CN202926211U - Mining hydraulic working machine - Google Patents

Mining hydraulic working machine Download PDF

Info

Publication number
CN202926211U
CN202926211U CN 201220634950 CN201220634950U CN202926211U CN 202926211 U CN202926211 U CN 202926211U CN 201220634950 CN201220634950 CN 201220634950 CN 201220634950 U CN201220634950 U CN 201220634950U CN 202926211 U CN202926211 U CN 202926211U
Authority
CN
China
Prior art keywords
pipe
water
high pressure
gear
under high
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Withdrawn - After Issue
Application number
CN 201220634950
Other languages
Chinese (zh)
Inventor
苏现波
马宝安
裴刚
陈东海
刘伟
刘晓
张春然
邹继成
王金凯
周惠英
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Henan Yujian Technology Co., Ltd.
Original Assignee
HENAN YUJIAN MINING TECHNOLOGY Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by HENAN YUJIAN MINING TECHNOLOGY Co Ltd filed Critical HENAN YUJIAN MINING TECHNOLOGY Co Ltd
Priority to CN 201220634950 priority Critical patent/CN202926211U/en
Application granted granted Critical
Publication of CN202926211U publication Critical patent/CN202926211U/en
Anticipated expiration legal-status Critical
Withdrawn - After Issue legal-status Critical Current

Links

Images

Abstract

A mining hydraulic working machine comprises a main machine, an execution platform, a clean water pump station, a hydraulic pump station and a switch cabinet; a flexible steel pipe controller and a high pressure water controller are installed in the execution platform; the main machine is connected with the flexible steel pipe controller via an oil pipe, and is connected with the high pressure water controller via a water pipe; the flexible steel pipe controller is connected with the hydraulic pump station via an oil pipe; the high pressure water controller is connected with the clean water pump station via a water pipe; and the execution platform, the clean water pump station and the hydraulic pump station are respectively connected with the switch cabinet via power cables. The utility model has a compact structure, greatly simplifies the structure of the working machine, can adjust the position and the direction of a formed hole under a coal mine, can adapt to the construction requirements of hole forming, dredging and expanding, gap slitting, fracturing and the like toward all directions under the mine, is stable, safe and reliable to work, occupies small space, and is particularly suitable to be used in the occasions with small space such as an underground coal mine.

Description

A kind of mining water power working rig
Technical field
The utility model belongs to the coal-bed gas exploitation equipment technical field, particularly a kind of mining water power working rig of waterpower pore-forming, thin hole, reaming, slot and the pressure break etc. for reaching the ground gas drainage holes under coal mine.
Background technology
The highly gassy mine that China exists is more, and has the advantages that coal seam gas-bearing capacity is high, pressure is large, gas permeability is poor and the extraction difficulty is large.At present, the average mining depth of China's State owned coal mine mine is approximately 420 meters.Along with the further increasing of the pit mining degree of depth, geostatic stress and gas pressure also increase thereupon, and the gas pumping difficulty also further increases.By experimental study for many years, China has also formed underground gas borehole pumping method and the technique of the suitable China's coal-mine characteristics of cover gradually.The effect of down-hole drilling mash gas extraction is subject to bore diameter size, boring length and the boring impact of coal mass relief scope on every side, adopt conventional mechanical drilling machine construction large diameter borehole to exist that the hole that collapses is serious, deslagging is difficult, become the short and rig load of hole length to be the technical problems such as multiple increase how much, from technology with all there is economically sizable difficulty.Therefore, seeking a technological approaches that enlarges bore diameter, increase boring length and raising boring unload effects scope is necessary.
Simultaneously, along with the increase geostatic stress of mining depth increases gradually, boring is because the geostatic stress effect is easily collapsed, stopped up, and Acceptable life is not long, but not technology and the equipment of boring reparation at present can't be repaired the boring of collapsing, stopping up.
Along with developing rapidly of water jet theory and application technology, both at home and abroad the research of high-pressure water jet boring technology is also quite paid attention to, and dropped into a large amount of human and material resources theory and experimental study have been carried out in high-pressure water jet boring, some can creep into than the water jet rig of hard formation or water jet Aided Machine rig and succeed in developing, and have obtained increasing approval in all kinds of engineerings are used.
Aspect mash gas pumping drilling, reaming, low for projecting coal bed gas permeability, as to take out in advance weak effect characteristics, behind construction finishing drilling hole, adopt bore hole enlarging technology with high water jet to carry out reaming, namely utilize can spray high-pressure water jet, again can autorotation the reaming ejector coal body around boring is rotated cutting, move simultaneously the reaming that forms whole boring along the borehole axial direction by high pressure reaming drilling rod.After bore diameter enlarges, can increase the exposed area in coal seam, increase the relief range of boring, strengthen the radius of influence of boring, increase the hole pumping and mining gas amount, improve the extracting result of boring.Therefore; carry out the research of high-pressure water jet coal seam drilling hole counter-boring techniques and equipment, to increasing the extraction amount of coal mine gas, reduce the methane content in the colliery; reduce gas accident and occur, improve Safety of Coal Mine Production level and atmospheric environment protection aspect and be of great immediate significance.
The U.S., Australia and the developed country such as Japanese study for a long period of time to high-pressure water jet coal seam drilling hole counter-boring techniques, technical level is relatively high, can not obtain fine application but their high-pressure water jet is equipped under the coal seam geological condition of domestic complexity, and the Nozzle combination of high-pressure water jet coal seam drilling hole reaming, bit, hole drilling deslagging aspect need be optimized further still.
In China, the research of the 80's of 20th century high-pressure water jet rig for later in the coal seam the horizontal slotted hole of brill established theory and practice basis, although the slotted hole of obtaining in these tests only is 42m, the analysis showed that after deliberation the applying high voltage water-jet technology bores the potentiality of slotted hole very large.
Existing coal mine down-hole drilling equipment is the rig of various models, and its principle is to rotate by drilling rod, drives bit and creeps into.When creeping into, after the present segment rod boring, need in time to connect step by step the back segment drilling rod, during extension bar, rig must stop creeping into, and still needs when withdrawing to unload section by section, and the drilling efficiency of therefore existing rig is all lower.Although coiled tubing technology occurred in petroleum industry in recent years, coiled tubing is sent into injection head, coiled tubing to be sent in the oil drilling of several kms by injection head, water under high pressure carries out underground work by coiled tubing.But can't be used under coal mine owing to having following characteristics: (1) direction is unadjustable, is downward without exception, can not adapt under mine the needs to multi-direction punching; (2) device distribution is disperseed, pedestal, cylinder, the first-class dispersed placement that is of injection, and floor space is huge, is difficult to adapt to the use occasion of down-hole small space.
The utility model content
The utility model provides pore-forming height and direction under a kind of compact conformation, the adjustable mine of economizing on coal, working stability and safe and reliable mining water power working rig.
For achieving the above object, the technical solution of the utility model is: a kind of mining water power working rig, comprise main frame, carry out platform, clean water pump station, hydraulic power unit and switchboard, carry out in platform flexible pipe controller and water under high pressure controller are installed, main frame is connected with the flexible pipe controller, is connected with the water under high pressure controller by water pipe by oil pipe, the flexible pipe controller is connected with hydraulic power unit by oil pipe, the water under high pressure controller is connected with clean water pump station by water pipe, carries out platform, clean water pump station and hydraulic power unit and is electrically connected to switchboard by power cable respectively.
Described main frame comprises the hoist cylinder of sledge shape base and the side-inverted of sledge shape base, and hoist cylinder is equipped with cover by the left support abutment on its sidewall and right support abutment and moves footpath tumbler cylinder main shaft, and hoist cylinder is connected with oil pipe between main frame and execution platform; Cover moves footpath tumbler cylinder main shaft one end and is provided with the water under high pressure passage, and the import and export of water under high pressure passage are respectively equipped with water under high pressure tube connector and water under high pressure joint, and the water under high pressure tube connector is connected with water pipe between main frame and execution platform; Cover moves tumbler cylinder main shaft both sides, footpath and is provided with left support arm and right support arm, and left support arm and right support arm front end are provided with defeated pipe device; Left support arm and right support arm front end also are equipped with closed tube hydraulic motor, hydraulic clutch and reducer, closed tube hydraulic motor and main frame and the oil pipe of carrying out between platform are connected, the reducer output is provided with drive sprocket, cover moves footpath tumbler cylinder main shaft and is provided with the driven sprocket corresponding with drive sprocket, and drive sprocket and driven sprocket are provided with chain; Cover moves footpath tumbler cylinder main shaft and is provided with cylinder, is wound with flexible pipe on cylinder, and Water jet sprayer is installed on flexible pipe, and flexible pipe one end stretches in defeated pipe device, the other end is connected with the water under high pressure joint by high-pressure hose; The defeated pipe direction of defeated pipe device and cylinder excircle are tangent.
Described cover moves footpath tumbler cylinder main shaft and comprises splined shaft with sliding tray, back and forth axle, slippage cover, spline housing and spindle nose, and spline housing is sheathed on the splined shaft outside, and spline housing is connected by cylinder hoop and cylinder, and spindle nose is fixed on the splined shaft right side; Slippage cover and splined shaft endoporus matched in clearance, the slippage cover is set on reciprocal axle, back and forth axle is provided with left-hand screw groove and the right spiral that the end communicates, and slippage puts and offers slider bore, is provided with slide block in slider bore, slider top is provided with slide key, slide key and left-hand screw groove and right spiral are slidably matched, and offer square hole on spline housing, are provided with the slide block set that is sheathed on the slide block outside in square hole, slide block set is fixed in slippage by screw and puts, and the sliding tray of slide block set and splined shaft is slidably matched; Back and forth the right-hand member of axle passes spindle nose, spindle nose is positioned at right support abutment, is installed with the first gear on the spindle nose end face, and back and forth the axle outer end is provided with the second gear, the first gear and the second gear one side are provided with duplicate gear, and duplicate gear is meshed with the first gear and the second gear respectively.
Be provided with stage clip and steel ball in described slide block, jackscrew pushes up by steel ball and is pressed on stage clip.
Described defeated pipe device comprise arrange on transmission case body, upper cover plate, lower cover and lower cover put pipe hydraulic motor and hydraulic clutch, put the pipe hydraulic motor and be connected with oil pipe between main frame and execution platform; Be provided with side by side the chain on two pairs of sprocket wheels and the every pair of sprocket wheel in transmission case body, wherein a sprocket wheel in pair of sprocket is provided with drive sprocket axle, another is provided with the driven chain wheel shaft to a sprocket wheel in sprocket wheel, drive sprocket axle is provided with driving gear, the driven chain wheel shaft is provided with the driven gear that is meshed with driving gear, and the drive sprocket axle outer end drives with hydraulic clutch and is connected; The chain outside is fixed with fixture block by little bent plate, is provided with groove outside fixture block, forms the defeated tube chamber that contains flexible pipe between the relative fixture block of lateral surface.
Described transmission case body bottom is provided with track by fixed block, and fixed block is provided with the adjustment screw that withstands on track side surfaces, and top, track another side is pressed in the chain inboard.
Described support arm and cover move between the tumbler cylinder main shaft of footpath and are provided with adjusted device, and the tuning center of support arm overlaps with the center of rotation that cover moves footpath tumbler cylinder main shaft; Adjusted device comprises the copper sheathing of spindle nose outside and the ring gear of copper sheathing outside, the outer circumference surface of ring gear and right support arm are connected, be provided with the pinion shaft with the ring gear engagement in right support abutment, the end of pinion shaft is provided with turbine, turbine is meshed with the worm screw that stretches to the right support abutment outside, the outside tuning hydraulic motor that connects of worm screw, the tuning hydraulic motor is connected with oil pipe between main frame and execution platform.
Described flexible pipe controller is flexible pipe Long-distance Control instrument, it comprises the indication panel of fixing by junction plate on proportional flow direction combination valve peculiar to vessel and proportional flow direction combination valve peculiar to vessel, be connected with action bars by the reversing swinging moving axis on proportional flow direction combination valve peculiar to vessel, offer chute on action bars, motor and reductor are installed on junction plate, the output shaft of motor and reductor is positioned at the indication panel centre position, the output shaft of motor and reductor is provided with crank, the crank other end is equipped with slide-bar, and slide-bar and chute are slidably matched.
Described water under high pressure controller is water under high pressure Long-distance Control instrument, it comprises the indicating dial that arranges by adapter sleeve on high-pressure water valve and high-pressure water valve, the motor and the reductor that are positioned at the indicating dial rear portion are installed above adapter sleeve, and the output of motor and reductor is positioned at the indicating dial center; The output of motor and reductor is provided with pointer and crank, and the crank other end is hinged with connecting rod by bearing pin, and the connecting rod other end is hinged mutually by the slide valve lever of rotating shaft with high-pressure water valve.
Described mining water power working rig also comprises the remote console that is made of Long-distance Control button and display instrument, remote console is electrically connected to switchboard by power cable and control signal cable, and display instrument is connected with monitoring host computer by holding wire and carries out the video camera of platform.
Compared with prior art, the utlity model has following advantage:
1, the utility model comprises main frame, carry out platform, clean water pump station, hydraulic power unit and switchboard, carry out in platform flexible pipe Long-distance Control instrument and water under high pressure Long-distance Control instrument are installed, main frame is connected with flexible pipe Long-distance Control instrument by oil pipe, be connected with water under high pressure Long-distance Control instrument by water pipe, flexible pipe Long-distance Control instrument is connected with hydraulic power unit by oil pipe, water under high pressure Long-distance Control instrument is connected with clean water pump station by water pipe, carry out platform, clean water pump station and hydraulic power unit are electrically connected to switchboard by power cable respectively, its compact conformation, greatly simplified the structure of working rig, become hole site and direction under the adjustable mine of economizing on coal, can adapt under mine to the comprehensive pore-forming that carries out, dredge the hole, reaming, slot, the demand of the job executions such as pressure break, working stability, safe and reliable, take up room little, the occasion that is very suitable for the inferior narrow space of coal mine is used.
2, the video camera of remote console with the field operation scene information in service tunnel and carry out execution indication on platform and display instrument that meter information is transferred to remote setting on, the image information operating remote action button of operating personnel by showing, control signal is sent to switchboard, realization is controlled the start-stop of clean water pump station and hydraulic power unit, realize simultaneously carrying out the dynamic Control of platform, and to carrying out proportional flow direction combination valve peculiar to vessel and the high-pressure water valve travel direction in platform, the control of pressure versus flow, assurance is put pipe to working rig, the closed tube action, speed and high pressure water switch and pressure flow size are accurately controlled, both can be with regard near operation, can realize accurate Long-distance Control again, automaticity is high, for providing reliable equipment, coal mine downhole safety production guarantees, simultaneously can realize carrying out in the deathtrap breakthrough of high-pressure hydraulic construction operation, greatly improved the safety factor of construction operation.
3, the working rig support adopts sledge shape base and hoist cylinder, and support and elevating mechanism are integrated, and makes the working rig structure compacter, and is reliable and stable during work; The hoist cylinder synchronization lifting can realize that main frame carries out operation in the differing heights position; Adjusted device can make the right support arm rotate, and adjusts direction thereby drive defeated pipe device around the axis of cylinder, remains that the defeated pipe direction of defeated pipe device is consistent with the tangential direction of cylinder, carries out operation to realize main frame at Difference angles.
4, reciprocal axle is set in splined shaft, can make cylinder realize axially reciprocating in rotating in same direction, remain consistent with the defeated tube hub line of defeated pipe device on left and right directions when flexible pipe moves along the excircle tangential direction of cylinder, thereby the different-diameter flexible pipe is realized that multilayer order is wound around, realize the orderly folding and unfolding action of flexible pipe.
5, the hydraulic synchronization loop is to putting pipe hydraulic motor fuel feeding, and hydraulic clutch closes, and fixture block clamping flexible pipe is outwards carried, meanwhile, the closed tube hydraulic motor is fuel feeding not, and hydraulic clutch separates, cylinder is passive rotation under the pulling of flexible pipe, completes to put the pipe action; Otherwise, to closed tube hydraulic motor fuel feeding, hydraulic clutch closes, in chain-driving bottom roll active backward rotation, be wound around flexible pipe on cylinder, meanwhile, put not fuel feeding of pipe hydraulic motor, hydraulic clutch separates, and flexible pipe drives fixture block and chain counter motion, complete the closed tube action, advance or recovery operation easy, flexible pipe can be realized main passive movement and forward and reverse being synchronized with the movement in defeated pipe device in cylinder, makes to put pipe and the closed tube motion is flexible, be convenient to control, action is precisely reliable.
When 6, cylinder rotates, can make splined shaft and reciprocal axle produce outer corner difference, by changing gear-driven gear parameter, can realize the outer corner difference that needs; Splined shaft and the outer corner difference that back and forth exists between axle make slide key relative sliding in left-hand screw groove or right spiral, thereby cylinder is moved axially, due to the left-hand screw groove on reciprocal axle and right spiral be left-right rotary to helicla flute, and communicate at the two ends, left and right, when slide block moves to the end in the left-hand screw groove, slide key changes right spiral automatically over to, can realize automatic reverse, and vice versa; Move axially when can effectively guarantee drum rotating, when moving along the cylinder tangential direction, flexible pipe remains consistent with the defeated tube hub line of defeated pipe device on left and right directions, can guarantee winding or the release movement rule, stable of flexible pipe on cylinder, can realize working continuously, make bore mode be interrupted section by section by drilling rod and creep into, be interrupted to withdraw to become section by section and creep into continuously and withdraw from continuously, greatly improved operating efficiency.In addition, can when making drum rotating one circle, move axially the distance of flexible pipe diameter by selecting different pitch and the transmission mechanisms of helicla flute on reciprocal axle, realize flexible pipe winding of single layer or multi-lay winding.
7, be provided with track in transmission case body bottom, the top, a side of track is pressed in the inboard of chain, but the stretching chain prevent from that chain is lax to cause flexible pipe to skid, guarantee to put the pipe action accurately errorless.
8, be provided with stage clip in slide block, jackscrew pushes up by steel ball and is pressed on stage clip, and under the stage clip effect, slide key remains with left-hand screw groove or right spiral and be slidably matched, and realizes at the two ends of left-and-right spiral groove conversion direction neatly.
Description of drawings
Fig. 1 is structural representation of the present utility model;
Fig. 2 is the structural representation of main frame in Fig. 1;
Fig. 3 is the left view of Fig. 2;
Fig. 4 is the right view of Fig. 2;
Fig. 5 is the structural representation that in Fig. 2, cover moves footpath tumbler cylinder main shaft;
Fig. 6 is the structural representation of defeated pipe device in Fig. 2;
Fig. 7 is the generalized section of Fig. 6;
Fig. 8 is the structural representation of flexible pipe Long-distance Control instrument in Fig. 1;
Fig. 9 is the structural representation of Fig. 1 mesohigh water Long-distance Control instrument.
The specific embodiment
Mining water power working rig as shown in Figure 1, it comprises main frame 1, carries out platform 3, clean water pump station 4, hydraulic power unit 5 and switchboard 6, carries out platform 3 and is electrically connected to switchboard 6 respectively by power cable 16 by power cable 15, hydraulic power unit 5 by power cable 14, clean water pump station 4.In carrying out platform 3, flexible pipe Long-distance Control instrument 301 and water under high pressure Long-distance Control instrument 302 are installed, main frame 1 is connected with flexible pipe Long-distance Control instrument 301, is connected with water under high pressure Long-distance Control instrument 302 by water pipe 10 by multiple-tubing string 11, at the opposite side of carrying out platform 3, hydraulic power unit 5 is connected with oil pressure gauge with flexible pipe Long-distance Control instrument 301 by two oil pipes 12, and clean water pump station 4 is connected with water pressure gauge with water under high pressure Long-distance Control instrument 302 by two water pipes 13.Main frame 1 is positioned at service tunnel 19, and flexible pipe 21 front ends of main frame 1 are provided with Water jet sprayer 22, and Water jet sprayer 22 is positioned at operation hole 20.
In order to realize Long-distance Control, improve safety factor, the utility model also is provided with remote console, it is made of Long-distance Control button 7 and display instrument 8, remote console is electrically connected to switchboard 6 by power cable 17 and control signal cable 18, display instrument 8 is connected with by three holding wires 9 working condition that 2, three video cameras 2 of three video cameras are respectively used to monitoring host computer 1, carry out platform 3 and service tunnel 19, to determine doing what operation on remote console.on the display instrument 8 that the field operation scene information that video camera 2 is interior with service tunnel 19 and the execution indication on execution platform 3 and meter information are transferred to remote setting, the image information operating remote action button 7 of operating personnel by showing, control signal is sent to switchboard 6, realization is controlled the start-stop of clean water pump station 4 and hydraulic power unit 5, realize simultaneously carrying out the dynamic Control of platform 3, and to the high-pressure water valve travel direction in the proportional flow direction combination valve peculiar to vessel in flexible pipe Long-distance Control instrument 301 and water under high pressure Long-distance Control instrument 302, the control of pressure versus flow, the action of pipe and closed tube is put in assurance to working rig, speed and high pressure water switch and pressure flow size are accurately controlled, both can be with regard near operation, can realize accurate Long-distance Control again, simultaneously can realize carrying out in the deathtrap breakthrough of high-pressure hydraulic construction operation.
As Fig. 2, Fig. 3 and shown in Figure 4, main frame 1 comprises the hoist cylinder 24 of sledge shape base 38 and 38 side-inverteds of sledge shape base, the piston rod of hoist cylinder 24 is fixed on sledge shape base 38, hoist cylinder 24 and main frame 1 and the oil pipe 11 of carrying out between platform 3 are connected, realize lifting by hoist cylinder 24 flexible, two hoist cylinders 24 are by arranging synchronous valve or syncmotor is realized synchronization lifting in hydraulic system, also can realize synchronization lifting by on two oil cylinder tops, the synchronous crossbeam of rigidity being set, make main frame 1 carry out operation in the differing heights position.Hoist cylinder 24 is equipped with cover by the left support abutment 35 on its sidewall and right support abutment 31 and moves footpath tumbler cylinder main shaft 30, cover moves footpath tumbler cylinder main shaft 30 1 ends and is provided with water under high pressure passage 65, the import and export of water under high pressure passage 65 are respectively equipped with water under high pressure tube connector 42 and water under high pressure joint 44, and water under high pressure tube connector 42 and main frame 1 and the water pipe 10 of carrying out between platform 3 are connected.Move tumbler cylinder main shaft 30 both sides, footpath at cover and be provided with left support arm 37 and right support arm 28, the front end of left support arm 37 and right support arm 28 is equipped with defeated pipe device 25 by junction plate.Cover moves footpath tumbler cylinder main shaft 30 and is provided with cylinder 23, be wound with flexible pipe 21 on cylinder 23, Water jet sprayer 22 is installed on flexible pipe 21, flexible pipe 21 1 ends stretch in defeated pipe device 25, the other end is connected with water under high pressure joint 44 by high-pressure hose 109, utilizes clean water pump station 4 to provide water under high pressure to flexible pipe 21.The defeated pipe direction of defeated pipe device 25 and the excircle of cylinder 23 are tangent.on the junction plate of left support arm 37 and right support arm 28 front ends, closed tube hydraulic motor 41 is installed also, hydraulic clutch 40 and reducer 39, closed tube hydraulic motor 41 and main frame 1 and the oil pipe 11 of carrying out between platform 3 are connected, the output of reducer 39 is provided with drive sprocket 26, cover moves footpath tumbler cylinder main shaft 30 and is provided with the driven sprocket corresponding with drive sprocket 26 29, drive sprocket 26 and driven sprocket 29 are in transmission connection by chain 27, closed tube hydraulic motor 41 drives drive sprocket 26 and rotates, driving driven sprocket 29 rotates, thereby drive cover and move footpath tumbler cylinder main shaft 30 and cylinder 23 counter-rotatings, to realize the closed tube action to flexible pipe 21.
As shown in Figure 5, cover moves footpath tumbler cylinder main shaft 30 and comprises the splined shaft 34 with sliding tray 46, reciprocal axle 47, slippage cover 48, spline housing 50 and spindle nose 53, and spline housing 50 is sheathed on the outside of splined shaft 34, and spline housing 50 is connected by screw with cylinder hoop 51.Cylinder 23 connects as one by spoke and cylinder hoop 51, and spline housing 50 is connected by cylinder hoop 51 and cylinder 23.The endoporus matched in clearance of slippage cover 48 and splined shaft 34, slippage cover 48 is sleeved on reciprocal axle 47, back and forth is being provided with left-hand screw groove 66 and the right spiral 67 that end, two ends, left and right communicates on axle 47.Offer slider bore 45 on slippage cover 48, be provided with slide block 49 in slider bore 45, slide block 49 tops are provided with slide key 70, and slide key 70 is slidably matched with left-hand screw groove 66 and right spiral 67.Offer square hole 68 on spline housing 50, be provided with the slide block set 69 that is sheathed on slide block 49 outsides in square hole 68, slide block set 69 is fixed on slippage cover 48 by screw, and slide block set 69 is slidably matched with sliding tray 46.Be provided with stage clip 72 and steel ball 73 in slide block 49, jackscrew 71 pushes up by steel ball 73 and is pressed on stage clip 72, and under stage clip 72 effects, slide key 70 remains with left-hand screw groove 66 or right spiral 67 and is slidably matched.Spindle nose 53 is fixed on splined shaft 34 right sides, the right-hand member of spindle nose 53 and reciprocal axle 47 is positioned at right support abutment 31, be installed with the first gear 59 on spindle nose 53 end faces, back and forth axle 47 outer ends are provided with the second gear 60, the second gear 60 is connected with reciprocal axle 47 by key 61, the first gear 59 and the second gear 60 1 sides are provided with duplicate gear 63, and duplicate gear 63 is meshed with the first gear 59 and the second gear 60 respectively.
Reciprocal axle 47 is set splined shaft 34 is interior, can make cylinder 23 realize axially reciprocating in rotating in same direction, remain consistent with the defeated tube hub line of defeated pipe device 25 on left and right directions when flexible pipe 21 moves along the excircle tangential direction of cylinder 23, thereby different-diameter flexible pipe 21 is realized that multilayer order is wound around, realize the orderly folding and unfolding action of flexible pipe 21.
Move between footpath tumbler cylinder main shaft 30 at right support arm 28 and cover and be provided with adjusted device, the tuning center of right support arm 28 overlaps with the center of rotation that cover moves footpath tumbler cylinder main shaft 30.Adjusted device comprises the copper sheathing 54 of spindle nose 53 outsides and the ring gear 52 of copper sheathing 54 outsides, the outer circumference surface of ring gear 52 and right support arm 28 are connected, be provided with the pinion shaft 56 with ring gear 52 engagements in right support abutment 31, the end of pinion shaft 56 is provided with turbine 57, turbine 57 is meshed with the worm screw 58 that stretches to right support abutment 31 outsides, the outside of worm screw 58 connects tuning hydraulic motor 36, and tuning hydraulic motor 36 is connected with oil pipe 11 between main frame 1 and execution platform 3.By adjusted device, right support arm 28 is rotated, thereby make defeated pipe device 25 adjust direction around cylinder 23 axis, remain that the defeated pipe direction of defeated pipe device 25 is consistent with the tangential direction of cylinder 23, carry out operation to realize main frame 1 at Difference angles.
As shown in Figure 6 and Figure 7, described defeated pipe device 25 comprise on transmission case body 74, upper cover plate 75, lower cover 111 and lower cover 111 arrange put pipe hydraulic motor 32 and hydraulic clutch 33, put pipe hydraulic motor 32 and be connected with oil pipe 11 between main frame 1 and execution platform 3.At the interior chain 78 that is provided with side by side on two pairs of sprocket wheels and the every pair of sprocket wheel of transmission case body 74, the sprocket wheel 77 that a sprocket wheel 76 wherein in pair of sprocket is provided with in drive sprocket axle 87, right side pair of sprocket is provided with driven chain wheel shaft 88, be provided with driving gear 85 on drive sprocket axle 87, driven chain wheel shaft 88 is provided with driving gear 85 numbers of teeth and equates and intermeshing driven gear 86, and drive sprocket axle 87 lower ends drive with hydraulic clutch 33 and are connected.Be provided with little bent plate 110 in the outside of chain 78, little bent plate 110 is fixed with fixture block 80 by screw 79, fixture block 80 outsides are provided with groove, form the defeated tube chamber that contains flexible pipe 21 between the relative fixture block 80 of lateral surface, and defeated tube chamber and flexible pipe 21 profiles adapt.For stretching chain 78, prevent that it from lax causing flexible pipe 21 to skid, be provided with track 82 in transmission case body 74 bottoms by fixed block 83, fixed block 83 is provided with the adjustment screw 84 that withstands on track 82 sides, and the top, another side of track 82 is pressed in the inboard of chain 78.
Flexible pipe 21 is clamped between two fixture blocks 80, and the frictional force between flexible pipe 21 dependence and fixture block 80 travels forward and puts pipe.By the hydraulic synchronization loop is set, to putting pipe hydraulic motor 32 fuel feeding, hydraulic clutch 33 closes, fixture block 80 clamping flexible pipes 21 are outwards carried, meanwhile, closed tube hydraulic motor 41 is fuel feeding not, and hydraulic clutch 40 separates, cylinder 23 is passive rotation under the pulling of flexible pipe 21, completes to put the pipe action; Otherwise, to closed tube hydraulic motor 41 fuel feeding, hydraulic clutch 40 closes, drive initiatively backward rotation of bottom roll 23 at chain 27, be wound around flexible pipe 21 on cylinder 23, meanwhile, put not fuel feeding of pipe hydraulic motor 32, hydraulic clutch 33 separates, and flexible pipe 21 drives fixture block 80 and chain 78 counter motions, completes the closed tube action.
The operating principle of cylinder 23 is: closed tube hydraulic motor 41 rotates, and drives drive sprocket 26 and rotates, and drives driven sprocket 29 by chain 27 and rotates, and splined shaft 34 and driven sprocket 29 interlocks rotate thereby drive cylinder 23; Splined shaft 34 is connected with spindle nose 53, splined shaft 34 drives spindle nose 53 and rotates, spindle nose 53 drives the first gear 59 and rotates, the first gear 59 and duplicate gear 63 engagements, duplicate gear 63 meshes with the second gear 60 simultaneously, rotates thereby drive reciprocal axle 47, and makes splined shaft 34 and reciprocal axle 47 produce outer corner difference, by changing gear-driven gear parameter, can realize the outer corner difference that needs; Splined shaft 34 and the outer corner difference that back and forth exists between axle 47 make slide key 70 at left-hand screw groove 66 or the interior relative sliding of right spiral 67, thereby make slide block 49 and slide block set 69 in the interior movement of sliding tray 46, and drive spline housing 50 and cylinder 23 moves.Due to the left-hand screw groove 66 on reciprocal axle 47 and right spiral 67 be left-right rotary to helicla flute, and communicate at the two ends, left and right, in the interior motion of left-hand screw groove 66 to the end the time, slide key 70 changes right spiral 67 automatically over to, realizes automatic reverse when slide block 49, vice versa.By selecting the different pitch of helicla flute on reciprocal axle 47 and selecting suitable outer corner difference by transmission mechanism, cylinder 23 is revolved when turning around, move axially the distance of flexible pipe 21 diameter, realize flexible pipe 21 windings of single layer or multi-lay winding.
As shown in Figure 8, flexible pipe Long-distance Control instrument 301 comprises on proportional flow direction combination valve 96 peculiar to vessel and proportional flow direction combination valve 96 peculiar to vessel by the fixing indication panel 89 of junction plate 97, be connected with action bars 90 by reversing swinging moving axis 95 on proportional flow direction combination valve 96 peculiar to vessel, offer chute 91 on action bars 90.Motor and reductor 92 are installed on junction plate 97, the output shaft of motor and reductor 92 is positioned at the centre position of indication panel 89, the output shaft of motor and reductor 92 is provided with crank 93, and the other end of crank 93 is equipped with slide-bar 94, and slide-bar 94 is slidably matched with chute 91.Selecting hydraulic oil by operating operation bar 90 is to supply with closed tube hydraulic motor 41, or supplies with and put pipe hydraulic motor 32, thereby realizes closed tube and put switching between pipe, controls simultaneously the hydraulic fluid flow rate size.Indication panel 89 is respectively equipped with the graduation mark of 40 ° from the centre to both sides, if action bars 90 is to the right for putting pipe, action bars 90 is left closed tube, control the hydraulic fluid flow rate size by the angular dimension that manipulation bar 90 swings to the left or to the right, thereby control the rotating speed of hydraulic motor, realize controlling the speed of putting pipe or closed tube.
As shown in Figure 9, water under high pressure Long-distance Control instrument 302 comprises the indicating dial 98 that arranges by adapter sleeve 107 on high-pressure water valve 108 and high-pressure water valve 108, the motor and the reductor 100 that are positioned at indicating dial 98 rear portions are installed above adapter sleeve 107, and the output of motor and reductor 100 is positioned at the center of indicating dial 98.Be provided with pointer 99 and crank 102 on the output of motor and reductor 100, the other end of crank 102 is hinged with connecting rod 104 by bearing pin 103, and the other end of connecting rod 104 is hinged mutually by the slide valve lever 106 of rotating shaft 105 with high-pressure water valve 108.During work, the water under high pressure of clean water pump station 4 outputs enters the P mouth of high-pressure water valve 108 by water pipe 13, and arrive in operation hole 20 by flexible pipe 21, by operating electrical machines and reductor 100 runnings, make crank and connecting rod movement, can control the position of slide valve lever 106, see the assigned address of looking into pointer 99, thereby adjust water under high pressure flow and the flow direction, realize controlling the switch of water under high pressure and the size of water under high pressure flow.
When the flexible pipe on the utility model cylinder 23 was one deck, back and forth axle 47 and slippage cover 48 can coordinate screw to replace by leading screw.

Claims (10)

1. mining water power working rig, it is characterized in that, comprise main frame, carry out platform, clean water pump station, hydraulic power unit and switchboard, carry out in platform flexible pipe controller and water under high pressure controller are installed, main frame is connected with the flexible pipe controller, is connected with the water under high pressure controller by water pipe by oil pipe, the flexible pipe controller is connected with hydraulic power unit by oil pipe, the water under high pressure controller is connected with clean water pump station by water pipe, carries out platform, clean water pump station and hydraulic power unit and is electrically connected to switchboard by power cable respectively.
2. mining water power working rig as claimed in claim 1, it is characterized in that, described main frame comprises the hoist cylinder of sledge shape base and the side-inverted of sledge shape base, hoist cylinder is equipped with cover by the left support abutment on its sidewall and right support abutment and moves footpath tumbler cylinder main shaft, and hoist cylinder is connected with oil pipe between main frame and execution platform; Cover moves footpath tumbler cylinder main shaft one end and is provided with the water under high pressure passage, and the import and export of water under high pressure passage are respectively equipped with water under high pressure tube connector and water under high pressure joint, and the water under high pressure tube connector is connected with water pipe between main frame and execution platform; Cover moves tumbler cylinder main shaft both sides, footpath and is provided with left support arm and right support arm, and left support arm and right support arm front end are provided with defeated pipe device; Left support arm and right support arm front end also are equipped with closed tube hydraulic motor, hydraulic clutch and reducer, closed tube hydraulic motor and main frame and the oil pipe of carrying out between platform are connected, the reducer output is provided with drive sprocket, cover moves footpath tumbler cylinder main shaft and is provided with the driven sprocket corresponding with drive sprocket, and drive sprocket and driven sprocket are provided with chain; Cover moves footpath tumbler cylinder main shaft and is provided with cylinder, is wound with flexible pipe on cylinder, and Water jet sprayer is installed on flexible pipe, and flexible pipe one end stretches in defeated pipe device, the other end is connected with the water under high pressure joint by high-pressure hose; The defeated pipe direction of defeated pipe device and cylinder excircle are tangent.
3. mining water power working rig as claimed in claim 2, it is characterized in that, described cover moves footpath tumbler cylinder main shaft and comprises the splined shaft with sliding tray, reciprocal axle, slippage cover, spline housing and spindle nose, spline housing is sheathed on the splined shaft outside, spline housing is connected by cylinder hoop and cylinder, and spindle nose is fixed on the splined shaft right side; Slippage cover and splined shaft endoporus matched in clearance, the slippage cover is set on reciprocal axle, back and forth axle is provided with left-hand screw groove and the right spiral that the end communicates, and slippage puts and offers slider bore, is provided with slide block in slider bore, slider top is provided with slide key, slide key and left-hand screw groove and right spiral are slidably matched, and offer square hole on spline housing, are provided with the slide block set that is sheathed on the slide block outside in square hole, slide block set is fixed in slippage by screw and puts, and the sliding tray of slide block set and splined shaft is slidably matched; Back and forth the right-hand member of axle passes spindle nose, spindle nose is positioned at right support abutment, is installed with the first gear on the spindle nose end face, and back and forth the axle outer end is provided with the second gear, the first gear and the second gear one side are provided with duplicate gear, and duplicate gear is meshed with the first gear and the second gear respectively.
4. mining water power working rig as claimed in claim 3, is characterized in that, be provided with stage clip and steel ball in described slide block, jackscrew pushes up by steel ball and is pressed on stage clip.
5. mining water power working rig as claimed in claim 2, it is characterized in that, described defeated pipe device comprise arrange on transmission case body, upper cover plate, lower cover and lower cover put pipe hydraulic motor and hydraulic clutch, put the pipe hydraulic motor and be connected with oil pipe between main frame and execution platform; Be provided with side by side the chain on two pairs of sprocket wheels and the every pair of sprocket wheel in transmission case body, wherein a sprocket wheel in pair of sprocket is provided with drive sprocket axle, another is provided with the driven chain wheel shaft to a sprocket wheel in sprocket wheel, drive sprocket axle is provided with driving gear, the driven chain wheel shaft is provided with the driven gear that is meshed with driving gear, and the drive sprocket axle outer end drives with hydraulic clutch and is connected; The chain outside is fixed with fixture block by little bent plate, is provided with groove outside fixture block, forms the defeated tube chamber that contains flexible pipe between the relative fixture block of lateral surface.
6. mining water power working rig as claimed in claim 5, is characterized in that, described transmission case body bottom is provided with track by fixed block, and fixed block is provided with the adjustment screw that withstands on track side surfaces, and top, track another side is pressed in the chain inboard.
7. mining water power working rig as claimed in claim 2, is characterized in that, described support arm and cover move between the tumbler cylinder main shaft of footpath and be provided with adjusted device, and the tuning center of support arm overlaps with the center of rotation that cover moves footpath tumbler cylinder main shaft; Adjusted device comprises the copper sheathing of spindle nose outside and the ring gear of copper sheathing outside, the outer circumference surface of ring gear and right support arm are connected, be provided with the pinion shaft with the ring gear engagement in right support abutment, the end of pinion shaft is provided with turbine, turbine is meshed with the worm screw that stretches to the right support abutment outside, the outside tuning hydraulic motor that connects of worm screw, the tuning hydraulic motor is connected with oil pipe between main frame and execution platform.
8. mining water power working rig as claimed in claim 1, it is characterized in that, described flexible pipe controller is flexible pipe Long-distance Control instrument, it comprises the indication panel of fixing by junction plate on proportional flow direction combination valve peculiar to vessel and proportional flow direction combination valve peculiar to vessel, be connected with action bars by the reversing swinging moving axis on proportional flow direction combination valve peculiar to vessel, offer chute on action bars, motor and reductor are installed on junction plate, the output shaft of motor and reductor is positioned at the indication panel centre position, the output shaft of motor and reductor is provided with crank, the crank other end is equipped with slide-bar, slide-bar and chute are slidably matched.
9. mining water power working rig as claimed in claim 1, it is characterized in that, described water under high pressure controller is water under high pressure Long-distance Control instrument, it comprises the indicating dial that arranges by adapter sleeve on high-pressure water valve and high-pressure water valve, the motor and the reductor that are positioned at the indicating dial rear portion are installed above adapter sleeve, and the output of motor and reductor is positioned at the indicating dial center; The output of motor and reductor is provided with pointer and crank, and the crank other end is hinged with connecting rod by bearing pin, and the connecting rod other end is hinged mutually by the slide valve lever of rotating shaft with high-pressure water valve.
10. as arbitrary described mining water power working rig in claim 1-9, it is characterized in that, also comprise the remote console that is consisted of by Long-distance Control button and display instrument, remote console is electrically connected to switchboard by power cable and control signal cable, and display instrument is connected with monitoring host computer by holding wire and carries out the video camera of platform.
CN 201220634950 2012-11-27 2012-11-27 Mining hydraulic working machine Withdrawn - After Issue CN202926211U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN 201220634950 CN202926211U (en) 2012-11-27 2012-11-27 Mining hydraulic working machine

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN 201220634950 CN202926211U (en) 2012-11-27 2012-11-27 Mining hydraulic working machine

Publications (1)

Publication Number Publication Date
CN202926211U true CN202926211U (en) 2013-05-08

Family

ID=48216184

Family Applications (1)

Application Number Title Priority Date Filing Date
CN 201220634950 Withdrawn - After Issue CN202926211U (en) 2012-11-27 2012-11-27 Mining hydraulic working machine

Country Status (1)

Country Link
CN (1) CN202926211U (en)

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN103015898A (en) * 2012-11-27 2013-04-03 河南宇建矿业技术有限公司 Mining hydraulic power operation machine
CN111188620A (en) * 2020-01-13 2020-05-22 西南交通大学 High-ground-temperature tunnel rock burst prevention and treatment device

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN103015898A (en) * 2012-11-27 2013-04-03 河南宇建矿业技术有限公司 Mining hydraulic power operation machine
CN111188620A (en) * 2020-01-13 2020-05-22 西南交通大学 High-ground-temperature tunnel rock burst prevention and treatment device

Similar Documents

Publication Publication Date Title
CN103016044B (en) Comprehensive method of drilling, permeability increasing, repairing and gas-driven displacing of drill hole underground coal mine
CN103061673B (en) Multifunctional micropile rig
CN107327274A (en) A kind of natural gas extraction digging apparatus
CN103015898B (en) Mining hydraulic power operation machine
CN109267982A (en) A kind of staged fracturing and control water completion method and tubing string, underground sliding bush switching system
CN106761405B (en) A kind of high-accuracy multifunctional horizontal spiral drilling machine
CN202325239U (en) Hydraulic jetting radial drilling device
CN103912217A (en) Hydraulic drive deep hole core drilling machine for scientific drilling
CN201763241U (en) Bushing & drilling-in dual purpose drilling machine
CN202926211U (en) Mining hydraulic working machine
CN102659060A (en) Integrated pulling translation device and translation method for drilling machine on same well site
CN205172494U (en) Coiled tubing tractor
CN205370442U (en) Drill jumbo
CN104594838B (en) Radial drilling device for oil-water well downhole casing
CN203188899U (en) Full sleeve special-type drilling machine
CN204532057U (en) A kind of Miniature portable spindle-type drill
CN105332667B (en) A kind of coiled tubing tractor
CN105003215A (en) Coiled tubing unit
CN104453708B (en) Trepan continuously
CN203022628U (en) Mining hydraulic-power continuous hole forming operation device
CN206418962U (en) A kind of high-accuracy multifunctional horizontal spiral drilling machine
CN201620778U (en) Retractable arm for connecting and disconnecting drill rod and casing mechanism
CN102434168A (en) Pipe connecting device
CN212027660U (en) Intelligent coal mine drilling machine
CN210003221U (en) sectional drill rod docking equipment

Legal Events

Date Code Title Description
C14 Grant of patent or utility model
GR01 Patent grant
C56 Change in the name or address of the patentee

Owner name: HENAN YUJIAN TECHNOLOGY CO., LTD.

Free format text: FORMER NAME: HENAN YUJIAN MINING TECHNOLOGY CO., LTD.

CP01 Change in the name or title of a patent holder

Address after: 454000 No. 128, west the Yellow River Road, Henan, Jiaozuo

Patentee after: Henan Yujian Technology Co., Ltd.

Address before: 454000 No. 128, west the Yellow River Road, Henan, Jiaozuo

Patentee before: Henan Yujian Mining Technology Co., Ltd.

AV01 Patent right actively abandoned

Granted publication date: 20130508

Effective date of abandoning: 20150527

RGAV Abandon patent right to avoid regrant