CN202449189U - Lifting support pier - Google Patents

Lifting support pier Download PDF

Info

Publication number
CN202449189U
CN202449189U CN2012200109640U CN201220010964U CN202449189U CN 202449189 U CN202449189 U CN 202449189U CN 2012200109640 U CN2012200109640 U CN 2012200109640U CN 201220010964 U CN201220010964 U CN 201220010964U CN 202449189 U CN202449189 U CN 202449189U
Authority
CN
China
Prior art keywords
support pier
pier
epimere
hole
support
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Lifetime
Application number
CN2012200109640U
Other languages
Chinese (zh)
Inventor
郑晨阳
刘涛
刘剑波
郑军
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
JIANGSU NEW CENTURY SHIPBUILDING CO Ltd
Original Assignee
JIANGSU NEW CENTURY SHIPBUILDING CO Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by JIANGSU NEW CENTURY SHIPBUILDING CO Ltd filed Critical JIANGSU NEW CENTURY SHIPBUILDING CO Ltd
Priority to CN2012200109640U priority Critical patent/CN202449189U/en
Application granted granted Critical
Publication of CN202449189U publication Critical patent/CN202449189U/en
Anticipated expiration legal-status Critical
Expired - Lifetime legal-status Critical Current

Links

Images

Landscapes

  • Bridges Or Land Bridges (AREA)

Abstract

The utility model relates to a lifting support pier which comprises an upper section (1) of the support pier and a lower section (2) of the support pier, wherein the upper section (1) of the support pier is arranged in a blind hole of the lower section (2) of the support pier; two iron wedges (3) are respectively arranged in a hole of the lower section (2) of the support pier and at the center of the hole in a symmetrical way; and the iron wedges (3) are coincided with the contact part of the upper section (1) of the support pier. The lifting support pier is simple in operation, and can be recycled, thus lightening the labor intensity, accelerating the building speed and lowering the building cost.

Description

A kind of up-down support pier
Technical field:
The utility model relates to the ship building frock, relates in particular to a kind of up-down support pier.
Background technology:
Along with reaching its maturity of marine technology, also constantly upgrading of frock design along with the development of marine technology.Safely, suitable, convenient is the indispensable requirement of modernized tooling device design and use.Traditionally the segmented general group and when closing up the topside support pier generally behind segmental hoisting, be in place, even often be in place in advance also need be when lifting on-the-spot finishing support pier height.Because the topside support pier is generally below segmentation, the lifting of support pier and adjustment be suitable difficulty and very big danger is arranged when operating all.Traditional support pier just possibly disliked short behind the adjustment height and scraps or change one section through repairing for several times to cut, and has wasted material.Frequent in the berth combination stage simultaneously all is to cut down waiting to replace the flitch of putting pier because the paint problem need be replaced and put pier traditionally, and the flitch that also needs to replace pier after finishing for pier cuts down, and has both damaged flitch and also can expend very big manpower.
Summary of the invention:
The purpose of the utility model provides a kind of simple to operate, ability recycle, reduces labour intensity, improves construction speed, reduces the up-down support pier of laid down cost.
The utility model is to realize like this; A kind of up-down support pier; Comprise support pier epimere, support pier hypomere; It is characterized in that: be provided with the support pier epimere in the described support pier hypomere blind hole, be symmetrically arranged with the iron wedge with the center, hole in the sector hole under the support pier, iron wedge and support pier epimere contact position match.
Described iron wedge of the utility model and support pier epimere contact position are provided with the inclined-plane.
The utility model is simple to operate, the ability recycle, has reduced labour intensity, has improved construction speed, has reduced laid down cost.
Description of drawings:
Fig. 1 is the utility model front view structural representation.
Fig. 2 is the utility model left view structural representation.
Among the figure 1, the support pier epimere, 2, the support pier hypomere, 3, the iron wedge.
The specific embodiment:
Below in conjunction with specific embodiment the utility model is further described:
With reference to accompanying drawing; A kind of up-down support pier comprises support pier epimere 1, support pier hypomere 2, it is characterized in that: be provided with support pier epimere 1 in described support pier hypomere 2 blind holes; Be symmetrically arranged with iron wedge 3 with the center, hole in support pier hypomere 2 holes, iron wedge 3 matches with support pier epimere 1 contact position.Described iron wedge 3 is provided with the inclined-plane with support pier epimere 1 contact position.During practical implementation, up-down support pier principle is to utilize iron wedge bevel altitude difference to adjust up and down distance of up-down support pier, to realize the topside support pier and to put the height adjustment of pier.Boat segmental is always organized and is closed up the stage, before segmental hoisting with the up-down support pier according to drawing in length and breadth coordinate be hung in advance and put in place, treat segmentation accurately behind the location, topside is gone up and down the support pier holder putting below the stool, with the horse plate segmentation is fixed, can gantry crane be broken off relations.The utility model can make the topside support pier settle in advance and put in place, need not on-site hoisting and finishing, has also reduced the lifting time of gantry crane, saving of work and time.In the berth combination process; Because the breakage of paint need be replaced support pier: the up-down support pier is arranged to treats to go up flitch near the position support pier and pad; It is solid with the flitch pad to regulate the iron wedge; Replace the iron wedge Panasonic of support pier and remove the flitch on it waiting, just can carry out touch-up paint work, if be necessary that waiting to paint patch work finishes and can former support pier recovered to put in place again this zone.

Claims (2)

1. up-down support pier; Comprise support pier epimere (1), support pier hypomere (2); It is characterized in that: be provided with support pier epimere (1) in described support pier hypomere (2) blind hole; Be symmetrically arranged with iron wedge (3) with the center, hole in support pier hypomere (2) hole, iron wedge (3) matches with support pier epimere (1) contact position.
2. a kind of up-down support pier according to claim 1 is characterized in that: described iron wedge (3) is provided with the inclined-plane with support pier epimere (1) contact position.
CN2012200109640U 2012-01-12 2012-01-12 Lifting support pier Expired - Lifetime CN202449189U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN2012200109640U CN202449189U (en) 2012-01-12 2012-01-12 Lifting support pier

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN2012200109640U CN202449189U (en) 2012-01-12 2012-01-12 Lifting support pier

Publications (1)

Publication Number Publication Date
CN202449189U true CN202449189U (en) 2012-09-26

Family

ID=46865075

Family Applications (1)

Application Number Title Priority Date Filing Date
CN2012200109640U Expired - Lifetime CN202449189U (en) 2012-01-12 2012-01-12 Lifting support pier

Country Status (1)

Country Link
CN (1) CN202449189U (en)

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN102923276A (en) * 2012-10-11 2013-02-13 江苏熔盛重工有限公司 Quick support tool used for section assembly and block carrying of ship
CN111268057A (en) * 2020-03-30 2020-06-12 李令强 Method for assembling and welding main sections and closing main sections of ships or marine equipment

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN102923276A (en) * 2012-10-11 2013-02-13 江苏熔盛重工有限公司 Quick support tool used for section assembly and block carrying of ship
CN111268057A (en) * 2020-03-30 2020-06-12 李令强 Method for assembling and welding main sections and closing main sections of ships or marine equipment

Similar Documents

Publication Publication Date Title
CN107974944B (en) A kind of hanging method of Y type road-cum-rail bridge floorings hanging apparatus
CN104070231A (en) Large alloy steel part cutting method through diamond wire saw
CN103287555B (en) A kind of movable hydraulic pressure docking block and using method thereof
CN201907630U (en) Self-elevating supporting device for supporting ship segment
CN202449189U (en) Lifting support pier
CN202097392U (en) Hydraulic edge cutting equipment for aluminum alloy die-casting part
CN103879883B (en) Beam lifting fastening-type special fixture
CN206800199U (en) A kind of sprinkling equipment with high ferro bridge pier automatic maintenance function
CN202847967U (en) Hull outfitting device preassemble structure
CN104191502A (en) Concrete square pile mold convenient to release
CN208072383U (en) A kind of Novel steel pile pile assembled pile cover
CN203285056U (en) Stair formwork supporting base
CN203345184U (en) Movable hydraulic docking block
CN202246915U (en) Automatic pressure-disengaging machine device for residual anode
CN204548424U (en) Automatic Track Finding water quality detection catamaran
CN102635232A (en) Reinforcement method for transverse reinforcement interior edge at side of arc-shaped beam
CN104727557A (en) Method and structure for constructing concrete distributer in aluminum-alloy template system
CN208341463U (en) A kind of Aircraft Skin Stretch Forming Process auxiliary device
CN203623907U (en) Lifting cup support for offshore platform
CN204772963U (en) Wood cement board shedder
CN102744784B (en) Heavy-load railway pre-cast T beam overall binding carcass and construction method thereof
CN206551309U (en) A kind of segmented mold drive device of tyre vulcanizer to middle regulator
CN204871478U (en) Boats and ships winch guider's fixed additional strengthening
CN203874738U (en) Automatic material proportioning device
CN203581312U (en) Tool used for sectionalized support in ship construction

Legal Events

Date Code Title Description
C14 Grant of patent or utility model
GR01 Patent grant
EE01 Entry into force of recordation of patent licensing contract

Assignee: JIANGSU NEW TIMES SHIPBUILDING CO., LTD.

Assignor: Jiangsu New Century Shipbuilding Co.,Ltd.

Contract record no.: 2013320000728

Denomination of utility model: Lifting support pier

Granted publication date: 20120926

License type: Exclusive License

Record date: 20131028

LICC Enforcement, change and cancellation of record of contracts on the licence for exploitation of a patent or utility model
CX01 Expiry of patent term

Granted publication date: 20120926

CX01 Expiry of patent term