CN202954747U - Drainage and production string of coal-bed gas well - Google Patents

Drainage and production string of coal-bed gas well Download PDF

Info

Publication number
CN202954747U
CN202954747U CN 201220569338 CN201220569338U CN202954747U CN 202954747 U CN202954747 U CN 202954747U CN 201220569338 CN201220569338 CN 201220569338 CN 201220569338 U CN201220569338 U CN 201220569338U CN 202954747 U CN202954747 U CN 202954747U
Authority
CN
China
Prior art keywords
pump
oil pipe
bed gas
gas well
coal
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Lifetime
Application number
CN 201220569338
Other languages
Chinese (zh)
Inventor
李玉魁
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
BEIJING JIUZUN ENERGY TECHNOLOGY Co Ltd
Original Assignee
BEIJING JIUZUN ENERGY TECHNOLOGY Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by BEIJING JIUZUN ENERGY TECHNOLOGY Co Ltd filed Critical BEIJING JIUZUN ENERGY TECHNOLOGY Co Ltd
Priority to CN 201220569338 priority Critical patent/CN202954747U/en
Application granted granted Critical
Publication of CN202954747U publication Critical patent/CN202954747U/en
Anticipated expiration legal-status Critical
Expired - Lifetime legal-status Critical Current

Links

Images

Landscapes

  • Rigid Pipes And Flexible Pipes (AREA)

Abstract

The utility model discloses a drainage and production string of coal-bed gas well. The drainage and production string of coal-bed gas well comprising a tubing assembly, a pump and a screen pipe arranged under a seam floor. The pump is connected under the tubing assembly, the screen pipe is connected under the pump, the tubing assembly is connected in a production casing, and the bottom of the screen pipe is blocked through a plug. The drainage and production string of coal-bed gas well has the advantages that the structure is simple, gas and water can be effectively separated without a gas anchor, the pump inspection circle can be largely prolonged, the need for continuous and stable production of the coal-bed gas well can be fully met, the production cost can be reduced, and the production aging can be increased.

Description

The coal bed gas well array is adopted tubing string
Technical field
The utility model relates to a kind of coal bed gas well array and adopts tubing string, it is by adjustment and combination to the flow string structure, can carry out in the down-hole efficient gas-water separation, can significantly extend pump detection period, can satisfy the continual and steady needs of producing of coal bed gas well fully, thereby reduced cost of production, improved the production timeliness.
Background technology
Traditional coal bed gas well flow string comprises the oil pipe component that connects successively from top to bottom, pump and screen casing, and gas anchor also need be installed in the top of screen casing.For the impact (air-resistance phenomenon) on tubular pump fixing valve of the methane gas that reduces output, need to the upper part, gas anchor (being used for gas-water separation) be installed at intake (screen casing).
Traditional coal bed gas well flow string is produced its separating effect of the well of tolerance more than 500 cubic metres daily very undesirable in actual use.The one, the standing valve of tubing pump is not closed completely by gases affect to cause leakage serious, the 2nd, be in all the time the compression and expansion state under the pressure that in pump chamber, gas produces and suction in the piston back-and-forth movement process, can not make to be full of liquid in pump chamber, the direct result that both causes is exactly not produce water.Coal bed gas well makes methane gas obtain desorb and passes through the production casing output by continuously carrying out drainage and step-down, in case tubing pump is draining effectively, coal seam water will be assembled in sleeve pipe so, liquid level will raise naturally, consequently the coal seam back pressure raises, and methane gas can not the desorb output.
The utility model content
The purpose of this utility model is, provide a kind of coal bed gas well array to adopt tubing string, it is by adjustment and combination to the flow string structure, can carry out in the down-hole efficient gas-water separation, can significantly extend pump detection period, can satisfy the continual and steady needs of producing of coal bed gas well fully, thereby reduce cost of production, improve the production timeliness.
Above-mentioned purpose of the present utility model can adopt following technical proposal to realize:
A kind of coal bed gas well array is adopted tubing string, and it comprises oil pipe component, and pump and be positioned at the screen casing of seat earth below, pump are connected to the oil pipe component lower end, and screen casing is connected to the below of pump, and described oil pipe component is connected to the inside of production casing, and the bottom of screen casing is stopped up with blocking piece.
Coal bed gas well array as above is adopted tubing string, described oil pipe component comprises oil pipe, and the outside of oil pipe is equipped with tubing centrilizer, is provided with sucker rod and oil pumping rod centering device in oil pipe, oil pumping rod centering device is connected to the outside of sucker rod, and the lower end of sucker rod connects the piston of said pump.
Coal bed gas well array as above is adopted tubing string, described oil pipe component also comprises data cable, described data cable is fixed on the outside of described oil pipe by cable card, tubing centrilizer, cable is positioned in the top of tubing centrilizer, the below of described oil pipe is provided with the PGS that cable connects, the lower end connecting sensor of data cable.
Coal bed gas well array as above is adopted tubing string, and described pump is tubing pump, and described blocking piece is female plug.
Characteristics of the present utility model and advantage are: it is simple in structure, do not need gas anchor can realize efficient gas-water separation yet, can significantly extend pump detection period, can satisfy the continual and steady needs of producing of coal bed gas well fully, thereby reduced cost of production, improved the production timeliness.
Description of drawings
In order to be illustrated more clearly in the technical scheme in the utility model embodiment, during the below will describe embodiment, the accompanying drawing of required use is done to introduce simply, apparently, accompanying drawing in the following describes is only embodiment more of the present utility model, for those of ordinary skills, under the prerequisite of not paying creative work, can also obtain according to these accompanying drawings other accompanying drawing.
Fig. 1 is the structural representation that coal bed gas well array of the present utility model is adopted tubing string.
The specific embodiment
Below in conjunction with the accompanying drawing in the utility model embodiment, the technical scheme in the utility model embodiment is clearly and completely described, obviously, described embodiment is only the utility model part embodiment, rather than whole embodiment.Based on the embodiment in the utility model, those of ordinary skills are not making the every other embodiment that obtains under the creative work prerequisite, all belong to the scope of the utility model protection.
The utility model proposes a kind of coal bed gas well array and adopt tubing string, it comprises oil pipe component 1, pump 2 and the screen casing 4 that is positioned at seat earth 3 belows, pump 2 is connected to the lower end of oil pipe component 1, screen casing 4 is connected to the below of pump 2, described oil pipe component 1 is connected to the inside of production casing 5, and the bottom of screen casing 4 is stopped up with blocking piece 6.
The row of the present embodiment adopts tubing string does not need gas anchor, be positioned at the below of seat earth 3 due to screen casing 4, for example be positioned at seat earth 3 following 10 meters, coal seam liquid Y enters gathering downwards naturally under Action of Gravity Field after production casing 5, and under the effect of pump 2, enter in oil pipe component 1 from screen casing 4; Methane gas G in the coal seam desorb enter production casing 5 rear on assemble, can not enter under Action of Gravity Field in screen casing 4, so just realized the purpose of gas-water separation.That is to say, the present embodiment be in the situation that also can thoroughly separate air water without gas anchor, thereby guaranteed the continuous and stable production of draining aerogenesis.
According to an embodiment of the present utility model, described oil pipe component 1 comprises oil pipe 1a, the outside of oil pipe 1a is equipped with tubing centrilizer 1b, tubing centrilizer 1b is used for avoiding the electronic pressure gauge data cable to wear and tear in the borehole wall, be provided with sucker rod 1c and oil pumping rod centering device 1d in oil pipe 1a, oil pumping rod centering device 1e is connected to the outside of sucker rod 1c, and the lower end of sucker rod 1c connects the piston 2a of the piston 2 of said pump.In the present embodiment, the coal seam liquid Y that enters screen casing 4 enters in oil pipe 1a by pump 2, and by sucker rod 1c, coal seam liquid Y is retracted to outside pit shaft.Wherein, coal seam liquid is mainly water, can contain a small amount of coal dust.
Described oil pipe component 1 also comprises data cable 1e, described data cable 1e is fixed on the outside of described oil pipe 1a by cable card 1f and tubing centrilizer 1b, cable card 1f is positioned at the top of tubing centrilizer 1b, the below of described oil pipe is provided with the PGS 1g that cable connects, the lower end connecting sensor 1g of data cable 1e.
Described pump 2 can be tubing pump, and described blocking piece 6 can be female plug.
In addition, the top of production casing 5 is provided with surface pipe 5a.
Advantage and the effect of the utility model embodiment are as follows:
1, can effectively carry out gas-water separation in the down-hole, avoid stopping well because of what gases affect caused.
2, simplify flow string, reduce production costs.
3, extend pump detection period, realize continuous and stable production.
4, the tubular column structure of the present embodiment is reasonable, and gas-water separation is respond well, through the experiment to 56 mouthfuls of wells, causes stopping well or inspection pump without a bite well because of gases affect.
5, on market, every gas anchor price is 3500.00 yuan, because the coal bed gas well flow string of the present embodiment does not need gas anchor, therefore, but 3500.00 yuan of every mouthful of well direct saving costs.
The every inspection pump of coal bed gas well once, pump detection and workover expense is 25000.00 yuan, calculates by twice inspection pump every year on average, it is 50000.00 yuan that every mouthful of well was saved the pump detection and workover expense in 1 year.
If gas production before coal bed gas well is examined and will be recovered after pump needs one month at least at every turn, three months at most, every month every mouthful of well cost of production in 20000.00 yuan of left and right (containing the electricity charge, labour cost etc.)
As can be seen from the above data, use the coal bed gas well array of the present embodiment to adopt tubing string, every mouthful of well can save production cost more than 70000.00 yuan every year at least.
The above is only several embodiment of the present utility model, and those skilled in the art can carry out various changes to the utility model embodiment according to application documents are disclosed, modification or combination and do not break away from spirit and scope of the present utility model.

Claims (4)

1. a coal bed gas well array is adopted tubing string, it is characterized in that, described tubing string comprises oil pipe component, pump and be positioned at the screen casing of seat earth below, pump are connected to the oil pipe component lower end, and screen casing is connected to the below of pump, described oil pipe component is connected to the inside of production casing, and the bottom of screen casing is stopped up with blocking piece.
2. coal bed gas well array according to claim 1 is adopted tubing string, it is characterized in that, described oil pipe component comprises oil pipe, the outside of oil pipe is equipped with tubing centrilizer, be provided with sucker rod and oil pumping rod centering device in oil pipe, oil pumping rod centering device is connected to the outside of sucker rod, and the lower end of sucker rod connects the piston of said pump.
3. coal bed gas well array according to claim 2 is adopted tubing string, it is characterized in that, described oil pipe component also comprises data cable, described data cable is fixed on the outside of described oil pipe by cable card, tubing centrilizer, cable is positioned in the top of tubing centrilizer, the below of described oil pipe is provided with the PGS that cable connects, the lower end connecting sensor of data cable.
4. the described coal bed gas well array of according to claim 1 to 3 any one is adopted tubing string, it is characterized in that, described pump is tubing pump, and described blocking piece is female plug.
CN 201220569338 2012-10-31 2012-10-31 Drainage and production string of coal-bed gas well Expired - Lifetime CN202954747U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN 201220569338 CN202954747U (en) 2012-10-31 2012-10-31 Drainage and production string of coal-bed gas well

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN 201220569338 CN202954747U (en) 2012-10-31 2012-10-31 Drainage and production string of coal-bed gas well

Publications (1)

Publication Number Publication Date
CN202954747U true CN202954747U (en) 2013-05-29

Family

ID=48460324

Family Applications (1)

Application Number Title Priority Date Filing Date
CN 201220569338 Expired - Lifetime CN202954747U (en) 2012-10-31 2012-10-31 Drainage and production string of coal-bed gas well

Country Status (1)

Country Link
CN (1) CN202954747U (en)

Cited By (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN103397858A (en) * 2013-07-24 2013-11-20 濮阳泰和油气工程有限公司 Drainage and production combined sand washing machine for coal bed gas and method for applying drainage and production combined sand washing machine
CN104251136A (en) * 2013-06-28 2014-12-31 中国石油天然气股份有限公司 Method for determining coal bed gas well coal submergence
CN106884673A (en) * 2017-02-25 2017-06-23 太原理工大学 A kind of method that goaf coal bed gas pinpoints efficient extraction
CN107100592A (en) * 2017-05-12 2017-08-29 中国石油大学(华东) Coal bed gas multi-machine interaction hydraulic-driven mining process system
CN110099868A (en) * 2016-12-23 2019-08-06 埃尼股份公司 For removing the device and method of hydrocarbon from water body

Cited By (11)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN104251136A (en) * 2013-06-28 2014-12-31 中国石油天然气股份有限公司 Method for determining coal bed gas well coal submergence
CN104251136B (en) * 2013-06-28 2017-03-15 中国石油天然气股份有限公司 Method for determining coal bed gas well coal submergence
CN103397858A (en) * 2013-07-24 2013-11-20 濮阳泰和油气工程有限公司 Drainage and production combined sand washing machine for coal bed gas and method for applying drainage and production combined sand washing machine
CN103397858B (en) * 2013-07-24 2015-11-04 濮阳泰和油气工程有限公司 Coal bed gas extraction associating sand washing machine and application process
CN110099868A (en) * 2016-12-23 2019-08-06 埃尼股份公司 For removing the device and method of hydrocarbon from water body
CN110099868B (en) * 2016-12-23 2022-03-25 埃尼股份公司 Apparatus and method for removing hydrocarbons from a body of water
US11891314B2 (en) 2016-12-23 2024-02-06 Eni S.P.A. Apparatus and method for removing hydrocarbons from a body of water
CN106884673A (en) * 2017-02-25 2017-06-23 太原理工大学 A kind of method that goaf coal bed gas pinpoints efficient extraction
CN106884673B (en) * 2017-02-25 2019-11-12 太原理工大学 A kind of method that goaf coal bed gas pinpoints efficient extraction
CN107100592A (en) * 2017-05-12 2017-08-29 中国石油大学(华东) Coal bed gas multi-machine interaction hydraulic-driven mining process system
CN107100592B (en) * 2017-05-12 2019-07-09 中国石油大学(华东) Coal bed gas multi-machine interaction hydraulic-driven mining process system

Similar Documents

Publication Publication Date Title
CN202954747U (en) Drainage and production string of coal-bed gas well
MX2009013401A (en) Hydrocarbons.
CN102747993B (en) Liquid foaming agent injection method
CN103061724B (en) Towards the layering pressure control associating mining device easily telling powder and telling the two coal seam of sand
CN201963286U (en) Oil production pipe for reducing water content of central pipe of horizontal well
CN101220809A (en) Sand-prevention and oil-draining type oil pump
CN206129597U (en) Spiral shell sucker -rod pumping is prevented burning with preventing buggy by coal seam gas well
CN202360063U (en) Automatic degassing and recovering device for oil well casing
CN202954792U (en) Anti-blocking filtering screen pipe assembly of coal-bed gas well
CN2828309Y (en) Automatic water drainage gas production device of coal-bed gas well
CN201144831Y (en) Coal bed gas well electric submersible centrifugal pump discharging and mining device
CN200964832Y (en) Extraction-assistant production-increasing device for oil pump
CN202500536U (en) Oil pumping pipe column and rod column with self-locking type connecting-tripping device
CN203808948U (en) Anti-blocking filter screen tube special for drainage of coal-bed gas wells
CN2898292Y (en) Eccentric sand settling type gas-proof device
CN101949277B (en) Oil extraction method of weight adding under pump and oil well pump with weight adding under pump
CN201794557U (en) Ultrasonic atomization drainer for gas well
CN202531415U (en) Phi 25mm small displacement solid plunger oil-well pump
CN103452820A (en) Anti-sand and anti-gas lock pump for coal-bed gas mechanical on/off valve
CN2491622Y (en) Double acting pump for well oil water separation and refilling
CN105298453B (en) Hydraulic automatic back pressure reducing device
CN104747139B (en) Hydraulic drive type oil extraction system
CN2251636Y (en) Separate zone production synchronous oil pump
CN203499650U (en) Magnetic suspension pump integration underground oil extraction device
CN203584324U (en) Optimization device of gas locking oil well production tubular column of electric submersible pump

Legal Events

Date Code Title Description
C14 Grant of patent or utility model
GR01 Patent grant
CX01 Expiry of patent term
CX01 Expiry of patent term

Granted publication date: 20130529