CN202990182U - Suspension arm glass rib fixing system - Google Patents

Suspension arm glass rib fixing system Download PDF

Info

Publication number
CN202990182U
CN202990182U CN 201220614758 CN201220614758U CN202990182U CN 202990182 U CN202990182 U CN 202990182U CN 201220614758 CN201220614758 CN 201220614758 CN 201220614758 U CN201220614758 U CN 201220614758U CN 202990182 U CN202990182 U CN 202990182U
Authority
CN
China
Prior art keywords
glass rib
box body
suspension arm
cross
section
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Lifetime
Application number
CN 201220614758
Other languages
Chinese (zh)
Inventor
陈敬申
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Jangho Group Co Ltd
Guangzhou Jangho Curtain Wall System Engineering Co Ltd
Shanghai Jangho Curtain Wall System Engineering Co Ltd
Original Assignee
SHANGHAI JIANGHE WALL SYSTEM ENGINEERING Co Ltd
Beijing Jangho Curtain Wall Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by SHANGHAI JIANGHE WALL SYSTEM ENGINEERING Co Ltd, Beijing Jangho Curtain Wall Co Ltd filed Critical SHANGHAI JIANGHE WALL SYSTEM ENGINEERING Co Ltd
Priority to CN 201220614758 priority Critical patent/CN202990182U/en
Application granted granted Critical
Publication of CN202990182U publication Critical patent/CN202990182U/en
Anticipated expiration legal-status Critical
Expired - Lifetime legal-status Critical Current

Links

Images

Landscapes

  • Securing Of Glass Panes Or The Like (AREA)

Abstract

The utility model relates to a suspension arm glass rib fixing system which comprises an embedded bolt and a metal box, wherein the metal box comprises side plates and a bottom plate; the side plates and the bottom plate are surrounded to form a box body with an opening at one end; the side plates are vertical to the bottom plate; the bottom plate extends out of the side plates with a certain length, and the excessive part of the bottom plate is fixed on the wall space through the embedded bolt so as to allow the whole metal box to be fixed on the wall space; the cross section of the box body is adapted to the cross section that is to be mounted with the suspension arm glass rib and larger than the cross section of the glass rib so as to centrally sleeve the suspension arm glass rib inside; an elastic material is filled in a clearance between the box body and the suspension arm glass rib; a bolt hole is vertically and downwardly arranged in the box body and passes through the side plates; and the bolt passes through the bolt hole to fix the sleeved suspension arm glass rib into the box body from the upper side and the lower side. The suspension arm glass rib fixing system can ensure the structural safety of basic nodes of the suspension arm glass rib, avoid local damage, has long service life and simple structure, and is convenient to mount and low in cost.

Description

Cantilever Glass Rib fixed system
Technical field
The utility model belongs to building field, relates to the device of full glass curtain wall in constructing, and relates in particular to cantilever Glass Rib fixed system.
Background technology
Under the demand and the requirement of architect to permeability of current architectural effect art, cantilever Glass Rib system is used more and more.In prior art, the main bolt that adopts fixes Glass Rib, especially the cantilever Glass Rib.Like this, under the root bending moment effect, usually need more bolt to resist shearing, correspondingly need to open more bolt hole at the end of fixing of Glass Rib, this has not only reduced the cross section of root, and contacting of bolt and glass produced larger stress and concentrated, and destruction all occurs in here thereby make in reality mostly.Especially coastal area, blast is very large, adds the factors such as Large-Span Cantilever, and bolted fixed system originally just has been subject to suitable restriction.
For this reason, need to provide a kind of improved cantilever Glass Rib fixed system.
Summary of the invention
The purpose of this utility model is to provide a kind of cantilever Glass Rib fixed system, and its ability of resisting the end moment of flexure is strong, simple in structure, safety.
For achieving the above object, the utility model adopts following technical scheme:
Cantilever Glass Rib fixed system, it comprises pre-embedded bolt and can; Described can comprises side plate and a base plate, and described side plate and described base plate surround the box body of an end opening and described side plate perpendicular to described base plate; Described base plate exceeds the certain length in described side plate edge, and exceeds the described base plate of part at this and be fixed on metope by pre-embedded bolt, thereby makes whole described can be fixed on metope;
The cross section of the cross section of described box body and the described cantilever Glass Rib that will install adapts and greater than the cross section of described cantilever Glass Rib, so that described cantilever Glass Rib medially is set with wherein; Be filled with elastomeric material in space between described box body and described cantilever Glass Rib;
The setting of described box body verticallydownwardly runs through the bolt hole of its side plate, and bolt passes described bolt hole will be fixed in described box body by sheathed described cantilever Glass Rib from the both sides, up and down.
Preferably, the cross section of described can is rectangle.
The beneficial effects of the utility model are: utilize this cantilever Glass Rib fixed system, Glass Rib and attached weight thereof are born by bolt, and this bolt is only born vertical load, and the moment of flexure that the cantilever Glass Rib is subjected to is born by box and glass finned surface contact position.This cantilever Glass Rib fixed system has increased the end lateral stability effectively, guarantees the structural safety of root node.
Description of drawings
Fig. 1 is the schematic top plan view of the use state of the utility model cantilever Glass Rib fixed system.
Fig. 2 is the A-A view of Fig. 1.
Fig. 3 is the B-B view of Fig. 1.
The specific embodiment
Introduce in detail preferred embodiment of the present utility model below in conjunction with accompanying drawing.
As Fig. 1, Fig. 2, shown in Figure 3, the cantilever Glass Rib fixed system of the preferred embodiment comprises pre-embedded bolt 10 and can 20.
Wherein, can 20 comprises that four side plates 21 and 22, four side plates 21 of a base plate and base plate 22 surround the box body 200 of an end opening 23 and side plate 21 perpendicular to base plate 22.
Base plate 22 exceeds the certain length in side plate 21 edges, and exceeds part base plate 22 at this and be fixed on metope 30 by pre-embedded bolt 10, thereby makes whole can 20 be fixed on metope 30.This fixed form is simple and reliable, convenient operation.
The cross section of the cross section of box body 200 and the cantilever Glass Rib 40 that will install adapts and greater than the cross section (as shown in Figure 3) of cantilever Glass Rib 40, so that cantilever Glass Rib 40 medially is sleeved in box body 200.
In the present embodiment, the cross section of cantilever Glass Rib 40 is rectangle, and correspondingly, the cross section of box body 200 is rectangle, and opening 23 is rectangle, and side plate 21 has certain length.Cantilever Glass Rib 40 is inserted in box body 200 also medially wherein sheathed by opening 23, realize the restriction on vertical direction.For avoiding occuring the local failure problem, be filled with elastomeric material in the space between box body 200 and cantilever Glass Rib 40, elastomeric material can be elastic gum or any suitable substance of the prior art.
As shown in Figure 1 and Figure 2, box body 200 verticallydownwardly settings run through the bolt hole 210 of its up and down side plate, and the bolt hole of two correspondences namely is set on the side plate of up and down in the present embodiment.Bolt 211 passes bolt hole 210, thereby will be fixed in by sheathed cantilever Glass Rib 40 in box body 200 from the both sides, up and down, realizes restriction in a lateral direction.Bolt hole 210 preferably is opened in the medium position of side plate 21 length.
In above-mentioned cantilever Glass Rib fixed system, the weight of cantilever Glass Rib 40 and associate member thereof is born by the bolt 211 at middle part, and 211, this bolt bears vertical load, and moment of flexure E is born by box body 200 and cantilever Glass Rib 40 side plate contact positions.This cantilever Glass Rib fixed system has increased the end lateral stability widely, guarantees the structural safety of root node.
The size of box body 200 need to be customized according to thickness and the width of cantilever Glass Rib 400, and the height of box body 200 (being the length of side plate 21) need to decide according to the size of moment of flexure.
Described above is only preferred embodiment of the present utility model, certainly can not limit protection domain of the present utility model with this.Any equivalents and replacement to technique scheme are all in protection domain of the present utility model.

Claims (2)

1. cantilever Glass Rib fixed system, is characterized in that: comprise pre-embedded bolt and can; Described can comprises side plate and a base plate, and described side plate and described base plate surround the box body of an end opening and described side plate perpendicular to described base plate; Described base plate exceeds the certain length in described side plate edge, and exceeds the described base plate of part at this and be fixed on metope by pre-embedded bolt, thereby makes whole described can be fixed on metope;
The cross section of the cross section of described box body and the described cantilever Glass Rib that will install adapts and greater than the cross section of described cantilever Glass Rib, so that described cantilever Glass Rib medially is set with wherein; Be filled with elastomeric material in space between described box body and described cantilever Glass Rib;
The setting of described box body verticallydownwardly runs through the bolt hole of its side plate, and bolt passes described bolt hole will be fixed in described box body by sheathed described cantilever Glass Rib from the both sides, up and down.
2. cantilever Glass Rib fixed system as claimed in claim 1, it is characterized in that: the cross section of described can is rectangle.
CN 201220614758 2012-11-20 2012-11-20 Suspension arm glass rib fixing system Expired - Lifetime CN202990182U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN 201220614758 CN202990182U (en) 2012-11-20 2012-11-20 Suspension arm glass rib fixing system

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN 201220614758 CN202990182U (en) 2012-11-20 2012-11-20 Suspension arm glass rib fixing system

Publications (1)

Publication Number Publication Date
CN202990182U true CN202990182U (en) 2013-06-12

Family

ID=48561375

Family Applications (1)

Application Number Title Priority Date Filing Date
CN 201220614758 Expired - Lifetime CN202990182U (en) 2012-11-20 2012-11-20 Suspension arm glass rib fixing system

Country Status (1)

Country Link
CN (1) CN202990182U (en)

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN102926492A (en) * 2012-11-20 2013-02-13 广州江河幕墙系统工程有限公司 Suspension arm glass rib fixing system
CN106948721A (en) * 2017-04-25 2017-07-14 沈阳远大铝业工程有限公司 Cladding glass rib stabilizing spring device

Cited By (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN102926492A (en) * 2012-11-20 2013-02-13 广州江河幕墙系统工程有限公司 Suspension arm glass rib fixing system
CN102926492B (en) * 2012-11-20 2015-11-25 江河创建集团股份有限公司 Cantilever Glass Rib fixed system
CN106948721A (en) * 2017-04-25 2017-07-14 沈阳远大铝业工程有限公司 Cladding glass rib stabilizing spring device
CN106948721B (en) * 2017-04-25 2018-11-02 沈阳远大铝业工程有限公司 Cladding glass rib stabilizing spring device

Similar Documents

Publication Publication Date Title
CN205191146U (en) An antidetonation gallows of anti horizontal earthquake power
CN205152782U (en) High -damp rubber support
CN202990182U (en) Suspension arm glass rib fixing system
CN203963248U (en) The fixed base of adjustable-angle and vertical hanger rod connecting piece and diagonal brace link
CN102926492A (en) Suspension arm glass rib fixing system
CN204608591U (en) There is the bridge of shock-damping structure
CN202501101U (en) Cable support arm
CN205791306U (en) Cable testing bridge heavy duty suspension bracket
CN201850679U (en) Removable stone curtain wall hanging assembly
CN109114391A (en) A kind of fixed device of lifter rod lifting
CN202695986U (en) Support bridge
CN204138088U (en) A kind of novel pair of bar hollow cage guide
CN204006429U (en) A kind of equipment mounting bracket for building
CN103174332A (en) Electromagnetic lock of metro safety door
CN105625164A (en) Bridge damping structure
CN203384499U (en) High-seismic-resistance ladder type cable bridge for nuclear island of nuclear power plant
CN205231654U (en) Combined bridge frame
CN207844947U (en) A kind of chassis saddle weight
CN201946411U (en) Sealing structure of diaphragm-type oil storage cabinet
CN207052973U (en) A kind of outdoor electricity distribution cabinet
CN203603312U (en) Integrated house wall
CN204080624U (en) A kind of seamless bridge joint structure
CN206846248U (en) A kind of lifter rod lifting fixing device
CN203066248U (en) Non-build-in layer outer wall used for top plate of basement
CN203889955U (en) Tower crane attachment device of bridge tower

Legal Events

Date Code Title Description
C14 Grant of patent or utility model
GR01 Patent grant
ASS Succession or assignment of patent right

Free format text: FORMER OWNER: JANGHO GROUP CO., LTD. SHANGHAI JIANGHE WALL SYSTEM ENGINEERING CO., LTD.

Effective date: 20130904

Owner name: JANGHO GROUP CO., LTD.

Free format text: FORMER OWNER: BEIJING JANGHO CURTAIN WALL CO., LTD.

Effective date: 20130904

C41 Transfer of patent application or patent right or utility model
C56 Change in the name or address of the patentee
COR Change of bibliographic data

Free format text: CORRECT: ADDRESS; FROM: 511340 GUANGZHOU, GUANGDONG PROVINCE TO: 101300 SHUNYI, BEIJING

CP01 Change in the name or title of a patent holder

Address after: 511340, 25 innovation Avenue, Xintang Town, Guangzhou, Guangdong, Zengcheng

Patentee after: Guangzhou Jangho Curtain Wall System Engineering Co.,Ltd.

Patentee after: JANGHO GROUP Co.,Ltd.

Patentee after: SHANGHAI JANGHO CURTAIN WALL SYSTEM ENGINEERING Co.,Ltd.

Address before: 511340, 25 innovation Avenue, Xintang Town, Guangzhou, Guangdong, Zengcheng

Patentee before: Guangzhou Jangho Curtain Wall System Engineering Co.,Ltd.

Patentee before: Beijing Jangho Curtain Wall Co.,Ltd.

Patentee before: SHANGHAI JANGHO CURTAIN WALL SYSTEM ENGINEERING Co.,Ltd.

TR01 Transfer of patent right

Effective date of registration: 20130904

Address after: 101300 Beijing City, Shunyi District, the north of cattle, No. five street, No. 5

Patentee after: JANGHO GROUP Co.,Ltd.

Address before: 511340, 25 innovation Avenue, Xintang Town, Guangzhou, Guangdong, Zengcheng

Patentee before: Guangzhou Jangho Curtain Wall System Engineering Co.,Ltd.

Patentee before: JANGHO GROUP Co.,Ltd.

Patentee before: SHANGHAI JANGHO CURTAIN WALL SYSTEM ENGINEERING Co.,Ltd.

AV01 Patent right actively abandoned

Granted publication date: 20130612

Effective date of abandoning: 20151125

AV01 Patent right actively abandoned

Granted publication date: 20130612

Effective date of abandoning: 20151125

C25 Abandonment of patent right or utility model to avoid double patenting