CN202888109U - 高压跌落保险快速过通装置 - Google Patents

高压跌落保险快速过通装置 Download PDF

Info

Publication number
CN202888109U
CN202888109U CN 201220591200 CN201220591200U CN202888109U CN 202888109 U CN202888109 U CN 202888109U CN 201220591200 CN201220591200 CN 201220591200 CN 201220591200 U CN201220591200 U CN 201220591200U CN 202888109 U CN202888109 U CN 202888109U
Authority
CN
China
Prior art keywords
high pressure
voltage falling
type fuse
falling type
pressure fall
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Lifetime
Application number
CN 201220591200
Other languages
English (en)
Inventor
马晖
黄可增
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
State Grid Corp of China SGCC
Handan Power Supply Co of State Grid Hebei Electric Power Co Ltd
Original Assignee
Handan Power Supply Co of State Grid Hebei Electric Power Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Handan Power Supply Co of State Grid Hebei Electric Power Co Ltd filed Critical Handan Power Supply Co of State Grid Hebei Electric Power Co Ltd
Priority to CN 201220591200 priority Critical patent/CN202888109U/zh
Application granted granted Critical
Publication of CN202888109U publication Critical patent/CN202888109U/zh
Anticipated expiration legal-status Critical
Expired - Lifetime legal-status Critical Current

Links

Images

Landscapes

  • Emergency Protection Circuit Devices (AREA)

Abstract

本实用新型公开一种高压跌落保险快速过通装置,包括高压跌落保险管(1),在高压跌落保险管(1)的上端部设有能够夹紧高压跌落保险静触头(7)的弹簧夹锁装置,弹簧夹锁装置通过螺丝与高压跌落保险管(1)紧密连接。它能够在用电高峰期,10KV配网高压跌落保险发生保险口烧蚀,因而高压跌落保险无法正常关合影响电网正常供电,而此时又正值用电高峰期或夜晚居民关键用电节点修理人员无法长时间停电修理时,实现快速临时过通,避免了在用电高峰期大面积、长时间停电,因而大大提高了配网运行的供电可靠性。

Description

高压跌落保险快速过通装置
技术领域
本实用新型涉及一种高压跌落保险,尤其是一种高压跌落保险快速过通装。是一种在用电高峰期,由于10KV配网高压跌落保险发生保险口烧蚀,无法正常关合而影响电网正常供电,而此时又正值用电高峰期或夜晚居民关键用电节点修理人员无法长时间停电修理时,采用的一种快速临时过通装置。
背景技术
目前,配网跌落保险管接口部位烧蚀损坏只能是停电进行跌落保险的整体更换,停电面积大,耗时时间长,因而大大降低了配网运行的供电可靠性。
因此,设计一种当高压跌落保险出现接口部位烧蚀后能快速临时过通的装置是十分必要的。
发明内容
发明内容
本实用新型所要解决的技术问题是提供一种可使供电抢修人员,在用电高峰期,10KV 配网高压跌落保险发生接口烧蚀损坏而无法关合时,能够临时快速替换损坏设备的装置。
本实用新型解决其技术问题的技术方案是:
高压跌落保险快速过通装置,包括高压跌落保险管,在高压跌落保险管的上端部设有能够夹紧高压跌落保险静触头的弹簧夹锁装置,弹簧夹锁装置通过螺丝与高压跌落保险管紧密连接。所述的弹簧夹锁装置包括带有内滑道的矩形框壳体,绝缘树脂矩形框壳体的下框上有高压跌落保险管端部通过孔,在矩形框壳体内设有上压弹簧铜片和下压弹簧铜片,在上压弹簧铜片与矩形框壳体的上框之间设有上弹簧,在下压弹簧铜片与矩形框壳体的下框之间设有下弹簧,在上压弹簧铜片与下压弹簧铜片之间设有临时撑头。
本实用新型的使用方法:
1.使用之前把用绝缘树脂做的超轻撑头放置在弹簧夹锁装置的上下铜片之间将上下铜片撑开一定的距离(为关合高压跌落保险管夹住静触头做准备)。
2.然后抢修操作人员用正常关合跌落保险管的办法关合高压跌落保险快速过通装置;当高压跌落保险静触头碰触到撑头后会将撑头推弹出弹簧夹锁装置,此时上下铜片就会在上下弹簧的作用下同时夹挤住高压跌落保险静触头,从而完成高压跌落保险管的关合。
与现有技术相比,本实用新型能够在用电高峰期,10KV配网高压跌落保险发生保险口烧蚀,因而高压跌落保险无法正常关合影响电网正常供电,而此时又正值用电高峰期或夜晚居民关键用电节点修理人员无法长时间停电修理时,实现快速临时过通,避免了在用电高峰期大面积、长时间停电,因而大大提高了配网运行的供电可靠性。
附图说明
图1是本实用新型的结构示意图(闭合后状态);
图2是本实用新型的结构示意图(闭合前状态);
图3是图1中件1、2、4、5、6、8位置关系图;
图4是图1中件2、4、5、6、8位置关系图;
图5是图1中件5的外形图;
图6是图1中件4的结构示意图;
图7是图1中件2的结构示意图;
图8是图2中件3的结构示意图。
具体实施方式
如图所示,高压跌落保险快速过通装置,包括高压跌落保险管1,在高压跌落保险管1的上端部设有能够夹紧高压跌落保险静触头7的弹簧夹锁装置,弹簧夹锁装置通过螺丝与高压跌落保险管1紧密连接。所述的弹簧夹锁装置包括带有内滑道的矩形框壳体5,绝缘树脂矩形框壳体5的下框上有高压跌落保险管端部通过孔9,在矩形框壳体5内设有上压弹簧铜片4和下压弹簧铜片2,在上压弹簧铜片4与矩形框壳体5的上框之间设有上弹簧6,在下压弹簧铜片2与矩形框壳体5的下框之间设有下弹簧8,在上压弹簧铜片4与下压弹簧铜片2之间设有临时撑头3。

Claims (2)

1.高压跌落保险快速过通装置,包括高压跌落保险管(1),其特征在于,在高压跌落保险管(1)的上端部设有能够夹紧高压跌落保险静触头(7)的弹簧夹锁装置,弹簧夹锁装置通过螺丝与高压跌落保险管(1)紧密连接。
2.根据权利要求1所述的高压跌落保险快速过通装置,其特征在于,所述的弹簧夹锁装置包括带有内滑道的矩形框壳体(5),绝缘树脂矩形框壳体(5)的下框上有高压跌落保险管端部通过孔(9),在矩形框壳体(5)内设有上压弹簧铜片(4)和下压弹簧铜片(2),在上压弹簧铜片(4)与矩形框壳体(5)的上框之间设有上弹簧(6),在下压弹簧铜片(2)与矩形框壳体(5)的下框之间设有下弹簧(8),在上压弹簧铜片(4)与下压弹簧铜片(2)之间设有临时撑头(3)。
CN 201220591200 2012-11-12 2012-11-12 高压跌落保险快速过通装置 Expired - Lifetime CN202888109U (zh)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN 201220591200 CN202888109U (zh) 2012-11-12 2012-11-12 高压跌落保险快速过通装置

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN 201220591200 CN202888109U (zh) 2012-11-12 2012-11-12 高压跌落保险快速过通装置

Publications (1)

Publication Number Publication Date
CN202888109U true CN202888109U (zh) 2013-04-17

Family

ID=48079505

Family Applications (1)

Application Number Title Priority Date Filing Date
CN 201220591200 Expired - Lifetime CN202888109U (zh) 2012-11-12 2012-11-12 高压跌落保险快速过通装置

Country Status (1)

Country Link
CN (1) CN202888109U (zh)

Cited By (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN102931042A (zh) * 2012-11-12 2013-02-13 邯郸供电公司 高压跌落保险快速过通装置
CN104715984A (zh) * 2013-12-12 2015-06-17 国网上海市电力公司 一种跌落式熔断器的摆杆机构中的焊接板
CN104715984B (zh) * 2013-12-12 2018-08-31 国网上海市电力公司 一种跌落式熔断器的摆杆机构中的焊接板

Cited By (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN102931042A (zh) * 2012-11-12 2013-02-13 邯郸供电公司 高压跌落保险快速过通装置
CN102931042B (zh) * 2012-11-12 2014-09-17 国家电网公司 高压跌落保险快速过通装置
CN104715984A (zh) * 2013-12-12 2015-06-17 国网上海市电力公司 一种跌落式熔断器的摆杆机构中的焊接板
CN104715984B (zh) * 2013-12-12 2018-08-31 国网上海市电力公司 一种跌落式熔断器的摆杆机构中的焊接板

Similar Documents

Publication Publication Date Title
CN202888109U (zh) 高压跌落保险快速过通装置
CN203617176U (zh) 隔离开关触指安装工具
CN204651742U (zh) 一种用于维修刀闸动触头的绝缘隔板
CN202094509U (zh) 隔离开关触指带电紧固器
CN102931042A (zh) 高压跌落保险快速过通装置
CN202405163U (zh) 一种高压隔离刀闸
CN204067766U (zh) 快接型接地装置
CN206099928U (zh) 一种柴油汽车发动机智能无触点预热继电器
CN203278207U (zh) 具有过热关断功能的开关电路
CN205967946U (zh) 一种焊带压紧装置
CN202917651U (zh) 灯具接线端子工装
CN206976184U (zh) 一种断路器检修触头
CN202383230U (zh) 一种配电线路断路检测装置
CN201682178U (zh) 一种设置有红外测温窗口的高压配电设备
CN206271799U (zh) 一种用于锂电池的电池连接片
CN202042810U (zh) 一种真空断路器的维护装置
CN206807137U (zh) 一种风电场的站用电接线电路
CN110361640A (zh) 一种熔断型避雷器组试验装置
CN203706957U (zh) 高压断路器分合闸控制装置
CN201408696Y (zh) 高压隔离开关触头触指装置
CN203398069U (zh) 一种快速插装型熔断器
CN202905526U (zh) 一种刀闸静触头调整专用扳手
CN203278184U (zh) 无线接入点保护装置
CN204464165U (zh) 一种绝缘筒
CN203012040U (zh) 一种离线检测模具id盒装置

Legal Events

Date Code Title Description
C14 Grant of patent or utility model
GR01 Patent grant
ASS Succession or assignment of patent right

Owner name: HANDAN POWER SUPPLY COMPANY

Effective date: 20131010

Owner name: STATE ELECTRIC NET CROP.

Free format text: FORMER OWNER: HANDAN POWER SUPPLY COMPANY

Effective date: 20131010

C41 Transfer of patent application or patent right or utility model
COR Change of bibliographic data

Free format text: CORRECT: ADDRESS; FROM: 056002 HANDAN, HEBEI PROVINCE TO: 100031 XICHENG, BEIJING

TR01 Transfer of patent right

Effective date of registration: 20131010

Address after: 100031 Xicheng District West Chang'an Avenue, No. 86, Beijing

Patentee after: State Grid Corporation of China

Patentee after: Handan Power Supply Company

Address before: 056002 No. 19 Zhonghua North Street, Hebei, Handan

Patentee before: Handan Power Supply Company

AV01 Patent right actively abandoned

Granted publication date: 20130417

Effective date of abandoning: 20140917

RGAV Abandon patent right to avoid regrant