CN202949193U - Four-arranging wire snow-removing bucket - Google Patents

Four-arranging wire snow-removing bucket Download PDF

Info

Publication number
CN202949193U
CN202949193U CN 201220543098 CN201220543098U CN202949193U CN 202949193 U CN202949193 U CN 202949193U CN 201220543098 CN201220543098 CN 201220543098 CN 201220543098 U CN201220543098 U CN 201220543098U CN 202949193 U CN202949193 U CN 202949193U
Authority
CN
China
Prior art keywords
bucket
wire
snow
slide plate
plate
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Lifetime
Application number
CN 201220543098
Other languages
Chinese (zh)
Inventor
付杨超
胡正
邓炜
王喆
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
State Grid Corp of China SGCC
State Grid Sichuan Electric Power Co Ltd
Original Assignee
Xichang Power Bureau Of Sichuan Electric Power Co
State Grid Corp of China SGCC
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Xichang Power Bureau Of Sichuan Electric Power Co, State Grid Corp of China SGCC filed Critical Xichang Power Bureau Of Sichuan Electric Power Co
Priority to CN 201220543098 priority Critical patent/CN202949193U/en
Application granted granted Critical
Publication of CN202949193U publication Critical patent/CN202949193U/en
Anticipated expiration legal-status Critical
Expired - Lifetime legal-status Critical Current

Links

Images

Landscapes

  • Cleaning Of Streets, Tracks, Or Beaches (AREA)

Abstract

The utility model discloses a four-arranging wire snow-removing bucket which comprises a snow-collecting bucket and a suspension device for hanging the snow-collecting bucket on a wire. The snow-collecting bucket is rotatably matched with a bucket shaft of the suspension device and is a box with an upper base provided with an opening, the box is in an isosceles trapezoid table shape, a pair of sides in four sides is vertical faces, the other pair of sides is inclined planes, an upper base face is lager than a lower base face, bucket shaft holes are arranged on the vertical faces of the snow-collecting bucket, a returning pin is installed on the lower base face, and the lower base face is further provided with a water seepage hole. Hole centers of the bucket shaft holes are located on a symmetrical line of the vertical faces and are below a midpoint of the symmetrical line, and the returning pin is located under the bucket shaft. Compared with the prior art, the four-arranging wire snow-removing bucket enables covering ice to be automatically dropped by means of a self system arrangement without the effect of other acting force, improves power supply reliability and reduces economic loss, and significant contributions are made to disaster prevention work.

Description

A kind of four minutes column wire snow removing buckets
Technical field
The utility model belongs to the power transmission line field of preventing and reducing natural disasters, and is specifically related to a kind of wire snow removing bucket.
Background technology
Current, transmission pressure mainly adopts built on stilts mode to be arranged on bar or tower, part is positioned at the larger mountain area of difference variation or the north, very easily make winter wire carry out snow, carry out ice, cause conductor galloping, damage gold utensil, wire fracture, bar or tower distortion, even shaft tower is toppled over the generation that causes the accident, and has a strong impact on the safe operation of transmission system.Send out, defeated, join, the aspect such as user causes economic loss in various degree.For reducing economic loss, improve power supply reliability, just need a kind of method and apparatus that can make shoe ice Automatic-falling.
Summary of the invention
Given this, the utility model purpose is to provide a kind of and can makes the device of carrying out the ice Automatic-falling.
For solving above technical problem, the technical scheme that the utility model provides is, a kind of four minutes column wire snow removing buckets are provided, comprise a snow collecting bucket and snow collecting bucket is suspended on suspension arrangement on wire, the bucket spindle of snow collecting bucket and suspension arrangement is rotatably assorted, described snow collecting bucket is the box of upper bottom opening, this box is isosceles trapezoid platform shape, it is vertical plane that a pair of side is arranged in four sides, another is the inclined-plane to the side, and upper bottom surface is greater than bottom surface, is provided with the bucket spindle hole on the vertical plane of snow collecting bucket, bottom surface is equipped with the return nail, and also is provided with water seepage hole on bottom surface; The hole heart in described bucket spindle hole is positioned on the line of symmetry of vertical plane, and at the mid point of this line of symmetry on the lower side; Described return nail is positioned under bucket spindle.
The structure of described suspension arrangement is: bucket arm lower end and bucket spindle are rotationally connected, and bucket arm upper end is connected with slide fastener, and slide fastener is connected with slide plate slides, and the both sides of slide plate are equipped with platen, and slide plate and platen are united fixing cord.
The main body of described slide plate is disk, is provided with a L shaped sliding plate drag hook on its circumference, is provided with a criss-cross wire kerve on this disk, also is provided with an opening and is communicated with the wire kerve on disk.
The opening both sides of described slide plate are respectively arranged with a yoke plate connecting hole, and slide plate is bolted yoke plate, and yoke plate two ends are respectively arranged with the slide plate connecting hole.
The main body of described platen is disk, is evenly distributed with 4 wire support mouths on the circumference of platen, and the center of platen is provided with screw, and described wire support mouth and above-mentioned wire kerve overlap to form the wire fixing hole.Slide plate and platen guarantee that by pressing bolted slide plate and platen tightly are suspended on wire.
Described slide fastener lower end is bucket arm connecting plate, be provided with bucket arm connecting hole on bucket arm connecting plate, the slide fastener upper end is the arc skateboard connecting plate, and the arc-shaped side cross section of this arc skateboard connecting plate is inverted L-shaped slide plate hook, and described slide plate hook is slidably matched with above-mentioned sliding plate drag hook.
Described bucket arm is H shape, and the upper end of its montant is provided with the slide fastener connecting hole, and the lower end is provided with the bucket spindle connecting hole.
Be provided with gum cover between described slide plate, platen and wire, described gum cover is the sebific duct that is provided with opening.Gum cover is made by elastomeric material, has certain toughness, is installed between wire and slide plate, platen, and the effect of increasing friction force is arranged, and the effect of the damage wires of preventing is arranged.
Described bucket spindle two ends are provided with jump-ring slot.
The length of described return nail is greater than the minimum range between bucket arm two montants.In the process of snow collecting bucket rotation, the return nail can collide with the bucket arm.
Compared with prior art, four minutes described in the utility model column wire snow removing buckets are only under the effect of earth gravity without other active forces, can rely on self system's setting to make and carry out the ice Automatic-falling, improve power supply reliability, reduced economic loss, for significant contribution has been made in the work of taking precautions against natural calamities.
Snow collecting bucket is made by uncorruptible metal material, is the larger box that can collect snow or ice of an opening, its role is to, during a certain numerical value in the wire tension scope, snow collecting bucket sheds suddenly in bucket and bears a heavy burden, and wire is shunk, and shake, thereby remove snow or ice on wire.The bucket spindle hole is for snow collecting bucket can reliably be connected with the bucket arm by bucket spindle, and snow collecting bucket is deflected along the bucket spindle axle center under the ice and snow Action of Gravity Field; The return nail is in order to make snow collecting bucket when deflecting, to bump with the bucket arm, guarantee that the ice and snow in snow collecting bucket is poured out fully, subsequently, because the weight of return nail is larger, making the snow collecting bucket return; Water seepage hole is for snow collecting bucket is lower in ambient temperature, and wire has the situation of collection snow or ice to descend to play the effect of snow removing or ice.
Description of drawings
Fig. 1 is four minutes described in the utility model column wire snow removing bucket front elevational schematic.
Fig. 2 is the left view of Fig. 1.
Fig. 3 is accumulated snow bucket front elevational schematic described in the utility model.
Fig. 4 is Fig. 3 left view.
Fig. 5 is Fig. 3 upward view.
Fig. 6 is bucket spindle front elevational schematic described in the utility model.
In Fig. 7, a is the front elevational schematic of bucket arm, and b looks schematic diagram for the left side of bucket arm.
In Fig. 8, a is the front elevational schematic of slide fastener, and b is that schematic diagram is looked on the left side of slide fastener.
Fig. 9 is the front elevational schematic of slide plate.
Figure 10 is the front elevational schematic of yoke plate.
Figure 11 is the front elevational schematic of platen.
Figure 12 is the front elevational schematic of gum cover.
Embodiment
Describe below in conjunction with accompanying drawing and specific embodiment.
Referring to Fig. 1 to Fig. 5.Described four minutes column wire snow removing buckets of the present embodiment, comprise a snow collecting bucket 1 and snow collecting bucket is suspended on suspension arrangement on wire 9, the structure of suspension arrangement is: bucket arm 3 lower ends and bucket spindle 2 are rotationally connected, bucket arm 3 upper ends are connected with slide fastener 4, slide fastener 4 is slidably connected with slide plate 5, the both sides of slide plate 5 are equipped with platen 7, slide plate 5 and platen 7 associating fixing cords 9.Snow collecting bucket 1 is rotatably assorted with the bucket spindle 2 of suspension arrangement, and bucket spindle 2 two ends are provided with jump-ring slot 31, as shown in Figure 6.
Snow collecting bucket 1 is the box of upper bottom opening, and this box is isosceles trapezoid platform shape, and it is vertical plane that a pair of side is arranged in four sides, and another is the inclined-plane to the side, and upper bottom surface is greater than bottom surface.Two vertical planes are parallel to each other, and mutually vertical with bottom surface, and as previously mentioned, these two vertical planes are congruent isosceles trapezoids.Be provided with bucket spindle hole 11 on the vertical plane of snow collecting bucket 1, bottom surface is equipped with return nail 12, and also is provided with 4 water seepage holes 13 on bottom surface.The hole heart in described bucket spindle hole 11 is positioned on the line of symmetry of vertical plane, and at the mid point of this line of symmetry on the lower side.Here said line of symmetry refers to it is a line segment, and two end points of this line segment are respectively the upper base of vertical plane and the mid point of going to the bottom.The setting position in bucket spindle hole 11 is most important to the rotary movement of snow collecting bucket 1, if more than bucket spindle hole 11 was positioned at the line of symmetry mid point, snow collecting bucket 1 collection snow tailheaviness was positioned at below the rotating bucket axle, can not deflect.Return nail 12 is positioned under bucket spindle 2, and center line or the axial line with regard to return nail 12 is positioned on above-mentioned line of symmetry exactly, and the return nail 12 shown in Fig. 1 to Fig. 5 is trapezoidal cylinder, with the bottom of snow collecting bucket 1 at grade.4 13 of water seepage holes are evenly distributed in the center line both sides of return nail 12, and take the center line of return nail 12 as line of symmetry.
The main body of slide plate 5 is disk, is provided with a L shaped sliding plate drag hook 51 on its circumference, is provided with a criss-cross wire kerve 52 on this disk, also is provided with an opening and is communicated with right-angled intersection place of wire kerve 52 on disk, as shown in Figure 9.Wire enters wire kerve 52 from opening, and wire kerve 52 is the cross setting, and 4 cecums are arranged, and each cecum is placed a wire.The opening both sides of slide plate 5 are respectively arranged with a yoke plate connecting hole 53, and slide plate 5 is bolted yoke plate 6, and yoke plate 6 two ends are respectively arranged with slide plate connecting hole 61, as shown in figure 10.
The main body of platen 7 is for being similarly disk, the equal diameters of its diameter and slide plate 5.Be evenly distributed with 4 wire support mouths 71 on the circumference of platen 7, the center of platen 7 is provided with screw 72, as shown in figure 11.Described wire support mouth 71 overlaps to form the wire fixing hole with above-mentioned wire kerve 52, and is namely by pressing bolt, that slide plate 5 and platen 7 is fastening, but wire kerve 52 need overlap with wire support mouth 71.
Slide fastener 4 lower ends are bucket arm connecting plate, are provided with bucket arm connecting hole 41 on bucket arm connecting plate, and slide fastener 4 upper ends are the arc skateboard connecting plate, and the arc-shaped side cross section of this arc skateboard connecting plate is inverted L-shaped slide plate hook 42, as shown in Figure 8.Described slide plate hook 42 is slidably matched with above-mentioned sliding plate drag hook 51.
Bucket arm 3 is H shape, and the upper end of its montant is provided with slide fastener connecting hole 32, and the lower end is provided with bucket spindle connecting hole 31, as shown in Figure 7.The length of return nail 12 is greater than the minimum range between 3 liang of montants of bucket arm.
Be provided with gum cover 8 between slide plate 5, platen 7 and wire 9, described gum cover 8 is for being provided with the sebific duct of opening, as shown in figure 12.
In snowfall, snowflake is not to be to be that straight line falls fully, namely can not drop on equably in snow collecting bucket, when the weight of accumulated snow reaches a certain numerical value in the wire tension scope, snow collecting bucket deflects suddenly, and sheds heavy burden in bucket, and wire is shunk, and shake, thereby remove snow or ice on wire.Through the more area of ice and snow, install one except glacial cirque in the sag minimum point of aerial condutor or overhead ground wire at electric line, as required, the snow removing bucket that selected size is fit to.
Be below only preferred implementation of the present utility model, should be pointed out that above-mentioned preferred implementation should not be considered as restriction of the present utility model, protection range of the present utility model should be as the criterion with the claim limited range.For those skilled in the art, within not breaking away from spirit and scope of the present utility model, can also make some improvements and modifications, these improvements and modifications also should be considered as protection range of the present utility model.

Claims (10)

1. four minutes column wires snow removing struggles against, it is characterized in that, comprise a snow collecting bucket (1) and snow collecting bucket is suspended on suspension arrangement on wire, snow collecting bucket (1) is rotatably assorted with the bucket spindle (2) of suspension arrangement, described snow collecting bucket (1) is the box of upper bottom opening, this box is isosceles trapezoid platform shape, it is vertical plane that a pair of side is arranged in four sides, another is the inclined-plane to the side, upper bottom surface is greater than bottom surface, be provided with bucket spindle hole (11) on the vertical plane of snow collecting bucket (1), bottom surface is equipped with return nail (12), and also is provided with water seepage hole (13) on bottom surface; The hole heart in described bucket spindle hole (11) is positioned on the line of symmetry of vertical plane, and at the mid point of this line of symmetry on the lower side; Described return nail (12) is positioned under bucket spindle (2).
2. column wire snow removing in four minutes according to claim 1 struggles against, it is characterized in that, the structure of described suspension arrangement is: bucket arm (3) lower end and bucket spindle (2) are rotationally connected, bucket arm (3) upper end is connected with slide fastener (4), slide fastener (4) is slidably connected with slide plate (5), the both sides of slide plate (5) are equipped with platen (7), slide plate (5) and platen (7) associating fixing cord.
3. column wire snow removing in four minutes according to claim 2 struggles against, it is characterized in that, the main body of described slide plate (5) is disk, be provided with a L shaped sliding plate drag hook (51) on its circumference, be provided with a criss-cross wire kerve (52) on this disk, also be provided with an opening and be communicated with wire kerve (52) on disk.
4. column wire snow removing in four minutes according to claim 3 struggles against, it is characterized in that, the opening both sides of described slide plate (5) are respectively arranged with a yoke plate connecting hole (53), and slide plate (5) is bolted yoke plate (6), and yoke plate (6) two ends are respectively arranged with slide plate connecting hole (61).
5. column wire snow removing in four minutes according to claim 3 struggles against, it is characterized in that, the main body of described platen (7) is disk, be evenly distributed with 4 wire support mouths (71) on the circumference of platen (7), the center of platen (7) is provided with screw (72), and described wire support mouth (71) overlaps to form the wire fixing hole with above-mentioned wire kerve (52).
6. column wire snow removing in four minutes according to claim 3 struggles against, it is characterized in that, described slide fastener (4) lower end is bucket arm connecting plate, be provided with bucket arm connecting hole (41) on bucket arm connecting plate, slide fastener (4) upper end is the arc skateboard connecting plate, the arc-shaped side cross section of this arc skateboard connecting plate is inverted L-shaped slide plate hook (42), and described slide plate hook (42) is slidably matched with above-mentioned sliding plate drag hook (51).
7. four minutes according to claim 6 column wire snow removing buckets, is characterized in that, described bucket arm (3) is H shape, and the upper end of its montant is provided with slide fastener connecting hole (32), and the lower end is provided with bucket spindle connecting hole (31).
8. four minutes according to claim 2 column wire snow removing buckets, is characterized in that, be provided with gum cover (8) between described slide plate (5), platen (7) and wire, described gum cover (8) is for being provided with the sebific duct of opening.
9. four minutes according to claim 1 column wires snow removing bucket, is characterized in that, described bucket spindle (2) two ends are provided with jump-ring slot (31).
10. four minutes according to claim 7 column wire snow removing buckets, is characterized in that, the length of described return nail (12) is greater than the minimum range between bucket arm (3) two montants.
CN 201220543098 2012-10-23 2012-10-23 Four-arranging wire snow-removing bucket Expired - Lifetime CN202949193U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN 201220543098 CN202949193U (en) 2012-10-23 2012-10-23 Four-arranging wire snow-removing bucket

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN 201220543098 CN202949193U (en) 2012-10-23 2012-10-23 Four-arranging wire snow-removing bucket

Publications (1)

Publication Number Publication Date
CN202949193U true CN202949193U (en) 2013-05-22

Family

ID=48424873

Family Applications (1)

Application Number Title Priority Date Filing Date
CN 201220543098 Expired - Lifetime CN202949193U (en) 2012-10-23 2012-10-23 Four-arranging wire snow-removing bucket

Country Status (1)

Country Link
CN (1) CN202949193U (en)

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN102891462A (en) * 2012-10-23 2013-01-23 四川省电力公司西昌电业局 Quartered wire snow removing hopper

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN102891462A (en) * 2012-10-23 2013-01-23 四川省电力公司西昌电业局 Quartered wire snow removing hopper
CN102891462B (en) * 2012-10-23 2016-05-11 国网四川省电力公司凉山供电公司 A kind of conductors on quad bundled snow removing bucket

Similar Documents

Publication Publication Date Title
CN201638948U (en) Throw-pull earth wire for transmission line
CN103904603A (en) Distribution line typhoon-preventing integrated device capable of achieving pole and wire protecting and achieving pole protecting, wire abandoning, energy absorbing and disengaging
CN205666589U (en) Wire deicing instrument
CN104917098A (en) Trip pulley capable of automatic locking
CN109638749A (en) A kind of overhead transmission line line protection device
CN102938545B (en) A kind of 10KV distribution line stringing optical cable crossover device
CN211006424U (en) Highway construction safety warning device
CN204216250U (en) Mechanization earth connection operating platform
CN203787913U (en) Typhoon-proof pole-protecting wire-protecting and pole-protecting wire-abandoning energy-absorbing disengaging integrated device of distribution line
CN202949193U (en) Four-arranging wire snow-removing bucket
CN205666544U (en) A machine is led in electric wire netting construction
CN105337236B (en) The windproof anchoring of ultra-high-tension power transmission line
CN202111445U (en) Tension insulator string snow protection plate
CN205039455U (en) Frame construction with patrol and examine electric ranaway
CN102916371A (en) Overhead ground wire repair method and device
CN209855353U (en) Power transmission line iron tower mounted on top of building
CN102891462B (en) A kind of conductors on quad bundled snow removing bucket
CN203398639U (en) Vibration-proof hammer moving recovering device for overhead ground wire
CN107069533A (en) A kind of super UHV Overhead Transmission Line tangent tower ground wire lifting tool
CN106099816B (en) A kind of suspension type trolley wire electrical cable intelligent deicing robot
CN203522016U (en) Device for lifting overhead ground wire
CN202997422U (en) Replacing device of high altitude 500KV strain fourfold insulator string
CN206060031U (en) A kind of cable casting device
CN102868131B (en) A kind of power transmission cable device for expelling ice and snow
CN205141534U (en) Auto -lock unwrapping wire coaster

Legal Events

Date Code Title Description
C14 Grant of patent or utility model
GR01 Patent grant
C56 Change in the name or address of the patentee
CP03 Change of name, title or address

Address after: 615050, Liangshan Yi Autonomous Prefecture, Xichang province Sichuan city road two section 216

Patentee after: LIANSHAN POWER SUPPLY COMPANY OF STATE GRID SICHUAN ELECTRIC POWER COMPANY

Patentee after: State Grid Corporation of China

Address before: 615000, No. 66, Chengnan South Road, Liangshan Yi Autonomous Prefecture, Sichuan Province, Xichang

Patentee before: Xichang Electric Power Bureau of Sichuan Electric Power Corporation

Patentee before: State Grid Corporation of China

AV01 Patent right actively abandoned

Granted publication date: 20130522

Effective date of abandoning: 20160511

AV01 Patent right actively abandoned

Granted publication date: 20130522

Effective date of abandoning: 20160511

C25 Abandonment of patent right or utility model to avoid double patenting