Emergency water drainage pipeline of logistics construction Download PDFInfo
- Publication number
- CN202990040U CN202990040U CN 201220608530 CN201220608530U CN202990040U CN 202990040 U CN202990040 U CN 202990040U CN 201220608530 CN201220608530 CN 201220608530 CN 201220608530 U CN201220608530 U CN 201220608530U CN 202990040 U CN202990040 U CN 202990040U
- Authority
- CN
- China
- Prior art keywords
- floor
- water drainage
- construction
- logistics
- drainage pipeline
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Expired - Fee Related
Links
Images
Landscapes
- Sink And Installation For Waste Water (AREA)
Abstract
The utility model belongs to the field of construction equipment engineering and provides an emergency water drainage pipeline of a logistics construction. A floor water drainage pipeline is arranged on a floor of each storey of the logics construction. A storey water drainage opening of each floor water drainage pipeline is formed in a floorslab portion close to a skirting line of each storey. Each floor water drainage pipeline is connected with an outdoor field water drainage system. The emergency water drainage pipeline of the logistics construction has the advantages that when fire breaks out in the logics construction and a large amount of water for fire control is needed or faults that various of water pipelines inside the construction are crashed and damaged and the like occur and a large amount of water needs to be drained, flood damage caused by fire control water drainage or fault water drainage is reduced as much as possible through adoption of effective storey water drainage technology and measurement.
Description
Technical field
The utility model belongs to fixed buildings Construction Facilities Engineering field, is specifically related to the land drainage in logistics construction.
Background technology
In prior art, each floor face of building all requires the water for firefighting facilities such as hydrant and automatic spray are set usually, but the fire-fighting drainage of hydrant, automatic spray shower nozzle need not consider to put out a fire for fire the time.And logistics construction has just required for fire-fighting draining and accident drainage measure, in time discharges excess surface water, in order to avoid this layer goods or bottom floor are caused the dipping loss.Existing routine building drainage system can't satisfy the needs of logistics construction draining.
The utility model content
Technical problem to be solved in the utility model is to provide a kind of emergent drainage pipe of logistics construction, and it can reduce the flood loss that fire extinguishing draining or fault draining bring.
For solving the problems of the technologies described above, basic conception of the present utility model is: on each floor ground of logistics construction, the floor drain pipeline is set, the floor outfall of described floor drain pipeline is arranged on the nearly floor of described each floor skirting position, and the floor drain pipeline is connected with outdoor yard drain system.
The first technical scheme as the utility model basic conception, the floor drain pipeline is connected successively by side wall floor drain, short tube, the down stream tee joint of each floor, the down stream tee joint of each floor is connected with the outdoor drainage standpipe respectively, one end of described side wall floor drain is described floor outfall, the other end is connected in outer wall body with described short tube, the top of described outdoor drainage standpipe arranges abat-vent, and end arranges insect preventing net cover.
The second technical scheme as the utility model basic conception, the floor drain pipeline is connected by short tube, the down stream tee joint of each floor, the down stream tee joint of each floor is connected with the outdoor drainage standpipe respectively, one end of described short tube is described floor outfall, and be embedded in outer wall body, the top of described outdoor drainage standpipe arranges abat-vent, and end arranges insect preventing net cover.
In above-mentioned two kinds of technical schemes, soil stack also can be arranged on indoor, but preferably is arranged on outdoor, constructability, simultaneously also avoid soil stack the indoor destruction that meets accident, caused the inefficacy of whole emergent drainage pipe, and avoided the flood that may cause in lower chamber.
In the utility model, according to logistics construction floor fire compartmentation layout situation, take fire compartmentation etc. as the unit, on floor (containing bottom) ground, in conjunction with architectural plane situation and logistics process, at the nearly floor of skirting position, emergent drainage pipe is set, in time with water for fire extinguishing, fault draining ejectment to outdoor open drain, avoid this layer goods or bottom floor are caused the dipping loss.
The beneficial effects of the utility model are: solve logistics construction inner just in case breaking out of fire, need to employ a large amount of fire-fighting fire extinguishing waters, or the fault such as all kinds of water pipes of bad building interior that bump and the large water gaging of discharging, requirement reduces by taking effective floor water discharge technology and measure the flood loss that fire extinguishing draining or fault draining bring as far as possible.
Description of drawings
The utility model will be further described below in conjunction with accompanying drawing and application process.
Fig. 1 is the utility model embodiment one schematic diagram.
Fig. 2 is I connection detail in Fig. 1.
Fig. 3 is the utility model embodiment two schematic diagrames.
The specific embodiment
Fig. 1 and Fig. 2 are the schematic diagram of embodiment one of the present utility model.As depicted in figs. 1 and 2: on each floor ground of logistics construction, the nearly floor of skirting 9 positions arrange the side wall floor drain 1 that the fire-fighting draining is used, by short tube 2 and down stream tee joint 3 and outdoor drainage standpipe 4 with the horizontal ejectment of indoor ponding to the outdoor rain mouth of a river 10, side wall floor drain 1 and short tube 2 levels are passed exterior wall 8.Side wall floor drain 1 is the floor outfall near the port of skirting, and the direction of arrow in figure is the direction of current, and emergent water can pass through the floor outfall, passes through side wall floor drain 1, short tube 2 and down stream tee joint 3, outdoor drainage standpipe 4 and enters the outdoor rain mouth of a river 10.For preventing that mouse, insect etc. from by outdoor drainage standpipe invasion logistics construction, arranging abat-vent 5 on the top of outdoor drainage standpipe 4, end arranges insect preventing net cover 6.
In embodiment shown in Figure 3 two, on each floor ground of logistics construction, the nearly floor of skirting 9 positions directly arrange short tube 2, short tube 2 is embedded in exterior wall 8, one end is the floor outfall, the other end is connected with down stream tee joint 3, and the down stream tee joint of each floor is connected with outdoor drainage standpipe 4, with the horizontal ejectment of indoor ponding to the outdoor rain mouth of a river 10.On the top of outdoor drainage standpipe 4, abat-vent 5 is set, end arranges insect preventing net cover 6.
In Fig. 1 and Fig. 3, the outdoor rain mouth of a river 10 is only a kind of mode of outdoor yard drain, and protection domain is not limited with diagram.
Above two kinds of schemes that the utility model is implemented to provide are introduced in detail, and for one of ordinary skill in the art, the thought according to the utility model embodiment all will change in specific embodiments and applications.In sum, this description should not be construed as restriction of the present utility model, and all any changes of making according to the utility model design philosophy are all within protection domain of the present utility model.
Claims (3)
1. the emergent drainage pipe of a logistics construction, it is characterized in that: on each floor ground of logistics construction, the floor drain pipeline is set, the floor outfall of described floor drain pipeline is arranged on the nearly floor of described each floor skirting position, and described floor drain pipeline is connected with outdoor yard drain system.
2. the emergent drainage pipe of a kind of logistics construction according to claim 1, it is characterized in that: described floor drain pipeline is by the side wall floor drain (1) of each floor, short tube (2), down stream tee joint (3) connects successively, the down stream tee joint of described each floor (3) is connected with outdoor drainage standpipe (4) respectively, one end of described side wall floor drain (1) is described floor outfall, the other end is connected in outer wall body with described short tube (2), the top of described outdoor drainage standpipe (4) arranges abat-vent (5), end arranges insect preventing net cover (6).
3. the emergent drainage pipe of a kind of logistics construction according to claim 1, it is characterized in that: described floor drain pipeline is connected by short tube (2), the down stream tee joint (3) of each floor, the down stream tee joint of described each floor (3) is connected with outdoor drainage standpipe (4) respectively, one end of described short tube (2) is described floor outfall, and be embedded in outer wall body, the top of described outdoor drainage standpipe (4) arranges abat-vent (5), and end arranges insect preventing net cover (6).
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN 201220608530 CN202990040U (en) | 2012-11-16 | 2012-11-16 | Emergency water drainage pipeline of logistics construction |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN 201220608530 CN202990040U (en) | 2012-11-16 | 2012-11-16 | Emergency water drainage pipeline of logistics construction |
Publications (1)
Publication Number | Publication Date |
---|---|
CN202990040U true CN202990040U (en) | 2013-06-12 |
Family
ID=48561233
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN 201220608530 Expired - Fee Related CN202990040U (en) | 2012-11-16 | 2012-11-16 | Emergency water drainage pipeline of logistics construction |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN202990040U (en) |
Cited By (2)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN102926443A (en) * | 2012-11-16 | 2013-02-13 | 上海现代华盖建筑设计研究院有限公司 | Emergency drainage pipe for logistic building |
CN109811990A (en) * | 2019-03-22 | 2019-05-28 | 中铁建设集团有限公司 | The base station building emergency guarantee 5G that can vertically dispose at a high speed |
-
2012
- 2012-11-16 CN CN 201220608530 patent/CN202990040U/en not_active Expired - Fee Related
Cited By (3)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN102926443A (en) * | 2012-11-16 | 2013-02-13 | 上海现代华盖建筑设计研究院有限公司 | Emergency drainage pipe for logistic building |
CN109811990A (en) * | 2019-03-22 | 2019-05-28 | 中铁建设集团有限公司 | The base station building emergency guarantee 5G that can vertically dispose at a high speed |
CN109811990B (en) * | 2019-03-22 | 2023-10-31 | 中铁建设集团有限公司 | Building emergency guarantee 5G base station capable of being vertically deployed at high speed |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN206752580U (en) | A kind of multi-functional voltage stabilizing good antiscale property fire water box | |
CN106638681A (en) | Integrated pipe gallery | |
CN106955446B (en) | A kind of fire-fighting spray device for construction | |
CN202990040U (en) | Emergency water drainage pipeline of logistics construction | |
CN212730787U (en) | Indoor fire-fighting automatic water-spraying fire-extinguishing system | |
CN201778366U (en) | Sinking-type leak-proof system for toilet | |
CN204898782U (en) | Supply fire -water pond and water tank combination formula system of outdoor fire hydrant water intaking | |
CN102330456B (en) | Riser connecting member for draining at same layer | |
CN102926443A (en) | Emergency drainage pipe for logistic building | |
KR20060091331A (en) | Testing valve box of sprinkler | |
CN102330452B (en) | Overflow-proof same-layer water drainage riser connecting piece | |
CN111623172A (en) | Anti-leakage structure for pipeline penetrating floor slab | |
CN207419877U (en) | A kind of integrated discharge structure of decoration | |
CN202831109U (en) | Same layer water draining device | |
CN202219051U (en) | Tall building fireproof device | |
CN205776816U (en) | A kind of Side fascia waterproof construction system | |
CN107435364A (en) | A kind of campus site rainwater Collection utilization system | |
CN203823319U (en) | H-shaped tube with telescopic joints | |
CN106437842A (en) | Auxiliary transfer pump station of drainage tunnel in subway crossing | |
CN208884626U (en) | Singly build hypogee fire water box | |
CN105544656A (en) | Fire-hydrant water supply system | |
CN207846620U (en) | A kind of water supply and sewage work building blocking device | |
CN206360119U (en) | A kind of Side fascia waterproof construction system | |
CN205276381U (en) | Fire hydrant water supply equipment | |
CN216041541U (en) | Novel drainage system of double-sewer main pipe of building |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
C14 | Grant of patent or utility model | ||
GR01 | Patent grant | ||
CF01 | Termination of patent right due to non-payment of annual fee | ||
CF01 | Termination of patent right due to non-payment of annual fee |
Granted publication date: 20130612 Termination date: 20171116 |