CN202925950U - Thermal power plant main power house and integrated power house of additional building - Google Patents

Thermal power plant main power house and integrated power house of additional building Download PDF

Info

Publication number
CN202925950U
CN202925950U CN 201220373047 CN201220373047U CN202925950U CN 202925950 U CN202925950 U CN 202925950U CN 201220373047 CN201220373047 CN 201220373047 CN 201220373047 U CN201220373047 U CN 201220373047U CN 202925950 U CN202925950 U CN 202925950U
Authority
CN
China
Prior art keywords
building
house
main
main power
power plant
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Lifetime
Application number
CN 201220373047
Other languages
Chinese (zh)
Inventor
付焕兴
周大吉
陈卫国
辛晓光
赵乾卓
周显德
马爱萍
鄢明章
邓涛
吴东梅
江剑
吴桐
曾章斌
龙剑锋
刘翔
陈进
申克
张悦文
王旭东
王雪斐
朱瑾
姜云甫
李陆伟
郝海洋
王静涛
Original Assignee
Southwest Electric Power Design Institute Co Ltd of China Power Engineering Consulting Group
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Southwest Electric Power Design Institute Co Ltd of China Power Engineering Consulting Group filed Critical Southwest Electric Power Design Institute Co Ltd of China Power Engineering Consulting Group
Priority to CN 201220373047 priority Critical patent/CN202925950U/en
Application granted granted Critical
Publication of CN202925950U publication Critical patent/CN202925950U/en
Anticipated expiration legal-status Critical
Expired - Lifetime legal-status Critical Current

Links

Images

Landscapes

  • Patch Boards (AREA)

Abstract

The utility model discloses a thermal power plant main power house and an integrated power house of an additional building. The thermal power plant main power house and the integrated power house of the additional building comprises a main power house and a steam engine house inside the main power house, a production and additional complex building is arranged at the fixed end of the steam engine house, a bunker bay is arranged between two boilers, a high-voltage distribution device is arranged on A row side next to the steam engine house inside the main power house, and no other electrical equipment is exposed outside the main power plant A row except an outgoing line which transmits from high altitude. After combining the high-voltage distribution device, a central control room and a production additional building, field distribution is planned rationally, and therefore technological processes are rational and smooth, high-voltage distribution device geographic information system (GIS) is smooth in outlet, a maintenance shop is convenient to overhaul and maintain, and a material room does not affect production and overhaul. A main transformer, a station transformer and a start/ standby transformer are arranged below 500 kilovolts GIS, high degree space is utilized through overlapping arrangement, and occupied land is saved, plant land area of the thermal power plant is reduced greatly, the plant land can be decreased by 30% to 40% compared with a conventional arrangement pattern, and land conservation effect is obvious.

Description

The integrated factory building of Power Plant Main House and accessory building
Technical field
The utility model relates to the integrated factory building of a kind of Power Plant Main House and accessory building.
Background technology
As shown in Figure 1, the mill construction of existing thermal power plant is: collection is controlled the building and is arranged between two stoves; High voltage distribution installation (500kV AIS, main transformer, factory become, rise/standby become etc.) outdoor layout outside the A row; Dispersed placement is at on-site everywhere in production accessory building (producing office building, dining room, dormitory on duty, Boiler water Feeding System workshop, maintenance shop and material depot etc.).
The shortcoming that existing above-mentioned mill construction exists is: production accessory building dispersed placement plant area floor space is large, and power plant produces and can not manage concentratedly.The high voltage distribution installation layout is disperseed, floor space is large, and not compact in appearance, electric utility exposes, and is not attractive in appearance.
The utility model content
The purpose of this utility model is for above-mentioned situation, provides a kind of plant area that saves to take up an area, improve the Power Plant Main House of production management efficiency and the integrated factory building of accessory building.
The purpose of this utility model realizes by following technical proposals:
The integrated factory building of a kind of Power Plant Main House and accessory building, the steam turbine building that comprises main building, main building inside, fixed end in described steam turbine building is provided with production and auxiliary complex building, be provided with bunker bay in the middle of two boilers, A row side in described main building inside near steam turbine building is provided with high voltage distribution installation, and the outer outlet except passing through from the high-altitude of main building A row does not have other electric fixtures to expose.
The fixed end of producing and assisting complex building to be located at steam turbine building can be saved the occupation of land of plant area, these production supporting facility of originally disperseing are integrated, do not need to go planning to take up an area, relatively existing routine setting can be saved plant area's occupation of land, conveniently carries out production management again.
Bunker bay can be saved occupation of land in the middle of being located at two boilers, takes full advantage of two spaces between boiler, and the A that shortens main building is listed as the size of chimney, is convenient to save pipeline material.
A row side in main building inside near steam turbine building is provided with high voltage distribution installation, has saved the transformer of the outer dispersed placement of A row and the occupation of land of AIS.
The outer outlet except passing through from the high-altitude of main building A row does not have other electric fixtures to expose, and has saved occupation of land, makes main building compact, attractive in appearance.
As preferably, described high voltage distribution installation comprise main transformer, factory become, rise/standbyly become, 500KV GIS.
As preferably, described main transformer, factory become, rise/the standby below that is arranged in 500kV GIS that becomes.This arranged superposed mode available height space-saving takes up an area.
As preferably, described production and auxiliary complex building inside are provided with and produce office building, centralized control room and Boiler water Feeding System workshop.
As preferably, described production and auxiliary complex building inside are provided with dining room, dormitory on duty.
As preferably, being provided with the maintenance shop near the space for maintenance in the middle part of steam turbine building, be convenient to overhaul, safeguard, improved production efficiency.
As preferably, at the distolateral material depot that is provided with of described main building enlarging, do not affect and produce and maintenance, improved the efficient of drawing materials with material.
GIS full name gas insulated combined electric appliance equipment (Gas Insulated Switchgear) is mainly all combined bus, line breaker, CT, PT, isolating switch, arrester.Be exactly the switching station that we often can see, also be high voltage distribution installation.The pattern of high voltage distribution installation has three kinds: the first is air-insulated ordinary distribution device, is called for short AIS.Its bus is exposed directly to be contacted with air, and line breaker can be with porcelain knob or pot type.What Gezhouba Hydropower Plant adopted is namely this pattern.The second is hybrid power distribution equipment, is called for short H-GIS.Bus adopts open type, and other is the sulfur hexafluoride gas-insulating switching device.The third is sulfur hexafluoride gas-insulating and fully-enclosed power distribution equipment.Its English full name GAS-INSTULATED SWITCHGEAR is called for short GIS.The advantage of GIS is that floor space is little, and reliability is high, high safety, and maintenance workload is very little, and the maintenance intervals of its critical piece is not less than 20 years.
the beneficial effects of the utility model: the utility model is with high voltage distribution installation, central station of floating dock, make rational planning for after the production accessory building the merges distribution in place, accomplish that technological process is reasonable, smooth and easy, the high voltage distribution installation outlet is smooth and easy, maintenance shop's easy access, safeguard, material depot does not affect production, maintenance, main transformer, factory becomes, rise/be arranged under 500kV GIS and can utilize the height space saving to take up an area by arranged superposed for becoming, this structure significantly reduces plant area of thermal power plant land area, compare the conventional general layout of arranging, can save approximately 30%-40% of plant area's land used, the successful of saving the area.
Description of drawings
Fig. 1 is existing mill construction schematic diagram.
Fig. 2 is front view of the present utility model.
Fig. 3 is right view of the present utility model, is used for showing the arranged superposed structure of main transformer and 500KV GIS.
Wherein, 1 is main building, and 2 is steam turbine building, 3 for producing and auxiliary complex building, and 4 is the first boiler, and 5 is the second boiler, 6 is bunker bay, and 7 is high voltage distribution installation, and 8 is the maintenance shop, 9 is material depot, and 10 is deaerator bay, and 11 is main transformer, 12 is 500KV GIS, and 13 for producing office building, and 14 is the dining room, 15 is dormitory on duty, and 16 is the Boiler water Feeding System workshop, and 17 is centralized control room.
The specific embodiment
Below in conjunction with specific embodiments and the drawings, the utility model is further described.
As shown in the figure, the integrated factory building of a kind of Power Plant Main House and accessory building, the steam turbine building 2 that comprises main building 1, main building inside, fixed end in described steam turbine building 2 is provided with production and auxiliary complex building 3, be provided with bunker bay 6 in the middle of two boilers 4,5, A row side in described main building inside near steam turbine building is provided with high voltage distribution installation 7, and the outer outlet except passing through from the high-altitude of main building A row does not have other electric fixtures to expose.
The fixed end of producing and assisting complex building to be located at steam turbine building can be saved the occupation of land of plant area, these production supporting facility of originally disperseing are integrated, do not need to go planning to take up an area, relatively existing routine setting can be saved plant area's occupation of land, conveniently carries out production management again.
Bunker bay can be saved occupation of land in the middle of being located at two boilers, takes full advantage of two spaces between boiler, and the A that shortens main building is listed as the size of chimney, is convenient to save pipeline material.
A row side in main building inside near steam turbine building is provided with high voltage distribution installation, has saved the transformer of the outer dispersed placement of A row and the occupation of land of AIS.
The outer outlet except passing through from the high-altitude of main building A row does not have other electric fixtures to expose, and has saved occupation of land, makes main building compact, attractive in appearance.
Described high voltage distribution installation comprise main transformer 11, factory become, rise/standbyly become, 500KV GIS 12.
Described main transformer 11, factory become, rise/the standby below that is arranged in 500kV GIS 12 that becomes.This arranged superposed mode available height space-saving takes up an area.
Described production and auxiliary complex building inside are provided with and produce office building 13, centralized control room 17 and Boiler water Feeding System workshop 16.
Described production and auxiliary complex building inside are provided with dining room 14, dormitory on duty 15.
Being provided with maintenance shop 8 near the space for maintenance in the middle part of steam turbine building, be convenient to overhaul, safeguard, improved production efficiency.
At the distolateral material depot 9 that is provided with of described main building enlarging, do not affect and produce and maintenance, improved the efficient of drawing materials with material.
The above is only preferred embodiment of the present utility model; not in order to limit the utility model; all any modifications of doing within spirit of the present utility model and principle, be equal to and replace and improvement etc., within all should being included in protection domain of the present utility model.

Claims (3)

1. the integrated factory building of a Power Plant Main House and accessory building, the steam turbine building (2) that comprises main building (1), main building inside, it is characterized in that: the fixed end in described steam turbine building is provided with production and auxiliary complex building (3), be provided with bunker bay (6) in the middle of two boilers (4,5), A row side in described main building inside near steam turbine building is provided with high voltage distribution installation (7), and the outer outlet except passing through from the high-altitude of main building A row does not have other electric fixtures to expose.
2. the integrated factory building of Power Plant Main House as claimed in claim 1 and accessory building is characterized in that: described high voltage distribution installation comprise main transformer (11), factory become, rise/standbyly become, 500KV GIS(12).
3. the integrated factory building of Power Plant Main House as claimed in claim 2 and accessory building is characterized in that: described main transformer, factory become, rise/the standby below that is arranged in 500kV GIS that becomes.
CN 201220373047 2012-07-31 2012-07-31 Thermal power plant main power house and integrated power house of additional building Expired - Lifetime CN202925950U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN 201220373047 CN202925950U (en) 2012-07-31 2012-07-31 Thermal power plant main power house and integrated power house of additional building

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN 201220373047 CN202925950U (en) 2012-07-31 2012-07-31 Thermal power plant main power house and integrated power house of additional building

Publications (1)

Publication Number Publication Date
CN202925950U true CN202925950U (en) 2013-05-08

Family

ID=48215924

Family Applications (1)

Application Number Title Priority Date Filing Date
CN 201220373047 Expired - Lifetime CN202925950U (en) 2012-07-31 2012-07-31 Thermal power plant main power house and integrated power house of additional building

Country Status (1)

Country Link
CN (1) CN202925950U (en)

Cited By (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN107299783A (en) * 2016-04-16 2017-10-27 上海华电闵行能源有限公司 Boat changes type distributed busbar protection compartment system
CN108487707A (en) * 2018-04-17 2018-09-04 华能国际电力股份有限公司海门电厂 A kind of compact tiny structure coal yard high-efficiency environment friendly coal-burning power plant structure
CN112576075A (en) * 2020-11-27 2021-03-30 华能江阴燃机热电有限责任公司 Heat control arrangement structure of gas-steam combined cycle heat supply unit factory building
CN108487707B (en) * 2018-04-17 2024-05-31 华能国际电力股份有限公司海门电厂 Efficient environment-friendly coal-fired power plant structure for compact micro-negative pressure coal yard

Cited By (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN107299783A (en) * 2016-04-16 2017-10-27 上海华电闵行能源有限公司 Boat changes type distributed busbar protection compartment system
CN108487707A (en) * 2018-04-17 2018-09-04 华能国际电力股份有限公司海门电厂 A kind of compact tiny structure coal yard high-efficiency environment friendly coal-burning power plant structure
CN108487707B (en) * 2018-04-17 2024-05-31 华能国际电力股份有限公司海门电厂 Efficient environment-friendly coal-fired power plant structure for compact micro-negative pressure coal yard
CN112576075A (en) * 2020-11-27 2021-03-30 华能江阴燃机热电有限责任公司 Heat control arrangement structure of gas-steam combined cycle heat supply unit factory building

Similar Documents

Publication Publication Date Title
CN204885964U (en) Photovoltaic case becomes with contravariant function of stepping up
CN203352172U (en) Auxiliary power wiring structure for large thermal power plant
CN202925950U (en) Thermal power plant main power house and integrated power house of additional building
CN110518479B (en) 66kV voltage level wind power generation Fahrenheit boost transformer substation
CN204732755U (en) A kind of frame-type transformer station
CN201601496U (en) Low-voltage reactive power compensation device
CN202616640U (en) Box type transformer station
CN204258114U (en) A kind of 500kV substation equipment arrangement
CN102493951A (en) Intelligent controlling and monitoring system for water pump
CN203481825U (en) Optimized natural gas distribution-type energy main wiring circuit
CN203135287U (en) Intelligent box-type substation
CN204179529U (en) A kind of intelligent medium landscape type ring main unit
CN203882788U (en) Combined transformer for wind power generation
CN202231638U (en) Solar power supply device of remote measurement and control terminal
CN202260199U (en) Box-type transformer substation for wind power generation
CN207664589U (en) A kind of removal cable feeder pillar
CN107240884B (en) Distribution device HGIS equipment's arrangement structure
CN201549796U (en) Substation maintenance box
CN110318563A (en) A kind of 3 buildings arrangement formula substation
CN217281685U (en) 50MW 110kV new forms of energy booster station system
CN207251205U (en) Transformation system is isolated in oilfield intelligent on-load voltage regulation
CN204597313U (en) Ring radiation shape GIS substation structure
CN204205293U (en) A kind of high efficiency and heat radiation low-voltage electrical cabinet for indoor
CN204835327U (en) Integrated transformer substation of half open -type of 110kV
CN219371847U (en) Oilfield well field energy routing cabin

Legal Events

Date Code Title Description
C14 Grant of patent or utility model
GR01 Patent grant
C56 Change in the name or address of the patentee

Owner name: CHINA POWER ENGINEERING CONSULTING GROUP SOUTHWEST

Free format text: FORMER NAME: SOUTHWEST ELECTRIC POWER DESIGN INSTITUTE OF CHINA POWER ENGINEERING CONSULTING GROUP CORPORATION

CP01 Change in the name or title of a patent holder

Address after: 610021 Dongfeng Road, Chengdu, Sichuan, No. 18, No.

Patentee after: Southwest Electric Power Design Institute CO., Ltd. of China Power Engineering Consulting Group

Address before: 610021 Dongfeng Road, Chengdu, Sichuan, No. 18, No.

Patentee before: SOUTHWEST ELECTRIC POWER DESIGN INSTITUTE OF CHINA POWER ENGINEERING CONSULTING Group Corp.