CN202785270U - Overhead hoist for track board bar-mat reinforcement meshes - Google Patents

Overhead hoist for track board bar-mat reinforcement meshes Download PDF

Info

Publication number
CN202785270U
CN202785270U CN2012204263750U CN201220426375U CN202785270U CN 202785270 U CN202785270 U CN 202785270U CN 2012204263750 U CN2012204263750 U CN 2012204263750U CN 201220426375 U CN201220426375 U CN 201220426375U CN 202785270 U CN202785270 U CN 202785270U
Authority
CN
China
Prior art keywords
mat reinforcement
reinforcement meshes
overhead hoist
track board
bar
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Fee Related
Application number
CN2012204263750U
Other languages
Chinese (zh)
Inventor
李云飞
韦伟
鲍俊捷
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Fifth Engineering Co Ltd of CTCE Group
Original Assignee
Fifth Engineering Co Ltd of CTCE Group
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Fifth Engineering Co Ltd of CTCE Group filed Critical Fifth Engineering Co Ltd of CTCE Group
Priority to CN2012204263750U priority Critical patent/CN202785270U/en
Application granted granted Critical
Publication of CN202785270U publication Critical patent/CN202785270U/en
Anticipated expiration legal-status Critical
Expired - Fee Related legal-status Critical Current

Links

Abstract

The overhead hoist for track board bar-mat reinforcement meshes includes a rectangular hanging bracket formed by steel pipes, wherein lifting lugs used for being connected with a hoisting brace are arranged at four corners and middle parts on the two horizontal sides of the rectangular hanging bracket; and lifting hooks connected with the bar-mat reinforcement meshes are arranged under the lifting lugs. The overhead hoist for track board bar-mat reinforcement meshes solves the problems of bigger deformation and displacement during the hoisting of II-type track board bar-mat reinforcement meshes, has the characteristics of simple structure and low cost, enables the hoisting to be stable, and ensures the quality of bar-mat reinforcement meshes.

Description

A kind of track plate reinforcing mattress sheet overhead hoist
Technical field
The utility model relates to a kind of track plate reinforcing mattress sheet overhead hoist, particularly a kind of CRTS II type track plate reinforcing mattress sheet overhead hoist.
Background technology
CRTS II plate-type ballastless track system technology, that China is on the basis of the non-fragment orbit technology of equipment Imported From German EMH Company Marx Bo Ge building constructor research and development, in conjunction with the China Express Railway development need, through digestion, absorption, again innovation, formed ballastless track of high-speed railway technology with Chinese characteristics.CRTS II type fragment-free track slab (hereinafter referred to as " II type track plates ") production technology is the core technology in this system, now has been widely used in Beijing-Tianjin inter-city, Beijing-Shanghai, the railway line for passenger traffic High Speed Rail Projects such as the capital wide, Shanghai elder brother, Shanghai Chinese Rong, Shi Wu.General reinforced mesh suspender adopts 4 liftings, and the deformation comparison of such suspender net sheet in track plate reinforcing mattress sheet handling process is large, and bar spacing changes greatly, and might reduce the insulating power of reinforced mesh.
The utility model content
Its purpose of the utility model just is to provide a kind of track plate reinforcing mattress sheet overhead hoist, has solved the problem that distortion is large in the II type track plate reinforcing mattress sheet handling process, displacement is larger.Have characteristics simple in structure, that cost is low, and handling is steady, has guaranteed the quality of reinforced mesh.
The technical scheme that realizes above-mentioned purpose and take comprises the rectangular hanger that is made of steel pipe, and four jiaos on described suspension bracket be connected to be provided with both lateral sides and connected the hanger that hang the purlin, is provided with the suspension hook of connecting reinforcement net sheet below the described hanger.
Compared with prior art the utlity model has following advantage.
6 lifting appliances of II type track plate reinforcing mattress sheet make II type track plate reinforcing mattress sheet stressed more even in the handling process, have reduced the generation that the distortion of handling process middle orbit plate reinforced mesh is excessive, reinforcement displacement is larger, have guaranteed the quality of II type track plates.
Description of drawings
The utility model is described in further detail below in conjunction with accompanying drawing.
Fig. 1 is this apparatus structure schematic front view.
Fig. 2 is this apparatus structure diagrammatic top view.
The specific embodiment
This device comprises the rectangular hanger 1 that is made of steel pipe, and as shown in Figure 1, 2,1 four jiaos on described suspension bracket is connected with both lateral sides to be provided with and is connected the hanger 2 that hang the purlin, and described hanger 2 belows are provided with the suspension hook 3 of connecting reinforcement net sheet.
Described diameter of steel tube is 50mm, the wide 2.4m of described suspension bracket 1 long 4.15m, and described hanger 2 arranges at 0.2m, 1.875m, the 3.95m place of suspension bracket 1 length direction.
Embodiment
This device is that intrinsic suspender is reequiped, and adds 2 suspension centres in the middle part, has reduced distortion, the reinforcing bar displacement of reinforced mesh in the handling process, has guaranteed the quality of reinforced mesh, makes II type track plate prefabrication production technology more ripe.
6 suspender overall lengths of reinforced mesh 4.15m, beam overall 2.4m, length direction divide 5 sections, are separated middle each 1.25m, each 0.2m of two ends by the round steel pipe of 4 road diameter 50mm.Horizontal direction divides 3 sections, and by 4 road diameter 50mm round steel pipe separately, middle each 0.8m respectively establishes a suspension centre at both sides longitudinal direction 0.2m, 1.875m, 3.95m place, and 6 each suspension hook are set in identical position.During the reinforced mesh handling, hang 6 reinforced mesh suspenders of cooperation with the purlin, put down 6 suspension hooks, manually catch on reinforced mesh master flaccidity of tendon and muscle lateral cross point place with suspension hook, hang 6 reinforced mesh suspenders of slow lifting with the purlin, reinforced mesh is slowly lifted from mold, when handling to certain altitude, slowly move to the reinforced mesh storage area, and make storage area reinforced mesh consistency from top to bottom, every interlayer separates with batten.
The cardinal principle of this device is to utilize mechanical property to reduce reinforced mesh because the distortion that deadweight produces and the displacement of reinforcing bar, it mainly operates as follows: adopt the purlin to hang during the handling of (1) II type track plate reinforcing mattress sheet and cooperate 6 suspenders, make suspender drop down onto top in the reinforced mesh; (2) manually put down 6 suspension hooks, catch on the edge in length and breadth to the reinforcing bar infall, and manually buttress suspension hook; (3) purlin is hung and slowly is raised up to suspension hook and stretches, and the operating personnel leaves reinforced mesh; (4) slow rise is hung in the purlin, and the handling reinforced mesh is to storage area; (5) put 4 battens depositing on mold or the every layer of reinforced mesh evenly pad, manually buttress reinforced mesh, the reinforced mesh that handling is come aligns with the reinforced mesh termination that lower floor deposits, and slowly drops on the chock of lower floor's reinforced mesh; (6) purlin is hung and is continued slowly to fall, and manually unclamps 6 suspension hooks, enters next handling circulation.

Claims (2)

1. track plate reinforcing mattress sheet overhead hoist, comprise the rectangular hanger (1) that is consisted of by steel pipe, it is characterized in that (1) four jiao on described suspension bracket is connected with both lateral sides to be provided with and is connected the hanger (2) that hang the purlin, described hanger (2) below is provided with the suspension hook (3) of connecting reinforcement net sheet.
2. a kind of track plate reinforcing mattress sheet overhead hoist according to claim 1, it is characterized in that, described diameter of steel tube is 50mm, the wide 2.4m of the long 4.15m of described suspension bracket (1), and described hanger (2) arranges at 0.2m, 1.875m, the 3.95m place of suspension bracket (1) length direction.
CN2012204263750U 2012-08-27 2012-08-27 Overhead hoist for track board bar-mat reinforcement meshes Expired - Fee Related CN202785270U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN2012204263750U CN202785270U (en) 2012-08-27 2012-08-27 Overhead hoist for track board bar-mat reinforcement meshes

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN2012204263750U CN202785270U (en) 2012-08-27 2012-08-27 Overhead hoist for track board bar-mat reinforcement meshes

Publications (1)

Publication Number Publication Date
CN202785270U true CN202785270U (en) 2013-03-13

Family

ID=47812578

Family Applications (1)

Application Number Title Priority Date Filing Date
CN2012204263750U Expired - Fee Related CN202785270U (en) 2012-08-27 2012-08-27 Overhead hoist for track board bar-mat reinforcement meshes

Country Status (1)

Country Link
CN (1) CN202785270U (en)

Cited By (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN104692227A (en) * 2015-02-15 2015-06-10 建研科技股份有限公司 Steel mesh lifting appliance and lifting method of steel mesh
CN106223625A (en) * 2016-07-25 2016-12-14 中国建筑第八工程局有限公司 Reinforcing bar upright handling method in small space based on integral platform
CN108750915A (en) * 2018-07-18 2018-11-06 宁波交通工程建设集团有限公司 Prefabricated case beam roof steel bar mesh sheet suspender and operating method

Cited By (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN104692227A (en) * 2015-02-15 2015-06-10 建研科技股份有限公司 Steel mesh lifting appliance and lifting method of steel mesh
CN106223625A (en) * 2016-07-25 2016-12-14 中国建筑第八工程局有限公司 Reinforcing bar upright handling method in small space based on integral platform
CN106223625B (en) * 2016-07-25 2018-12-18 中国建筑第八工程局有限公司 The upright handling method of reinforcing bar in small space based on integral platform
CN108750915A (en) * 2018-07-18 2018-11-06 宁波交通工程建设集团有限公司 Prefabricated case beam roof steel bar mesh sheet suspender and operating method
CN108750915B (en) * 2018-07-18 2024-02-06 宁波交通工程建设集团有限公司 Prefabricated box girder top plate reinforcing steel mesh lifting appliance and operation method

Similar Documents

Publication Publication Date Title
CN103088750B (en) Especial-big span suspension bridge of uniparted hyperboloid space rope net main cable and construction method thereof
CN201943007U (en) Constant amplitude frame beam crane capable of being used in combination with movable support frame
CN202785270U (en) Overhead hoist for track board bar-mat reinforcement meshes
CN203923882U (en) One-sided dorsal funciculus steel work cable stayed bridge
CN102848462A (en) Long surface pedestal production line for two-way pre-tensioned pre-stressed concrete track slab
CN206902566U (en) A kind of arch rib bridge girder cantilever construction Hanging Basket
CN110258352A (en) The steel reinforced concrete combined bridge construction method that two bridgings are done
CN201915299U (en) Pretensioned prestressed concrete track slab of slab ballastless track
CN103437285B (en) Full space support cast-in-place box beam construction technology
CN201901510U (en) Hoisting rack for concrete sleeper
CN203334182U (en) Structure used for connecting railway concrete retaining wall with steel bridge panel
CN202967862U (en) Lifting appliance for beam channel reinforcement cage
CN207700074U (en) The double limb triangle hanging baskets of continuous rigid frame bridge cantilever beam section construction
CN203034805U (en) Double-concrete wallboard formwork scissors type support keel system
CN201990347U (en) Construction lift body-connecting device
CN203559334U (en) Reinforcing structure for suspended carrying part of aluminum alloy overhead bridge escalator
CN208277128U (en) A kind of T beam hydraulic formwork system
CN202611077U (en) Light steel keel boom back supporting member
CN203039301U (en) A high-fall pipeline device
CN207765918U (en) The open airs 110kV GIS power distribution equipments place two returns one across outlet structure
CN201942466U (en) Hoisting device for indoor prefabricated component
CN204297925U (en) The horizontal lifting tool of track plates
CN204941011U (en) Steel tower arranged in double loop " door " font
CN202745456U (en) Large Y-shaped angle steel tower
CN202808120U (en) Triangular standard knot of building hoist

Legal Events

Date Code Title Description
C14 Grant of patent or utility model
GR01 Patent grant
CF01 Termination of patent right due to non-payment of annual fee
CF01 Termination of patent right due to non-payment of annual fee

Granted publication date: 20130313

Termination date: 20170827