CN202810175U - Follow-up platform for formwork construction for barrel structures - Google Patents
Follow-up platform for formwork construction for barrel structures Download PDFInfo
- Publication number
- CN202810175U CN202810175U CN 201220376629 CN201220376629U CN202810175U CN 202810175 U CN202810175 U CN 202810175U CN 201220376629 CN201220376629 CN 201220376629 CN 201220376629 U CN201220376629 U CN 201220376629U CN 202810175 U CN202810175 U CN 202810175U
- Authority
- CN
- China
- Prior art keywords
- platform
- platform body
- follow
- construction
- tubular construction
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Expired - Fee Related
Links
Images
Abstract
The utility model discloses a follow-up platform for formwork construction for barrel structures. The follow-up platform comprises a platform body; the planar shape of the platform body is matched with the shape of the cross section of a barrel structure, the platform body comprises keels, a face plate and lifting rings, and the face plate and the lifting rings are fixedly connected onto the keels; and a plurality of support holes which are arranged peripherally are reserved on the barrel structure and correspond to operating layers, support parts are fixed into the support holes, and the platform body is supported on the support parts. The set follow-up platform body is quite suitable for the barrel structure with the vertically consistent areas, and can be reused after being manufactured, and the follow-up platform has the advantages of safety, reliability, speediness in assembly and disassembly, and the like. Owing to the follow-up platform, outstanding contribution is made in the multiple aspects of accelerating construction progress, reducing economical cost and the like.
Description
Technical field
The utility model relates to the template construction tailgate platform of the template construction tailgate platform, particularly a kind of tubular construction of technical field of building construction.
Background technology
In construction work, Core Walls Structure and elevator shaft are the vertical passageway of the whole building of a perforation, are tubular construction.Safety during for assurance tubular construction formwork erection, the operating platform of setting up with the floor increase becomes a kind of essential facility.Traditional method is to adopt scaffold building to add the platform panel or the regularization operating platform is set.The method that scaffold is set up in employing exists that material turnover is not high, the accumulation rental charge is higher and the time of setting up affect the problems such as programming easily, and employing is less at present; The method that the regularization operating platform is set generally is that the operating platform support is fixed on the floor, less, the simple operation of this method cost absorption expense, but increased cylindrical shell formwork erection difficulty and affected cylindrical shell formwork erection progress.Therefore, a kind ofly make and install few, the simple operation of cost, and the cylindrical shell template operation platform that does not affect follow-up construction becomes the latent demand of vast unit in charge of construction.
The utility model content
The purpose of this utility model is in order to overcome the deficiency of traditional operation platform, a kind of tubular construction template construction tailgate platform to be provided, and its construction is adopted in the making of this platform and to install cost few, and is easy to operate, do not affect follow-up work.
The technical scheme that the utility model is taked for the technical problem that exists in the solution known technology is: a kind of tubular construction template construction tailgate platform, comprise main platform body, and the flat shape of described main platform body and the shape of cross section of tubular construction are adaptive; Described main platform body comprises keel and is fixed in panel and suspension ring on the described keel; Corresponding each work layer all is reserved with a plurality of prop hole along circumferential arrangement on tubular construction, is fixed with cradling element in described the prop hole, and described cradling element upper support has main platform body.
Described main platform body is provided with the two-layer panel that splits on the upper and lower surface of described keel.
Described suspension ring form with the round steel simmering and bending, and the length of described round steel is not less than 150mm.
Described cradling element passes bearing length ≮ 450mm that body of wall stretches out.
Advantage and good effect that the utility model has are: the tailgate platform main body that adopts typing, be highly suitable for area tubular construction unanimous between the higher and lower levels, after the tailgate platform body making is finished, can repeatedly have enough to meet the need use, have the characteristics such as safe and reliable, that loading and unloading are quick.The many-sides such as accelerating construction progress, reduction financial cost there is outstanding contribution.
Description of drawings
Fig. 1 is structural representation of the present utility model;
Fig. 2 is the floor map of the utility model main platform body.
Among the figure: 1, tubular construction; 2, panel; 3, keel; 4, suspension ring; 5, cradling element; 6, prop up prop hole; 7, lifting appliance; 8, wire rope.
The specific embodiment
For further understanding summary of the invention of the present utility model, Characteristic, hereby exemplify following examples, and cooperate accompanying drawing to be described in detail as follows:
See also Fig. 1 and Fig. 2, a kind of tubular construction template construction tailgate platform comprises main platform body, and the shape of cross section of the flat shape of main platform body and tubular construction 1 is adaptive; Main platform body comprises keel 3 and is fixed in panel 2 and suspension ring 4 on the keel 3; Corresponding each work layer all is reserved with a plurality of prop hole along circumferential arrangement on tubular construction 1, is fixed with cradling element 5 in the prop hole 6, and cradling element 5 upper supports have main platform body.
In the present embodiment, main platform body is provided with the two-layer panel 2 that splits on keel 3 upper and lower surfaces.Suspension ring 4 are to form with the round steel simmering and bending, and the length of round steel is not less than 150mm.Cradling element 5 passes bearing length ≮ 450mm that body of wall stretches out.
Using method of the present utility model:
On entering, before the work layer construction, first cradling element 5 is fixed on lower one deck and reserves in the prop hole 6, use lifting appliance 7, pass through to connect suspension ring 4 with wire rope 8, the main platform body handling to construction part, is placed on the fixing cradling element 5, enters the next procedure construction.
During dismounting, use lifting appliance 7,, by connecting suspension ring 4 main platform body is sling with wire rope 8; Unload cradling element 5, go to next layer use week.
Although the above is described preferred embodiment of the present utility model by reference to the accompanying drawings; but the utility model is not limited to the above-mentioned specific embodiment; the above-mentioned specific embodiment only is schematic; be not restrictive; those of ordinary skill in the art is under enlightenment of the present utility model; not breaking away from the scope situation that the utility model aim and claim protect, can also make a lot of forms, these all belong within the protection domain of the present utility model.
Claims (4)
1. a tubular construction template construction tailgate platform comprises main platform body, it is characterized in that, the flat shape of described main platform body and the shape of cross section of tubular construction are adaptive; Described main platform body comprises keel and is fixed in panel and suspension ring on the described keel; Corresponding each work layer all is reserved with a plurality of prop hole along circumferential arrangement on tubular construction, is fixed with cradling element in described the prop hole, and described cradling element upper support has main platform body.
2. described tubular construction template construction tailgate platform according to claim 1 is characterized in that described main platform body is provided with the two-layer panel that splits on the upper and lower surface of described keel.
3. described tubular construction template construction tailgate platform according to claim 1 is characterized in that, described suspension ring form with the round steel simmering and bending, and the length of described round steel is not less than 150mm.
4. described tubular construction template construction tailgate platform according to claim 1 is characterized in that described cradling element passes bearing length ≮ 450mm that body of wall stretches out.
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN 201220376629 CN202810175U (en) | 2012-07-31 | 2012-07-31 | Follow-up platform for formwork construction for barrel structures |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN 201220376629 CN202810175U (en) | 2012-07-31 | 2012-07-31 | Follow-up platform for formwork construction for barrel structures |
Publications (1)
Publication Number | Publication Date |
---|---|
CN202810175U true CN202810175U (en) | 2013-03-20 |
Family
ID=47869081
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN 201220376629 Expired - Fee Related CN202810175U (en) | 2012-07-31 | 2012-07-31 | Follow-up platform for formwork construction for barrel structures |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN202810175U (en) |
Cited By (2)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN104947926A (en) * | 2015-07-01 | 2015-09-30 | 中建一局集团建设发展有限公司 | Core tube inner tank upper formwork system hard protection device and construction method thereof |
CN109183821A (en) * | 2018-09-18 | 2019-01-11 | 中国矿业大学 | A kind of quick detachable predetermined level precipitation well construction and construction method |
-
2012
- 2012-07-31 CN CN 201220376629 patent/CN202810175U/en not_active Expired - Fee Related
Cited By (3)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN104947926A (en) * | 2015-07-01 | 2015-09-30 | 中建一局集团建设发展有限公司 | Core tube inner tank upper formwork system hard protection device and construction method thereof |
CN104947926B (en) * | 2015-07-01 | 2017-03-01 | 中建一局集团建设发展有限公司 | A kind of Core Walls Structure inner core top formwork system hard protection device and its construction method |
CN109183821A (en) * | 2018-09-18 | 2019-01-11 | 中国矿业大学 | A kind of quick detachable predetermined level precipitation well construction and construction method |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN102212630B (en) | Construction method for replacing cooling wall of blast furnace by utilizing movable hanging scaffold | |
CN103572763B (en) | Large-span steel supports pattern foundation pit supporting structure Demolition Construction method | |
CN102691420A (en) | Installation and construction method for multilayer large-span steel truss | |
CN103979383A (en) | Multi-layer lifting platform for building construction | |
CN103243930A (en) | System and method for modularized construction of super high-rise steel structures | |
CN109097516A (en) | The construction method of blast furnace overhaul engineering replacement last furnace shell | |
CN202500567U (en) | Multilayer combined hanging scaffold for concrete liner of well wall of vertical well | |
CN103615111A (en) | Silo top construction method | |
CN110306782A (en) | Reactor building shell dome template and its assembling and construction method | |
CN202810175U (en) | Follow-up platform for formwork construction for barrel structures | |
CN102877638A (en) | Operating platform and operating method for constructing suspension steel structure system | |
CN203654702U (en) | Operating platform for construction of reinforced concrete chimney | |
CN108996385B (en) | Method for setting and using lifting device for hoisting blast furnace shell | |
CN109055637B (en) | Hydraulic lifting process for mounting furnace shell in blast furnace overhaul | |
CN106567548A (en) | Segmented mounting method for square raw coal hopper | |
CN106544959A (en) | The construction method of the lifting sections of the king-tower containing saddle and bridge main tower saddle | |
CN201825670U (en) | Lifting appliance used for generator stator | |
CN202643086U (en) | Hoisting tool of hydroxylation reactor | |
CN102465601B (en) | Method for installing main body frame steel structure of benzene hydrogenation project | |
CN105731271A (en) | Combined tower crane for roof construction and construction method thereof | |
CN203394032U (en) | Inside-cylinder climb-type operation frame | |
CN203654754U (en) | Double-layered overhanging type discharging platform | |
CN205935746U (en) | Simple and easy terraced barreled is put | |
CN201770429U (en) | Portal type framework used for hoisting and slipping | |
CN205134921U (en) | Building outer wall concrete constructional column hangs construction platform |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
C14 | Grant of patent or utility model | ||
GR01 | Patent grant | ||
C17 | Cessation of patent right | ||
CF01 | Termination of patent right due to non-payment of annual fee |
Granted publication date: 20130320 Termination date: 20130731 |