A kind of novel siphon drainage suspension system
Technical field
The utility model relates to the dewatering in siphon type technical field, is specifically related to a kind of technical scheme that high-density polytene pipeline adopts the dewatering in siphon type of two Secondary Suspension module compositions that is exclusively used in.
Background technology
Existing siphon drainage suspension system, the pipe clamp that is connected, suspends in midair of being connected of square steel card and rectangular steel tube guide rail, rectangular steel tube guide rail and rectangular steel tube guide rail is worn pin with the W type of tip degree or V-type and is connected with all adopting being connected of rectangular steel tube guide rail, because W type or V-type are worn the artificial dynamics that the locks error of grasping in the mismachining tolerance of pin and supporting pin-and-hole and construction, make the rivet clasp reliability reduction of its rivet clasp point.And siphon drainge system work can shake the time; High density polyethylene (HDPE) (HDPE) the drainage pipe phenomenon of also can expanding with heat and contract with cold, thus thermal stresses produced; Above two factors all easily produce rivet clasp point and destroy.A large amount of engineering practices prove, often there are W type or V-type to wear shaken pine or shake and take off phenomenon of pin under shock effect when system works, the rivet clasp point is destroyed, if the rivet clasp of square steel card is destroyed, the sinking distortion of rectangular steel tube guide rail and drainage pipe will be caused, even the badly damaged of system can be caused; If the rivet clasp of rivet clasp pipe clamp is destroyed, the stress that drainage pipe varies with temperature generation can superpose, the displacement that namely causes drainage pipe to vary with temperature generation will superpose, thereby cause drainage pipe thermofussion welding interface to be pulled open, the infiltration drainage occurs, and may bring thus great economic loss.
Through retrieval, Intellectual Property in China patent prior art disclosed " a kind of bridge deck siphon drainage system ", the number of applying for a patent: " 201020299586.3 ", it utilizes the difference in height of bridge floor and the potential energy that water has, form negative pressure in the water continuous stream when the hanging pipe end changes standpipe over to and falls, improve drainage efficiency by the hydrocone type rectifier is installed in the dewatering in siphon type mouth; Although improved drainage efficiency, siphon drainge system work can shake the time, and the drainage pipe phenomenon of also can expanding with heat and contract with cold produces thermal stresses; Thereby cause drainage pipe thermofussion welding interface to be pulled open, the infiltration drainage occurs, and may bring thus great economic loss.
The utility model siphon drainage suspension system has changed the fixing means that traditional fixed point coordinates expansion coupling, through strict mechanical analysis, adopts two Secondary Suspensions, rivet clasp point is set and does not establish expansion coupling, and effectively extraction duct shakes; Also can a small amount of hitch point be set according to building structure, reduce system cost and building costs; This system's accessory is prefabricated component, provides a kind of reasonable in design, installs simple and convenient and safe and reliable; Have very strong practicality, be conducive to extensive promotion and application.
The utility model content
The purpose of this utility model is, deficiency for existing siphon drainage suspension system, provide a kind of reasonable in design, install simple and conveniently and safe and reliable, be exclusively used in the siphonic roof storm system of high density polyethylene (HDPE) (HDPE) pipeline and two Secondary Suspension module compositions.
For achieving the above object, technical scheme provided by the utility model is:
A kind of novel siphon drainage suspension system comprises drainage pipe, roof drain, standpipe card; It is characterized in that, it also comprises a Secondary Suspension assembly and two Secondary Suspension assemblies; A wherein said Secondary Suspension assembly connecting building thing body of wall ceiling, described two Secondary Suspension assemblies are suspended under a described Secondary Suspension assembly, and described two Secondary Suspension assemblies connect described drainage pipe and it are sling.
At first installation sheet is fixed on the fixed point of concrete or steel building ceiling, the middle part of installation sheet is welded with nut, each prefabricated slotted eye of two ends.Be welded with 5 millimeters circular holes of each prefabricated diameter on nut, biside plate above the square steel card.To tighten in the nut on the upper end screw-in installation sheet of threaded rod, the lower end screws in the top nut of above-mentioned square steel card and tightens; Forked tail filament is located on the square steel pipe guide rail by the pre-manufactured hole on the square steel card, and once boring, tapping, the locked task completed on the square steel pipe guide rail, so is combined and installed together square steel card rivet clasp, forms a reliable Secondary Suspension assembly.
5 millimeters circular holes of each prefabricated four diameters on square steel connector biside plate, forked tail filament is located on the square steel pipe guide rail by the pre-manufactured hole on the square steel connector, once boring, tapping, the locked task completed is connected and fixed more piece square steel pipe guide rail in twos by described square steel connector.
5 millimeters holes of each prefabricated diameter on two side plates that the suspention pipe clamp is combined with the square steel pipe guide rail, forked tail filament is located on the square steel pipe guide rail by the pre-manufactured hole on the suspention pipe clamp, once boring, tapping, the locked task completed will be suspended the pipe clamp rivet clasp in midair on the square steel pipe guide rail.
Load onto the stop ribbon heater between suspention pipe clamp and drainage pipe, make drainage pipe and suspention pipe clamp form the rivet clasp point, so far consist of the rivet clasp pipe clamp.Between suspention pipe clamp and drainage pipe, the dress rubber packing has just consisted of the guiding pipe clamp; The every 5 mitron length of described drainage pipe arrange a rivet clasp pipe clamp, between rivet clasp pipe clamp and rivet clasp pipe clamp, the guiding pipe clamp are set.
Two Secondary Suspension assemblies comprise suspention pipe clamp, stop ribbon heater, rubber packing; The suspention pipe clamp is fixed on drainage pipe with it under parallel square steel pipe guide rail.Form two stable Secondary Suspension assemblies.When the rivet clasp of forked tail filament can be avoided system works, because vibrations cause getting loose of rivet clasp point; Application stop ribbon heater is arranged on and consists of the rivet clasp point that the rivet clasp pipe clamp forms between suspention pipe clamp and drainage pipe, the stress transfer of expanding with heat and contract with cold that drainage pipe can be varied with temperature generation is applied on the rectangular steel tube guide rail, thereby effectively limit the displacement that drainage pipe varies with temperature generation, avoid drainage pipe thermofussion welding interface to be pulled open, infiltration or drainage occur.
The beneficial effects of the utility model are: the utility model adopts two Secondary Suspensions, has changed the fixing means that traditional fixed point coordinates expansion coupling, through strict mechanical analysis, rivet clasp point is set and does not establish expansion coupling, and effectively extraction duct shakes; System also can arrange a small amount of hitch point according to building structure, reduces system cost and building costs; System's accessory is prefabricated component, and its reasonable in design is installed simple and convenient and safe and reliable; Have very strong practicality, be conducive to extensive promotion and application.
Below in conjunction with accompanying drawing and embodiment, the utility model is further illustrated.
Description of drawings
Fig. 1 is the utility model overall structure schematic diagram;
Fig. 2 is the schematic diagram of the installation sheet in Fig. 1;
Fig. 3 is the schematic diagram of the square steel pipe guide rail in Fig. 1;
Fig. 4 is the schematic diagram of the square steel card in Fig. 1;
Fig. 5 is the schematic diagram of the square steel connector in Fig. 1;
Fig. 6 is the schematic diagram of the suspention pipe clamp in Fig. 1;
Fig. 7 is the schematic diagram of the forked tail filament in Fig. 1.
1-roof drain wherein; The 2-installation sheet; The 3-M10 threaded rod; 4-square steel card; 5-rectangular steel tube guide rail; 6-square steel connector; The 7-forked tail filament; The 8-drainage pipe; 9-suspends pipe clamp in midair; The 91-pipe clamp that leads; 92-rivet clasp pipe clamp; 10-stop ribbon heater; The 11-rubber packing; 12-standpipe card; 13-M18 (20,24) threaded rod; 14-M18 (20,24) installation sheet.
The specific embodiment
Embodiment: see also Fig. 1 to Fig. 7, a kind of novel siphon drainage suspension system that the present embodiment provides, it comprises drainage pipe 8, roof drain 1, standpipe card 12; It also comprises a Secondary Suspension assembly and two Secondary Suspension assemblies; A wherein said Secondary Suspension assembly connecting building thing body of wall ceiling, described two Secondary Suspension assemblies are suspended under a described Secondary Suspension assembly, and described two Secondary Suspension assemblies connect described drainage pipe and it are sling.
A described Secondary Suspension assembly comprises installation sheet 2, square steel card 4, square steel pipe guide rail 5 and forked tail filament 7, and wherein said installation sheet 2 connecting thread bars 3 pass described square steel card 4 and are arranged on square steel pipe guide rail 5; Described square steel card 4 is fixed on square steel pipe guide rail 5 by forked tail filament 7.
When described square steel pipe guide rail 5 is more piece, connect by square steel connector 6 between every two joints, form the square steel pipe guide rail 5 of more piece.
The middle part of described installation sheet 2 is welded with nut 21, each prefabricated slotted eye 22 of two ends.
Be welded with each prefabricated circular hole 41 on steel card nut 42, biside plate above described square steel card 4.
On described square steel connector 6 biside plates, each prefabricated four circular holes, be connected and fixed more piece square steel pipe guide rail 5 in twos by described square steel connector 6.
Described two Secondary Suspension assemblies comprise suspention pipe clamp 9, stop ribbon heater 10, rubber packing 11; Described suspention pipe clamp 9 is fixed on described drainage pipe 8 with it under parallel square steel pipe guide rail 5.
Described stop ribbon heater 10 is arranged between described suspention pipe clamp 9 and described drainage pipe 8, makes drainage pipe 8 and described suspention pipe clamp 9 form the rivet clasp point, consists of rivet clasp pipe clamp 92.
Described rubber packing 11 is arranged between suspention pipe clamp 9 and drainage pipe 8, consists of guiding pipe clamp 91.
The every 5 mitron length of described drainage pipe 8 arrange a rivet clasp pipe clamp 92, and described guiding pipe clamp 91 is arranged between described rivet clasp pipe clamp 92 and rivet clasp pipe clamp 92.
At first the utility model is fixed on installation sheet 2 on the fixed point of concrete or steel building when installing and using, and the middle part of described installation sheet 2 is welded with M10 nut 21, each prefabricated slotted eye 22 of two ends.Be welded with 5 millimeters circular holes 41 of each prefabricated diameter on the nut 42, biside plate of square steel card above square steel card 4.Upper end that will M10 threaded rod 3 screws in M10 nut 21 on installation sheet 2 and tightens, and the lower end screws in nut 42 on above-mentioned square steel card 4 and tightens; Forked tail filament 7 is located on square steel pipe guide rail 5 by the pre-manufactured hole circular port 22 on square steel card 4, and once boring, tapping, the locked task completed on square steel pipe guide rail 5, so is combined and installed together square steel card 4 rivet clasps, forms a reliable Secondary Suspension assembly.
Dress stop ribbon heater 10 between suspention pipe clamp 9 and drainage pipe 8; Make drainage pipe 8 and suspention pipe clamp form the rivet clasp point, so far consist of rivet clasp pipe clamp 92; Between suspention pipe clamp 9 and drainage pipe 8, dress rubber packing 11 has just consisted of guiding pipe clamp 91; Every 5 mitron length arrange a rivet clasp pipe clamp 92, and guiding pipe clamp 91 is set between rivet clasp pipe clamp 92 and rivet clasp pipe clamp 92; Wherein suspend pipe clamp 9 in midair and comprise for the fixing screw 93 of drainage pipe 8, be used for being mutually permanently connected a little 94 with square steel pipe guide rail 5; 5 millimeters circular holes of each prefabricated diameter on two side plates of guiding pipe clamp 91 and rivet clasp pipe clamp 92 and 5 combinations of square steel pipe guide rail, forked tail filament 7 is located on square steel pipe guide rail 5 by the pre-manufactured hole of guiding pipe clamp 91, once boring, tapping, the locked task completed, to lead pipe clamp 91 and rivet clasp pipe clamp 92 is fixed on square steel pipe guide rail 5, drainage pipe 8 is fixed on it on parallel square steel pipe guide rail 5, forms two stable Secondary Suspension assemblies.
For fixing of 8 vertical directions of drainage pipe in native system, adopt M18 installation sheet 14 to be fixed on the fixed point of concrete or steel building, the middle part of M18 installation sheet 14 is welded with nut, each prefabricated slotted eye of two ends equally.Be welded with nut above the standpipe card.To tighten in the nut on an end screw-in M18 installation sheet 14 of M18 threaded rod, the other end screws in standpipe card nut, and is with the standpipe card, that drainage pipe 8 is fixing.
Wherein forked tail filament 7 comprises for fixing tapping lines 71, for putting forth effort hold-doun nut 72; In the time of can avoiding system works with forked tail filament 7 rivet clasps, because vibrations cause getting loose of rivet clasp point; Application stop ribbon heater 10 is arranged on and consists of the rivet clasp point that rivet clasp pipe clamp 92 forms between suspention pipe clamp 9 and drainage pipe 8, the stress transfer of expanding with heat and contract with cold that drainage pipe can be varied with temperature generation is applied on rectangular steel tube guide rail 5, thereby effectively limit the displacement that drainage pipe 8 varies with temperature generation, avoid drainage pipe 8 thermofussion welding interfaces to be pulled open, the infiltration drainage occurs.
The siphonic roof storm system that the utility model provides, the deficiency for existing siphon drainage suspension system is exclusively used in high density polyethylene (HDPE) (HDPE) pipeline and two Secondary Suspension module compositions, reasonable in design, install simple and convenient and safe and reliable.
Native system has changed the fixing means that traditional fixed point coordinates expansion coupling, and through strict mechanical analysis, native system adopts two Secondary Suspensions, rivet clasp point is set and does not establish expansion coupling, and effectively extraction duct shakes; System also can arrange a small amount of hitch point according to building structure, reduces system cost and building costs; System's accessory is prefabricated component, provides a kind of reasonable in design, installs simple and convenient and safe and reliable; Have very strong practicality, be conducive to extensive promotion and application.
The utility model is according to above-described embodiment, adopts structure same or analogous with it and other siphon drainage suspension system of obtaining, all within the utility model protection domain.