CN202936780U - Sequential port prestress anchor rod prevented from being drawn out from anchor eye - Google Patents

Sequential port prestress anchor rod prevented from being drawn out from anchor eye Download PDF

Info

Publication number
CN202936780U
CN202936780U CN 201220551255 CN201220551255U CN202936780U CN 202936780 U CN202936780 U CN 202936780U CN 201220551255 CN201220551255 CN 201220551255 CN 201220551255 U CN201220551255 U CN 201220551255U CN 202936780 U CN202936780 U CN 202936780U
Authority
CN
China
Prior art keywords
anchor
anchor rod
bowl
rod body
expansion
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Fee Related
Application number
CN 201220551255
Other languages
Chinese (zh)
Inventor
言志信
江平
邓骁
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Lanzhou University
Original Assignee
Lanzhou University
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Lanzhou University filed Critical Lanzhou University
Priority to CN 201220551255 priority Critical patent/CN202936780U/en
Application granted granted Critical
Publication of CN202936780U publication Critical patent/CN202936780U/en
Anticipated expiration legal-status Critical
Expired - Fee Related legal-status Critical Current

Links

Images

Landscapes

  • Piles And Underground Anchors (AREA)

Abstract

The utility model relates to a sequential port prestress anchor rod capable of preventing drawing out from an anchor eye. The sequential port prestress anchor rod comprises an anchor rod body with an expansion tooth bowl at the bottom end, an expansion plug with an expansion plug center hole in the center, as well as a bearing stand, a bearing plate and a nut, wherein anchor rod holes are formed on both the bearing stand and the bearing plate, the top end of the anchor rod body sequentially penetrates through the expansion plug center hole, the bearing stand and the anchor rod hole of the bearing plate to be connected together with the nut; and the expansion plug is positioned inside the expansion tooth bowl. The sequential port prestress anchor rod provided by the utility model has a simple structure, is low in cost, is convenient to construct, constructs a novel pulling force-pressing force-plug composite prestress anchoring system, can prevent the anchor rod from being drawn out from the anchor eye with grouting, and the stability, the engineering safety and the anchoring durableness of a geotechnical body can be enhanced.

Description

Smoothly prevent the prestressed anchor extracted from anchor hole
Technical field
The utility model is related to Anchorage Technology, more particularly to the prestressed anchor for preventing from extracting from anchor hole of blurting out.
Background technology
At present, ground anchorage is by embedded anchor pole in the earth formation, stratum is tightly locked together, rely on the interaction of anchor pole-injecting cement paste-hole wall ground muscle power, transfer and improve the self-strength and self-stable ability of Rock And Soil, to improve stress state, it is ensured that the stabilization of outside Rock And Soil, so that it is guaranteed that the technology of engineering safety.The engineer applied of Anchorage Technology started from for 19 end of the centurys, with the development of its theory and technology, the departments such as mine, water conservancy, water power, highway, railway, municipal administration, urban construction, geology, military project are extended to, it is used as a kind of ideal support form, extensive use is obtained in slope project, underground engineering, deep-foundation pit engineering, key effect is played in national economy major project.
Ground anchorage is not only influenceed by formation lithology, Rock-soil Mass Structure, geological structure, hydrogeology, topography and geomorphology etc., it is also possible to acted on by violent earthquake, and they constitute a threat to the safety of ground anchorage.
Between the construction and run phrase of ground anchorage, it is most basic, most typically, most common ground anchorage failure mode that anchor pole is extracted from anchor hole together with injecting cement paste, it will cause ground anchorage to fail, and bring hidden danger to engineering safety, so as to limit the anchor force that anchor pole can be provided.Thus, when Rock And Soil needs the anchor force of offer larger, common bolt anchoring can not meet the requirement of engineering, govern Anchorage Technology application and develop, how the loading transfer mechanism of ground anchorage is improved, the drawbacks of overcoming common anchoring, as the fundamental way for improving anchor-holding force of anchor bolt, improvement anchoring effect.
In addition, injecting cement paste can hardly provide anchor force initial stage in anchoring, thus do not adapt to need the requirement of supporting immediately after soft rock-soil body is excavated.Although existing pipe-seam type anchor rod has overcome to disadvantages mentioned above, anchor force can be provided after rockbolt installation immediately, is conducive to the deformation of control Rock And Soil in time, the anchor force that anchor pole can be provided is little;Simultaneously as soft rock-soil is known from experience squeezes into tube chamber from the pipe seam of pipe-seam type anchor rod, the reduction of anchor force is caused.
The content of the invention
Technical problem to be solved in the utility model is to provide a kind of prestressed anchor for preventing from extracting from anchor hole of blurting out that can be improved and provide anchor force immediately, save material, easy construction.
To solve the above problems, prestressed anchor described in the utility model that prevent from extracting from anchor hole of blurting out, it is characterised in that:It includes the expansible stopper and pad, backing plate, nut that anchor rod body of the bottom with expansion tooth bowl, center are provided with expansible stopper centre bore;The pad on the backing plate with being equipped with bolthole;The bolthole that the top of the anchor rod body sequentially passes through the expansible stopper centre bore, the pad and the backing plate is connected together with the nut;The expansible stopper is placed in the expansion tooth bowl.
The expansion tooth bowl blurts out, be circumferentially spacedly distributed the tooth being connected with bowl bottom in small bowl-shape, its opening upwards in the big bottom of mouth;Multiple annular platforms are distributed with the inner surface of the tooth.
The expansible stopper is in truncated cone-shaped, and its side and the inner surface of the tooth coincide.
The top of the anchor rod body is provided with screw thread.
An injected hole is provided with the backing plate.
The utility model has advantages below compared with prior art:
1, the utility model first carries on anchor rod body top through center the expansible stopper of through hole, until expansible stopper is pushed into the expansion tooth bowl of anchor rod body bottom institute band, the inner surface of the frustum cone side and expansion tooth bowl tooth of expansible stopper is set to coincide, then it is placed in company with anchor rod body in drilling, until the expansion tooth bowl of anchor rod body bottom institute band is pushed into the bottom that drills, by the pipe being enclosed within anchor rod body drive the expansible stopper of truncated cone-shaped to expansion tooth bowl bottom it is close while, the teeth directional surrounding of extrusion expansion tooth bowl is opened, and be pressed into borehole wall Rock And Soil, when stopping applying thrust to pipe, the inner surface annular platform that the expansible stopper of anchor rod body bottom is inflated tooth bowl tooth is blocked, remain in that expansion tooth bowl teeth directional surrounding opens embolism among borehole wall Rock And Soil.Take out after pipe, backing plate is added on anchor pole top, even if also anchor pole top passes through the bolthole at backing plate center, and tightens nut, anchor rod body is that side slope Rock And Soil applies prestressing force.
2nd, the utility model by injected hole on backing plate to filling and injecting slurry body in drilling, injecting cement paste after consolidation is by the expansion tooth bowl with anchor rod body and its bottom, and expansible stopper is tightly consolidated in one, when slope ground body is deformed, anchor force is passively produced by anchor rod body side slope Rock And Soil.
3rd, the utility model significantly optimizes and improved the loading transfer mechanism of ground anchorage, construct pulling force-pressure-embolism NEW TYPE OF COMPOSITE prestress anchoraging system, it can effectively prevent that anchor pole from extracting together with injecting cement paste from anchor hole, i.e. anchor pole is destroyed together with injecting cement paste along with the contact interface of Rock And Soil, significantly improve rock-reinforcing effect, the self-stable ability of Rock And Soil is preferably transferred, so as to improve the stability of Rock And Soil and the security of engineering.
4th, injecting cement paste of the present utility model is to being wrapped in the expansion tooth bowl of anchor rod body therein and its bottom, and expansible stopper plays waterproof, anticorrosion, anti-rust action, so as to improve the durability of ground anchorage.
5th, the utility model is simple in construction, with low cost, easy construction.
Brief description of the drawings
Embodiment of the present utility model is described in further detail below in conjunction with the accompanying drawings.
Fig. 1 is structural representation of the present utility model.
Fig. 2 is the structural representation of the utility model bottom.
Fig. 3 is anchor rod body shaft section schematic diagram of the present utility model.
Fig. 4 is expansible stopper schematic diagram of the present utility model.
Fig. 5 is expansible stopper shaft section schematic diagram of the present utility model.
Fig. 6 is expansion tooth bowl top view of the present utility model.
Fig. 7 is expansion tooth bowl shaft section schematic diagram of the present utility model.
In figure:1-Rock And Soil, 2-injecting cement paste 3-8-top of drilling 4-anchor rod body, 5-pad, 6-backing plate, 7-nut, 9-expansible stopper 10-expansion tooth bowl 11-tooth, 12-hole wall, 13-annular platform, 14-injected hole, 15-screw thread, 16-expansible stopper centre bore.
Embodiment
As shown in Fig. 1 ~ 7, the prestressed anchor extracted from anchor hole is smoothly prevented, it includes the expansible stopper 9 and pad 5, backing plate 6, nut 7 that anchor rod body 4 of the bottom with expansion tooth bowl 10, center are provided with expansible stopper centre bore 16.Pad 5 on backing plate 6 with being equipped with bolthole;The bolthole that the top 8 of anchor rod body 4 sequentially passes through expansible stopper centre bore 16, pad 5 and backing plate 6 is connected together with nut 7;Expansible stopper 9 is placed in expansion tooth bowl 10.
Wherein:Tooth bowl 10 is expanded in small bowl-shape, its opening upwards in the big bottom of mouth, that is, is blurted out, be circumferentially spacedly distributed the tooth 11 being connected with bowl bottom;Multiple annular platforms 13 are distributed with the inner surface of tooth 11.
Expansible stopper 9 is in truncated cone-shaped, and its side and the inner surface of tooth 11 coincide.
The top 8 of anchor rod body 4 is provided with screw thread 15.
An injected hole 14 is provided with backing plate 6.
Embodiment 1By design requirement to the Drilling of Rock And Soil 1 drilling 3, and drilling 3 mouthfuls place progress pad 5 construction;(2) the top of anchor rod body 4 is passed through into the expansible stopper 9 with expansible stopper centre bore 16, until expansible stopper 9 is pushed into the expansion tooth bowl 10 of the bottom institute band of anchor rod body 4, the inner surface of the frustum cone side and expansion tooth 10 teeth 11 of bowl of expansible stopper 9 is coincide;(3) expansible stopper 9 is placed in drilling 3 together in company with anchor rod body 4, until the expansion tooth bowl 10 of the bottom institute band of anchor rod body 4 is pushed into 3 bottoms that drill;(4) the pipe longer than anchor rod body 4 is used, be sleeved on anchor rod body 4, apply thrust in pipe, by pipe drive the expansible stopper 9 of truncated cone-shaped to 10 bottoms of expansion tooth bowl it is close while, the tooth 11 of extrusion expansion tooth bowl 10 opens to surrounding, and is pressed into the drilling Rock And Soil 1 of 3 hole wall 12;                                                
Figure DEST_PATH_IMAGE001
Stop applying pipe thrust and be drawn off, the inner surface annular platform 13 that expansible stopper 9 is inflated tooth 10 teeth 11 of bowl is blocked, remain in that the tooth 11 of expansion tooth bowl 10 opens embolism among the drilling Rock And Soil 1 of 3 hole wall 12 to surrounding;
Figure 130429DEST_PATH_IMAGE002
Backing plate 6 is added on anchor pole top 8, even if also anchor pole top 8 passes through the bolthole at the center of backing plate 6, and tightens nut 7, anchor rod body 4 is that side slope Rock And Soil 1 applies prestressing force;
Figure DEST_PATH_IMAGE003
Pass through filling and injecting slurry body 1 in 14 pairs of drillings 3 of injected hole on backing plate, injecting cement paste 2 after consolidation by with anchor rod body 4 and its expansible stopper of bottom 9, and expansion tooth bowl 10 is tightly consolidated in one, when slope ground body 1 is deformed, the prestressing force not only applied by anchor rod body 4, while being subjected to the anchor force that slope ground body 1 is deformed and passively produced.
Embodiment 2By design requirement to the Drilling of Rock And Soil 1 drilling 3, and drilling 3 mouthfuls place progress pad 5 construction;(2) the top of anchor rod body 4 is passed through into the expansible stopper 9 with expansible stopper centre bore 16, until expansible stopper 9 is pushed into the expansion tooth bowl 10 of the bottom institute band of anchor rod body 4, the inner surface of the thin frustum cone side and expansion tooth 10 teeth 11 of bowl of expansible stopper 9 is coincide;(3) expansible stopper 9 is placed in drilling 3 together in company with anchor rod body 4, until the expansion tooth bowl 10 of the bottom institute band of anchor rod body 4 is pushed into 3 bottoms that drill;(4) the pipe shorter than anchor rod body 4 is used, it is sleeved on anchor rod body 4, then backing plate 6 is added on anchor pole top 8, even if also anchor pole top 8 passes through the hole of backing plate 6, backing plate 6 is pressed in the upper end of pipe, nut 7 is screwed on anchor pole top 8, with tightening for nut 7, backing plate 6 is increased to the pressure of pipe, drive the expansible stopper 9 of truncated cone-shaped to 10 bottoms of expansion tooth bowl it is close while, the tooth 11 of extrusion expansion tooth bowl 10 opens to surrounding, and is pressed into the drilling Rock And Soil of 3 hole wall 12;
Figure 413642DEST_PATH_IMAGE001
Nut 7 is backed out, lower bolster 6 is unloaded, so as to stop applying thrust to pipe, and is drawn off, the inner surface annular platform 13 that expansible stopper 9 is inflated tooth 10 teeth 11 of bowl is blocked, remains in that expansion tooth 10 teeth 11 of bowl open embolism among the drilling Rock And Soil of 3 hole wall 12 to surrounding;
Figure 236105DEST_PATH_IMAGE002
Backing plate 6 is added again on anchor pole top 8, even if also anchor pole top 8 passes through the bolthole at the center of backing plate 6, and tightens nut 7, anchor rod body 4 is that side slope Rock And Soil 1 applies prestressing force;Pass through filling and injecting slurry body 1 in 14 pairs of drillings 3 of injected hole on backing plate, injecting cement paste 2 after consolidation by with anchor rod body 4 and its expansible stopper of bottom 9, and expansion tooth bowl 10 is tightly consolidated in one, when slope ground body 1 is deformed, the prestressing force not only applied by anchor rod body 4, while being subjected to the anchor force that slope ground body 1 is deformed and passively produced.

Claims (5)

1. the prestressed anchor for preventing from extracting from anchor hole of blurting out, it is characterised in that:It includes bottom with expansion tooth bowl(10)Anchor rod body(4), center be provided with expansible stopper centre bore(16)Expansible stopper(9)And pad(5), backing plate(6), nut(7);The pad(5)With the backing plate(6)On be equipped with bolthole;The anchor rod body(4)Top(8)Sequentially pass through the expansible stopper centre bore(16), the pad(5)With the backing plate(6)Bolthole and the nut(7)Connect together;The expansible stopper(9)It is placed in the expansion tooth bowl(10)It is interior.
2. prestressed anchor as claimed in claim 1 that prevent from extracting from anchor hole of blurting out, it is characterised in that:The expansion tooth bowl(10)In small bowl-shape, its opening upwards in the big bottom of mouth, that is, blurt out, be circumferentially spacedly distributed the tooth being connected with bowl bottom(11);The tooth(11)Inner surface multiple annular platforms are distributed with(13).
3. prestressed anchor as claimed in claim 1 that prevent from extracting from anchor hole of blurting out, it is characterised in that:The expansible stopper(9)In truncated cone-shaped, its side and the tooth(11)Inner surface coincide.
4. prestressed anchor as claimed in claim 1 that prevent from extracting from anchor hole of blurting out, it is characterised in that:The anchor rod body(4)Top(8)It is provided with screw thread(15).
5. prestressed anchor as claimed in claim 1 that prevent from extracting from anchor hole of blurting out, it is characterised in that:The backing plate(6)On be provided with an injected hole(14).
CN 201220551255 2012-10-26 2012-10-26 Sequential port prestress anchor rod prevented from being drawn out from anchor eye Expired - Fee Related CN202936780U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN 201220551255 CN202936780U (en) 2012-10-26 2012-10-26 Sequential port prestress anchor rod prevented from being drawn out from anchor eye

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN 201220551255 CN202936780U (en) 2012-10-26 2012-10-26 Sequential port prestress anchor rod prevented from being drawn out from anchor eye

Publications (1)

Publication Number Publication Date
CN202936780U true CN202936780U (en) 2013-05-15

Family

ID=48321026

Family Applications (1)

Application Number Title Priority Date Filing Date
CN 201220551255 Expired - Fee Related CN202936780U (en) 2012-10-26 2012-10-26 Sequential port prestress anchor rod prevented from being drawn out from anchor eye

Country Status (1)

Country Link
CN (1) CN202936780U (en)

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN103774652A (en) * 2012-10-26 2014-05-07 兰州大学 Pre-stressed anchor rod capable of preventing from being pulled out from anchor eye along opening

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN103774652A (en) * 2012-10-26 2014-05-07 兰州大学 Pre-stressed anchor rod capable of preventing from being pulled out from anchor eye along opening
CN103774652B (en) * 2012-10-26 2015-10-28 兰州大学 Smoothly prevent the prestressed anchor extracted from anchor hole

Similar Documents

Publication Publication Date Title
Yang et al. Failure mechanism and control technology of water-immersed roadway in high-stress and soft rock in a deep mine
CN103774649B (en) Anti-mouth prevents the prestressed anchor extracted from anchor hole
CN105201514B (en) A kind of water-bearing stratum shaft wall structure and construction method
CN202359557U (en) Pawl type anchor rod
CN108386217B (en) A kind of the automatic classification expansion head Pulling-Resistant Anchor Rod and its application method of reinforcing soft rock mass
CN101173517A (en) Pile-pulling construction method
CN104074190A (en) Secondary high-pressure grouting expansion bit anchor rod and construction method thereof
CN206752482U (en) Control the combination retaining structure of biased deformation
CN109441512A (en) Armored concrete two-ended cables and its construction method
CN103132514A (en) Detent type anchor rod
CN102828761A (en) Full-thread glass fiber composite hollow grouting anchor rod
CN101975074B (en) Soft rock roadway anchored concrete filled steel tube anti-floor heave device and construction method thereof
CN107780411A (en) Bellows anchor pole, fastener, anchor pole with water-tight corrosion-proof fastener
CN108756809A (en) A kind of method for sealing of shield tunnel geological prospecting borehole
CN207891874U (en) A kind of bellows anchor pole, clamp device, anchor pole with waterproof and anticorrosion clamp device
CN208605162U (en) A kind of shield tunnel geological prospecting borehole hole sealing structure
CN203257442U (en) Anchor rod/anchor rope with leakproof plug of rubber for anchoring
CN204023566U (en) A kind of secondary high-pressure slip-casting enlarged footing anchor pole
CN202936791U (en) Pre-stressed anchor rod prevented from being pulled out of anchor eye
CN105507929B (en) A kind of method that repetition applies prestressed cable bolting
CN201310366Y (en) Aperture pipe for high hydraulic mud injection
CN202936780U (en) Sequential port prestress anchor rod prevented from being drawn out from anchor eye
CN202936778U (en) Aboral pre-stressed anchor capable of preventing from being pulled out of anchor holes
CN103967011A (en) Recyclable umbrella-shaped pressure-bearing ground anchor in soft soil stratum
CN203583501U (en) Deep-layer shear resistant device capable of preventing rock sliding

Legal Events

Date Code Title Description
C14 Grant of patent or utility model
GR01 Patent grant
CF01 Termination of patent right due to non-payment of annual fee

Granted publication date: 20130515

Termination date: 20151026

EXPY Termination of patent right or utility model