CN202989932U - 一种设有大倾角预应力锚索的h型双排桩结构 - Google Patents
一种设有大倾角预应力锚索的h型双排桩结构 Download PDFInfo
- Publication number
- CN202989932U CN202989932U CN201220661066.1U CN201220661066U CN202989932U CN 202989932 U CN202989932 U CN 202989932U CN 201220661066 U CN201220661066 U CN 201220661066U CN 202989932 U CN202989932 U CN 202989932U
- Authority
- CN
- China
- Prior art keywords
- angle
- row
- campshed
- high inclination
- prestress anchorage
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Expired - Fee Related
Links
- 238000004873 anchoring Methods 0.000 claims description 6
- 238000004519 manufacturing process Methods 0.000 abstract 1
- 238000010276 construction Methods 0.000 description 7
- 238000006073 displacement reaction Methods 0.000 description 4
- 230000002787 reinforcement Effects 0.000 description 4
- 238000010586 diagram Methods 0.000 description 3
- 238000009412 basement excavation Methods 0.000 description 2
- 238000000034 method Methods 0.000 description 2
- 238000004458 analytical method Methods 0.000 description 1
- 230000009286 beneficial effect Effects 0.000 description 1
- 238000010205 computational analysis Methods 0.000 description 1
- 238000005516 engineering process Methods 0.000 description 1
Images
Landscapes
- Rod-Shaped Construction Members (AREA)
Abstract
本实用新型涉及一种设有大倾角预应力锚索的h型双排桩结构,属于建筑基坑工程及边坡工程技术领域。本实用新型包括多组平行排列并呈h型布置的前排桩和后排桩,冠梁Ⅰ、冠梁Ⅱ、连系梁、大倾角预应力锚索和腰梁。前排桩和后排桩的顶端分别设有冠梁Ⅰ和冠梁Ⅱ,联系梁一端与前排桩的桩顶连接、另一端与后排桩通过腰梁半铰接在后排桩的桩顶下方,各组后排桩的桩间等间距或不等间距设置有大倾角预应力锚索。本实用新型通过联系梁连接的前、后排桩形成的h型双排桩整体刚度极大,可提供较大的抗力;且在后排桩桩间打入大倾角预应力锚索之后,能有效地提高支护结构的抗倾覆能力,同时还可适当减少后排桩的桩长以达到节约造价的目的。
Description
技术领域
本实用新型涉及一种设有大倾角预应力锚索的h型双排桩结构,属于建筑基坑工程及边坡工程技术领域。
背景技术
随着我国国民经济的迅速增长,经济社会的快速发展极大地推动了我国城市化进程,使我国的城市建设日新月异。由于在城市化进程中,中心城区的建筑越来越多且越来越密集,特别是高层、超高层建筑的大量发展,建筑物及构筑物向着更大、更深的方向发展,此情形对我们工程技术人员提出了更高的要求,迫切需要我们在建筑基坑及边坡工程领域提出更好地解决此类问题的方法。又因为常规的支护结构形式因其抗倾覆及位移很难满足目前现有的设计规范要求且水平或小角度锚索存在侵入相邻地块的可能性,因而有其一定的局限性,同时其很难再满足建筑基坑工程及边坡工程领域在此类工程实际问题的设计及施工的需要。因此,本实用新型支护结构为一种设有大倾角预应力锚索的h型双排桩结构便在这种工程背景下应运而生。
发明内容
本实用新型的目的在于提供一种可提高抗倾覆能力又能减少位移、且尽可能避免锚索侵入相邻地块的设有大倾角预应力锚索的h型双排桩支护结构。
本实用新型的技术方案是:一种设有大倾角预应力锚索的h型双排桩结构,包括多组平行排列并呈h型布置的前排桩1和后排桩2,冠梁Ⅰ3、冠梁Ⅱ4、连系梁5、大倾角预应力锚索6和腰梁8。前排桩1和后排桩2的顶端分别设有冠梁Ⅰ3和冠梁Ⅱ4,联系梁5一端与前排桩1的桩顶连接、另一端与后排桩2通过腰梁8半铰接在后排桩2的桩顶下方,各组后排桩2的桩间等间距或不等间距设置有大倾角预应力锚索6。
所述后排桩2的悬臂高度为2.5m~4m。
所述大倾角预应力锚索6的锚头锚固在与后排桩2半铰接的腰梁8上,大倾角预应力锚索6向下打入的角度为45°~75°。
所述大倾角预应力锚索6的锚固段7的长度大于6m。
所述前排桩1和后排桩2的桩体平面布置呈矩形阵列排布。
本实用新型的使用步骤是:
(1)根据场地地质条件和基坑安全稳定计算分析的要求,确定前、后排桩的桩间距、排距及后排桩的悬臂高度;确定大倾角预应力锚索的锚固段、自由段长度、锚索间距及向下打入角度;确定前、后排桩的桩长、桩身截面强度及进行配筋设计;确定前、后排桩的桩顶冠梁截面尺寸并进行配筋计算;确定联系梁的截面尺寸、间距及配筋量;确定腰梁的截面尺寸并进行配筋计算,进行确定基坑开挖施工工序。
(2)施工后排桩2;桩型由设计确定。
(3)施工前排桩1;桩型由设计确定。
(4)施工大倾角预应力锚索。
(5)施工前、后排桩的桩顶冠梁、联系梁及腰梁,使整个支护体系形成一个整体,各部分协同受力变形。
(6)对大倾角锚索施加预应力;在后排桩的桩间处打入大倾角预应力锚索之后,能有效地提高支护结构的抗倾覆能力,同时还能够减少支护结构的位移且避免了锚索侵入相邻地块的可能。
(7)土方的开挖及运输。
本实用新型的有益效果是:通过联系梁连接的前、后排桩形成的h型双排桩整体刚度极大,可提供较大的抗力;且在后排桩桩间打入大倾角预应力锚索之后,能有效地提高支护结构的抗倾覆能力,还能够减少支护结构的位移且避免了锚索侵入相邻地块的可能,同时还可适当减少后排桩的桩长以达到节约造价的目的。
附图说明
图1为本实用新型平面布置示意图;
图2为本实用新型横向剖面示意图;
图3为本实用新型纵向剖面示意图;
图中各标号为:1:前排桩,2:后排桩,3:冠梁Ⅰ,4:冠梁Ⅱ,5:连系梁,6:大倾角预应力锚索,7:锚固段,8:腰梁。
具体实施方式
下面结合附图和实施例,对本实用新型作进一步说明,但本实用新型的内容并不限于所述范围。
实施例1:如图1-3所示,一种设有大倾角预应力锚索的h型双排桩结构,包括6组平行排列并呈h型布置的前排桩1和后排桩2,冠梁Ⅰ3、冠梁Ⅱ4、连系梁5、大倾角预应力锚索6和腰梁8。前排桩1和后排桩2的顶端分别设有冠梁Ⅰ3和冠梁Ⅱ4,联系梁5一端与前排桩1的桩顶连接、另一端与后排桩2通过腰梁8半铰接在后排桩2的桩顶下方,各组后排桩2的桩间等间距设置有大倾角预应力锚索6。后排桩2的悬臂高度为2.5m。大倾角预应力锚索6的锚头锚固在与后排桩2半铰接的腰梁8上,大倾角预应力锚索6向下打入的角度为45°。大倾角预应力锚索6的锚固段7的长度为7m。前排桩1和后排桩2的桩体平面布置呈矩形阵列排布。
实施例2:如图1-3所示,一种设有大倾角预应力锚索的h型双排桩结构,包括12组平行排列并呈h型布置的前排桩1和后排桩2,冠梁Ⅰ3、冠梁Ⅱ4、连系梁5、大倾角预应力锚索6和腰梁8。前排桩1和后排桩2的顶端分别设有冠梁Ⅰ3和冠梁Ⅱ4,联系梁5一端与前排桩1的桩顶连接、另一端与后排桩2通过腰梁8半铰接在后排桩2的桩顶下方,各组后排桩2的桩间不等间距设置有大倾角预应力锚索6。后排桩2的悬臂高度为4m。大倾角预应力锚索6的锚头锚固在与后排桩2半铰接的腰梁8上,大倾角预应力锚索6向下打入的角度为75°。大倾角预应力锚索6的锚固段7的长度为6.5m。
实施例3:如图1-3所示,一种设有大倾角预应力锚索的h型双排桩结构,包括9组平行排列并呈h型布置的前排桩1和后排桩2,冠梁Ⅰ3、冠梁Ⅱ4、连系梁5、大倾角预应力锚索6和腰梁8。前排桩1和后排桩2的顶端分别设有冠梁Ⅰ3和冠梁Ⅱ4,联系梁5一端与前排桩1的桩顶连接、另一端与后排桩2通过腰梁8半铰接在后排桩2的桩顶下方,各组后排桩2的桩间等间距设置有大倾角预应力锚索6。后排桩2的悬臂高度为3.5m。大倾角预应力锚索6的锚头锚固在与后排桩2半铰接的腰梁8上,大倾角预应力锚索6向下打入的角度为60°。
Claims (5)
1.一种设有大倾角预应力锚索的h型双排桩结构,其特征在于:包括多组平行排列并呈h型布置的前排桩(1)和后排桩(2),冠梁Ⅰ(3)、冠梁Ⅱ(4)、连系梁(5)、大倾角预应力锚索(6)和腰梁(8);前排桩(1)和后排桩(2)的顶端分别设有冠梁Ⅰ(3)和冠梁Ⅱ(4),联系梁(5)一端与前排桩(1)的桩顶连接、另一端与后排桩(2)通过腰梁(8)半铰接在后排桩(2)的桩顶下方,各组后排桩(2)的桩间等间距或不等间距设置有大倾角预应力锚索(6)。
2.根据权利要求1所述的设有大倾角预应力锚索的h型双排桩结构,其特征在于:所述后排桩(2)的悬臂高度为2.5m~4m。
3.根据权利要求1所述的设有大倾角预应力锚索的h型双排桩结构,其特征在于:所述大倾角预应力锚索(6)的锚头锚固在与后排桩(2)半铰接的腰梁(8)上,大倾角预应力锚索(6)向下打入的角度为45°~75°。
4.根据权利要求3所述的设有大倾角预应力锚索的h型双排桩结构,其特征在于:所述大倾角预应力锚索(6)的锚固段(7)的长度大于6m。
5.根据权利要求1所述的设有大倾角预应力锚索的h型双排桩结构,其特征在于:所述前排桩(1)和后排桩(2)的桩体平面布置呈矩形阵列排布。
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201220661066.1U CN202989932U (zh) | 2012-12-05 | 2012-12-05 | 一种设有大倾角预应力锚索的h型双排桩结构 |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201220661066.1U CN202989932U (zh) | 2012-12-05 | 2012-12-05 | 一种设有大倾角预应力锚索的h型双排桩结构 |
Publications (1)
Publication Number | Publication Date |
---|---|
CN202989932U true CN202989932U (zh) | 2013-06-12 |
Family
ID=48561126
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN201220661066.1U Expired - Fee Related CN202989932U (zh) | 2012-12-05 | 2012-12-05 | 一种设有大倾角预应力锚索的h型双排桩结构 |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN202989932U (zh) |
Cited By (7)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN103643687A (zh) * | 2013-12-25 | 2014-03-19 | 中铁二院工程集团有限责任公司 | 框架式抗滑路堑结构 |
CN106968258A (zh) * | 2017-05-23 | 2017-07-21 | 深圳宏业基岩土科技股份有限公司 | 基坑侧壁有隧道的基坑支护结构 |
CN107130613A (zh) * | 2017-05-19 | 2017-09-05 | 重庆大学 | 大跨隧道正穿既有挡墙的支挡结构及其施工方法 |
CN107165174A (zh) * | 2017-05-23 | 2017-09-15 | 深圳宏业基岩土科技股份有限公司 | 椅式门架支护结构 |
CN110295611A (zh) * | 2019-08-05 | 2019-10-01 | 左克伟 | 基坑反向加载支护方法 |
CN112726639A (zh) * | 2020-12-22 | 2021-04-30 | 广州市设计院 | 边坡支护结构及其施工方法 |
CN113322986A (zh) * | 2021-06-11 | 2021-08-31 | 山东建筑大学 | 一种桩-锚-梁复合消能减震结构体系及施工方法 |
-
2012
- 2012-12-05 CN CN201220661066.1U patent/CN202989932U/zh not_active Expired - Fee Related
Cited By (10)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN103643687A (zh) * | 2013-12-25 | 2014-03-19 | 中铁二院工程集团有限责任公司 | 框架式抗滑路堑结构 |
CN107130613A (zh) * | 2017-05-19 | 2017-09-05 | 重庆大学 | 大跨隧道正穿既有挡墙的支挡结构及其施工方法 |
CN107130613B (zh) * | 2017-05-19 | 2019-06-07 | 重庆大学 | 大跨隧道正穿既有挡墙的支挡结构及其施工方法 |
CN106968258A (zh) * | 2017-05-23 | 2017-07-21 | 深圳宏业基岩土科技股份有限公司 | 基坑侧壁有隧道的基坑支护结构 |
CN107165174A (zh) * | 2017-05-23 | 2017-09-15 | 深圳宏业基岩土科技股份有限公司 | 椅式门架支护结构 |
CN106968258B (zh) * | 2017-05-23 | 2020-04-28 | 深圳宏业基岩土科技股份有限公司 | 基坑侧壁有隧道的基坑支护结构 |
CN107165174B (zh) * | 2017-05-23 | 2020-10-16 | 深圳宏业基岩土科技股份有限公司 | 椅式门架支护结构 |
CN110295611A (zh) * | 2019-08-05 | 2019-10-01 | 左克伟 | 基坑反向加载支护方法 |
CN112726639A (zh) * | 2020-12-22 | 2021-04-30 | 广州市设计院 | 边坡支护结构及其施工方法 |
CN113322986A (zh) * | 2021-06-11 | 2021-08-31 | 山东建筑大学 | 一种桩-锚-梁复合消能减震结构体系及施工方法 |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN202989932U (zh) | 一种设有大倾角预应力锚索的h型双排桩结构 | |
CN202936797U (zh) | 一种设有斜撑的双排桩支护结构 | |
CN202152463U (zh) | 基础承压梁板式风力发电塔基础 | |
CN203307817U (zh) | 一种设有钢管预应力混凝土连接前后排桩的双排桩结构 | |
CN203855866U (zh) | 工便梁大跨度框架桥架空顶 | |
CN203684230U (zh) | 一种预制双排桩结构 | |
CN203923924U (zh) | 0号段托架预压装置 | |
CN101761090A (zh) | 海上风电机组的空间桁架式多桶基础 | |
CN102852156A (zh) | 一种复合桩基础结构 | |
CN102535525B (zh) | 一种利用抗浮锚杆支撑地下筏板上排筏板钢筋架的方法 | |
CN104594360A (zh) | 一种复合式双排桩基坑支护结构 | |
CN201593193U (zh) | 海上风电机组的空间桁架式多桶基础 | |
CN202787296U (zh) | 一种锚杆风机基础结构 | |
CN203034478U (zh) | 锚杆/索悬臂式挡土墙 | |
CN103981799B (zh) | 一种钢管混凝土张弦劲性梁及其施工方法 | |
CN102852155A (zh) | 一种复合桩基础 | |
CN103147443A (zh) | 基坑支护结构及其施工方法 | |
CN110374645A (zh) | 一种特厚煤层大断面窄煤柱沿空巷道等效支护方法 | |
CN105756077A (zh) | 基础环岩石锚杆基础 | |
CN205399464U (zh) | 基础环岩石锚杆基础 | |
CN201151913Y (zh) | 新型结构斜插挖孔桩基础 | |
CN201826322U (zh) | 筒型基础构件 | |
CN206680997U (zh) | 一种用于输电铁塔拉索基础的螺旋桩结构 | |
CN203129155U (zh) | 明梁暗肋型格构式锚索基坑支护结构 | |
CN208088311U (zh) | 桩后反压减弯型桩板支护结构 |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
C14 | Grant of patent or utility model | ||
GR01 | Patent grant | ||
CF01 | Termination of patent right due to non-payment of annual fee |
Granted publication date: 20130612 Termination date: 20141205 |
|
EXPY | Termination of patent right or utility model |