CN202832643U - 一种具有自移装置的设备列车 - Google Patents

一种具有自移装置的设备列车 Download PDF

Info

Publication number
CN202832643U
CN202832643U CN 201220567890 CN201220567890U CN202832643U CN 202832643 U CN202832643 U CN 202832643U CN 201220567890 CN201220567890 CN 201220567890 CN 201220567890 U CN201220567890 U CN 201220567890U CN 202832643 U CN202832643 U CN 202832643U
Authority
CN
China
Prior art keywords
self
equipment train
hydraulic
car
hydraulic supporting
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Fee Related
Application number
CN 201220567890
Other languages
English (en)
Inventor
刘宝
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
ZMJ LU'AN XINJIANG MACHINERY CO Ltd
Original Assignee
ZMJ LU'AN XINJIANG MACHINERY CO Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by ZMJ LU'AN XINJIANG MACHINERY CO Ltd filed Critical ZMJ LU'AN XINJIANG MACHINERY CO Ltd
Priority to CN 201220567890 priority Critical patent/CN202832643U/zh
Application granted granted Critical
Publication of CN202832643U publication Critical patent/CN202832643U/zh
Anticipated expiration legal-status Critical
Expired - Fee Related legal-status Critical Current

Links

Images

Landscapes

  • Vehicle Cleaning, Maintenance, Repair, Refitting, And Outriggers (AREA)

Abstract

本实用新型公开了一种具有自移装置的设备列车,包括两个平板车(1)和连接相邻两个平板车(1)之间的推移千斤顶(2);所述平板车(3)设有多根纵向的能向上下两侧伸缩固定的液压支柱(4)。所述液压支柱(4)为4根,并安装在平板车(1)的四个对角上,平均分成2对;其中一对液压支柱(4)比另一对液压支柱(4)长度长。所述液压支柱(4)包括上下两个活塞杆(41)和连接控制上下两个活塞杆(41)伸缩的液压系统(42)。本实用新型的优点;移车过程操作方便、节省劳动力、提高工效、安全系数大大提高。

Description

一种具有自移装置的设备列车
技术领域
本实用新型涉及矿井运输设备领域,特别是涉及一种具有自移装置的设备列车。
背景技术
目前全国多数煤矿企业已采用综合机械化采煤工艺,机电设备已实现大型化、高速化、连续化和自动化。为便于设备的管理、煤矿企业将所有设备的电控系统集中在回风或运输巷,距工作面40-150m之间,统称设备列车。随着回采工作面不断的推进,设备列车需不断的回撤,传统的回撤方法多采用绞车牵引,在现场需要每隔一段移一次绞车,作业人员劳动强度大,安全性不强。传统绞车牵引主要存在以下缺点:
(1)车的安装,预制及打压柱,绞车随着设备列车移动,绞车需不断前移,在前移绞车期间,设备列车的防跑车固定较困难。
(2)设备列车处于巷道上、下坡段,绞车在牵引或下放时需使用单体支柱配合,人员操作时安全系数低。(因为使用绞车要随时移动,不可能打基础固定,所以在移车时要使用单体上顶巷道顶板、下压紧绞车底座,实现绞车的固定。)
(3)用绞车移设备列车可分为班班移车和定期移车。班班移车,主要存在问题:每班移完设备列车后,还需移绞车。且绞车的四压柱两戗柱比较笨重,每次都需要人工移动,人员操作时安全系数低,工效低,每班至少延长移车时间两小时左右。定期移车:定期移车除了存在以上问题外,每月至少影响几个班的产量。
实用新型内容
(一)要解决的技术问题
本实用新型所要解决的技术问题是提供一种防跑车固定效果好、工作效率高和使用更安全的设备列车。
(二)技术方案
为解决上述问题,本实用新型提供一种具有自移装置的设备列车,包括两个平板车和连接相邻两个平板车之间的推移千斤顶;所述每个平板车设有多根纵向的能向上下两侧伸缩固定的液压支柱。
上述的具有自移装置的设备列车中,所述液压支柱为4根,并安装在平板车的四个对角上,平均分成2对;其中一对液压支柱比另一对液压支柱长度长。
上述的具有自移装置的设备列车中,还包括连接头,所述平板车与推移千斤顶通过连接头相连。
上述的具有自移装置的设备列车中,所述液压支柱包括上下两个活塞杆和连接控制上下两个活塞杆伸缩的液压系统。
(三)有益效果
本实用新型的具有自移装置的设备列车,通过设置两个平板车和推移千斤顶的结构,增加了平板车的数量,提高了工作效率,避免了每次人工都要移动笨重的四压柱所带来的安全隐患。通过设置4根液压支柱,让液压支柱向上下两侧的巷道顶板和巷道底板支撑,使平板车防跑车固定更牢固。移车时用液压支柱上顶巷道顶板、下压巷道底板实现自移装置的前车或后车的固定,然后通过推移千斤顶的推和拉,来实现设备列车一个部距的移动。整个过程通过人工操作液压系统完成。移车过程操作方便、节省劳动力、提高工效、安全系数大大提高。
附图说明
图1为本实用新型的结构示意图;
图2为图1的仰视图;
图中1为车架、2为推移千斤顶、3为连接头、4为液压支柱、5为巷道顶板、6为巷道底板。
具体实施方式
以下结合附图实施例对本实用新型作进一步详细描述。
如图1和图2所示,一种具有自移装置的设备列车,包括前后两个平板车1、相邻两个平板车1之间的推移千斤顶2和2个连接头3;所述前后的平板车1与推移千斤顶2之间用连接头3相连。所述平板车3设有4根纵向的能向上下两侧伸缩固定的液压支柱4,所述液压支柱4可以由液压系统控制,并安装在平板车1的四个对角上,平均分成2对其中一对液压支柱4比另一对液压支柱4长度长。所述液压支柱4包括上下两个活塞杆41和连接控制上下两个活塞杆41伸缩的液压系统42。
在本实用新型的具有自移装置的设备列车工作时,所述前一辆平板车1上的液压支柱4通过液压控制系统42向上下两部活塞杆41伸长,下部的活塞杆41支撑巷道地板6,上部的活塞杆41支撑巷道顶板5,把前平板车1牢牢的固定在某一指定位置。再将后车的四根液压支柱4收回,使之脱离巷道顶板5和巷道地板6,通过操纵推拉千斤顶2,使后一辆平板车1前移,后平板车1拉到位后,将后平板车1上的四个液压支柱4的上下两部活塞杆41分别伸出支撑巷道顶板5和巷道底板6,然后将前平板车1的液压支柱4上的活塞杆41收回,通过操纵推拉千斤顶2,使前平板车1前移,前平板车1到位后将液压支柱4的上下两部活塞杆41伸出,分别支撑巷道顶板5和巷道底板6,完成一个循环。每个循环可实现两个步距。本实用新型的平板车,通过设置两个前后平板车1和推移千斤顶2的结构,增加了平板车1的数量,提高了工作效率,避免了每次人工都要移动笨重的四压柱所带来的安全隐患。通过设置4根液压支柱4,让液压支柱向上下两侧的巷道顶板5和巷道底板6支撑,使平板车1防跑车固定更牢固。移车时用液压支柱4上顶巷道顶板5、下压巷道6底板实现自移装置的前车或后车的固定,然后通过推移千斤顶2的推和拉,来实现设备列车一个部距的移动。整个过程通过人工操作液压系统42完成。移车过程操作方便、节省劳动力、提高工效、安全系数大大提高。
惟以上所述的内容,仅为本实用新型的优选方案,应当不能以此限定本实用新型的范围,即凡是依本实用新型权利要求及实用新型说明内容所作的简单的等同变化与修饰,皆仍属于本实用新型专利涵盖的范围内。

Claims (4)

1.一种具有自移装置的设备列车,其特征在于,包括两个平板车(1)和连接相邻两个平板车(1)之间的推移千斤顶(2);所述平板车(3)设有多根纵向的能向上下两侧伸缩固定的液压支柱(4)。
2.根据权利要求1所述的具有自移装置的设备列车,其特征在于,所述液压支柱(4)为4根,并安装在平板车(1)的四个对角上,平均分成2对;其中一对液压支柱(4)比另一对液压支柱(4)长度长。
3.根据权利要求1所述的具有自移装置的设备列车,其特征在于,还包括连接头(3),所述平板车(1)与推移千斤顶(2)通过连接头(3)相连。
4.根据权利要求1或2所述的具有自移装置的设备列车,其特征在于,所述液压支柱(4)包括上下两个活塞杆(41)和连接控制上下两个活塞杆(41)伸缩的液压系统(42)。
CN 201220567890 2012-10-25 2012-10-25 一种具有自移装置的设备列车 Expired - Fee Related CN202832643U (zh)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN 201220567890 CN202832643U (zh) 2012-10-25 2012-10-25 一种具有自移装置的设备列车

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN 201220567890 CN202832643U (zh) 2012-10-25 2012-10-25 一种具有自移装置的设备列车

Publications (1)

Publication Number Publication Date
CN202832643U true CN202832643U (zh) 2013-03-27

Family

ID=47944375

Family Applications (1)

Application Number Title Priority Date Filing Date
CN 201220567890 Expired - Fee Related CN202832643U (zh) 2012-10-25 2012-10-25 一种具有自移装置的设备列车

Country Status (1)

Country Link
CN (1) CN202832643U (zh)

Cited By (7)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN104279003A (zh) * 2014-09-18 2015-01-14 中国煤炭科工集团太原研究院有限公司 井下单体液压支柱快速运输装置及其完成的运输方法
CN104670253A (zh) * 2015-02-06 2015-06-03 成都科创佳思科技有限公司 一种加工车间用牵车台
CN105151057A (zh) * 2015-09-28 2015-12-16 临汾市新晋汾焦铁设备制造有限公司 煤矿设备液压自移列车
CN104279003B (zh) * 2014-09-18 2017-01-04 中国煤炭科工集团太原研究院有限公司 井下单体液压支柱快速运输装置及其完成的运输方法
CN110758419A (zh) * 2019-09-27 2020-02-07 山东中衡光电科技有限公司 一种矿用设备列车的自移锚固装置
CN113669105A (zh) * 2021-08-30 2021-11-19 国家能源集团宁夏煤业有限责任公司 一种多功能的搬运矿车
CN114194224A (zh) * 2021-12-30 2022-03-18 郑州航空港区速达工业机械服务有限公司 一种有轨自移设备列车及其操作方法

Cited By (8)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN104279003A (zh) * 2014-09-18 2015-01-14 中国煤炭科工集团太原研究院有限公司 井下单体液压支柱快速运输装置及其完成的运输方法
CN104279003B (zh) * 2014-09-18 2017-01-04 中国煤炭科工集团太原研究院有限公司 井下单体液压支柱快速运输装置及其完成的运输方法
CN104670253A (zh) * 2015-02-06 2015-06-03 成都科创佳思科技有限公司 一种加工车间用牵车台
CN105151057A (zh) * 2015-09-28 2015-12-16 临汾市新晋汾焦铁设备制造有限公司 煤矿设备液压自移列车
CN110758419A (zh) * 2019-09-27 2020-02-07 山东中衡光电科技有限公司 一种矿用设备列车的自移锚固装置
CN113669105A (zh) * 2021-08-30 2021-11-19 国家能源集团宁夏煤业有限责任公司 一种多功能的搬运矿车
CN113669105B (zh) * 2021-08-30 2024-01-30 国家能源集团宁夏煤业有限责任公司 一种多功能的搬运矿车
CN114194224A (zh) * 2021-12-30 2022-03-18 郑州航空港区速达工业机械服务有限公司 一种有轨自移设备列车及其操作方法

Similar Documents

Publication Publication Date Title
CN202882972U (zh) 顺槽迈步分体式超前液压支架组
CN202832643U (zh) 一种具有自移装置的设备列车
CN102128040B (zh) 液压迈步式超前支护装备
CN103452574B (zh) 循环自移式超前支护辅助移架装置
CN104791004B (zh) 一种煤矿顺槽迈步自移设备列车
CN102587945B (zh) 掘进巷道液压迈步式多级临时支护装备
CN202391444U (zh) 综采工作面液压支架梁式回撤装置
CN105041357A (zh) 单轨吊运尾变首式超前支护系统
CN112160784A (zh) 运输顺槽交替循环支撑式超前支护装置及支护方法
CN203796302U (zh) 循环自移式超前支护辅助移架装置
CN201953390U (zh) 液压迈步式超前支护装备
CN209761465U (zh) 无反复支撑超前支护及搬运成套设备
CN102587951B (zh) 液压式u型钢支架托装机
CN104018869B (zh) 超前支架支护装置
CN202970789U (zh) 伸缩式低压电缆储存装置
CN202243482U (zh) 矿用液压自移无轨设备列车
CN110745151A (zh) 一种矿用液压无轨自移设备列车
CN203428405U (zh) 快速掘进用迈步式自移胶带机机尾
CN201901161U (zh) 支撑迈步式移设备列车承载装置
CN202294822U (zh) 一种矿用电站移动装置
CN202467863U (zh) 隧道加宽段衬砌台车
CN202768027U (zh) 一种与掘进机配套使用的快速掘进临时支护系统
CN113153387B (zh) 一种循环自移式液压组合支架
CN202325608U (zh) 机采工作面步移式支护架
CN204627664U (zh) 一种煤矿顺槽迈步自移设备列车

Legal Events

Date Code Title Description
C14 Grant of patent or utility model
GR01 Patent grant
C53 Correction of patent for invention or patent application
CB03 Change of inventor or designer information

Inventor after: Liu Bao

Inventor after: Gan Yuanping

Inventor after: Zhu Shide

Inventor after: You Ruijie

Inventor after: Li Jianling

Inventor before: Liu Bao

COR Change of bibliographic data

Free format text: CORRECT: INVENTOR; FROM: LIU BAO TO: LIU BAO GAN YUANPING ZHU SHIDE YOU RUIJIE LI JIANLING

CF01 Termination of patent right due to non-payment of annual fee

Granted publication date: 20130327

Termination date: 20171025

CF01 Termination of patent right due to non-payment of annual fee