CN202847967U - Hull outfitting device preassemble structure - Google Patents

Hull outfitting device preassemble structure Download PDF

Info

Publication number
CN202847967U
CN202847967U CN 201220453479 CN201220453479U CN202847967U CN 202847967 U CN202847967 U CN 202847967U CN 201220453479 CN201220453479 CN 201220453479 CN 201220453479 U CN201220453479 U CN 201220453479U CN 202847967 U CN202847967 U CN 202847967U
Authority
CN
China
Prior art keywords
hull
preassemble
outfitting device
fairlead
roller
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Fee Related
Application number
CN 201220453479
Other languages
Chinese (zh)
Inventor
杨义
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
JIANGDONG SHIPYARD OF CHINA CHANGJIANG NATIONAL SHIPPING GROUP
Original Assignee
JIANGDONG SHIPYARD OF CHINA CHANGJIANG NATIONAL SHIPPING GROUP
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by JIANGDONG SHIPYARD OF CHINA CHANGJIANG NATIONAL SHIPPING GROUP filed Critical JIANGDONG SHIPYARD OF CHINA CHANGJIANG NATIONAL SHIPPING GROUP
Priority to CN 201220453479 priority Critical patent/CN202847967U/en
Application granted granted Critical
Publication of CN202847967U publication Critical patent/CN202847967U/en
Anticipated expiration legal-status Critical
Expired - Fee Related legal-status Critical Current

Links

Images

Abstract

The utility model discloses a hull outfitting device preassemble structure which comprises a fairlead and a fairlead roller on the edge of a hull, and a bollard, a cleat roller, a windlass winch, a small hatchcover and a chain stopper on a deck of the hull. The construction conditions of hull outfitting device preassemble structure are improved, and the positioning precision is greatly improved. In conducting this process, entire outfitting device has to be cleaned, and related drawing and arrangement of turbine, hull and electrical engineering have to be compared again so as to achieve mutually coordination. Accurate positioning is realized after solid modeling with three-dimensional software when block assembly allowance is taken into consideration.

Description

The outer pre-assembling structure of Xi equipment of hull
Technical field
This is practical to relate to the outer Xi equipment prepackage of hull design, further improves the ship building quality, and this prepackage technique is formulated and designed to shortening production cycle for enterprise uses manpower and material resources sparingly and guarantees personnel's construction safety, and.
Background technology
Build boats and ships therefore, the installation of outfitting is normally installed after the launching, causes extensive work to be delayed, and operating efficiency is low, install arbitrarily, the rework rate height that applies for checking and examination wastes energy, to this, must pick up from the source, before the segmentation prepackage is arranged in the segmentation sand-blast finish, all be in place by this technique, for a large amount of man-hours are saved in follow-up work.
The utility model content
The purpose of this utility model provides the outer pre-assembling structure of Xi equipment of a kind of hull, satisfy the design of prepackage technique and satisfied the PSPC requirement, execution conditions to the workmen also improve, the precision of location also significantly improves simultaneously, so when formulating this technique, full ship outfitting are cleared up, again contrasting turbine, hull, electric correlatogram paper cloth puts, mutually coordinate, after considering the segment folding surplus, it is pinpoint to use three-dimensional software to carry out behind the solid modelling.
The technical solution of the utility model is as follows:
The outer pre-assembling structure of Xi equipment of hull includes the mooring pipe, the fairlead that are provided with at the hull edge place, and deck in ship structure is provided with bollard, goat's horn roller, windlass winch, little hatchcover, chain stopper.
Described mooring pipe passes cable and walks around described goat's horn roller.
The utility model has satisfied the design of prepackage technique, and satisfied the PSPC requirement, execution conditions to the workmen also improve, the precision of location also significantly improves simultaneously, so when formulating this technique, full ship outfitting are cleared up, again contrasting turbine, hull, electric correlatogram paper cloth puts, mutually coordinate, after considering the segment folding surplus, it is pinpoint to use three-dimensional software to carry out behind the solid modelling.
Description of drawings
Fig. 1 is structural representation of the present utility model.
The specific embodiment
Referring to accompanying drawing, the outer pre-assembling structure of Xi equipment of hull, include the mooring pipe 1, the fairlead 2 that are provided with at the hull edge place, deck in ship structure is provided with bollard 3, goat's horn roller 4, windlass winch 5, cludy lid 6, chain stopper 7, and mooring pipe passes cable and walks around described goat's horn roller 4.
The workmen, makes and prepares and the neck material according to supporting outfitting BOM table and outfitting construction drawing at back court, after segmental structure is partly built end, namely goes up the construction of tire location, this process advantage:
1. made things convenient for the workmen to draw materials, made, the construction object is clear and definite, and whole ssection fitting-out is enhanced productivity without mistakes and omissions.
2. preloader is numerous and diverse in the segmentation, this technique and drawing data, and relevant coordinate dimension is clear, and it is convenient to install, and has guaranteed the accuracy of outfitting location, reduces rework rate, saves cost.
To the segmentation that PSPC relates to, it is integrated to have realized that shell Xi is coated with, and has guaranteed the total quality of product, has improved the market competitiveness of enterprises.

Claims (2)

1. the outer pre-assembling structure of Xi equipment of hull includes the mooring pipe, the fairlead that are provided with at the hull edge place, and it is characterized in that: deck in ship structure is provided with bollard, goat's horn roller, windlass winch, little hatchcover, chain stopper.
2. the outer pre-assembling structure of Xi equipment of hull according to claim 1, it is characterized in that: described mooring pipe passes cable and walks around described goat's horn roller.
CN 201220453479 2012-09-06 2012-09-06 Hull outfitting device preassemble structure Expired - Fee Related CN202847967U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN 201220453479 CN202847967U (en) 2012-09-06 2012-09-06 Hull outfitting device preassemble structure

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN 201220453479 CN202847967U (en) 2012-09-06 2012-09-06 Hull outfitting device preassemble structure

Publications (1)

Publication Number Publication Date
CN202847967U true CN202847967U (en) 2013-04-03

Family

ID=47979191

Family Applications (1)

Application Number Title Priority Date Filing Date
CN 201220453479 Expired - Fee Related CN202847967U (en) 2012-09-06 2012-09-06 Hull outfitting device preassemble structure

Country Status (1)

Country Link
CN (1) CN202847967U (en)

Cited By (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN103274021A (en) * 2013-06-02 2013-09-04 大连理工大学 Integrated machine base module of shipborne anchor machine and mounting method of integrated machine base module
CN103963922A (en) * 2014-05-04 2014-08-06 上海江南长兴重工有限责任公司 Installation method for stern deck mooring equipment
CN110758674A (en) * 2019-09-18 2020-02-07 沪东中华造船(集团)有限公司 Method for installing ship anchor winch block section
CN114604388A (en) * 2022-03-25 2022-06-10 中船黄埔文冲船舶有限公司 Hatch coaming integrated construction method, bulk cargo ship hatch coaming and bulk cargo ship

Cited By (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN103274021A (en) * 2013-06-02 2013-09-04 大连理工大学 Integrated machine base module of shipborne anchor machine and mounting method of integrated machine base module
CN103274021B (en) * 2013-06-02 2015-06-17 大连理工大学 Integrated machine base module of shipborne anchor machine and mounting method of integrated machine base module
CN103963922A (en) * 2014-05-04 2014-08-06 上海江南长兴重工有限责任公司 Installation method for stern deck mooring equipment
CN110758674A (en) * 2019-09-18 2020-02-07 沪东中华造船(集团)有限公司 Method for installing ship anchor winch block section
CN110758674B (en) * 2019-09-18 2021-11-02 沪东中华造船(集团)有限公司 Method for installing ship anchor winch block section
CN114604388A (en) * 2022-03-25 2022-06-10 中船黄埔文冲船舶有限公司 Hatch coaming integrated construction method, bulk cargo ship hatch coaming and bulk cargo ship

Similar Documents

Publication Publication Date Title
CN202847967U (en) Hull outfitting device preassemble structure
CN102030076B (en) Cabin entry process for main diesel generating set of 50,000-ton semi-submerged ship
CN104071300B (en) The installation method that anchor station anchor lip ground is integral prefabricated
CN101976288A (en) Ship subsection manufacture analog system
CN102320349A (en) The ship ' s equipment method
CN104149935A (en) Single-roller cavel fairlead for ships
CN204255974U (en) Multi-spot measurement and control electromagnetic current metre
CN201597723U (en) Combined suspension bracket of sectional pipe
CN103963922A (en) Installation method for stern deck mooring equipment
CN203793565U (en) Comprehensive ship control simulator
CN105059475A (en) Detachable bulwark structure of underwater probing ship
CN103985020A (en) Radio frequency identification-based marine outfitting production management control system
CN205219106U (en) Engine cylinder of robot lid pile up neatly clamping device
CN202449189U (en) Lifting support pier
CN202110104U (en) Pressure-bearing test board for methane-generating pit
CN204046091U (en) A kind of shipboard cable case
KR101686733B1 (en) Ship block lifting system using 3-dimensional model
KR20160113941A (en) System for exzmination of block lifting safety based on 3-dimensional model
CN201745729U (en) Novel simplified moveable derrick
CN103507915A (en) Integral hoisting design method for wood ship upper layer building
CN202703847U (en) Rapid hoisting and locating device for upper construction of ship body
Xianghui Slimming Problem for Shipbuilding
CN204895767U (en) Removable bulwark structure of undersea exploration ship
KR20150056493A (en) method for creating 3-dimensional model for block lifting
CN202759188U (en) Cable laying device of medium-sized cable laying ship

Legal Events

Date Code Title Description
C14 Grant of patent or utility model
GR01 Patent grant
CF01 Termination of patent right due to non-payment of annual fee

Granted publication date: 20130403

Termination date: 20140906

EXPY Termination of patent right or utility model