall pipe of the hearth is 55-60 degrees; an air cap is designed in a structure that the included angle between pipes is 90 degrees; an ash discharge pipe is connected to the lower end of an air chamber; a sealing door is arranged on the lower part of the ash discharge pipe; a coke discharge pipe is added on an air outlet plate; the extending part of the coke discharge pipe is fixed on the air outlet plate through a stainless steel plate; and a sealing door is arranged on the lower part of the coke discharge pipe. By adopting the boiler returning device, cracking at the joint of the returning inclined pipe and the water-cooled wall pipe of the hearth is avoided; and fine materials flowing into the returning air chamber and coke on the air outlet plate can be timely discharged out of the boiler, so that materials are circulated smoothly, the circulating efficiency and the burnout rate of the materials are improved, and the continuous and stable operation and the yield of the boiler are ensured.

Description

A kind of boiler material-returning device
Technical field:
The utility model relates to a kind of oil field CFBB, particularly a kind of boiler material-returning device.
Background technology:
When the oil field CFBB moves, material circulates in this closed path at burner hearth, cyclone separator, down-comer, material-returning device, because vibration and the thermal expansion degree of water-cooling wall pipe of burner hearth, returning charge inclined tube are different, cause weld cracking between inclined tube and water screen tube, material leaks, and flue gas is altered outward.Between inclined tube and vertical water-wall tube, angle is larger, has some setbacks when causing material to enter burner hearth, and boiler operatiopn is unstable, affects it and exerts oneself.Under material washed away for a long time, the blast cap of returning charge air compartment (straight pipe type) serious wear had the tiny material of part to flow to air compartment, causes the returning charge deficiency in draught.Material is when flowing through material-returning device, and local high temperature can cause coking, and the carbonizing matter on exhausting plate can stop that the high-pressure blast of a large amount of fluidisation materials enters in down-comer, has destroyed the circulation of material, causes the blowing out accident.
The utility model content:
The technical problems to be solved in the utility model is to provide a kind of boiler material-returning device, this device has realized avoiding returning charge inclined tube and water-cooling wall pipe of burner hearth junction cracking, can in time discharge out of the furnace flowing into the tiny material of returning charge air compartment and the carbonizing matter on exhausting plate, make Matter Transfer smooth, improved cycle efficieny and the burnout rate of material, guaranteed the boiler continuous and steady operation and go out power rate.Overcome the deficiency that in cracking between the returning charge inclined tube of existing CFBB and furnace wall cooling, blast cap wearing and tearing, returning charge air compartment, on solid accumulation and exhausting plate, carbonizing matter is difficult to discharge.
Technical solution adopted in the utility model is: a kind of boiler material-returning device comprises burner hearth, cyclone separator, down-comer, air compartment, returning charge inclined tube, burner hearth vertical water-wall tube, exhausting plate and blast cap; Install the stainless steel metal expansion bellow additional between returning charge inclined tube and burner hearth vertical water-wall tube, angle between returning charge inclined tube and stainless steel metal expansion bellow and burner hearth vertical water-wall tube is arranged in 55 ° of-60 ° of scopes, it is the structure of 90 ° that blast cap is designed to angle between tube and tube, at air compartment lower end connection ash releasing tube, the ash releasing tube bottom is provided with hermatic door, install a coke discharging tube additional on exhausting plate, the coke discharging tube extension is fixed on exhausting plate by corrosion resistant plate, and the coke discharging tube bottom is provided with hermatic door.
The beneficial effects of the utility model are: the utility model has been owing to having adopted the mode that installs the stainless steel metal expansion bellow additional, thereby has the effect of avoiding returning charge inclined tube and water-cooling wall pipe of burner hearth junction cracking; Owing to having adopted the mode that connects ash releasing tube and coke discharging tube, thereby have and to flow into the tiny material of returning charge air compartment and the function that the carbonizing matter on exhausting plate in time discharges out of the furnace, make Matter Transfer smooth, improved cycle efficieny and the burnout rate of material, guaranteed the boiler continuous and steady operation and go out power rate.
Description of drawings:
The utility model is described in more detail below in conjunction with the drawings and specific embodiments.
Fig. 1 is structural representation of the present utility model.
The specific embodiment:
As shown in drawings, a kind of boiler material-returning device comprises burner hearth 1, cyclone separator 2, down-comer 3, air compartment 4, returning charge inclined tube 5, burner hearth vertical water-wall tube 6, exhausting plate 8 and blast cap 9; Install stainless steel metal expansion bellow 7 additional between returning charge inclined tube 5 and burner hearth vertical water-wall tube 6, in order to overcome thermal stress and amplitude, avoid the weld cracking of returning charge inclined tube 5 and burner hearth vertical water-wall tube 6.Angle between returning charge inclined tube 5 and stainless steel metal expansion bellow 7 and burner hearth vertical water-wall tube 6 is arranged in 55 ° of-60 ° of scopes, and material enters burner hearth swimmingly under the double action of deadweight and returning charge wind.It is the structure of 90 ° that blast cap 9 is designed to angle between tube and tube, and the wearing-in period that can extend blast cap 9 has also reduced tiny material and entered returning charge air compartment 4.Connect ash releasing tubes 10 in air compartment 4 lower ends, ash releasing tube 10 bottoms are provided with hermatic door 12, to entering the material of air compartment 4, can discharge at any time by ash releasing tube 10, ensure sufficient returning charge air quantity.Install a coke discharging tube 11 on exhausting plate 8 additional, coke discharging tube 11 extensions are fixed on exhausting plate 8 by corrosion resistant plate, and coke discharging tube 11 bottoms are provided with hermatic door 12, can according to on-the-spot practical operation situation, discharge coking material.
Be understandable that, above about specific descriptions of the present utility model, only for the utility model being described and being not to be subject to the described technical scheme of the utility model embodiment, those of ordinary skill in the art is to be understood that, still can modify or be equal to replacement the utility model, to reach identical technique effect; Use needs as long as satisfy, all within protection domain of the present utility model.

Claims (1)

1. a boiler material-returning device, comprise burner hearth (1), cyclone separator (2), down-comer (3), air compartment (4), returning charge inclined tube (5), burner hearth vertical water-wall tube (6), exhausting plate (8) and blast cap (9), it is characterized in that: install stainless steel metal expansion bellow (7) additional between returning charge inclined tube (5) and burner hearth vertical water-wall tube (6), angle between returning charge inclined tube (5) and stainless steel metal expansion bellow (7) and burner hearth vertical water-wall tube (6) is arranged in 55 ° of-60 ° of scopes, it is the structure of 90 ° that blast cap (9) is designed to angle between tube and tube, at air compartment (4) lower end connection ash releasing tube (10), ash releasing tube (10) bottom is provided with hermatic door (12), install a coke discharging tube (11) additional on exhausting plate (8), coke discharging tube (11) extension is fixed on exhausting plate (8) by corrosion resistant plate, coke discharging tube (11) bottom is provided with hermatic door (12).
CN 201220622382 2012-11-21 2012-11-21 Boiler returning device Expired - Fee Related CN203010587U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN 201220622382 CN203010587U (en) 2012-11-21 2012-11-21 Boiler returning device

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN 201220622382 CN203010587U (en) 2012-11-21 2012-11-21 Boiler returning device

Publications (1)

Publication Number Publication Date
CN203010587U true CN203010587U (en) 2013-06-19

Family

ID=48602176

Family Applications (1)

Application Number Title Priority Date Filing Date
CN 201220622382 Expired - Fee Related CN203010587U (en) 2012-11-21 2012-11-21 Boiler returning device

Country Status (1)

Country Link
CN (1) CN203010587U (en)

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN106287688A (en) * 2016-01-31 2017-01-04 无锡华光锅炉股份有限公司 A kind of material returning device bellows structure
CN109268823A (en) * 2018-08-24 2019-01-25 东方电气集团东方锅炉股份有限公司 A kind of circulating fluidized bed boiler and control method for preventing material returning device from vibrating

Cited By (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN106287688A (en) * 2016-01-31 2017-01-04 无锡华光锅炉股份有限公司 A kind of material returning device bellows structure
CN109268823A (en) * 2018-08-24 2019-01-25 东方电气集团东方锅炉股份有限公司 A kind of circulating fluidized bed boiler and control method for preventing material returning device from vibrating
CN109268823B (en) * 2018-08-24 2023-08-18 东方电气集团东方锅炉股份有限公司 Circulating fluidized bed boiler capable of preventing material returning device from vibrating and control method

Similar Documents

Publication Publication Date Title
CN102635844B (en) Boiler system using waste heat of flue gas of rotary hearth furnace
CN101598334B (en) Bottom slag cooling method of circulating fluidized bed
CN204388046U (en) Biomass recirculating fluidized bed boiler
CN202581248U (en) Improved rotary hearth furnace flue gas waste heat boiler device
CN102221201A (en) Equal-bed pressure cold slag fluidized bed of circulating fluidized bed boiler and operation method thereof
CN203010587U (en) Boiler returning device
CN204986938U (en) Energy -conserving dust removal troilite exhaust -heat boiler
CN105627301A (en) Circulating fluidized bed boiler for purely burning furfural residues
CN102374658A (en) Angular pipe water circulating structure with complete forced upward flowing on heating surface
CN104534442A (en) Low mass flow speed ultra-supercritical boiler water circulation device and water circulation method
CN203744243U (en) Slag discharge device for wear-resistant water-cooled circulating fluidized bed boiler
CN203605217U (en) CFB (circulating fluidized bed) boiler slag discharging device for burning coal gangue
CN102297509B (en) Boiler drum longitudinally arranged chain grate hot water boiler
CN204853416U (en) Exhaust -heat boiler is smelted to VI flue
CN201377787Y (en) High-temperature resistant and wear resistant ceramic cyclone separator of CFBB
CN104315872B (en) Boiler flue gas waste heat recycling and energy-saving device with boiler flue gas dust removing effect
CN104566977B (en) Conduction oil heating furnace with dual fluidized beds
CN207230919U (en) A kind of chain grate hot-water boiler with boiler tail afterheat energy-saving environmental protecting device
CN102901092B (en) For the air-cooled slag-discharge pipe of Small and Medium Circulating Fluidized Bed Boiler
CN207815345U (en) A kind of combined type deashing arrangement of garbage burning boiler
CN205606538U (en) Circulating fluidized bed boiler of pure fever furfural sediment
CN207815303U (en) CFB Slag cooling structure
CN218566201U (en) Nested formula ash discharge structure in high temperature dust collecting equipment
CN211177996U (en) Secondary lead smelting and waste heat recovery boiler
CN203687064U (en) Biomass boiler water-cooling slag hole structure

Legal Events

Date Code Title Description
C14 Grant of patent or utility model
GR01 Patent grant
C17 Cessation of patent right
CF01 Termination of patent right due to non-payment of annual fee

Granted publication date: 20130619

Termination date: 20131121