The utility model content
In view of this, the purpose of this utility model is to provide a kind of fast-assembling transformer station, accelerates the installation process of transformer station by modular mode, solves the problem of prior art complex installation process complexity.
The technical solution of the utility model is as follows:
A kind of fast-assembling transformer station comprises: the first plug-in type switching system PASS module, transformer module, the first switch cubicle module, second switch cabinet module and secondary device module, wherein:
A described PASS module is connected between the high pressure end of incoming cables of high voltage source and described transformer module, high voltage source is introduced described transformer module, is exported by the low-pressure line-outgoing end from described transformer module after the described transformer module voltage of transformation;
Described the first switch cubicle module connects low-pressure line-outgoing end and the low-voltage bus bar of described transformer module, so that the low-tension supply of described transformer module output is introduced described low-voltage bus bar;
Described second switch cabinet module connects described low-voltage bus bar, forms the low-tension supply output;
Described secondary device module connects other various modules, so that various modules are controlled, protected and monitor.
Preferably, above-mentioned fast-assembling transformer station also comprises:
A plurality of connection high voltage sourcies and on-the-spot high voltage bus, to form the 2nd PASS module of multichannel high pressure inlet wire, each described the 2nd PASS module is introduced described high voltage bus with described high voltage source;
A described PASS module connects described high voltage source by described high voltage bus.
Preferably, in the above-mentioned fast-assembling transformer station, described low-voltage bus bar and/or high voltage bus have the hanging member of steel construction.
Preferably, in the above-mentioned fast-assembling transformer station, described PASS module comprises lightning arrester, the isolating switch summation current transformer that is arranged on the installing rack.
Preferably, in the above-mentioned fast-assembling transformer station, described secondary device module is carried in the vehicle-mounted container.
Preferably, in the above-mentioned fast-assembling transformer station, described high voltage source is the 110KV power supply.
Preferably, in the above-mentioned fast-assembling transformer station, described low-tension supply is the 35KV power supply.
Preferably, in the above-mentioned fast-assembling transformer station, the quantity of described the 2nd PASS module is two, forms two high voltage source inputs.
Preferably, in the above-mentioned fast-assembling transformer station, the quantity of described second switch cabinet module is five, forms five low-tension supply outputs.
Can find out from technique scheme, in the fast-assembling transformer station that the utility model provides, with various primary equipments and secondary device according to the different modularizations that are combined of type, on-the-spot needs smooth mattess and has the bus structure that articulates of steel construction can realize installing, installation process, module is directly fixing or be positioned over ground and get final product, need not wherein each device is fixed, shortened fixedly flow process, and, finish in advance the connection of the various devices in the module in the various modules, thereby shortened the wiring flow process, reduced the wiring complexity.On the whole, installation, wiring process are simply, fast.
Embodiment
Transformer station comprises the primary equipments (being heavy current installation) such as transformer, instrument transformer and switchgear, and the secondary device of protective device, measure and control device and communication equipment, may further include in addition thunder resisting equipment.
Wherein, transformer is the capital equipment of transformer station, can be divided into two winding transformer, three-winding transformer and autotransformer, and the voltage height is directly proportional with umber of turn, and electric current then is inversely proportional to umber of turn.In addition, transformer can be divided into step-up transformer and step-down transformer by effect, and the former is used for electric power system sending end transformer station, and the latter is used for receiving end transformer station.The voltage of power transformation device and the voltage of electric power system adapt, can be by switching branch joint to keep qualified voltage in the different load situation.
Described instrument transformer comprises the voltage transformer summation current transformer, their operation principle is similar with transformer, the working voltage of high voltage installation and bus, (load or the short circuit current that are equipment and bus become the voltage and current that secondary device adapts to large electric current to scale.Voltage transformer secondary voltage is 100V under specified ruuning situation, and the Current Transformer Secondary electric current is 5A or 1A.
Described switchgear comprises that circuit breaker, isolating switch, on-load switch and high-tension fuse etc. are used for the equipment of disconnection or the circuit that closes; wherein: under protective relaying device control, automatically faulty equipment and circuit are disconnected when circuit breaker is used for the open circuit fault under the electric power system normal operation, automatic reclosing function can also be arranged.Specifically can be air circuit or sulfur hexafluoride breaker.Described isolating switch specifically can be disconnecting link, and its Main Function is isolation voltage when equipment or line maintenance, to guarantee safety.Described on-load switch can disconnect load current when normal operation, can cooperate with high voltage fuse to be used for 110KV and above voltage and not often transformer or the outlet of operation.
Above-mentioned these primary equipments and secondary device can be transported to by vehicle-mounted form scene (place that needs transformer station), and, for rainproof, dustproof needs, by the container loading as the compartment.But for reasons such as convenient transportations, can not cross the size that increases greatly container, the space that causes leaving for operating personnel is very limited, affected operating personnel's work, for this situation, this paper provides a kind of scheme that Container Dimensions can enlarge operating personnel's operating space that need not to increase.
Below in conjunction with the accompanying drawing among the utility model embodiment, the technical scheme among the utility model embodiment is clearly and completely described.Obviously, described embodiment only is a part of embodiment of the present utility model, rather than whole embodiment.Based on the embodiment in the utility model, those of ordinary skills are not making the every other embodiment that obtains under the creative work prerequisite, all belong to the scope of the utility model protection.
A kind of fast-assembling transformer station that the utility model provides, its a kind of structure comprises as shown in Figure 1: a PASS module 1, transformer module 2, the first switch cubicle module 3, second switch cabinet module 4 and secondary device module 5, wherein:
A described PASS module 1 is connected between high voltage source and the described transformer module 2 high pressure ends of incoming cables, high voltage source is introduced described transformer module 2, is exported by the low-pressure line-outgoing end from described transformer module 2 after described transformer module 2 voltages of transformation.
Described the first switch cubicle module 3 connects low-pressure line-outgoing end and the low-voltage bus bar of described transformer module 2, so that the low-tension supply of described transformer module 2 outputs is introduced described low-voltage bus bar.
Described second switch cabinet module 4 connects described low-voltage bus bar, forms the low-tension supply output.
Described secondary device module 5 connects other various modules, so that various modules are controlled, protected and monitor.
A described PASS (Plug And Switch System, plug and switch system) module 1 comprises lightning arrester, isolating switch summation current transformer at least, specifically can be a kind of mixed switch equipment, the advantage that namely has traditional air insulated switch equipment (AIS) has again SF
6The advantage of metal enclosed switchgear (GIS), concrete structure can comprise lightning arrester, isolating switch, earthed switch, cable outlet end, high speed grounding switch, current transformer (can be bushing current transformer), SF
6Voltage transformer or voltage sensor, these function element (except bushing current transformer) all are sealed in a SF
6In the gas-insulated shell (such as the case of cast aluminium), form a module.According to the difference that the wiring of electric substation requires, a described PASS module 1 arranges 2 or 3 insulating sleeves, and the current transformer in the PASS module 1 links to each other with high voltage bus by described insulating sleeve.PASS also can be understood as Performance And Save Space, i.e. superior performance and save the space.
Described secondary device module 5 is carried in the vehicle-mounted container, and described secondary device module 5 can be the set of various screen cabinets, and is loaded in the container as vehicle car.
Described high voltage source can be for the 110KV power supply or more than the 110KV, and described low-tension supply can be lower than for voltage the power supply of 110KV, can be the 35KV power supply.
Described low-voltage bus bar is on-the-spot original bus structure that articulates with steel construction, and the scene arranges foundation of civil work after can also setting in advance or install this transformer station again.
In other embodiments, if the on-the-spot high voltage bus that also is provided with the bus structure that articulates of firm structure, then described fast-assembling transformer station can further include a plurality of modules of introducing high voltage source from described high voltage bus, as shown in Figure 2:
Two the 2nd PASS modules 6 connect external high pressure power supply and on-the-spot high voltage bus, to form a plurality of high pressure inlet wires, high voltage source are introduced described high voltage bus.
The quantity of described second switch cabinet module 4 can be a plurality of, namely can form a plurality of low-tension supply outputs, concrete quantity can arrange as required, in this application, the quantity of described second switch cabinet module 4 can be five, for example shown in Figure 3, form five low-tension supply outputs (such as the 35KV power output end).
Can find out, above-mentioned each module all has mount pad, the mount pad of secondary device module 5 is container, the mount pad of the first switch cubicle module 3 and second switch cabinet module 4 is cabinet body structure, other primary equipments then can be frame or plate, in general, and for the installation of secondary device module 5, directly be positioned over ground and get final product, other modules then need to be fixed in ground (smooth mattess) by bolt or other fixed parts.
The assembling process of the above-mentioned fast-assembling transformer station that the application provides is as follows:
At first in the destination foundation of civil work is set, then by vehicle various modules are transported to described destination on-the-spot, unloading also is positioned over desired location, then, the mount pad of each module is positioned over mattess (secondary device module 5 directly is positioned over ground grading), and carries out to assemble after wiring and the debug process and finish.
In the fast-assembling transformer station that the utility model provides, various primary equipments are by in advance according to kind or demand makes up and modularization, only module need be fixed when then installing at the scene and once get final product, need not to form device to wherein each fixedly mounts one by one, secondary device is gathered and is loaded in the container, need not equally to arrange one by one, so saved installation procedure, shorten installation procedure.And because modularization, then the connection that respectively forms between the device in each module has pre-set, and only the line between each module and other modules need be connected to get final product when wiring, and is like this too for secondary device, saved the wiring program.See on the whole, the installation of this programme, wiring process simply, fast can be described as fast-assembling transformer station.
Need to prove, each embodiment can replenish mutually in this specification, and what each embodiment stressed is and the difference of other embodiment that identical similar part is mutually referring to getting final product between each embodiment.
In addition, also need to prove, in this article, relational terms such as the first and second grades only is used for an entity or operation are separated with another entity or operating space, and not necessarily requires or hint and have the relation of any this reality or sequentially between these entities or the operation.In addition, in this article, term " comprises ", " comprising " or its any other variant are intended to contain comprising of nonexcludability, thereby not only comprise those key elements so that comprise process, method, article or the equipment of a series of key elements, but also comprise other key elements of clearly not listing, or also be included as the intrinsic key element of this process, method, article or equipment.In the situation that not more restrictions, the key element that is limited by statement " comprising ... ", and be not precluded within process, method, article or the equipment that comprises described key element and also have other identical element.
To the above-mentioned explanation of the disclosed embodiments, make this area professional and technical personnel can realize or use the utility model.Multiple modification to these embodiment will be apparent concerning those skilled in the art, and General Principle as defined herein can be in the situation that do not break away from spirit or scope of the present utility model, in other embodiments realization.Therefore, the utility model will can not be restricted to these embodiment shown in this article, but will meet the widest scope consistent with principle disclosed herein and features of novelty.