CN202768012U - 隧洞初衬预制混凝土块组合体 - Google Patents

隧洞初衬预制混凝土块组合体 Download PDF

Info

Publication number
CN202768012U
CN202768012U CN 201220385539 CN201220385539U CN202768012U CN 202768012 U CN202768012 U CN 202768012U CN 201220385539 CN201220385539 CN 201220385539 CN 201220385539 U CN201220385539 U CN 201220385539U CN 202768012 U CN202768012 U CN 202768012U
Authority
CN
China
Prior art keywords
precast concrete
concrete block
block assembly
tunnel
prefabricated concrete
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Fee Related
Application number
CN 201220385539
Other languages
English (en)
Inventor
周山
吕芝林
符强
刘嫦
张海艳
孙向楠
周靖峰
罗晶
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
China Gezhouba Group No 5 Engineering Co Ltd
Original Assignee
China Gezhouba Group No 5 Engineering Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by China Gezhouba Group No 5 Engineering Co Ltd filed Critical China Gezhouba Group No 5 Engineering Co Ltd
Priority to CN 201220385539 priority Critical patent/CN202768012U/zh
Application granted granted Critical
Publication of CN202768012U publication Critical patent/CN202768012U/zh
Anticipated expiration legal-status Critical
Expired - Fee Related legal-status Critical Current

Links

Images

Abstract

一种隧洞初衬预制混凝土块组合体,包括多个预制混凝土块,多个预制混凝土块的外表面与隧洞设计形状一致,预制混凝土块的两端连接部设有预埋钢板,各个预制混凝土块之间通过连接件固定连接。本实用新型提供的一种隧洞初衬预制混凝土块组合体,可以在掘进后快速安装预制混凝土块组合体形成衬砌支撑,确保了人员、设备的施工安全,也降低了施工成本。

Description

隧洞初衬预制混凝土块组合体
技术领域
本实用新型涉及隧洞开挖施工领域,特别是一种涉及土层、全风化、强风化岩层等松软地层,或者地下水较丰富地层的隧洞,进行初期支护的初衬预制混凝土块组合体。
背景技术
在土层、全风化、强风化岩层等松软地层中,怎样安全、经济实现隧洞初衬施工,是施工中的难点之一;若加上地下水较为丰富的工况下实现隧洞初衬施工,其人员、设备的安全问题更加突出。传统的超前支护、钢支撑、喷混凝土的方法,既费工、费时,材料消耗又大,安全系数不高,难以满足工程的要求。
实用新型内容
本实用新型所要解决的技术问题是提供一种隧洞初衬预制混凝土块组合体,可以在隧洞初衬施工过程中实现快速施工,并确保人员、设备的施工安全。
为解决上述技术问题,本实用新型所采用的技术方案是:一种隧洞初衬预制混凝土块组合体,包括多个预制混凝土块,多个预制混凝土块的外表面与隧洞设计形状一致,预制混凝土块的两端连接部设有预埋钢板,各个预制混凝土块之间通过连接件固定连接。
多个预制混凝土块外表面的周长小于隧洞设计周长10-20cm。
所述的固定连接为焊接或螺栓连接。
位于顶部的多个预制混凝土块之间采用钢板连接件连接,位于两侧的多个预制混凝土块之间采用型钢支撑连接件连接。
所述的型钢支撑连接件在每个接缝为多个,型钢支撑连接件之间填充有干硬性砂浆。
所述的预制混凝土块为钢筋混凝土或为素混凝土。
本实用新型提供的一种隧洞初衬预制混凝土块组合体,可以在掘进后快速安装预制混凝土块组合体形成衬砌支撑,确保了人员、设备的施工安全,也降低了施工成本。
附图说明
下面结合附图和实施例对本实用新型作进一步说明:
图1为本实用新型整体结构的截面示意图。
图2为图1中A向视图。
图中:预制混凝土块1,预埋钢板2,连接件3,型钢支撑连接件4,干硬性砂浆5。
具体实施方式
如图1中,一种隧洞初衬预制混凝土块组合体,包括多个预制混凝土块1,多个预制混凝土块1的外表面与隧洞设计形状一致,预制混凝土块1的两端连接部设有预埋钢板2,各个预制混凝土块1之间通过连接件固定连接。所述的固定连接为焊接或螺栓连接。
多个预制混凝土块1外表面的周长小于隧洞设计周长10-20cm。形成的空隙用于做为预制混凝土块组合体安装时的可调及操作空间。
如图1中,位于顶部的多个预制混凝土块1之间采用钢板连接件连接。如图1、图2中,位于两侧的多个预制混凝土块1之间采用型钢支撑连接件4连接。
如图2中,所述的型钢支撑连接件4在每个接缝为多个,型钢支撑连接件4之间填充有干硬性砂浆5。
本例中所述的预制混凝土块1为钢筋混凝土或为素混凝土。
安装预制混凝土块组合体的步骤为:
一、安装底部的预制混凝土块;其次预安装顶部预制混凝土块,完成顶部预制混凝土块之间的连接。
二、安装两侧预制混凝土块;完成两侧预制混凝土块与底部预制混凝土块之间的连接,同时完成在两侧预制混凝土块的顶面焊接型钢支撑连接件4。
三、将顶部预制混凝土块焊接至型钢支撑连接件4,顶部预制混凝土块与两侧预制混凝土块剩余空间部分利用用木锤逐层锤实干硬性砂浆5回填,形成预制混凝土块组合体。本实用新型解决了在土层、全风化、强风化岩层等松软地层或地下水较丰富地层中,怎样安全完成隧洞初期支护的技术难题,具有结构简单合理,操作方便快速,成本低的优点。

Claims (6)

1.一种隧洞初衬预制混凝土块组合体,包括多个预制混凝土块(1),多个预制混凝土块(1)的外表面与隧洞设计形状一致,其特征是:
预制混凝土块(1)的两端连接部设有预埋钢板(2),各个预制混凝土块(1)之间通过连接件固定连接。
2.根据权利要求1所述的一种隧洞初衬预制混凝土块组合体,其特征是:多个预制混凝土块(1)外表面的周长小于隧洞设计周长10-20cm。
3.根据权利要求1所述的一种隧洞初衬预制混凝土块组合体,其特征是:所述的固定连接为焊接或螺栓连接。
4.根据权利要求1所述的一种隧洞初衬预制混凝土块组合体,其特征是:位于顶部的多个预制混凝土块(1)之间采用钢板连接件(3)连接,位于两侧的多个预制混凝土块(1)之间采用型钢支撑连接件(4)连接。
5.根据权利要求4所述的一种隧洞初衬预制混凝土块组合体,其特征是:所述的型钢支撑连接件(4)在每个接缝为多个,型钢支撑连接件(4)之间填充有干硬性砂浆(5)。
6.根据权利要求1所述的一种隧洞初衬预制混凝土块组合体,其特征是:所述的预制混凝土块(1)为钢筋混凝土或为素混凝土。
CN 201220385539 2012-08-06 2012-08-06 隧洞初衬预制混凝土块组合体 Expired - Fee Related CN202768012U (zh)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN 201220385539 CN202768012U (zh) 2012-08-06 2012-08-06 隧洞初衬预制混凝土块组合体

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN 201220385539 CN202768012U (zh) 2012-08-06 2012-08-06 隧洞初衬预制混凝土块组合体

Publications (1)

Publication Number Publication Date
CN202768012U true CN202768012U (zh) 2013-03-06

Family

ID=47774595

Family Applications (1)

Application Number Title Priority Date Filing Date
CN 201220385539 Expired - Fee Related CN202768012U (zh) 2012-08-06 2012-08-06 隧洞初衬预制混凝土块组合体

Country Status (1)

Country Link
CN (1) CN202768012U (zh)

Cited By (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN103243664A (zh) * 2013-05-22 2013-08-14 安徽水利开发股份有限公司 大孔径装配式钢筋混凝土涵洞构件
CN103643966A (zh) * 2013-12-31 2014-03-19 西南交通大学 一种装配式隧道衬砌管片
CN105952459A (zh) * 2016-05-04 2016-09-21 中铁二十四局集团浙江工程有限公司 一种隧道拼装式初期支护方法
CN106337689A (zh) * 2016-09-07 2017-01-18 中铁工程装备集团有限公司 用于地下工程的可循环利用的组合式结构
CN109578010A (zh) * 2018-11-14 2019-04-05 高仁超 隧洞全断面预制衬砌的设计和运输施工方法
CN114060062A (zh) * 2021-12-08 2022-02-18 刁志刚 一种洞桩法暗挖车站施工中边洞初支扣拱的施工方法

Cited By (9)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN103243664A (zh) * 2013-05-22 2013-08-14 安徽水利开发股份有限公司 大孔径装配式钢筋混凝土涵洞构件
CN103243664B (zh) * 2013-05-22 2015-12-16 安徽水利开发股份有限公司 大孔径装配式钢筋混凝土涵洞构件
CN103643966A (zh) * 2013-12-31 2014-03-19 西南交通大学 一种装配式隧道衬砌管片
CN103643966B (zh) * 2013-12-31 2015-08-19 西南交通大学 一种装配式隧道衬砌管片
CN105952459A (zh) * 2016-05-04 2016-09-21 中铁二十四局集团浙江工程有限公司 一种隧道拼装式初期支护方法
CN106337689A (zh) * 2016-09-07 2017-01-18 中铁工程装备集团有限公司 用于地下工程的可循环利用的组合式结构
CN106337689B (zh) * 2016-09-07 2019-05-10 中铁工程装备集团有限公司 用于地下工程的可循环利用的组合式结构
CN109578010A (zh) * 2018-11-14 2019-04-05 高仁超 隧洞全断面预制衬砌的设计和运输施工方法
CN114060062A (zh) * 2021-12-08 2022-02-18 刁志刚 一种洞桩法暗挖车站施工中边洞初支扣拱的施工方法

Similar Documents

Publication Publication Date Title
CN202768012U (zh) 隧洞初衬预制混凝土块组合体
CN102425427B (zh) 盾构空推过矿山法隧道施工方法
CN103397660B (zh) 一种地下建筑的装配施工方法
CN206942764U (zh) 一种洞内组装和拆卸盾构机或tbm掘进机的辅助结构
CN104763434B (zh) 一种无煤柱双巷掘进方法
CN201412163Y (zh) 一种敞开式隧道掘进机施工的圆形隧道衬砌结构
CN104895089A (zh) 地下室楼板与支护桩共同工作的永久支护体系的施工方法
CN102650212A (zh) 一种利用中导洞临时支护保护连拱隧道中隔墙的施工方法
CN104818728A (zh) 一种地下室楼板与支护桩共同工作的永久支护体系
CN203547753U (zh) 型钢混凝土井筒壁座
CN201232194Y (zh) 一种抗变形输电杆塔
CN202325550U (zh) 地铁暗挖隧道二次衬砌拼装式挡头装置
CN202124862U (zh) 螺旋锚板式复合基础
CN204185845U (zh) 一种防水桩板墙支护结构
CN103032045B (zh) 一种高分段天溜井井口封堵方法及封堵装置
CN110645022A (zh) 一种联络通道自锚式模板支架系统及施工方法
CN105065040A (zh) 一种顶板预制的地下空间暗挖构筑方法
CN102061702A (zh) 一种带有抗震槽的混凝土预制桩接头
CN202280152U (zh) 一种在钢筋混凝土板底设置预埋件的结构
CN102444408B (zh) 地铁暗挖隧道二次衬砌拼装式挡头装置
CN103967332B (zh) 一种建筑工地围挡的施工方法
CN204311457U (zh) 一种地铁车站基坑开挖施工用组合式支护体系
CN204253051U (zh) 一种用于巷旁支护的大尺度砌块
CN202401472U (zh) 一种咬合式墙面板
CN206205012U (zh) 一种smw工法桩测斜管布设装置

Legal Events

Date Code Title Description
C14 Grant of patent or utility model
GR01 Patent grant
CF01 Termination of patent right due to non-payment of annual fee
CF01 Termination of patent right due to non-payment of annual fee

Granted publication date: 20130306

Termination date: 20190806