CN107299783A CN201610234054.3A CN201610234054A CN107299783A CN 107299783 A CN107299783 A CN 107299783A CN 201610234054 A CN201610234054 A CN 201610234054A CN 107299783 A CN107299783 A CN 107299783A
Authority
CN
China
Prior art keywords
area
module
combustion engine
steam turbine
waste heat
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Pending
Application number
CN201610234054.3A
Other languages
Chinese (zh)
Inventor
吴坤林
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Shanghai Huadian Minhang Energy Co Ltd
Original Assignee
Shanghai Huadian Minhang Energy Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Shanghai Huadian Minhang Energy Co Ltd filed Critical Shanghai Huadian Minhang Energy Co Ltd
Priority to CN201610234054.3A priority Critical patent/CN107299783A/en
Publication of CN107299783A publication Critical patent/CN107299783A/en
Pending legal-status Critical Current

Links

Classifications

    • EFIXED CONSTRUCTIONS
    • E04BUILDING
    • E04HBUILDINGS OR LIKE STRUCTURES FOR PARTICULAR PURPOSES; SWIMMING OR SPLASH BATHS OR POOLS; MASTS; FENCING; TENTS OR CANOPIES, IN GENERAL
    • E04H5/00Buildings or groups of buildings for industrial or agricultural purposes
    • E04H5/02Buildings or groups of buildings for industrial purposes, e.g. for power-plants or factories

Landscapes

  • Engineering & Computer Science (AREA)
  • Architecture (AREA)
  • Civil Engineering (AREA)
  • Structural Engineering (AREA)

Abstract

Change type distributed busbar protection compartment system the invention discloses one kind boat, it includes:Steam turbine building, combustion engine, waste heat boiler module, transformer area and booster stations area module, natural gas pressure regulating station module, cooling tower area module, water purification pretreating zone and pre- desalting water treatment area module;Transformer, combustion engine, waste heat boiler, steam turbine building are sequentially arranged from south to north;Main building fixing end is exposed to the west, and is extended eastwards;Pre- desalting water treatment area, water purification pretreating zone, industrial wastewater and sanitary sewage disposal area merge arrangement, re-start integration to the region, each other close to emphasis service object, shorten pipeline contact to each other, save construction of structures land used.Beneficial effects of the present invention:Save construction of structures land used;Subregion land area is compressed, Shi Quan factories, which are formed, cleans neat, the clear and definite Amenities of function division.

Description

Boat changes type distributed busbar protection compartment system
Technical field
Change type distributed busbar protection compartment system the present invention relates to electric power enterprise planning design field, more particularly to a kind of boat.
Background technology
The basic principle of plant area's general layout, according to the specific condition in place is built, suits measures to local conditions, and accomplishes that plane figure is reasonable, compact, technological process is smooth, function division clearly, operational management Relatively centralized.Enough places will be reserved at enlarging end, general layout considers the main building area of steam turbine building and combustion engine, waste heat boiler for main body, in the middle part of plant area, main building area north-south arrangement, main building fixing end is northwards extended towards south.Steam turbine house-owner facade eastwards, be exposed to the west by waste heat boiler and combustion engine.The factory building size of combustion engine, waste heat boiler and steam turbine building, the spacing and scheme one between #1 machines and #2 machines is identical.
110kV power distribution equipments within doors are arranged in combustion engine and waste heat boiler the south(G.I.S)And relay bungalow, it is separated by with main building area road.Four main transformers, are arranged in plant area west end, and main transformer is to using cable connection between booster stations.Send out also will use cable, to the western enclosure wall of plant area outside 1.0m.
On-site sets voltage adjusting device and metering device is each a set of, and position is extended in end north, and reserved enlarging pressure regulation station location, voltage regulating station region in current period main building area and separately sets spike boiler room.
2 × 60MW combustion engine unit recirculated cooling waters use closed circulation system, induced cooling tower and corresponding central pump house, and particular location is in the east in main building area, and reserved enlarging place.Intake-discharge pipe road uses unit style, according to the relative position of steam turbine main building and built cooling tower, and recirculated water inlet pipe, drain pipe will in the east be passed in and out from steam turbine main building, can shorten the length of circulating water pipeline.The water source of unit cooling moisturizing is derived from six pools of heap of stone, in addition, newly setting moisturizing pump house one in plant area's northeast corner.
Current period engineering is due to being combustion gas thermoelectric cold triple supply project, need externally to provide steam after operation, so the consumption of chemical water will increase a lot, due to plant area's land used pretty nervous, so the water system such as treating nature water system, chemical pre- desalination processing system and Waste Water Treatment, according to technological process, merge arrangement, save the area.
Due to plant area's land used East and West direction relatively narrower, this programme main building area is postponed using East and West direction cloth, it is larger on plant area's integral layout influence, limited by place, water system auxiliary production facility can only be arranged apart, and treating nature water yard is included between fire pump room, dewaterer, outdoor structures etc. are arranged in plant area northeast face, and to be arranged in induced cooling tower in the south for pre- desalination workshop and outdoor structures etc., above facility is simultaneously considered needed for reserved place, satisfaction enlarging combustion engine.
Power plant's administration quarter concentrates on plant area's southeast corner and planned, the region is mainly power plant management center, the buildings such as administrative, production office building, dining room, complex building and operation apartment will be set, and land area will be controlled in 6000m2, and joint construction style will be used by site condition.
But postponed in main building region using north-south cloth, north and auxiliary production facility land used in the south just seem more nervous, and such as water system facility can only be arranged apart.And main building region is arranged after induced cooling tower in the east, by the control of construction of structures minimum spacing, arrange relatively loose, and induced cooling tower is arranged in main building region in the east, weather side in most strong wind frequency, combustion engine and waste heat boiler are easily influenceed by water smoke.
Therefore prior art has much room for improvement and developed.
The content of the invention
Change type distributed busbar protection compartment system the technical problem to be solved in the present invention is to provide one kind boat.
The present invention technical solution be:One kind boat changes type distributed busbar protection compartment system, and it includes:Steam turbine building, combustion engine, waste heat boiler module, transformer area and booster stations area module, natural gas pressure regulating station module, cooling tower area module, water purification pretreating zone and pre- desalting water treatment area module;
Transformer, combustion engine, waste heat boiler, steam turbine building are sequentially arranged from south to north;Main building fixing end is exposed to the west, and is extended eastwards;Pre- desalting water treatment area, water purification pretreating zone, industrial wastewater and sanitary sewage disposal area merge arrangement, re-start integration to the region, each other close to emphasis service object, shorten pipeline contact to each other, save construction of structures land used.
Further comprise gas metering station, gas metering station, natural gas pressure regulating station, each region centralized arrangement in natural gas diffusion area under control, there are handling, the construction of structures of storage function to compress subregion land area along road arrangement, Shi Quan factories, which are formed, cleans neat, the clear and definite Amenities of function division.
Further comprise and be arranged on the refrigeration heating station of southeast corner and the administration quarter of southwest corner.
Beneficial effects of the present invention:
Save construction of structures land used;Subregion land area is compressed, Shi Quan factories, which are formed, cleans neat, the clear and definite Amenities of function division.
Brief description of the drawings
Fig. 1 is present system overall structure figure;
Fig. 2 is 0 meter of layer plane figure in Fig. 1;
Fig. 3 is 6 meters of layer plane figures in Fig. 1;
Fig. 4 is 10 meters of layer plane figures in Fig. 1;
Fig. 5 is 12.5 meters of layer plane layers in Fig. 1;
Fig. 6 makes a living running water pump house plan.
Embodiment
Embodiment:
Refering to Fig. 1-Fig. 6, one kind boat changes type distributed busbar protection compartment system, steam turbine building, combustion engine, waste heat boiler island module, transformer area and booster stations area module, natural gas pressure regulating station module, cooling tower area module, water purification pretreating zone and pre- desalting water treatment area module etc..
The principle of Module Division:According to this engineering actual conditions, in this secondary design the various situations being likely to occur are considered for owner, particularly steam turbine building, combustion engine, waste heat boiler island module, on the basis of the basic module that each technique is used is divided, it is combined based on system module, by comparison combination repeatedly into various schemes, and deeply optimized, make the whole short victory of total figure arrangement system flow, maintenance is convenient, take up an area few, space utilization degree is high, passage is rationally smooth, realize the mentality of designing of " building the maximized green energy resource power plant of comprehensive benefit in a total life cycle ", simultaneously, also a flexile arrangement selection space is created to owner.
Collect each process system optimization achievement, steam turbine building, combustion engine, waste heat boiler region characteristics of compact layout.
This factory site land used is development zone land used, and project land used is obtained by the way of recruiting bat to hang, and plant area's land area needed for feasibility study requirement with having certain gap, and it is only 380m × 190m, area about 73300m2, so construction land is at full stretch to build place.By optimizing main building region reasonable Arrangement, include the arrangement adjustment in the exclusive transformer areas of A, the planning trend of recirculated water inlet pipe, drain pipe meets the arrangement in main building region.
Aid in the intensive centralized arrangement of production district, plant area's general layout Clear partition
Pass through intensive arrangement, pre- desalting water treatment area, water purification pretreating zone, industrial wastewater and sanitary sewage disposal area are merged into arrangement, integration is re-started to the region, each other close to emphasis service object, shorten pipeline contact to each other, save construction of structures land used, gas metering station, natural gas pressure regulating station, natural gas diffusion area under control Deng Ge regions centralized arrangement, there are handling, the construction of structures of storage function will be along road arrangement, subregion land area is compressed, Shi Quan factories, which are formed, cleans neat, the clear and definite Amenities of function division.
Strict implement Urban Planning Road red line, optimization plant area arrangement, approved Urban Planning Road red line is impassable, to solve the contradiction that red line is arranged with plant area, the arrangement of main transformer and booster stations will be optimized, pass through each professional coordination, the further optimization of main building region arrangement.Plant area's land used is compressed, plant area's arrangement and the contradiction of boundary lines of roads is solved, also created favorable conditions for reserved plant area land for future extension.
The current period is based oneself upon, future is had in mind, sustainable development path is walked
2 × 60MW of current period engineering construction(Level)Combustion gas thermoelectric cold triple supply project, full factory installed capacity at a specified future date is up to 4 × more than 60MW, according to the industrial development of the development plan in shen village industrial area, long-term and power plant surrounding area, industrial area scope will build large-scale commercial affairs, leisure and residential area, and the sustainable development to power plant brings opportunity.Plan that reserved work is reasonably necessary in consideration of it, carrying out and doing.
Arrangement is overcome due to the unfavorable factor that plant area's East and West direction relatively narrower is brought, through multiple optimization design, make plant area's general layout sectoring function clear and definite, technique stream is along smooth, production management is convenient, disturb few each other, be taken as the combustion gas thermoelectric cold triple supply project that natural gas is clean fuel, plant area's overall space will be more perfect, neat.
Plant area's general layout, with reference to place present situation is built, suits measures to local conditions, and considers near, the at a specified future date development of power plant.Based on above-mentioned prcgramming ideas, 2 × 60MW of current period(Level)The general layout of combustion engine Cogeneration Project is according to GE companies of the U.S. and Nanjing steamer motor(Group)The three large-sized unit main equipments and other data of correlation that Co., Ltd, Dongfang Rili Boiler Co., Ltd. provide are planned, and make the condition of reserved enlarging.
Current period engineering improves full factory's overall planning by according to the specified conditions for building place, is that good enlarging condition is created in the development of power plant from now on.
It is the nucleus of power plant, combustion engine and the outdoor arrangement of waste heat boiler based on steam turbine building and combustion engine, the main building area of waste heat boiler, steam turbine building is arranged within doors.This engineering is according to landform present situation and geological conditions, it is first determined the position in main building region, and east-west direction moves back eastwards 18.50m with power plant Xi Weiqiangchu, and as main building fixing end, North and South direction is substantially at by north in the middle part of place.By technological requirement, the arrangement general layout in main building area is as follows:Main transformer, combustion engine, waste heat boiler, steam turbine factory building are followed successively by from south to north.Main building fixing end is exposed to the west, and is extended eastwards.
Combustion engine and the outdoor arrangement of waste heat boiler, the centre distance that combustion engine is arranged between waste heat boiler the south, two combustion engine are 29.5m.North and South direction, the distance from combustion engine end to waste heat boiler chimney center is 42.579m.
Steam turbine building is arranged in waste heat boiler north, and centre channel partition, steam turbine building transverse direction twin spans arranges that main span and pair are across respectively 13.25m and 9.00m, and steam turbine house-owner's facade is exposed to the north.Steam turbine main building longitudinal length is 53.00m, separately adds 3.00m staircases.It is 12.00m from distance of the waste heat boiler chimney center northwards to steam turbine main building A organ timberings center.
110kV power distribution equipments within doors are arranged in main building area the south(G.I.S)And relay bungalow, it is separated by with main building area road.Because two sets of fuel engine power generations and steam-electric power are provided with four generators, it is necessary to four main transformers, inlet wire interval is also required to four, it is limited to place north-south size, main transformer is to using cable connection between booster stations.Send out also will use cable, to the western enclosure wall of plant area outside 1.0m.
Current period unit fuel send natural gas using river gas east, is delivered to by Local Area Network in factory, and conveyance conduit is responsible for the design separation of pipeline inside and outside design, factory in factory between measuring station and voltage regulating station by the southwestern institute of Chinese municipal administration outside factory.On-site voltage adjusting device and metering device are a set of, and position is on current period combustion engine factory building north, and reserved enlarging pressure regulation station location, and voltage regulating station the south separately sets spike boiler room.Our factory's metering device is responsible for design by the southwestern institute of Chinese municipal administration.
2 × 60MW combustion engine unit recirculated cooling waters use closed circulation system, and current period engineering is by a newly-built 3 × 2100m3/h induced cooling tower and corresponding central pump house, and particular location is in the northeast face of steam turbine building, and reserved enlarging place.Intake-discharge pipe road uses unit style, according to the relative position of steam turbine main building and built cooling tower, and recirculated water inlet pipe, drain pipe will be passed in and out from steam turbine main building north, can shorten the length of circulating water pipeline.The water source of unit cooling moisturizing is derived from six pools of heap of stone, in addition, newly setting moisturizing pump house one in plant area's northeast corner.
Current period engineering is due to being combustion gas thermoelectric cold triple supply project, need externally to provide steam after operation, so the consumption of chemical water will increase a lot, due to plant area's land used pretty nervous, so the water system such as treating nature water system, chemical pre- desalination processing system and Waste Water Treatment, according to technological process, merge arrangement, save the area.
Treating nature water yard includes between fire pump room, outdoor structures etc. and pre- desalination workshop and outdoor structures, dewaterer etc. being all arranged in plant area northeast face, and considers reserved place, needed for meeting enlarging combustion engine.
Power plant's administration quarter concentrates on plant area's southeast corner and planned, the region is mainly power plant management center, the buildings such as administrative, production office building, dining room, complex building and operation apartment will be set, and land area will be controlled in 6000m2, and joint construction style will be used by site condition.
In addition, including being arranged on the refrigeration heating station of southeast corner and the administration quarter of southwest corner.
In the description of this specification, the description of term " one embodiment " etc. means that combining the embodiment or specific features, structure, material or the feature of example description is contained at least one embodiment of the present invention or example.In this manual, identical embodiment or example are not necessarily referring to the schematic representation of above-mentioned term.Moreover, specific features, structure, material or the feature of description can in an appropriate manner be combined in any one or more embodiments or example.
The preferred embodiments of the present invention are the foregoing is only, are not intended to limit the invention, for those skilled in the art, the present invention there can be various modifications and variations.Within the spirit and principles of the invention, any modification, equivalent substitution and improvements made etc., should be included in the scope of the protection.

Claims (3)

1. one kind boat changes type distributed busbar protection compartment system, it is characterised in that:It includes:Steam turbine building, combustion engine, waste heat boiler module, transformer area and booster stations area module, natural gas pressure regulating station module, cooling tower area module, water purification pretreating zone and pre- desalting water treatment area module;
Transformer, combustion engine, waste heat boiler, steam turbine building are sequentially arranged from south to north;Main building fixing end is exposed to the west, and is extended eastwards;Pre- desalting water treatment area, water purification pretreating zone, industrial wastewater and sanitary sewage disposal area merge arrangement, re-start integration to the region, each other close to emphasis service object, shorten pipeline contact to each other, save construction of structures land used.
2. boat according to claim 1 changes type distributed busbar protection compartment system, it is characterised in that:Further comprise gas metering station, gas metering station, natural gas pressure regulating station, each region centralized arrangement in natural gas diffusion area under control, there are handling, the construction of structures of storage function to compress subregion land area along road arrangement, Shi Quan factories, which are formed, cleans neat, the clear and definite Amenities of function division.
3. boat according to claim 1 changes type distributed busbar protection compartment system, it is characterised in that:Further comprise and be arranged on the refrigeration heating station of southeast corner and the administration quarter of southwest corner.
CN201610234054.3A 2016-04-16 2016-04-16 Boat changes type distributed busbar protection compartment system Pending CN107299783A (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201610234054.3A CN107299783A (en) 2016-04-16 2016-04-16 Boat changes type distributed busbar protection compartment system

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201610234054.3A CN107299783A (en) 2016-04-16 2016-04-16 Boat changes type distributed busbar protection compartment system

Publications (1)

Publication Number Publication Date
CN107299783A true CN107299783A (en) 2017-10-27

Family

ID=60137084

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201610234054.3A Pending CN107299783A (en) 2016-04-16 2016-04-16 Boat changes type distributed busbar protection compartment system

Country Status (1)

Country Link
CN (1) CN107299783A (en)

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN113006532A (en) * 2021-04-16 2021-06-22 桐城范岗刷都产业小镇有限公司 Building house type capable of being freely planned

Citations (10)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN202324724U (en) * 2011-11-25 2012-07-11 中国电力工程顾问集团东北电力设计院 Whole-plant water business centralized arrangement structure of thermal power plant
CN202810263U (en) * 2012-09-12 2013-03-20 中国电力工程顾问集团西北电力设计院 Arrangement structure of comprehensive auxiliary plant of thermal power plant
CN202925950U (en) * 2012-07-31 2013-05-08 中国电力工程顾问集团西南电力设计院 Thermal power plant main power house and integrated power house of additional building
EP2634384A2 (en) * 2012-03-01 2013-09-04 Envi Con & Plant Engineering GmbH Power plant building assembly, in particular coal power plant building assembly
CN203347859U (en) * 2013-05-21 2013-12-18 中国华电工程(集团)有限公司 Novel distributed energy resource station system
CN203947816U (en) * 2014-03-05 2014-11-19 内蒙古电力勘测设计院有限责任公司 A kind of indirect air cooling unit arrangement based on three tower unifications
CN104251062A (en) * 2014-09-25 2014-12-31 中国能源建设集团广东省电力设计研究院 Optimized combined structure of thermal power plant turbine room, cooling tower and power distribution unit
CN204174975U (en) * 2014-09-01 2015-02-25 吉林省电力勘测设计院 A kind of power plant main power house arrangement
CN104591430A (en) * 2014-12-29 2015-05-06 浙江省电力设计院 Intensive distribution structure for chemical water treatment facilities of large-scale thermal power plant
CN204492264U (en) * 2015-01-22 2015-07-22 福建省电力勘测设计院 Gas-steam Combined Cycle power plant outdoor layout structure main building

Patent Citations (10)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN202324724U (en) * 2011-11-25 2012-07-11 中国电力工程顾问集团东北电力设计院 Whole-plant water business centralized arrangement structure of thermal power plant
EP2634384A2 (en) * 2012-03-01 2013-09-04 Envi Con & Plant Engineering GmbH Power plant building assembly, in particular coal power plant building assembly
CN202925950U (en) * 2012-07-31 2013-05-08 中国电力工程顾问集团西南电力设计院 Thermal power plant main power house and integrated power house of additional building
CN202810263U (en) * 2012-09-12 2013-03-20 中国电力工程顾问集团西北电力设计院 Arrangement structure of comprehensive auxiliary plant of thermal power plant
CN203347859U (en) * 2013-05-21 2013-12-18 中国华电工程(集团)有限公司 Novel distributed energy resource station system
CN203947816U (en) * 2014-03-05 2014-11-19 内蒙古电力勘测设计院有限责任公司 A kind of indirect air cooling unit arrangement based on three tower unifications
CN204174975U (en) * 2014-09-01 2015-02-25 吉林省电力勘测设计院 A kind of power plant main power house arrangement
CN104251062A (en) * 2014-09-25 2014-12-31 中国能源建设集团广东省电力设计研究院 Optimized combined structure of thermal power plant turbine room, cooling tower and power distribution unit
CN104591430A (en) * 2014-12-29 2015-05-06 浙江省电力设计院 Intensive distribution structure for chemical water treatment facilities of large-scale thermal power plant
CN204492264U (en) * 2015-01-22 2015-07-22 福建省电力勘测设计院 Gas-steam Combined Cycle power plant outdoor layout structure main building

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN113006532A (en) * 2021-04-16 2021-06-22 桐城范岗刷都产业小镇有限公司 Building house type capable of being freely planned

Similar Documents

Publication Publication Date Title
Verhoeven et al. Minewater 2.0 project in Heerlen the Netherlands: transformation of a geothermal mine water pilot project into a full scale hybrid sustainable energy infrastructure for heating and cooling
CN111582658B (en) Energy station equipment configuration and pipeline planning method considering multi-zone interconnection cooperation
CN102906506A (en) Synergistic energy ecosystem
Leyzerova et al. Sustainable strategies of urban planning
Paiho et al. Energy and emission analyses of renovation scenarios of a Moscow residential district
CN107299783A (en) Boat changes type distributed busbar protection compartment system
CN110991719B (en) Method for optimizing layout pipe diameters in layering mode for regional heat supply pipe network of intelligent comprehensive energy system
JP2003028449A (en) System and method for supplying energy to local community
CN203215829U (en) Circulating water heating structure for power station auxiliary equipment
Blumsack et al. Efficiency, economic and environmental assessment of ground source heat pumps in central Pennsylvania
Siuta-Olcha et al. On the influence of decommissioning an area thermal substation in a district heating system on heat consumption and costs in buildings–Long term field research
Tom Lawrence PhD et al. Capturing condensate by retrofitting AHUs
Zhila et al. Prospects for development of heat supply systems in high-rise districts
Levushkina et al. State and prospects of providing Russian rural areas with engineering life support systems
Nekrasov et al. Development prospects for the heating supply in Russia
Yokotsuka et al. Study on the underground energy network in Yaesu, Kyobashi and Nihonbashi area
Badea et al. Experimental Case Study
Kamal Potential for low temperature district heating system: Integrating 4th generation district heating system with existing technology
Li et al. Integrated energy and incremental distribution network integration planning
Prikhodko et al. Ways of modernization of heat metering units of buildings
Wolcott City Lights
Bajracharya et al. Financial Analysis of Solar Underfloor Heating System and Variable Refrigerant Flow (VRF) System for Space Heating: A Case Study of Resort.
Ianakiev Decarbonising heat in residential homes
Buffa Advanced control strategies for district heating and cooling systems
Wang et al. Evaluation on Introducing a DHC System with Co-Generation System in the City Center of Shenzhen

Legal Events

Date Code Title Description
PB01 Publication
PB01 Publication
SE01 Entry into force of request for substantive examination
SE01 Entry into force of request for substantive examination
RJ01 Rejection of invention patent application after publication

Application publication date: 20171027

RJ01 Rejection of invention patent application after publication