CN201447289U - Counting ground sheave pulley - Google Patents

Counting ground sheave pulley Download PDF

Info

Publication number
CN201447289U
CN201447289U CN2009200440966U CN200920044096U CN201447289U CN 201447289 U CN201447289 U CN 201447289U CN 2009200440966 U CN2009200440966 U CN 2009200440966U CN 200920044096 U CN200920044096 U CN 200920044096U CN 201447289 U CN201447289 U CN 201447289U
Authority
CN
China
Prior art keywords
pulley
counting
shaft
lifting
sheave shaft
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Fee Related
Application number
CN2009200440966U
Other languages
Chinese (zh)
Inventor
李中标
徐彬
魏志强
杨传还
顾国才
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
YANCHENG DAGANG PETROLEUM TOOLS FACTORY CO Ltd
Original Assignee
YANCHENG DAGANG PETROLEUM TOOLS FACTORY CO Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by YANCHENG DAGANG PETROLEUM TOOLS FACTORY CO Ltd filed Critical YANCHENG DAGANG PETROLEUM TOOLS FACTORY CO Ltd
Priority to CN2009200440966U priority Critical patent/CN201447289U/en
Application granted granted Critical
Publication of CN201447289U publication Critical patent/CN201447289U/en
Anticipated expiration legal-status Critical
Expired - Fee Related legal-status Critical Current

Links

Images

Landscapes

  • Investigation Of Foundation Soil And Reinforcement Of Foundation Soil By Compacting Or Drainage (AREA)

Abstract

The utility model provides a lifting device applicable to oil field well drilling and repairing, in particular to a counting ground sheave pulley. The counting ground sheave pulley comprises a pulley, a pulley shaft, lateral plates and a lifting ring, wherein two lateral plates are connected into a frame through fastening bolts, the lifting ring is installed on the top of the frame, the pulley is fixedly installed on the middle portion of the pulley shaft, two ends of the pulley shaft are installed in shaft holes in the middle portions of the two lateral plates through bearings, and one end of the pulley shaft is provided with a counter. The counting ground sheave pulley has rational structure, the length of a cable passing through the pulley, namely the lifting or descendent height of workpieces can be conveniently and accurately measured through the pulley shaft rotation circles recorded by the counter, and the counting ground sheave pulley is particularly applicable to lifting operation of underground equipment.

Description

Counting ground coaster
Technical field
The utility model relates to a kind of jacking system that is used for oil drilling, well workover, particularly a kind of counting ground coaster.
Background technology
In oil drilling, well workover process, because the lift work number of times is comparatively frequent, adjustable height height, equipment weigh, and in order to reduce labor intensity, to increase work efficiency, adopt the ground coaster usually.The ground coaster that uses is made up of pulley, sheave shaft, side plate and enhancing ring usually at present; Biside plate constitutes framework by tie bolt, and enhancing ring is equipped with at the top of framework; Pulley sleeve places on the wheel shaft and is loaded in the framework.During use, the ground coaster hangs on the workpiece by enhancing ring, twines cable on pulley, and an end of cable links to each other with the workpiece of required lifting, and its other end draws by manpower or motor, thereby workpiece is carried out lift work.Existing ground coaster, though tool is laborsaving, improve work efficiency, change the function of power thrusts, can not calculate cable the length by pulley be the height that workpiece is raised or descends, especially be unfavorable for the lifting operation of underground equipment.
The utility model content
For overcoming the deficiencies in the prior art part, the utility model provides a kind of counting rational in infrastructure electricity coaster, can calculate the height that workpiece is raised or descends easily and accurately, is specially adapted to the lift work of underground equipment.
The technical scheme that its technical matters that solves the utility model adopts is: it comprises pulley, sheave shaft, side plate and enhancing ring; Biside plate connects into framework by binding bolt, and enhancing ring is loaded on the top dress of framework; It is characterized in that: pulley is loaded on the middle part of sheave shaft regularly, and the two ends of sheave shaft are loaded in the axis hole at biside plate middle part by bearing; End at sheave shaft is equipped with counting machine.
The beneficial effects of the utility model are: it is rational in infrastructure, sheave shaft by the counting machine record rotates the number of turns, can calculate the length of cable by pulley easily and accurately, i.e. the workpiece height that is raised or descends is specially adapted to the lift work of underground equipment.
Description of drawings
Fig. 1 is a structural representation of the present utility model.
Among the figure: 1 is that enhancing ring, 2 is that side plate, 3 is that pulley, 4 is that sheave shaft, 5 is that end cap, 6 is that binding bolt, 7 is that counting machine, 8 is that bearing, 9 is a spline.
The specific embodiment
The utility model is described in further detail below in conjunction with accompanying drawing.
The utility model comprises pulley 3, sheave shaft 4, side plate 2 and enhancing ring 1; Biside plate 2 connects into framework by several binding bolts 6, and enhancing ring 1 is loaded on the top of framework; Pulley 3 is loaded on the middle part of sheave shaft 4 regularly by spline 9, and the two ends of sheave shaft 4 are loaded in the axis hole at biside plate 2 middle parts by bearing 8, and adopts end cap 5 sealings; End at sheave shaft 4 is equipped with counting machine 7.
During work, the utility model hangs on the workpiece of required lifting by enhancing ring 1, on pulley 3, twine cable, one end of cable links to each other with workpiece, its other end draws by manpower or motor, thereby workpiece is carried out lift work. and the sheave shaft 4 by counting machine 7 records rotates the number of turns, can calculate the length of cable by pulley 3 easily and accurately, be the height that workpiece is raised or descends, be specially adapted to the lift work of underground equipment.

Claims (1)

1. counting ground coaster comprises pulley, sheave shaft, side plate and enhancing ring; Biside plate connects into framework by binding bolt, and enhancing ring is loaded on the top dress of framework; It is characterized in that: pulley is loaded on the middle part of sheave shaft regularly, and the two ends of sheave shaft are loaded on bearing and are loaded in the axis hole at biside plate middle part; End at sheave shaft is equipped with counting machine.
CN2009200440966U 2009-06-17 2009-06-17 Counting ground sheave pulley Expired - Fee Related CN201447289U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN2009200440966U CN201447289U (en) 2009-06-17 2009-06-17 Counting ground sheave pulley

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN2009200440966U CN201447289U (en) 2009-06-17 2009-06-17 Counting ground sheave pulley

Publications (1)

Publication Number Publication Date
CN201447289U true CN201447289U (en) 2010-05-05

Family

ID=42552006

Family Applications (1)

Application Number Title Priority Date Filing Date
CN2009200440966U Expired - Fee Related CN201447289U (en) 2009-06-17 2009-06-17 Counting ground sheave pulley

Country Status (1)

Country Link
CN (1) CN201447289U (en)

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN110104558A (en) * 2019-05-08 2019-08-09 苏州市职业大学 It is a kind of for measure hanging device range of lift apart from testing agency

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN110104558A (en) * 2019-05-08 2019-08-09 苏州市职业大学 It is a kind of for measure hanging device range of lift apart from testing agency

Similar Documents

Publication Publication Date Title
CN202655880U (en) Bushing assembling mechanism
CN205949909U (en) Special rig of table bracket
CN201447289U (en) Counting ground sheave pulley
CN203321338U (en) Lifting working platform for vehicle-mounted deep well drilling machine
CN201890745U (en) Lifting and guiding device for tundish car
CN204195195U (en) A kind of press mounting of car wheel device
CN206241599U (en) A kind of main shaft for duckbilled dibbler is pressed into master device
CN102505587B (en) Special steel rail hoisting device for railway classification yard
CN202336845U (en) Combined type rapid dismounting and mounting device of engineering machinery hydraulic oil cylinder
CN201534231U (en) Circular collecting box turning device for circular collecting box bore
CN204912831U (en) A drilling machine that is used for simultaneous processing of ladder group of combined material cable testing bridge to go out six holes
CN201178362Y (en) Hanging frame for motor rotor disassembling
CN203125090U (en) Lift type shaft pulling device
CN202754722U (en) Novel rotating disc type crane car mechanism
CN201635685U (en) Hydraulic non-winch workover rig
CN203266492U (en) Top-drive gearbox set assembling tool
CN207206329U (en) A kind of Novel shaft bears horse
CN207432865U (en) A kind of turntable type carbon resistance rod forming machine built in hydraulic station
CN202726178U (en) Improved guide post of magnetic centering device of bilateral scissors
CN203702005U (en) Novel rotary drilling rig pin shaft locking structure
CN203332937U (en) Turning support of piston rod
CN201802306U (en) Drilling machine
CN201931525U (en) Lifting device for inner and outer dies of forming bench for quartz stone press plate production lines
CN212988843U (en) Soil microorganism collection system
CN203159030U (en) Improved crane hanger

Legal Events

Date Code Title Description
C14 Grant of patent or utility model
GR01 Patent grant
CF01 Termination of patent right due to non-payment of annual fee
CF01 Termination of patent right due to non-payment of annual fee

Granted publication date: 20100505

Termination date: 20180617