CN201310366Y - Aperture pipe for high hydraulic mud injection - Google Patents

Aperture pipe for high hydraulic mud injection Download PDF

Info

Publication number
CN201310366Y
CN201310366Y CNU2008202214166U CN200820221416U CN201310366Y CN 201310366 Y CN201310366 Y CN 201310366Y CN U2008202214166 U CNU2008202214166 U CN U2008202214166U CN 200820221416 U CN200820221416 U CN 200820221416U CN 201310366 Y CN201310366 Y CN 201310366Y
Authority
CN
China
Prior art keywords
wall
pipe
aperture pipe
orifice tube
aperture
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Fee Related
Application number
CNU2008202214166U
Other languages
Chinese (zh)
Inventor
李治国
杨毅
干昆蓉
刘坤昊
皱翀
王全胜
张建斌
曾超
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Technology Research of China Railway Tunnel Group Co Ltd
Original Assignee
China Railway Tunnel Group Co Ltd CRTG
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by China Railway Tunnel Group Co Ltd CRTG filed Critical China Railway Tunnel Group Co Ltd CRTG
Priority to CNU2008202214166U priority Critical patent/CN201310366Y/en
Application granted granted Critical
Publication of CN201310366Y publication Critical patent/CN201310366Y/en
Anticipated expiration legal-status Critical
Expired - Fee Related legal-status Critical Current

Links

Images

Abstract

The utility model belongs to the reinforcing and water shutoff technique of tunnel and underground engineering weak enclosing rock and provides an aperture pipe for high hydraulic mud injection, which is characterized in that an aperture pipe 2 is a seamless steel pipe with the outer diameter of Phi108mm, the wall thickness of 6mm and the length of 1.5m, one end of the aperture pipe 2 is welded with a flange disc 7, the other end is sealed into a caecal tube structure with cement mortar 6, the pipe wall of the aperture pipe 2 is provided with flax silk 4 which is twisted in a spindle mode, the aperture pipe 2 is located in a drill hole 3 with the depth of 2.0m on a grouting wall 1 or a grouting disc, and the space between the aperture pipe 2 and the pore wall of the drill hole is filled with sulphoaluminate cement mortar. The aperture pipe which is proposed by the utility model can satisfy the mad injection demands with the maximum pad injection pressure of 10Mpa.

Description

The orifice tube that is used for high hydraulic pressure slip casting
Technical field
The utility model belongs to the reinforcing and the water-plugging technique of tunnel and underground construction weak surrounding rock, mainly proposes a kind of orifice tube that is used for high hydraulic pressure slip casting.
Background technology
Carry out tunnel and underground engineering construction in bad geological section especially high pressure, rich pool, water under high pressure in the stratum or water under high pressure very easily occurring carries charges such as silt and gushes out from the excavation face, jeopardize personnel and device security, casualty accident in various degree takes place, and cause groundwater table decreasing, soil erosion damages surrounding enviroment, brings to resident's productive life to have a strong impact on.For guaranteeing construction safety and reaching environmental requirement, processing method commonly used is a slip casting method both at home and abroad at present, slip casting method is exactly by certain pressure a certain amount of gelling material to be injected the rock stratum or the soil body, make that it flows in formation fractures or soil body space, diffusion, filling, fixed, be formed with the adhesive bond of certain intensity and low permeability, strengthening stratum, shutoff underground water.For preventing that underground water is gushed out in the boring procedure, guarantee boring, slip casting safety, need in advance at wall for grouting or end on the magmatic rock dish orifice tube is installed and anchoring firm, gate valve is installed then, hole again, anchorage style relatively more commonly used at present is to put the anchoring agent at tube wall place, orifice tube aperture, in case of necessity at aperture peace flange, at wall for grouting or end and beat anchor pole on the magmatic rock dish and orifice tube is anchored in the boring this method complex process, the anchored force that provides is limited, the pulling capacity that orifice tube is subjected in the time of can not resisting high-pressure slip-casting is difficult to realize high-pressure slip-casting, can't guarantee slip casting effect, and orifice tube easily is ejected in the slip casting process, causes bigger potential safety hazard.
Summary of the invention
The purpose of this utility model promptly is to propose a kind of orifice tube that is used for high hydraulic pressure slip casting, makes it can satisfy that grouting pressure is the requirement of the high-pressure slip-casting of 10Mpa under the high hydraulic condition.
The utility model is finished its invention task in the following ways: a kind of orifice tube that is used for high hydraulic pressure slip casting, orifice tube is the seamless steel pipe of external diameter φ 108mm, wall thickness 6mm, length 1.5m, and orifice tube one end welding flange, the other end constitute the blind pipe structure by the cement mortar shutoff; Have the flax silk that twines with the spindle pattern on the tube wall of orifice tube, described orifice tube is positioned at wall for grouting or ends the dark boring of 2.0m on the magmatic rock dish, and between the hole wall of orifice tube and boring filling sulphate aluminium cement slurries.
Description of drawings
The user mode schematic diagram of Fig. 1 for adopting the utility model orifice tube the aperture to be carried out anchoring.
Among the figure: 1, wall for grouting, 2, orifice tube, 3, boring, 4, flax silk, 6, cement mortar, 7, flange, 8, reducer pipe.
The specific embodiment
In conjunction with the accompanying drawings the utility model embodiment is illustrated:
As shown in Figure 1, orifice tube 2 adopts the seamless steel pipe processing of external diameter φ 108mm, wall thickness 6mm, length 1.5m, and tube wall twines flax silk 4 by the pattern of spindle, mouth of pipe welding flange 7, and the pipe end, utilize cement mortar 6 shutoff, constitutes the blind pipe structure; Utilization is furnished with the rig of φ 130mm drill bit and goes up the dark hole of brill 2.0m at wall for grouting 1 (or ending the magmatic rock dish), put into the sulphate aluminium cement slurries of water/binder ratio W/C=0.3~0.4: 1 in 3 in boring, the amount of putting into is advisable to be full of 2/3 of boring length, after treating cement mortar 6 curing at the 2 pipe ends of orifice tube, adopt rig to be connected with reducer pipe 8, orifice tube 2 is headed in the boring 3, extruding sulphate aluminium cement slurries make it fully fill space between tube wall and hole wall, treat that the sulphate aluminium cement slurries solidify the anchoring of then having finished orifice tube after about 2h.

Claims (1)

1, a kind of orifice tube that is used for high hydraulic pressure slip casting, it is characterized in that: orifice tube (2) is the seamless steel pipe of external diameter φ 108mm, wall thickness 6mm, length 1.5m, and orifice tube (2) one end welding flanges (7), the other end constitute the blind pipe structure by cement mortar (6) shutoff; Have the flax silk (4) that twines with the spindle pattern on the tube wall of orifice tube (2), described orifice tube (2) is positioned at wall for grouting or ends the dark boring (3) of 2.0m on the magmatic rock dish, and is filled with the sulphate aluminium cement slurries between the hole wall of orifice tube (2) and boring.
CNU2008202214166U 2008-11-28 2008-11-28 Aperture pipe for high hydraulic mud injection Expired - Fee Related CN201310366Y (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CNU2008202214166U CN201310366Y (en) 2008-11-28 2008-11-28 Aperture pipe for high hydraulic mud injection

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CNU2008202214166U CN201310366Y (en) 2008-11-28 2008-11-28 Aperture pipe for high hydraulic mud injection

Publications (1)

Publication Number Publication Date
CN201310366Y true CN201310366Y (en) 2009-09-16

Family

ID=41107621

Family Applications (1)

Application Number Title Priority Date Filing Date
CNU2008202214166U Expired - Fee Related CN201310366Y (en) 2008-11-28 2008-11-28 Aperture pipe for high hydraulic mud injection

Country Status (1)

Country Link
CN (1) CN201310366Y (en)

Cited By (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN102392661A (en) * 2011-10-13 2012-03-28 北京中铁瑞威基础工程有限公司 Grouting construction method for high pressure and rich water zone of tunnel and orifice pipe component
CN102606846A (en) * 2011-12-21 2012-07-25 浙江东发环保工程有限公司 Sealing method for gap between glass steel tube and carbon steel sleeve
CN103362204A (en) * 2012-04-09 2013-10-23 苏州园林营造工程有限公司 Method for blocking rain sewage pipeline
CN104929564A (en) * 2014-12-18 2015-09-23 安徽恒源煤电股份有限公司 High-pressure water hole grouting and feeding device
CN114233390A (en) * 2021-12-20 2022-03-25 中铁二院工程集团有限责任公司 Auxiliary tunnel plugging structure suitable for weak surrounding rock and calculation method thereof

Cited By (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN102392661A (en) * 2011-10-13 2012-03-28 北京中铁瑞威基础工程有限公司 Grouting construction method for high pressure and rich water zone of tunnel and orifice pipe component
CN102606846A (en) * 2011-12-21 2012-07-25 浙江东发环保工程有限公司 Sealing method for gap between glass steel tube and carbon steel sleeve
CN103362204A (en) * 2012-04-09 2013-10-23 苏州园林营造工程有限公司 Method for blocking rain sewage pipeline
CN104929564A (en) * 2014-12-18 2015-09-23 安徽恒源煤电股份有限公司 High-pressure water hole grouting and feeding device
CN114233390A (en) * 2021-12-20 2022-03-25 中铁二院工程集团有限责任公司 Auxiliary tunnel plugging structure suitable for weak surrounding rock and calculation method thereof

Similar Documents

Publication Publication Date Title
CN104775428B (en) Compound-type pre-stvessed anchor cable structure and construction method thereof
CN201310362Y (en) Installing device of high pressure water burst drill hole bore pipe
CN103061785B (en) Grouting process for borehole casing pressure-proof seepage sealing grouting device for drilling roadway breaking water burst surrounding rock
CN105201514B (en) A kind of water-bearing stratum shaft wall structure and construction method
CN204703160U (en) Two anchoring section prestressed anchor Cable Structure
CN106065624B (en) Suitable for passing through the permanent seal cooling prestress anchorage cable and its construction method of broken rock
CN201310366Y (en) Aperture pipe for high hydraulic mud injection
CN103089276B (en) Deep-shallow hole and high-low pressure coupling grouting technology
CN204703159U (en) Prefabricated anchor head pressure anchor wire structure
CN104074190A (en) Secondary high-pressure grouting expansion bit anchor rod and construction method thereof
CN104790394A (en) Pressure anchor cable structure with prefabricated anchor head and construction method of pressure anchor cable structure
CN102418536A (en) Large-aperture pretension base plate hollow grouting device
WO2023142654A1 (en) Large-deformation and constant-resistance support grouting anchor cable
CN102168419B (en) Method for compounding anchor rod by geotextile reinforcing
CN108951648A (en) Open trench tunnel layer of sand Sand foundation ditch strengthening method
CN104532860B (en) Recoverable soil nail
CN109441512A (en) Armored concrete two-ended cables and its construction method
CN102535458A (en) Reinforced cement-soil anchor bolt and construction method thereof
CN210396781U (en) Anchor rod for reinforcing tunnel construction
CN202644538U (en) A grouting device used for a water-rich quicksand stratum
CN201033872Y (en) Slip casting type anchor bar
CN102748048A (en) Hole wall grouting anchor cable
CN101545255B (en) Method for manufacturing a PHC tubular pile in soft soil region through chambering and grouting
CN103883339B (en) A kind of cable bolting method repeating Shi Hanzhang
CN206256920U (en) Deformed steel bar high-pressure slip casting stock

Legal Events

Date Code Title Description
C14 Grant of patent or utility model
GR01 Patent grant
ASS Succession or assignment of patent right

Owner name: CHINA RAILWAY TUNNEL GROUP TECHNOLOGY RESEARCH CO.

Free format text: FORMER OWNER: ZHONGTIE TUNNEL GROUP CO., LTD.

Effective date: 20140603

C41 Transfer of patent application or patent right or utility model
TR01 Transfer of patent right

Effective date of registration: 20140603

Address after: 471009 Luoyang City, the old town of Henan champion Red Road, No. 3

Patentee after: China Railway Tunnel Group Technology Research Co., Ltd.

Address before: 471009 Henan province Luoyang Xigong Cemetery Road No. 3

Patentee before: Zhongtie Tunnel Group Co., Ltd.

CF01 Termination of patent right due to non-payment of annual fee
CF01 Termination of patent right due to non-payment of annual fee

Granted publication date: 20090916

Termination date: 20171128