CN202850041U - Reinforcing steel support for colligation of large-scale raft plate and ribbed beam base reinforcing steel - Google Patents
Reinforcing steel support for colligation of large-scale raft plate and ribbed beam base reinforcing steel Download PDFInfo
- Publication number
- CN202850041U CN202850041U CN 201220467869 CN201220467869U CN202850041U CN 202850041 U CN202850041 U CN 202850041U CN 201220467869 CN201220467869 CN 201220467869 CN 201220467869 U CN201220467869 U CN 201220467869U CN 202850041 U CN202850041 U CN 202850041U
- Authority
- CN
- China
- Prior art keywords
- reinforcing steel
- colligation
- hook
- raft plate
- reinforcing bar
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Expired - Fee Related
Links
Images
Landscapes
- Foundations (AREA)
Abstract
Disclosed is a reinforcing steel support for colligation of a large-scale raft plate and ribbed beam base reinforcing steel. The reinforcing steel support can effectively reduce construction difficulty and cost. The reinforcing steel support comprises framework reinforcing steel (10) and hook reinforcing steel (20). The hook reinforcing steel (20) is arranged along the length direction of the reinforcing steel (10) in a spaced mode. The hook reinforcing steel (20) and the reinforcing steel (10) are welded into a whole. The space among the hook reinforcing steel (20) is the same as that of base horizontal reinforcing steel.
Description
Technical field
The utility model relates to building structure, particularly a kind of Steel bar rack for large-scale raft plate and the colligation of girt strip reinforcement foundation.
Background technology
The horizontal reinforcement length on the basis of heavy construction is long, diameter is thicker, the reinforcing bar of a long diameter 25mm of the 9m 36.65kg that weighs, and reinforcing bar connects employing mechanical connection and higher according to the Core Walls Structure raft foundation, aloft operation during connection, difficulty of construction is larger.If construction then needs to set up scaffold fixed level reinforcing bar according to a conventional method, and the workman effect worker that constructs leads also and can be affected, and difficulty of construction increases, and incurs loss through delay the duration, larger labour cost and scaffolding steel pipe rental charge expenditure.
The utility model content
Technical problem to be solved in the utility model provides a kind of Steel bar rack for large-scale raft plate and the colligation of girt strip reinforcement foundation, effectively to reduce difficulty of construction and construction cost.
The technical scheme that its technical problem that solves the utility model adopts is as follows:
Steel bar rack for large-scale raft plate and the colligation of girt strip reinforcement foundation of the present utility model, it is characterized in that: it comprises skeleton reinforcing steel bar and hook reinforcing bar, the hook reinforcing bar arranges along the length direction interval of skeleton reinforcing steel bar and is welded as a whole with it, and the spacing of hook reinforcing bar is identical with the spacing of foundation level reinforcing bar.
The beneficial effects of the utility model are, set up with can saving fixed level reinforcing bar scaffold, do not affect workman's efficiency of construction, controlling well the horizontal reinforcement spacing, reduce difficulty of construction, more reducing labour cost and scaffolding steel pipe lease expenses expenditure in the reduction construction period.
Description of drawings
This manual comprises such as next width of cloth accompanying drawing:
Fig. 1 is the structural representation that the utility model is used for the Steel bar rack of large-scale raft plate and the colligation of girt strip reinforcement foundation.
The title of member shown in the figure and corresponding mark: skeleton reinforcing steel bar 10, hook reinforcing bar 20.
The specific embodiment
Below in conjunction with drawings and Examples the utility model is further specified.
With reference to Fig. 1, Steel bar rack for large-scale raft plate and the colligation of girt strip reinforcement foundation of the present utility model, it comprises skeleton reinforcing steel bar 10 and hook reinforcing bar 20, hook reinforcing bar 20 arranges along the length direction interval of skeleton reinforcing steel bar 10 and is welded as a whole with it, and the spacing of hook reinforcing bar 20 is identical with the spacing of foundation level reinforcing bar.For ease of making hook reinforcing bar 20 common semicirculars in shape.
During construction, skeleton reinforcing steel bar 10 with Steel bar rack is fixedly connected with basic vertical reinforcement first, again the foundation level reinforcing bar is placed in the hook reinforcing bar 20 of Steel bar rack with, then foundation level steel disk, basic vertical reinforcement are carried out colligation, set up with so both can having saved fixed level reinforcing bar scaffold, also can not affect workman's efficiency of construction, control well the horizontal reinforcement spacing, reduce difficulty of construction, more reducing labour cost and scaffolding steel pipe lease expenses expenditure in the reduction construction period.
The above the utility model that just explains through diagrams is used for some principles of the Steel bar rack of large-scale raft plate and the colligation of girt strip reinforcement foundation, be not be the utility model to be confined to shown in and in described concrete structure and the scope of application, so every corresponding modify that might be utilized and equivalent all belong to the claim that the utility model is applied for.
Claims (2)
1. the Steel bar rack that is used for large-scale raft plate and the colligation of girt strip reinforcement foundation, it is characterized in that: it comprises skeleton reinforcing steel bar (10) and hook reinforcing bar (20), hook reinforcing bar (20) arranges along the length direction interval of skeleton reinforcing steel bar (10) and is welded as a whole with it, and the spacing of hook reinforcing bar (20) is identical with the spacing of foundation level reinforcing bar.
2. the Steel bar rack for large-scale raft plate and the colligation of girt strip reinforcement foundation as claimed in claim 1, it is characterized in that: described hook reinforcing bar (20) is semicircle shape.
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN 201220467869 CN202850041U (en) | 2012-09-14 | 2012-09-14 | Reinforcing steel support for colligation of large-scale raft plate and ribbed beam base reinforcing steel |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN 201220467869 CN202850041U (en) | 2012-09-14 | 2012-09-14 | Reinforcing steel support for colligation of large-scale raft plate and ribbed beam base reinforcing steel |
Publications (1)
Publication Number | Publication Date |
---|---|
CN202850041U true CN202850041U (en) | 2013-04-03 |
Family
ID=47981257
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN 201220467869 Expired - Fee Related CN202850041U (en) | 2012-09-14 | 2012-09-14 | Reinforcing steel support for colligation of large-scale raft plate and ribbed beam base reinforcing steel |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN202850041U (en) |
Cited By (3)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN104005520A (en) * | 2014-06-10 | 2014-08-27 | 山东电力建设第二工程公司 | Steel fastener clamp |
CN110805167A (en) * | 2019-11-26 | 2020-02-18 | 中国十七冶集团有限公司 | Construction method for binding shear wall reinforcing steel bars by adopting outer hook support |
CN117166669A (en) * | 2023-08-15 | 2023-12-05 | 哈尔滨工业大学 | Prefabricated multi-face connecting monomer, masonry wall frame and assembly method of masonry wall frame |
-
2012
- 2012-09-14 CN CN 201220467869 patent/CN202850041U/en not_active Expired - Fee Related
Cited By (3)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN104005520A (en) * | 2014-06-10 | 2014-08-27 | 山东电力建设第二工程公司 | Steel fastener clamp |
CN110805167A (en) * | 2019-11-26 | 2020-02-18 | 中国十七冶集团有限公司 | Construction method for binding shear wall reinforcing steel bars by adopting outer hook support |
CN117166669A (en) * | 2023-08-15 | 2023-12-05 | 哈尔滨工业大学 | Prefabricated multi-face connecting monomer, masonry wall frame and assembly method of masonry wall frame |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN204876059U (en) | Prefabricated assembled shaped steel concrete frame structure system | |
CN203654299U (en) | Steel support loose end | |
CN203866966U (en) | Novel assembly type frame core tube steel structure residential housing system | |
CN201972269U (en) | Prefabricated reinforcing steel bar concrete shear wall | |
CN202850041U (en) | Reinforcing steel support for colligation of large-scale raft plate and ribbed beam base reinforcing steel | |
CN204418510U (en) | Floor support plate steel bar girder structure | |
CN204899064U (en) | Heavy grade slope roofing cast in situ concrete construction equipment | |
CN204040450U (en) | A kind of for angle connector in tools type section steel builder's jack | |
CN203755715U (en) | Wall underpinning structure | |
CN203403511U (en) | Steel section reinforced concrete structure based on cold-formed thin-walled steel sections | |
CN103046743A (en) | High-rise conversion layer type steel concrete girder hanging type template supporting system and construction method | |
CN203924495U (en) | The cage of reinforcement with warming plate and beam steel cage for the manufacture of cast-in-place shear wall body | |
CN202544399U (en) | Supporting frame for overhang floor slab with steel structure | |
CN204960324U (en) | Suspension type floor formwork support device | |
CN203924491U (en) | The T-shaped bar frame with warming plate for cast-in-place shear wall body | |
CN202689278U (en) | Superimposed hollow slab | |
CN201420400Y (en) | Supporting structure of towering reticulated shell structure | |
CN201620599U (en) | Rock wall crane beam concrete surface brace-free form of underground plant | |
CN203080919U (en) | Formwork support steel channel beam connecting system for construction of cast-in-situ concrete large cross-sectional beams | |
CN202644555U (en) | Prefabricated slab for flat-plate-type raft board framework | |
CN103437365B (en) | The steel strand support component of pattern foundation pit supporting structure inner support system | |
CN202577937U (en) | Tool-type external wall scaffold wall connecting piece | |
CN202745452U (en) | Mold support device using foundation slab to reserved rebars | |
CN203080923U (en) | Formwork support diagonal bracing system for construction of cast-in-situ concrete large cross-sectional beams | |
CN219175639U (en) | Direct-connection wallboard structure for assembled building |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
C14 | Grant of patent or utility model | ||
GR01 | Patent grant | ||
CF01 | Termination of patent right due to non-payment of annual fee |
Granted publication date: 20130403 Termination date: 20150914 |
|
EXPY | Termination of patent right or utility model |