CN203070775U - Novel workshop gas-distribution power-distribution control platform for debugging mechanical equipment - Google Patents

Novel workshop gas-distribution power-distribution control platform for debugging mechanical equipment Download PDF

Info

Publication number
CN203070775U
CN203070775U CN 201220728655 CN201220728655U CN203070775U CN 203070775 U CN203070775 U CN 203070775U CN 201220728655 CN201220728655 CN 201220728655 CN 201220728655 U CN201220728655 U CN 201220728655U CN 203070775 U CN203070775 U CN 203070775U
Authority
CN
China
Prior art keywords
compressed air
ceiling
control platform
workshop
plant equipment
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Fee Related
Application number
CN 201220728655
Other languages
Chinese (zh)
Inventor
吕绍林
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Bozhong Suzhou Precision Industry Technology Co Ltd
Original Assignee
Bozhong Suzhou Precision Industry Technology Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Bozhong Suzhou Precision Industry Technology Co Ltd filed Critical Bozhong Suzhou Precision Industry Technology Co Ltd
Priority to CN 201220728655 priority Critical patent/CN203070775U/en
Application granted granted Critical
Publication of CN203070775U publication Critical patent/CN203070775U/en
Anticipated expiration legal-status Critical
Expired - Fee Related legal-status Critical Current

Links

Images

Landscapes

  • Underground Structures, Protecting, Testing And Restoring Foundations (AREA)

Abstract

The utility model relates to a novel workshop gas-distribution power-distribution control platform for debugging a piece of mechanical equipment. The top of a workshop is provided with a ceiling. A power supply is formed by connecting a main power supply and a plurality of branch power supplies through power lines. A compressed air pipeline comprises a main compressed air pipeline and a plurality of compressed air branch pipelines. One end of the workshop is provided with the main power supply and the main compressed air pipeline. The compressed air branch pipelines are connected on the main compressed air pipeline. An aluminum alloy wire duct and the compressed air branch pipelines are arranged inside the ceiling. The power lines are placed inside the aluminum alloy wire duct. A relay box is arranged outside the ceiling. An air pipe is arranged on the compressed air branch pipelines through a compressed air pipe joint. The air pipe extends out of the ceiling and is fixed on the left side of the relay box. A valve for controlling the air pressure magnitude is arranged on the air pipe outside the ceiling. The mechanical equipment can be arranged between two air pipes. The control platform which saves space and energy has high safety, and facilitates debugging and related data copying. Furthermore, the control platform which is convenient to operate increases the production efficiency.

Description

A kind of control platform of new workshop distribution distribution debugging plant equipment
Technical field:
The utility model relates to the Installation and Debugging field of plant equipment, relates to a kind of control platform of new workshop distribution distribution debugging plant equipment in particular.
Background technology:
When in the plant equipment installation process or after the installation, need debug plant equipment, the arrangement of debug system and layout relationship the operation conditions of plant equipment, can directly influence production efficiency, general debug system exists a lot of not enough, the potential safety hazard of bringing as tracheae line and socket winding problem; Pneumatics letter shoot road material is that flexible pipe easily breaks; The debug system floor area is big etc.
The utility model content:
The purpose of this utility model is at the deficiencies in the prior art part, and a kind of control platform of debugging is provided, and it is safe, and is easy to operate, energy savings, and can enhance productivity.
Technology solution of the present utility model is as follows:
The control platform of a kind of new workshop distribution distribution debugging plant equipment comprises workshop, power supply, compressed air pipe, tracheae, aluminium alloy wire casing, relaying box and plant equipment, and ceiling is installed at the top, workshop, and ceiling is installed on apart from ground 3 meters height place; Described power supply is connected by power lead with some branch road power supplys by primary power; Described compressed air pipe comprises main compressed air pipe and some pneumatics gas branch pipes road, and described workshop one end is installed with primary power and main compressed air pipe, is connected with some pneumatics gas branch pipes road on the main compressed air pipe; Described aluminium alloy wire casing and pneumatics gas branch pipe road are installed on ceiling inside, are placed with power lead in the aluminium alloy wire casing; Described relaying box is installed on the ceiling outside; Described tracheae is installed on the pneumatics gas branch pipe road by the pneumatics gas-tpe fitting, and tracheae to stretch out ceiling outer and be fixed in the left side of relaying box, the tracheae ceiling outside is provided with the valve of controlling the air pressure size; Described plant equipment can be placed between two tracheaes.
As preferably, described main compressed air pipe and pneumatics gas branch pipe road all are that gas is carried iron pipe conduit.
As preferably, the back side of described relaying box is equipped with two network interfaces, in the aluminium alloy wire casing grid line is installed.
As preferably, the bottom of described aluminium alloy wire casing is equipped with daylight lamp, and daylight lamp is positioned at outside the ceiling.
As preferably, described relaying box can provide 220V and two kinds of voltages of 380V, satisfy the distinct device demand, and the back side of relaying box is provided with 220V switch and 380V switch.
As preferably, two Three-hole sockets, a 220V aviation plug seat and a 380V aviation plug seat have been installed in the front of described relaying box.
As preferably, described relaying box is provided with air switch.
The beneficial effects of the utility model are:
The utility model provides a kind of control platform of new workshop distribution distribution debugging plant equipment, it has better arranged the position of tracheae and power lead, for fear of potential safety hazard, main compressed air pipe and pneumatics gas branch pipe road all are to adopt iron pipe, and the material of power supply wire casing is aluminum alloy material; The relaying box of control platform can provide 220V and two kinds of voltages of 380V, satisfies the distinct device demand; Two Three-hole sockets also have been installed on the relaying box, and the aviation plug toilet is installed has directly used in relevant device, need not switching; On the relaying box network interface is installed, grid line is placed in the aluminium alloy wire casing, and network interface is installed on the relaying box, is convenient to debugging and related data copy and installation.Simultaneously the layout of the utility model total system can be saved a large amount of spaces, makes whole workshop neat and artistic, and can energy savings, and is safe, more is conducive to operation, can also enhance productivity.When the utility model need be ventilated energising when plant equipment, open related switch, the debugging of carrying out plant equipment gets final product.
Description of drawings:
Below in conjunction with accompanying drawing the utility model is described further:
Fig. 1 is the conspectus of power supply of the present utility model and compressed air pipe;
Fig. 2 is unit wiring mode of the present utility model;
Fig. 3 is the structural representation of relaying box of the present utility model;
Fig. 4 is the rear view of Fig. 3.
Embodiment:
The following stated is preferred embodiment of the present utility model only, is not that scope of the present utility model is limited.
Embodiment, see accompanying drawing 1 ~ 4, a kind of control platform of new workshop distribution distribution debugging plant equipment comprises workshop 1, power supply, compressed air pipe, tracheae 2, aluminium alloy wire casing 3, relaying box 4 and plant equipment 5, ceiling is installed at the top, workshop, and ceiling is installed on apart from ground 3 meters height place; Described power supply is connected by power lead by primary power 6 and some branch road power supplys 7; Described compressed air pipe comprises main compressed air pipe 8 and some pneumatics gas branch pipes road 9, described workshop one end is installed with primary power and main compressed air pipe, be connected with some pneumatics gas branch pipes road on the main compressed air pipe, described main compressed air pipe and pneumatics gas branch pipe road all are that gas is carried iron pipe conduit, can avoid producing potential safety hazard.
Described aluminium alloy wire casing and pneumatics gas branch pipe road are installed on ceiling inside, are placed with power lead in the aluminium alloy wire casing; The bottom of described aluminium alloy wire casing is equipped with daylight lamp 10, and daylight lamp is positioned at outside the ceiling.
Described relaying box is installed on the ceiling outside, and center, relaying box top is provided with a total circuit access port 11.
Described tracheae is installed on the pneumatics gas branch pipe road by the pneumatics gas-tpe fitting, and tracheae stretches out outside the ceiling and is fixed in the left side of relaying box, tracheae outside ceiling is provided with the valve 12 of control air pressure size, can regulate the air pressure size according to the equipment needs, tracheae bottom outside ceiling is connecting gas-tpe fitting 13, when plant equipment need be ventilated energising time, can with the tracheae on the plant equipment with open valve after gas-tpe fitting docks and can ventilate; Described plant equipment can be placed between two tracheaes.
The back side of described relaying box is equipped with two network interfaces 14, in the aluminium alloy wire casing grid line is installed, and is convenient to debugging and related data copy and installation.
Described relaying box can provide 220V and two kinds of voltages of 380V, satisfies the distinct device demand, and the back side of relaying box is provided with 220V switch 15 and 380V switch 16, satisfies the distinct device demand.
Two Three-hole sockets 17, a 220V aviation plug seat 18 and a 380V aviation plug seat 19 have been installed in the front of described relaying box, are convenient to relevant device and directly use, and need not switching.
Described relaying box is provided with air switch, can strengthen equipment and operating personnel's protection.

Claims (7)

1. a new workshop distribution distribution is debugged the control platform of plant equipment, it is characterized in that: comprise workshop, power supply, compressed air pipe, tracheae, aluminium alloy wire casing, relaying box and plant equipment, ceiling is installed at the top, workshop, and ceiling is installed on apart from ground 3 meters height place; Described power supply is connected by power lead with some branch road power supplys by primary power; Described compressed air pipe comprises main compressed air pipe and some pneumatics gas branch pipes road, and described workshop one end is installed with primary power and main compressed air pipe, is connected with some pneumatics gas branch pipes road on the main compressed air pipe; Described aluminium alloy wire casing and pneumatics gas branch pipe road are installed on ceiling inside, are placed with power lead in the aluminium alloy wire casing; Described relaying box is installed on the ceiling outside; Described tracheae is installed on the pneumatics gas branch pipe road by the pneumatics gas-tpe fitting, and tracheae to stretch out ceiling outer and be fixed in the left side of relaying box, the tracheae ceiling outside is provided with the valve of controlling the air pressure size; Described plant equipment can be placed between two tracheaes.
2. a kind of new workshop distribution distribution according to claim 1 is debugged the control platform of plant equipment, it is characterized in that: described main compressed air pipe and pneumatics gas branch pipe road all are that gas is carried iron pipe conduit.
3. a kind of new workshop distribution distribution according to claim 1 is debugged the control platform of plant equipment, and it is characterized in that: the back side of described relaying box is equipped with two network interfaces, in the aluminium alloy wire casing grid line is installed.
4. a kind of new workshop distribution distribution according to claim 1 is debugged the control platform of plant equipment, and it is characterized in that: the bottom of described aluminium alloy wire casing is equipped with daylight lamp, and daylight lamp is positioned at outside the ceiling.
5. a kind of new workshop distribution distribution according to claim 1 is debugged the control platform of plant equipment, it is characterized in that: described relaying box can provide 220V and two kinds of voltages of 380V, satisfy the distinct device demand, and the back side of relaying box is provided with 220V switch and 380V switch.
6. a kind of new workshop distribution distribution according to claim 1 is debugged the control platform of plant equipment, and it is characterized in that: two Three-hole sockets, a 220V aviation plug seat and a 380V aviation plug seat have been installed in the front of described relaying box.
7. a kind of new workshop distribution distribution according to claim 1 is debugged the control platform of plant equipment, and it is characterized in that: described relaying box is provided with air switch.
CN 201220728655 2012-12-26 2012-12-26 Novel workshop gas-distribution power-distribution control platform for debugging mechanical equipment Expired - Fee Related CN203070775U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN 201220728655 CN203070775U (en) 2012-12-26 2012-12-26 Novel workshop gas-distribution power-distribution control platform for debugging mechanical equipment

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN 201220728655 CN203070775U (en) 2012-12-26 2012-12-26 Novel workshop gas-distribution power-distribution control platform for debugging mechanical equipment

Publications (1)

Publication Number Publication Date
CN203070775U true CN203070775U (en) 2013-07-17

Family

ID=48769539

Family Applications (1)

Application Number Title Priority Date Filing Date
CN 201220728655 Expired - Fee Related CN203070775U (en) 2012-12-26 2012-12-26 Novel workshop gas-distribution power-distribution control platform for debugging mechanical equipment

Country Status (1)

Country Link
CN (1) CN203070775U (en)

Similar Documents

Publication Publication Date Title
CN203907212U (en) Sulfur hexafluoride connection opening device
CN203070775U (en) Novel workshop gas-distribution power-distribution control platform for debugging mechanical equipment
CN202654579U (en) Fire-fighting power source guarantee device
CN202771810U (en) Control platform for carrying out ventilation electrifying debugging over mechanical devices
CN203209356U (en) Hot and cold water cleaning system for large cleaning workshop
CN202905192U (en) Control platform for workshop gas-and-power distribution debugging mechanical device
CN201405858Y (en) Air pipeline cabinet
CN205127215U (en) High altitude power equipment extinguishing device
CN204187267U (en) A kind of hydraulic pressure aerating type bundled tube shipping container
CN212603260U (en) Air supply system for door and window profile extruder
CN204083816U (en) A kind of combustion gas building regulation boxes
CN102831937B (en) Control platform for performing ventilation and electrification debugging of mechanical equipment
CN102849084B (en) Pneumatic cabinet of electric locomotive and electric locomotive
CN202084811U (en) Telescopic protective cover for low-voltage switch
CN205944817U (en) Electric power outgoing line cabinet
CN206337581U (en) A kind of Urban Underground piping lane installs mouth mechanism
CN203937685U (en) A kind of wind regime cabinet
CN202260203U (en) Underground box-type substation
CN206302059U (en) A kind of switch cubicle of the quick secondary connection of energy
CN206211363U (en) A kind of safety inspection case containing multiple voltage grade
CN203521281U (en) SF6 breaker air inflating device
CN202087384U (en) Sealing air system of medium-speed coal mill
CN204368184U (en) The electropneumatic brake of 160Km electrical net detect car is shielded
CN210326286U (en) Land plug for workshop
CN201828413U (en) Full-function JZ-7 type brake testing bed

Legal Events

Date Code Title Description
C14 Grant of patent or utility model
GR01 Patent grant
CF01 Termination of patent right due to non-payment of annual fee

Granted publication date: 20130717

Termination date: 20161226

CF01 Termination of patent right due to non-payment of annual fee