CN202985764U - 一种用于叠合板配管预留接口施工的模块 - Google Patents

一种用于叠合板配管预留接口施工的模块 Download PDF

Info

Publication number
CN202985764U
CN202985764U CN 201220727287 CN201220727287U CN202985764U CN 202985764 U CN202985764 U CN 202985764U CN 201220727287 CN201220727287 CN 201220727287 CN 201220727287 U CN201220727287 U CN 201220727287U CN 202985764 U CN202985764 U CN 202985764U
Authority
CN
China
Prior art keywords
pipe
construction
module
superimposed sheet
model block
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Fee Related
Application number
CN 201220727287
Other languages
English (en)
Inventor
蔡宏平
沈亮
张�林
周小军
陈海东
梅九虎
李小鹏
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Zhongnan Construction (Nantong) Construction Industry Co., Ltd.
Original Assignee
NANTONG CONSTRUCTION GENERAL CONTRACTOR CO Ltd
Zhongnan Construction (shenyang) Construction Industry Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by NANTONG CONSTRUCTION GENERAL CONTRACTOR CO Ltd, Zhongnan Construction (shenyang) Construction Industry Co Ltd filed Critical NANTONG CONSTRUCTION GENERAL CONTRACTOR CO Ltd
Priority to CN 201220727287 priority Critical patent/CN202985764U/zh
Application granted granted Critical
Publication of CN202985764U publication Critical patent/CN202985764U/zh
Anticipated expiration legal-status Critical
Expired - Fee Related legal-status Critical Current

Links

Images

Landscapes

  • Installation Of Indoor Wiring (AREA)

Abstract

本实用新型公开一种用于叠合板配管预留接口施工的模块,所述模块为水泥砂浆套管块,其厚度与叠合板的厚度相等,两侧开有贯通孔,所述贯通孔便于两根线管穿过;其结构简单,成本低廉,且施工过程中省掉了模块拆除的时间,解决了在预制构件台模生产时,管子无法伸出,留到和台模面平齐又不便于管子的接管的问题。

Description

一种用于叠合板配管预留接口施工的模块
技术领域
本实用新型涉及一种用于叠合板配管预留接口施工的模块。
背景技术
预制装配整体式剪力墙结构的叠合板上许多灯座盒需要通过配管将电线接通到墙上的开关盒上,即通常所说的二次配管。在预制装配建筑中,叠合板上的电线配管需要在叠合板的适当的位置留着预留孔,便于在填充墙砌筑时进行二次配管,将板上的电线管接入到墙内的开关盒上。
叠合板线管接入填充墙处的预留孔,在现浇结构中往往直接伸出电线管。但在预制构件台模生产时,由于底模是流水线上的全钢台模,管子无法伸出,留到和台模面平齐又不便于管子的接管。
实用新型内容
实用新型目的:本实用新型的目的在于针对现有技术的不足,提供一种用于叠合板配管预留接口施工的模块,解决了在预制构件台模生产时,管子无法伸出,留到和台模面平齐又不便于管子的接管的问题。
技术方案:本实用新型所述的一种用于叠合板配管预留接口的模块,所述模块为水泥砂浆套管块,其厚度与叠合板的厚度相等,两侧开有贯通孔,所述贯通孔便于两根线管穿过。
进一步地,所述贯通孔截面的宽度大于或等于50mm。
一种叠合板配管预留接口的施工工艺,包括如下步骤:首先制作上述的模块;然后将制作好的模块固定到台模上;最后在台模上浇筑叠合板,模块直接浇筑在叠合板上;省掉了拆除的时间,同时砂浆块的成本比较低,并且便于提前预制。
进一步地,所述模块通过磁铁盒吸附在台模上予以固定。
填充墙砌筑前先将线管从该预留口中接出,砌筑时先和墙内的二次配管连接上,完成完整的配管工作。
本实用新型与现有技术相比,其有益效果是:本实用新型所述的用于叠合板配管预留接口施工的模块,该模块结构简单,成本低廉,且施工过程中省掉了模块拆除的时间,解决了在预制构件台模生产时,管子无法伸出,留到和台模面平齐又不便于管子的接管的问题。
附图说明
图1为实施例中所述模块的示意图。
图2为实施例中在台模上浇筑成型的叠合板预制层示意图。
图中:1:模块;2:台模;3:叠合板。
具体实施方式
下面对本实用新型技术方案进行详细说明,但是本实用新型的保护范围不局限于所述实施例。
如图1和2所示,一种用于叠合板配管预留接口施工的模块,所述模块1为水泥砂浆套管块,其厚度与叠合板的厚度相等,两侧开有贯通孔,所述贯通孔截面的宽度大于或等于50mm,所述贯通孔便于两根线管穿过。
一种叠合板配管预留接口的施工工艺,包括如下步骤:首先制作上述的模块1;然后将制作好的模块1通过磁铁盒吸附在台模2上予以固定;最后在台模2上浇筑叠合板3,模块1直接浇筑在叠合板3上。
填充墙砌筑前先将线管从该预留口中接出,砌筑时先和墙内的二次配管连接上,完成完整的配管工作。
如上所述,尽管参照特定的优选实施例已经表示和表述了本实用新型,但其不得解释为对本实用新型自身的限制。在不脱离所附权利要求定义的本实用新型的精神和范围前提下,可对其在形式上和细节上作出各种变化。

Claims (2)

1.一种用于叠合板配管预留接口施工的模块,其特征在于,所述模块为水泥砂浆套管块,其厚度与叠合板的厚度相等,两侧开有贯通孔,所述贯通孔便于两根线管穿过。
2.根据权利要求1所述的用于叠合板配管预留接口施工的模块,其特征在于,所述贯通孔截面宽度大于或等于50mm。
CN 201220727287 2012-12-26 2012-12-26 一种用于叠合板配管预留接口施工的模块 Expired - Fee Related CN202985764U (zh)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN 201220727287 CN202985764U (zh) 2012-12-26 2012-12-26 一种用于叠合板配管预留接口施工的模块

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN 201220727287 CN202985764U (zh) 2012-12-26 2012-12-26 一种用于叠合板配管预留接口施工的模块

Publications (1)

Publication Number Publication Date
CN202985764U true CN202985764U (zh) 2013-06-12

Family

ID=48556981

Family Applications (1)

Application Number Title Priority Date Filing Date
CN 201220727287 Expired - Fee Related CN202985764U (zh) 2012-12-26 2012-12-26 一种用于叠合板配管预留接口施工的模块

Country Status (1)

Country Link
CN (1) CN202985764U (zh)

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN103015617A (zh) * 2012-12-26 2013-04-03 中南建设(沈阳)建筑产业有限公司 一种用于叠合板配管预留接口施工的模块及其施工工艺

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN103015617A (zh) * 2012-12-26 2013-04-03 中南建设(沈阳)建筑产业有限公司 一种用于叠合板配管预留接口施工的模块及其施工工艺

Similar Documents

Publication Publication Date Title
CN203022024U (zh) 一种管廊现浇施工整体移动式模架
CN203420403U (zh) 一种基于线盒与线管安装预制砌块的填充墙砌筑结构
CN106272951A (zh) 组合模具预制混凝土墙板技术
CN201601444U (zh) 浇注母线槽用接头盒
CN208343121U (zh) 预制装配式钢结构混凝土墙板模具
CN202985764U (zh) 一种用于叠合板配管预留接口施工的模块
CN207256481U (zh) 一种具备钢筋骨架整体入模功能的快拆式pc墙板模具
CN203441108U (zh) 钢筋混凝土过梁中穿电管施工结构
CN107263681A (zh) 一种具备钢筋骨架整体入模功能的快拆式pc墙板模具
CN203947667U (zh) 蒸压加气混凝土板
CN103015617A (zh) 一种用于叠合板配管预留接口施工的模块及其施工工艺
CN202731935U (zh) 一种隧道衬砌台车预留槽
CN204136200U (zh) 一种用于预制电缆槽盖板的整体模板
CN203452335U (zh) 建筑工程水电安装结构
CN203654882U (zh) 一种预制混凝土组合临时墙
CN204081134U (zh) 预制混凝土墙体构件
CN203346950U (zh) 高层建筑临时供水管道暗敷构造
CN206542144U (zh) 一种预制集成线盒建筑构件
CN202689323U (zh) 一种提高墙板和墙板之间剪切力的墙板
CN203339577U (zh) 一种电缆排管施工装置
CN216587897U (zh) 一种预制混凝土卫生间底盘
CN202913698U (zh) 预制叠合楼板内预埋电源接线盒成型模具
CN203438384U (zh) 单边开口立式脱模悬辊模
CN204604539U (zh) 一种预制楼梯模具
CN205153283U (zh) 一种预制抽芯成孔板

Legal Events

Date Code Title Description
C14 Grant of patent or utility model
GR01 Patent grant
CP01 Change in the name or title of a patent holder
CP01 Change in the name or title of a patent holder

Address after: 110000, No. twenty-two, No. 45, Shenyang economic and Technological Development Zone, Shenyang, Liaoning

Co-patentee after: Jiangsu Zhongnan Construction Industry Group Co., Ltd.

Patentee after: Zhongnan Construction (Shenyang) Construction Industry Co., Ltd.

Address before: 110000, No. twenty-two, No. 45, Shenyang economic and Technological Development Zone, Shenyang, Liaoning

Co-patentee before: Nantong Construction General Contractor Co., Ltd.

Patentee before: Zhongnan Construction (Shenyang) Construction Industry Co., Ltd.

TR01 Transfer of patent right
TR01 Transfer of patent right

Effective date of registration: 20170712

Address after: 226333, Jiangsu Binhai Industrial Park, Nantong province started the Southern District

Patentee after: Zhongnan Construction (Nantong) Construction Industry Co., Ltd.

Address before: 110000, No. twenty-two, No. 45, Shenyang economic and Technological Development Zone, Shenyang, Liaoning

Co-patentee before: Jiangsu Zhongnan Construction Industry Group Co., Ltd.

Patentee before: Zhongnan Construction (Shenyang) Construction Industry Co., Ltd.

CF01 Termination of patent right due to non-payment of annual fee
CF01 Termination of patent right due to non-payment of annual fee

Granted publication date: 20130612

Termination date: 20181226