CN202825273U - Fixing device for processing brake seat plane of elevator - Google Patents

Fixing device for processing brake seat plane of elevator Download PDF

Info

Publication number
CN202825273U
CN202825273U CN 201220422671 CN201220422671U CN202825273U CN 202825273 U CN202825273 U CN 202825273U CN 201220422671 CN201220422671 CN 201220422671 CN 201220422671 U CN201220422671 U CN 201220422671U CN 202825273 U CN202825273 U CN 202825273U
Authority
CN
China
Prior art keywords
brake seat
elevator
base plate
bottom plate
processing
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Fee Related
Application number
CN 201220422671
Other languages
Chinese (zh)
Inventor
梁卫国
梁轶
肖向阳
张苗
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Loudi Sanxing Mining Equipment Manufacturing Co Ltd
Original Assignee
Loudi Sanxing Mining Equipment Manufacturing Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Loudi Sanxing Mining Equipment Manufacturing Co Ltd filed Critical Loudi Sanxing Mining Equipment Manufacturing Co Ltd
Priority to CN 201220422671 priority Critical patent/CN202825273U/en
Application granted granted Critical
Publication of CN202825273U publication Critical patent/CN202825273U/en
Anticipated expiration legal-status Critical
Expired - Fee Related legal-status Critical Current

Links

Images

Landscapes

  • Cage And Drive Apparatuses For Elevators (AREA)

Abstract

The utility model provides a fixing device for processing a brake seat plane of an elevator. The fixing device for processing the brake seat plane of the elevator comprises a bottom plate, four ejector columns are arranged on the bottom plate, two ejector columns are arranged on the middle portion of the bottom plate, and the other two ejector columns are arranged on two sides of the middle portion of the bottom plate. Set bolts are arranged on two sides of the other end of the bottom plate, and a plurality of process holes are formed in the bottom plate. According to the mentioned technical scheme, firstly, a tool is fixed on a chuck of a lathe, then the brake seat is placed on the tool, the non-processing plane of the brake seat is ejected through the ejector columns, and the brake seat is fixed on the tool through the process holes. After the brake seat is processed, a guide key groove is processed, first the brake seat is placed on a workbench, a workpiece is leveled up, and then the locating step of a dill plate is placed in the matching hole of the workpiece, and is aligned to the guide key groove. After a locating key is placed well, a drill jig and the workpiece are fastened, and hole drilling can be carried out. The assembly of brake legs and the brake seat is convenient, and interchangeability is strong.

Description

A kind ofly process the fixture that elevator lock seat plane is used
Technical field
The utility model relates to the mining equiment technical field, refers in particular to a kind of fixture that elevator lock seat plane is used of processing.
Background technology
Elevator well elevating conveyor/Elevator is the heavy mechanical equipment that transports by changing potential energy, such as mine hoist, mistake dam elevator etc.In a broad sense, elevator, overhead traveling crane, elevator, stable car, crane, headstock gear etc. all can be described as elevator.Elevator refers generally to the heavy mechanical equipment that power is large, hoisting power is stronger.
Mine hoist is the work mechanism on down-hole and ground, by the driven by motor plant equipment, thereby drives container lifting in pit shaft to drive steel wire rope, finishes the conveying task.Mine hoist is progressively to develop differentiation by original water lift.Modern mine hoist lifting capacity is large, and speed is high, and is safe, has developed into the full-automatic heavy mining machinery of electronic computer control.
Mine hoist mainly is comprised of motor, decelerator, reel or friction pulley, brakes, degree of depth indication mechanism, test the speed speed limiting system and control system etc., adopts to exchange or the direct current generator driving.Divide winding type mine elevator and friction-type mine hoist by the operation principle of boom hoist cable.The winding type mine elevator has single drum and two kinds on two reels, and the canoe of steel wire rope on reel is similar with general winch.Monotubular only has steel cable mostly, connects a container.Each reel of the bitubular is respectively joined steel cable, connects two containers, and a container rises during running, and another container descends.The winding type mine elevator mostly be used for annual production below 1,200,000 tons, well depth is less than 400 meters mine.The hoisting rope lodge of friction-type mine hoist is on friction pulley, and utilization rises container with the frictional force of friction pulley liner.The two ends of hoisting rope respectively connect a container, or an end connecting container, and the other end connects balance weight.The friction-type mine hoist is divided into tower friction-type mine hoist machine room according to arrangement and is located on the pit shaft top tower and lands friction-type mine hoist machine room and be directly arranged on the ground two kinds.Quantity by hoisting rope is divided into again single rope friction type mine hoist and multi-rope friction type mine hoist.The latter's advantage is: can adopt the less friction pulley of thinner steel wire rope and diameter, thereby the machine packet size is little, is convenient to make; Speed is high, hoisting power is large, security good.Produce per year more than 1,200,000 tons, well depth adopts this elevator mostly less than 2100 meters vertical shaft.
Original elevator lock seat is adding man-hour, because lock seat two ends weight, thickness is all inconsistent, causes adding the location difficulty in man-hour, especially when lock seat coach plane.After boring simultaneously six bolts hole, part skew dislocation can not be exchanged, and wastes time and energy when causing assembling.
Summary of the invention
The purpose of this utility model is to overcome the deficiencies in the prior art, and a kind of fixture and drilling jig for drilling device simple in structure, can be stably that the lock seat is fixing be provided.
For achieving the above object, technical scheme provided by the utility model is: a kind ofly process the fixture that elevator lock seat plane is used, it includes base plate, base plate is provided with four fore-sets, two middle parts that are positioned at base plate one end wherein, two other is positioned at both sides, base plate middle part, and base plate other end both sides are provided with tight fixed bolt, also are provided with several fabrication holes on the base plate.
Described fore-set is distributed on the base plate by the flat shape of the non-processing of lock seat.
Described tight fixed bolt is assemblied on the fastening block of base plate.
The utility model is fixed on frock on the lathe chuck first after having adopted such scheme, the lock seat is placed on the frock again, withstand with the non-processing plane of fore-set with the lock seat, will be fixed on the frock by fabrication hole again, after the processing of lock seat, insert guide key groove, first the lock seat is put on the workbench, levels up workpiece, again the bushing plate positioning step is put into the mating holes of workpiece, the alignment guide keyway, after putting positioning key well, tighten up drill jig and workpiece, can hole.Provide convenience when this programme makes lock leg and the assembling of lock seat, the exchange performance is strong.
Description of drawings
Fig. 1 is overall structure schematic diagram of the present utility model.
Fig. 2 is the workpiece schematic diagram of the utility model processing.
The specific embodiment
The utility model is described in further detail below in conjunction with institute's drawings attached, preferred embodiment of the present utility model is: referring to accompanying drawing 1 and accompanying drawing 2, the fixture that the described processing elevator of present embodiment lock seat plane is used includes base plate 1, base plate 1 is provided with four fore-sets 2, fore-set 2 is distributed on the base plate 1 by the flat shape of the non-processing of lock seat, two middle parts that are positioned at base plate 1 one ends wherein, two other is positioned at both sides, base plate 1 middle part, base plate 1 other end both sides are provided with tight fixed bolt 3, tight fixed bolt 3 is assemblied on the fastening block 5 of base plate 1, also is provided with several fabrication holes 4 on the base plate 1.When boring six holes, positioning step and positioning key are set, Dual positioning on the bushing plate.First the lock seat is placed on the frock, withstands with the non-processing plane of fore-set with the lock seat, will be fixed on the frock by fabrication hole again, again frock is fixed on the lathe chuck and can processes the brake disc performance.
The embodiment of the above is the preferred embodiment of the utility model only, is not to limit practical range of the present utility model with this, so the variation that all shapes according to the utility model, principle are done all should be encompassed in the protection domain of the present utility model.

Claims (3)

1. process the fixture that elevator lock seat plane is used for one kind, it is characterized in that: it includes base plate (1), base plate (1) is provided with four fore-sets (2), two middle parts that are positioned at base plate (1) one end wherein, two other is positioned at both sides, base plate (1) middle part, base plate (1) other end both sides are provided with tight fixed bolt (3), also are provided with several fabrication holes (4) on the base plate (1).
2. a kind of fixture that elevator lock seat plane is used of processing according to claim 1, it is characterized in that: fore-set (2) is distributed on the base plate (1) by the flat shape of the non-processing of lock seat.
3. a kind of fixture that elevator lock seat plane is used of processing according to claim 1, it is characterized in that: tight fixed bolt (3) is assemblied on the fastening block (5) of base plate (1).
CN 201220422671 2012-08-24 2012-08-24 Fixing device for processing brake seat plane of elevator Expired - Fee Related CN202825273U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN 201220422671 CN202825273U (en) 2012-08-24 2012-08-24 Fixing device for processing brake seat plane of elevator

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN 201220422671 CN202825273U (en) 2012-08-24 2012-08-24 Fixing device for processing brake seat plane of elevator

Publications (1)

Publication Number Publication Date
CN202825273U true CN202825273U (en) 2013-03-27

Family

ID=47937065

Family Applications (1)

Application Number Title Priority Date Filing Date
CN 201220422671 Expired - Fee Related CN202825273U (en) 2012-08-24 2012-08-24 Fixing device for processing brake seat plane of elevator

Country Status (1)

Country Link
CN (1) CN202825273U (en)

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN104384998A (en) * 2014-11-25 2015-03-04 宁夏共享模具有限公司 One-time processing equipment and processing method for wind power pedestal

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN104384998A (en) * 2014-11-25 2015-03-04 宁夏共享模具有限公司 One-time processing equipment and processing method for wind power pedestal

Similar Documents

Publication Publication Date Title
CN108500317A (en) A kind of belt transmission puncher
CN202825273U (en) Fixing device for processing brake seat plane of elevator
CN203091804U (en) Rope sheave drill jig for elevator guiding wheel
CN207660563U (en) A kind of underwater multiple-disc drilling tool conveying device
CN107720652B (en) A kind of construction method for hanging of frame structure large scale equipment
CN105735890A (en) Core drill
CN207451514U (en) A kind of building machinery lifting gear
CN203831023U (en) Vertical fitting tool for arranging propeller
CN115303978A (en) Supplementary core device that wears of water pump
CN201914876U (en) Heavy-duty steel wire rope winding drum
CN201253692Y (en) Table drill with lifting device
CN104401872B (en) Steel construction on the case beam navigating car weight handling equipment
CN208592418U (en) A kind of heavy forklift brake shoe anvil aperture apparatus
CN105499649A (en) Special power head return system for drilling machine
CN206108637U (en) Modularization operating system
CN219484969U (en) Drilling machine for processing injection mold
CN113586311B (en) Debugging tool and debugging method of deep sea wave energy power generation device
CN203728376U (en) Winding drum mechanism used for integrated mine hoist
CN202245868U (en) Drill winch capable of being lifted by helicopter
CN219622675U (en) Petroleum exploration equipment
CN201753587U (en) Aperture hydraulic clamper
CN211004326U (en) Anchor windlass closed gear box gear assembly fixture
CN213508452U (en) Municipal works are with pile device
CN201447289U (en) Counting ground sheave pulley
CN220667458U (en) Drilling device with anti-offset function

Legal Events

Date Code Title Description
C14 Grant of patent or utility model
GR01 Patent grant
CF01 Termination of patent right due to non-payment of annual fee

Granted publication date: 20130327

Termination date: 20150824

EXPY Termination of patent right or utility model