CN207815303U CN201721480858.8U CN201721480858U CN207815303U CN 207815303 U CN207815303 U CN 207815303U CN 201721480858 U CN201721480858 U CN 201721480858U CN 207815303 U CN207815303 U CN 207815303U
Authority
CN
China
Prior art keywords
water
cooling
chamber
cooling wall
dreg
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Withdrawn - After Issue
Application number
CN201721480858.8U
Other languages
Chinese (zh)
Inventor
肖峰
罗勇军
高琴
贾良晨
李琰
石敏
洪勇
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Shanghai Boiler Works Co Ltd
Original Assignee
Shanghai Boiler Works Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Shanghai Boiler Works Co Ltd filed Critical Shanghai Boiler Works Co Ltd
Priority to CN201721480858.8U priority Critical patent/CN207815303U/en
Application granted granted Critical
Publication of CN207815303U publication Critical patent/CN207815303U/en
Withdrawn - After Issue legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Landscapes

  • Gasification And Melting Of Waste (AREA)

Abstract

The utility model discloses a kind of CFB Slag cooling structure and methods.The cooling structure includes the water cooled wind chamber set on burner hearth bottom, and the outside of burner hearth is equipped with dreg cooling chamber's water-cooling wall, and dreg cooling chamber's water-cooling wall extends downwardly outside to the bottom of water cooled wind chamber along water cooled wind chamber, and dreg cooling chamber is constituted with water cooled wind chamber water-cooling wall.The high temperature bottom slag that the bottom ash particle that recirculating fluidized bed is formed is discharged from the slag inlet of burner hearth bottom slowly flows across, and contacts and exchanges heat with dreg cooling chamber's water-cooling wall and water cooled wind chamber water-cooling wall, fluid bed high temperature bottom slag is made to be cooled down;After cooling medium in dreg cooling chamber's water-cooling wall is heated, water cooled air compartment lower header enters water cooled wind chamber water-cooling wall, and the bottom ash heat that dreg cooling chamber absorbs enters boiler steam-water circulation system immediately.The utility model makes bottom ash accumulation of heat that can directly be recycled by boiler, improves boiler thermal efficiency;Dreg cooling chamber is directly cooled down with boiler water, is reduced or is not had to other water sources, save power plant water.

Description

CFB Slag cooling structure
Technical field
The utility model is related to a kind of CFB Slag cooling structures, and in particular to a kind of to use furnace wall cooling The structure and method of cooling bed boiler high temperature bottom ash are used for cooling cycle bottom dregs at fluid bed boiler, belong to recirculating fluidized bed Boiler technology field.
Background technology
The bottom ash of circulating fluidized bed boiler discharge is a kind of wide-size distribution(0~30mm), high-temperature(~900 DEG C)Solid Grain belongs to the material of more difficult operation and control, especially large capacity(Or the big quantity of slag)CFB boiler, both at home and abroad all without good Solution.Therefore, dreg cooling chamber belongs to one of technological difficulties the most intractable in fluidized-bed combustion boiler auxiliary system.It introduces the country Fluidized bed type dreg cooling chamber due to cooling down the factors such as heating surface wear there are slagging, boiler slag removal control failure and dreg cooling chamber and cause The problems such as expected cooling effect is not achieved in the dreg cooling chamber causes prodigious economic loss to power plant.And some mechanical cold slags Room, such as water cooling auger, water cold drum, since there is poorly sealed, cooling capacity is poor, repair and maintenance heavy workload etc. is asked Topic, application prospect is not very optimistic at home.
Method and apparatus currently on the market about recirculating fluidized bed bottom slag cooling is more, the cooling original of cylinder type cold grit chamber Reason is that CFB bottom ash is introduced by pipeline in the roller of rotation, and arrangement heating surface has medium in the interlayer or cylinder of roller Water cools down, since there are mechanical rotations for the device so that the pressure of water cooling medium cannot be excessively high, general to require to be less than 4.0MPa, additionally, due to there are the sealings of rotatable parts, slag inlet to be also very difficult to handle, comercial operation shows that the equipment is frequent There is leak, leakage slag, bottom ash heat can not be recycled effectively.
The dreg cooling chamber of wind and water combined circulating fluid bed type, design principle are that a class is added outside circulating fluidized bed boiler It is similar to be bubbled the dreg cooling chamber of bed type, be usually made of several rooms separated by weir wall, the bottom ash of fluidized-bed combustion boiler is drawn by pipeline To the empty room part of the device, bottom is fluidized by being passed through air dielectric in dreg cooling chamber's bottom air distribution plate of circulating fluid bed type Slag realizes flowing and conveying of the bottom ash between each room, and according to cooling required, snake heating surface of tubes is arranged in dreg cooling chamber.This The dreg cooling chamber of kind form shows the unsmooth flowing between each room of bottom ash and leads in operation, will often find that stifled slag etc. is asked Topic.
Invention content
Problem to be solved in the utility model is:Existing wind and water combined circulating fluid bed type dreg cooling chamber block up slag, abrasion, Heating surface is not easy the problems such as replacing, and provides a kind of bottom ash being suitable for the fuel such as the high ash content of circulating fluidized bed combustion, low heat value Cooling means and the device and corresponding system for realizing this method, and how to utilize the cold slag of furnace wall cooling surface pipe composition The cavity of room cools down bottom ash using the cavity as heating surface using the stove water of boiler, realizes the heat recovery of bottom ash, reduces cold The usage quantity and floor space of grit chamber.
In order to solve the above-mentioned technical problem, the utility model provides a kind of CFB Slag cooling structure, Include the water cooled wind chamber set on burner hearth bottom, the side of water cooled wind chamber is equipped with air inlet, and the water-cooling wall one of lower furnace portion is equipped with Slag inlet, which is characterized in that the outside of the burner hearth is equipped with dreg cooling chamber's water-cooling wall, and dreg cooling chamber's water-cooling wall is extended downwardly along water cooling The outside of air compartment to the bottom of water cooled wind chamber constitutes dreg cooling chamber with water cooled wind chamber water-cooling wall, and slag inlet is located in dreg cooling chamber, cold The bottom of grit chamber is equipped with slag-drip opening, and slag-drip opening is made of water-cooling wall six.
Preferably, the junction of the water cooled wind chamber and dreg cooling chamber be equipped with water cooled wind chamber lower header, water cooled wind chamber water-cooling wall, Dreg cooling chamber's water-cooling wall is connected to water cooled wind chamber lower header;Burner hearth, water cooled wind chamber, dreg cooling chamber three junction be equipped with water cooled wind chamber Upper collecting chamber, water-cooling wall one, water cooled wind chamber water-cooling wall are connected to water cooled wind chamber upper collecting chamber.
Preferably, dreg cooling chamber's water-cooling wall is by sequentially connected oblique outer downward water-cooling wall two, water straight down Cold wall three, in the diagonal downward water-cooling wall four, horizontal direction water-cooling wall five and extend to the water cooling of water cooled wind chamber straight up Wall seven forms, and slag-drip opening is set to five downside of water-cooling wall;Water cooled wind chamber water-cooling wall by sequentially connected water-cooling wall eight straight down, In the diagonal downward water-cooling wall nine, horizontal direction water-cooling wall ten and extend to the water-cooling wall ten of two bottom of water-cooling wall straight up One composition.
It is highly preferred that the water-cooling wall four and the angle of water-cooling wall five are 135 ° ~ 180 °.
Preferably, dreg cooling chamber's water-cooling wall uses fin panel casing.
Preferably, the burner hearth bottom is located at the lower section of slag-drip opening equipped with burner hearth air distribution plate.
Preferably, the cooling medium of all water-cooling walls is stove water.
Compared with prior art, the beneficial effects of the utility model are:
1. bottom ash accumulation of heat can be recycled directly by boiler, boiler thermal efficiency is improved;
2. dreg cooling chamber's surrounding is directly formed using water wall surface, keep dreg cooling chamber safe and reliable, is convenient for INSULATION DESIGN;
3. dreg cooling chamber is arranged in the lower part of water-cooling wall cone section, arrangement is convenient, saves space;
4. dreg cooling chamber is directly cooled down with boiler water, other water sources are reduced or do not had to, power plant water is saved.
Description of the drawings
Fig. 1 is a kind of structural schematic diagram of CFB Slag cooling structure provided by the utility model.
Specific implementation mode
To make the utility model be clearer and more comprehensible, hereby with preferred embodiment, and attached drawing is coordinated to be described in detail below.
Embodiment
As shown in Figure 1, being a kind of CFB Slag cooling structure provided by the utility model, including it is set to stove The side of the water cooled wind chamber 2 of 1 bottom of thorax, water cooled wind chamber 2 is equipped with air inlet B, and the water-cooling wall 1 of 1 lower part of burner hearth is equipped with slag input The outside of mouth A, the burner hearth 1 are equipped with dreg cooling chamber's water-cooling wall 7, and dreg cooling chamber's water-cooling wall 7 uses fin panel casing.Dreg cooling chamber's water-cooling wall 7 extend downwardly outside to the bottom of water cooled wind chamber 2 along water cooled wind chamber, and dreg cooling chamber 4 is constituted with water cooled wind chamber water-cooling wall, into Cinder notch A is located in dreg cooling chamber 4, and the bottom of dreg cooling chamber 4 is equipped with slag-drip opening 5, and slag-drip opening 5 is made of water-cooling wall 6 26.1 bottom of burner hearth It is equipped with burner hearth air distribution plate 9 positioned at the lower section of slag inlet A.Water cooled wind chamber 2 and the junction of dreg cooling chamber 4 are equipped with water cooled wind chamber lower header 3, water cooled wind chamber water-cooling wall, dreg cooling chamber's water-cooling wall 7 are connected to water cooled wind chamber lower header 3;Burner hearth 1, water cooled wind chamber 2, dreg cooling chamber 4 three The junction of person is equipped with water cooled wind chamber upper collecting chamber 6, and water-cooling wall 1, water cooled wind chamber water-cooling wall are connected to water cooled wind chamber upper collecting chamber 6. Dreg cooling chamber's water-cooling wall 7 is by sequentially connected oblique outer downward water-cooling wall 2 22, water-cooling wall 3 23 straight down, oblique introversion Under water-cooling wall 4 24, horizontal direction water-cooling wall 5 25 and extend to straight up water cooled wind chamber 2 water-cooling wall 7 27 form, Slag-drip opening 5 is set to 5 25 downside of water-cooling wall;Water cooled wind chamber water-cooling wall is by sequentially connected water-cooling wall 8 28 straight down, oblique Interior downward water-cooling wall 9 29, horizontal direction water-cooling wall 10 and extend to the water-cooling wall of 2 22 bottom of water-cooling wall straight up 11 compositions.Water-cooling wall 4 24 and the angle of water-cooling wall 5 25 are 135 ° ~ 180 °.The cooling medium of all water-cooling walls is stove Water.
A kind of CFB Slag cooling means:
The bed material of fuel and composition recirculating fluidized bed completes burning in the burner hearth 1, required portion of air by into Air port B enters water cooled wind chamber 2, then big by the flue gas entrainment that air distribution plate fluidized bed material and fuel, air and fuel combustion generate The particle of amount enters cyclone separator, and coarse granule carries out circulating combustion back to burner hearth 1 by material returning device by cyclonic separation, do not have The fine grained detached then forms flying dust and is discharged into tail portion convection pass by the top of cyclone separator with flue gas, ciculation fluidized The high temperature bottom slag that the bottom ash particle that bed is formed is discharged from the slag inlet A of 1 bottom of burner hearth slowly flows across, with dreg cooling chamber water-cooling wall 7 and The contact of water cooled wind chamber water-cooling wall exchanges heat, and fluid bed high temperature bottom slag is made to be cooled down, and is then discharged from slag-drip opening 5;Dreg cooling chamber After cooling medium in water-cooling wall 7 is heated, water cooled air compartment lower header 3 enters water cooled wind chamber water-cooling wall, the bottom that dreg cooling chamber 4 absorbs Slag heat enters boiler steam-water circulation system immediately.

Claims (7)

1. a kind of CFB Slag cooling structure, including it is set to burner hearth(1)The water cooled wind chamber of bottom(2), water cooling wind Room(2)Side be equipped with air inlet(B), burner hearth(1)The water-cooling wall one of lower part(21)It is equipped with slag inlet(A), which is characterized in that The burner hearth(1)Outside be equipped with dreg cooling chamber's water-cooling wall(7), dreg cooling chamber's water-cooling wall(7)It extends downwardly along the outer of water cooled wind chamber Side is to water cooled wind chamber(2)Bottom, with water cooled wind chamber water-cooling wall constitute dreg cooling chamber(4), slag inlet(A)Positioned at dreg cooling chamber(4) It is interior, dreg cooling chamber(4)Bottom be equipped with slag-drip opening(5), slag-drip opening(5)By water-cooling wall six(26)It constitutes.
2. CFB Slag cooling structure as described in claim 1, which is characterized in that the water cooled wind chamber(2) With dreg cooling chamber(4)Junction be equipped with water cooled wind chamber lower header(3), water cooled wind chamber water-cooling wall, dreg cooling chamber's water-cooling wall(7)With water cooling Air compartment lower header(3)Connection;Burner hearth(1), water cooled wind chamber(2), dreg cooling chamber(4)The junction of three is equipped with water cooled wind chamber upper collecting chamber (6), water-cooling wall one(21), water cooled wind chamber water-cooling wall and water cooled wind chamber upper collecting chamber(6)Connection.
3. CFB Slag cooling structure as described in claim 1, which is characterized in that dreg cooling chamber's water-cooling wall (7)By sequentially connected oblique outer downward water-cooling wall two(22), water-cooling wall three straight down(23), downward water in the diagonal Cold wall four(24), horizontal direction water-cooling wall five(25)And water cooled wind chamber is extended to straight up(2)Water-cooling wall seven(27)Group At slag-drip opening(5)Set on water-cooling wall five(25)Downside;Water cooled wind chamber water-cooling wall is by sequentially connected water-cooling wall eight straight down (28), downward water-cooling wall nine in the diagonal(29), horizontal direction water-cooling wall ten(30)And water-cooling wall two is extended to straight up (22)The water-cooling wall 11 of bottom(31)Composition.
4. CFB Slag cooling structure as claimed in claim 3, which is characterized in that the water-cooling wall four(24) With water-cooling wall five(25)Angle be 135 ° ~ 180 °.
5. CFB Slag cooling structure as described in claim 1, which is characterized in that dreg cooling chamber's water-cooling wall (7)Using fin panel casing.
6. CFB Slag cooling structure as described in claim 1, which is characterized in that the burner hearth(1)Bottom Positioned at slag-drip opening(5)Lower section be equipped with burner hearth air distribution plate(9).
7. CFB Slag cooling structure as described in claim 1, which is characterized in that the cooling of all water-cooling walls Medium is stove water.
CN201721480858.8U 2017-11-08 2017-11-08 CFB Slag cooling structure Withdrawn - After Issue CN207815303U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201721480858.8U CN207815303U (en) 2017-11-08 2017-11-08 CFB Slag cooling structure

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201721480858.8U CN207815303U (en) 2017-11-08 2017-11-08 CFB Slag cooling structure

Publications (1)

Publication Number Publication Date
CN207815303U true CN207815303U (en) 2018-09-04

Family

ID=63334477

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201721480858.8U Withdrawn - After Issue CN207815303U (en) 2017-11-08 2017-11-08 CFB Slag cooling structure

Country Status (1)

Country Link
CN (1) CN207815303U (en)

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN107859993A (en) * 2017-11-08 2018-03-30 上海锅炉厂有限公司 A kind of CFB Slag cooling structure and method

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN107859993A (en) * 2017-11-08 2018-03-30 上海锅炉厂有限公司 A kind of CFB Slag cooling structure and method
CN107859993B (en) * 2017-11-08 2023-12-01 上海锅炉厂有限公司 Bottom slag cooling structure and method for circulating fluidized bed boiler

Similar Documents

Publication Publication Date Title
CN102635844B (en) Boiler system using waste heat of flue gas of rotary hearth furnace
CN202581248U (en) Improved rotary hearth furnace flue gas waste heat boiler device
CN101571280B (en) A multi-pressure multi-inlet power generation waste heat boiler
CN101598334A (en) Bottom slag cooling method of circulating fluidized bed
CN200993379Y (en) Membrane type smoke cover structure
WO2021109324A1 (en) Modularized natural convection boiler system for recovering waste heat of liquid slag
CN101105287A (en) Screen type heated surface arrangement method for fluid bed boiler furnace
CN207815303U (en) CFB Slag cooling structure
CN104676617B (en) A kind of burning boiler flue accumulation prevention structure
CN104390211A (en) Air-water combined slag cooler with crushing device
CN201059537Y (en) Fluidized-bed boiler furnace screen type heating surface structure
CN107859993A (en) A kind of CFB Slag cooling structure and method
CN102635939A (en) Vertical coal hot air furnace with double-layer heat conduction
CN202692089U (en) Light type membrane-wall water-cooling air hopper
CN205640887U (en) Sediment waste heat utilization's air -cooled system at bottom of improvement circulating fluidized bed boiler
CN204494381U (en) The air-distribution device of selective deslagging
CN201003907Y (en) A waste heat power generation system for a new dry process cement production line
CN211011342U (en) Wind-water combined circulation vertical slag cooler
CN209068501U (en) A kind of static cold slag device for the regular deslagging of fluidized-bed combustion boiler
CN203203009U (en) Vertical modularized coal water slurry corner tube boiler
CN202002070U (en) Kiln component type heat pipe steam generator
CN110631009A (en) Fengshui Combined Cycle Vertical Slag Cooler
CN201662222U (en) Gas-liquid double-phase organic heat carrier boiler
CN202204155U (en) Organic thermal medium boiler of environmental-friendly energy-saving recirculating fluidized bed
CN205579960U (en) Buggy boiler

Legal Events

Date Code Title Description
GR01 Patent grant
GR01 Patent grant
AV01 Patent right actively abandoned
AV01 Patent right actively abandoned
AV01 Patent right actively abandoned

Granted publication date: 20180904

Effective date of abandoning: 20231201

AV01 Patent right actively abandoned

Granted publication date: 20180904

Effective date of abandoning: 20231201