CN202905192U - Control platform for workshop gas-and-power distribution debugging mechanical device - Google Patents
Control platform for workshop gas-and-power distribution debugging mechanical device Download PDFInfo
- Publication number
- CN202905192U CN202905192U CN 201220637283 CN201220637283U CN202905192U CN 202905192 U CN202905192 U CN 202905192U CN 201220637283 CN201220637283 CN 201220637283 CN 201220637283 U CN201220637283 U CN 201220637283U CN 202905192 U CN202905192 U CN 202905192U
- Authority
- CN
- China
- Prior art keywords
- compressed air
- aluminium alloy
- workshop
- tube
- pipe
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Expired - Fee Related
Links
Images
Landscapes
- Refuge Islands, Traffic Blockers, Or Guard Fence (AREA)
Abstract
The utility model relates to a control platform for a workshop gas-and-power distribution debugging mechanical device, characterized in that a main power supply and multiple branch power supplies are connected via power lines to form the power supply; pneumatic pipelines comprise a master pneumatic pipeline and multiple pneumatic branch pipelines; one end of the workshop is provided with the main power supply and the master pneumatic pipeline; the master pneumatic pipeline is connected with multiple pneumatic branch pipelines; the pneumatic branch pipelines are installed at a position 3 meters higher above the ground; aluminium alloy wire ducts are arranged below the pneumatic branch pipelines, with an automatic take-up reel apparatus arranged therebetween; the upper end of the air pipe is installed to the pneumatic branch pipeline via pipe joints; the distance between every two pipe joints is 2 meters; the gas pipes are stored via the automatic take-up reel apparatus; the automatic take-up reel apparatus receives extension socket wires; the lower end of the extension socket wire is connected with an extension socket; and the mechanical device can be arranged between two automatic take-up reel apparatuses. The control platform of the utility model is capable of saving space and energy with high security, convenient operation, and raised production efficiency.
Description
Technical field:
The utility model relates to the Installation and Debugging field of plant equipment, relates in particular a kind of control platform of workshop distribution distribution debugging plant equipment.
Background technology:
When in the mechanical equipment installation process or after the installation, need to debug plant equipment, the arrangement of debug system and layout relationship the operation conditions of plant equipment, can directly affect production efficiency, general debug system exists a lot of not enough, the potential safety hazard of bringing such as gas pipeline and socket winding problem; Compressed air conveyance conduit material is that flexible pipe easily breaks; The debug system floor area is large etc.
The utility model content:
The purpose of this utility model is for the deficiencies in the prior art part, and a kind of control platform of debugging is provided, and it is safe, and is easy to operate, energy savings, and can enhance productivity.
Technology solution of the present utility model is as follows:
A kind of control platform of workshop distribution distribution debugging plant equipment, comprise workshop, power supply, compressed air pipe, tracheae, socket, aluminium alloy channel, automatic folding drum device and plant equipment, described power supply by primary power with are connected the branch road power supply and connect by power lead; Described compressed air pipe comprises main compressed air pipe and some compressed air branch pipe(tube)s, and described workshop one end is installed with primary power and main compressed air pipe, is connected with some compressed air branch pipe(tube)s on the main compressed air pipe; Described compressed air branch pipe(tube) is installed on apart from ground 3 meters At The Height, and described aluminium alloy channel is installed in below the compressed air branch pipe(tube), is placed with power lead in the aluminium alloy channel; Automatic folding drum device is installed between described aluminium alloy channel and the compressed air branch pipe(tube); Described tracheae upper end is installed on the compressed air branch pipe(tube) by gas-tpe fitting, and the distance between every gas-tpe fitting is 2 meters, and tracheae takes in by automatic folding drum device, and the lower end of tracheae is installed on the aluminium alloy channel by gas-tpe fitting; Taken in the socket line on the described automatic folding drum device, socket line lower end connects socket, and socket is positioned at the bottom of aluminium alloy channel; Described plant equipment can be placed between two automatic folding drum devices.
As preferably, described main compressed air pipe and compressed air branch pipe(tube) all are that gas is carried iron pipe conduit.
As preferably, be provided with grid line in the described aluminium alloy channel.
As preferably, the bottom of described aluminium alloy channel is equipped with daylight lamp.
The beneficial effects of the utility model are:
The utility model provides a kind of control platform of workshop distribution distribution debugging plant equipment, it has better arranged the position of tracheae and power lead, for fear of potential safety hazard, main compressed air pipe and compressed air branch pipe(tube) all are to adopt iron pipe, and the material of power supply wire casing is aluminum alloy material; Automatic folding drum device can be appropriate take in tracheae and socket line, when needing to use tracheae or socket, tracheae or socket line can be pulled out from automatic folding drum device; Finish using, extract tracheae or mechanical power source plug after, tracheae or socket meeting are involved in the automatic takeup dish device automatically, have solved the potential safety hazard that tracheae and socket line winding problem are brought, and can save very large space; Simultaneously the utility model makes whole workshop neat and artistic, and can energy savings, and is safe, more is conducive to operation, can also enhance productivity.When the utility model need to be ventilated energising when plant equipment, from automatic folding drum device, tracheae and socket are pulled out, the unlatching related switch gets final product, and when stopping the ventilation energising, automatic folding drum device can be involved in tracheae and socket line in the automatic takeup dish device automatically.
Description of drawings:
Below in conjunction with accompanying drawing the utility model is described further:
Fig. 1 is the conspectus of power supply of the present utility model and compressed air pipe;
Fig. 2 is unit wiring mode of the present utility model.
Embodiment:
The following stated is preferred embodiment of the present utility model only, is not that scope of the present utility model is limited.
Embodiment sees attached Fig. 1 and 2, comprises workshop 1, power supply, compressed air pipe, tracheae 2, socket 3, aluminium alloy channel 4, automatic folding drum device 5 and plant equipment 6, described power supply by primary power 7 with are connected branch road power supply 8 and connect by power lead; Described compressed air pipe comprises main compressed air pipe 9 and some compressed air branch pipe(tube)s 10, and described workshop one end is installed with primary power and main compressed air pipe, is connected with some compressed air branch pipe(tube)s on the main compressed air pipe; Described compressed air branch pipe(tube) is installed on apart from ground 3 meters At The Height, and described aluminium alloy channel is installed in below the compressed air branch pipe(tube), is placed with power lead in the aluminium alloy channel; Automatic folding drum device is installed between described aluminium alloy channel and the compressed air branch pipe(tube); Described tracheae upper end is installed on the compressed air branch pipe(tube) by gas-tpe fitting, and the distance between every gas-tpe fitting is 2 meters, and tracheae takes in by automatic folding drum device, and the lower end of tracheae is installed on the aluminium alloy channel by gas-tpe fitting; Taken in the socket line on the described automatic folding drum device, socket line lower end connects socket, be the debugging plugged of plant equipment, and socket is positioned at the bottom of aluminium alloy channel; Described plant equipment can be placed between two automatic folding drum devices.
Described main compressed air pipe and compressed air branch pipe(tube) all are that gas is carried iron pipe conduit.
Described power lead is placed in the aluminium alloy channel, and the aluminium alloy channel light weight is easy to operate.
Be provided with grid line in the described aluminium alloy channel, for the production of copy and the installation of system's management and control and device software.
The bottom of described aluminium alloy channel is equipped with daylight lamp 11, for the debugging of plant equipment provides illumination.
Automatic folding drum device of the present utility model can be appropriate take in tracheae and socket line, when needing to use tracheae or socket, tracheae or socket line can be pulled out from automatic folding drum device; Finish using, extract tracheae or mechanical power source plug after, tracheae or socket meeting are involved in the automatic takeup dish device automatically, have solved the potential safety hazard that tracheae and socket line winding problem are brought, and can save very large space.
Claims (4)
1. a workshop distribution distribution is debugged the control platform of plant equipment, comprise workshop, power supply, compressed air pipe, tracheae, socket, aluminium alloy channel, automatic folding drum device and plant equipment, it is characterized in that: described power supply by primary power with are connected the branch road power supply and connect by power lead; Described compressed air pipe comprises main compressed air pipe and some compressed air branch pipe(tube)s, and described workshop one end is installed with primary power and main compressed air pipe, is connected with some compressed air branch pipe(tube)s on the main compressed air pipe; Described compressed air branch pipe(tube) is installed on apart from ground 3 meters At The Height, and described aluminium alloy channel is installed in below the compressed air branch pipe(tube), is placed with power lead in the aluminium alloy channel; Automatic folding drum device is installed between described aluminium alloy channel and the compressed air branch pipe(tube); Described tracheae upper end is installed on the compressed air branch pipe(tube) by gas-tpe fitting, and the distance between every gas-tpe fitting is 2 meters, and tracheae takes in by automatic folding drum device, and the lower end of tracheae is installed on the aluminium alloy channel by gas-tpe fitting; Taken in the socket line on the described automatic folding drum device, socket line lower end connects socket, and socket is positioned at the bottom of aluminium alloy channel; Described plant equipment can be placed between two automatic folding drum devices.
2. a kind of workshop distribution distribution according to claim 1 is debugged the control platform of plant equipment, it is characterized in that: described main compressed air pipe and compressed air branch pipe(tube) all are that gas is carried iron pipe conduit.
3. the control platform of a kind of workshop distribution distribution debugging plant equipment according to claim 1 is characterized in that: be provided with grid line in the described aluminium alloy channel.
4. a kind of workshop distribution distribution according to claim 1 is debugged the control platform of plant equipment, and it is characterized in that: the bottom of described aluminium alloy channel is equipped with daylight lamp.
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN 201220637283 CN202905192U (en) | 2012-11-27 | 2012-11-27 | Control platform for workshop gas-and-power distribution debugging mechanical device |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN 201220637283 CN202905192U (en) | 2012-11-27 | 2012-11-27 | Control platform for workshop gas-and-power distribution debugging mechanical device |
Publications (1)
Publication Number | Publication Date |
---|---|
CN202905192U true CN202905192U (en) | 2013-04-24 |
Family
ID=48125831
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN 201220637283 Expired - Fee Related CN202905192U (en) | 2012-11-27 | 2012-11-27 | Control platform for workshop gas-and-power distribution debugging mechanical device |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN202905192U (en) |
-
2012
- 2012-11-27 CN CN 201220637283 patent/CN202905192U/en not_active Expired - Fee Related
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN103791227B (en) | Medical liquid-state oxygen central gas supply system construction | |
CN202905192U (en) | Control platform for workshop gas-and-power distribution debugging mechanical device | |
CN202654579U (en) | Fire-fighting power source guarantee device | |
CN202021137U (en) | Local automatic adhesive supply system device of rolling and connecting machine set for cigarettes | |
CN202572357U (en) | Product assembly table with automatic work instruction function | |
CN202771810U (en) | Control platform for carrying out ventilation electrifying debugging over mechanical devices | |
CN203070775U (en) | Novel workshop gas-distribution power-distribution control platform for debugging mechanical equipment | |
CN205127215U (en) | High altitude power equipment extinguishing device | |
CN102831937B (en) | Control platform for performing ventilation and electrification debugging of mechanical equipment | |
CN204113596U (en) | Air compressor | |
CN205042800U (en) | Portable high -pressure spray wash system of production line | |
CN209250081U (en) | A kind of laying apparatus for power cable | |
CN202852739U (en) | Light-emitting diode (LED) lamp aging rack device | |
CN207013470U (en) | A kind of device of quick separating mould and die sleeve | |
CN202830309U (en) | Elasticizer repiece suction gun device | |
CN204997573U (en) | Yarn trapper suitable for stifled machine is glued to duricrust | |
CN202308929U (en) | Automatically waterproof bolt threading machine | |
CN203517314U (en) | Manifold container device | |
CN212908673U (en) | Portable mobile three-level power box | |
CN202231381U (en) | Cover turn-over type miner's lamp charging cabinet wire routing box | |
CN203753407U (en) | Aero seat bucket with onboard recreation device | |
CN109785897A (en) | A kind of mechanical equipment carries out the switch of ventilation hot- line test | |
CN202602188U (en) | Slot | |
CN204805724U (en) | Trachea installation mechanism | |
CN208528498U (en) | A kind of Full-automatic screw locking machine |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
C14 | Grant of patent or utility model | ||
GR01 | Patent grant | ||
C17 | Cessation of patent right | ||
CF01 | Termination of patent right due to non-payment of annual fee |
Granted publication date: 20130424 Termination date: 20131127 |