CN202766929U - Turnout-free connected track group with different track gauges - Google Patents

Turnout-free connected track group with different track gauges Download PDF

Info

Publication number
CN202766929U
CN202766929U CN201220485527.4U CN201220485527U CN202766929U CN 202766929 U CN202766929 U CN 202766929U CN 201220485527 U CN201220485527 U CN 201220485527U CN 202766929 U CN202766929 U CN 202766929U
Authority
CN
China
Prior art keywords
track
turnout
different
gauges
group
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Lifetime
Application number
CN201220485527.4U
Other languages
Chinese (zh)
Inventor
王慧林
王永革
田书龙
张育恒
蔺吉胜
郭建国
曹雪芹
成国清
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Shanxi Jincheng Anthracite Mining Group Co Ltd
Original Assignee
Shanxi Jincheng Anthracite Mining Group Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Shanxi Jincheng Anthracite Mining Group Co Ltd filed Critical Shanxi Jincheng Anthracite Mining Group Co Ltd
Priority to CN201220485527.4U priority Critical patent/CN202766929U/en
Application granted granted Critical
Publication of CN202766929U publication Critical patent/CN202766929U/en
Anticipated expiration legal-status Critical
Expired - Lifetime legal-status Critical Current

Links

Images

Abstract

The utility model relates to the technical field of track traffic, in particular to a turnout-free connected track group with different track gauges. The turnout-free connected track group with the different track gauges solves the problems that when an existing track group with different track gauges is crossed, a turnout needs using for carrying out connection, so that the turnout is damaged, high in cost, and frequent in operation, and times of locomotive parking are frequent. The turnout-free connected track group with the different track gauges comprises a first track (1), a second track (2) and a guard rail (3). A rail gauge of the second track (2) is smaller than that of the first track (1), the second track (2) is crossed with the first track (1), one portion of the second track (2) is arranged in the first track (1), and the other portion of the second track (2) is arranged outside the first track (2). Breaking openings which can enable locomotives to operate along respective tracks are arranged on the crossed position of the first track (1) and the second track (2), and the guard rail (3) is arranged on inner sides of tracks, corresponding to respective gaps of the first track (1) and the second track (2). The turnout-free connected track group with the different track gauges is simple in structure and reasonable in design.

Description

The track groups that different gauges connect without track switch
Technical field
The utility model relates to the track traffic technical field, is specially the track groups that different gauges intersections connect without track switch.
Background technology
At present, the track of existing different gauges often needs to use the track switch of a plurality of different rail types to connect when intersecting; but; locomotive is when the infall, the numerous operation of very important person's power frequency track switch at first, the while switch blade of track switch that often can bend; so that locomotive frequently stops during by infall; can not pass through smoothly, easily accidents caused, and track switch also needs frequent replacing; cause cost high, what impact was produced normally carries out.
Therefore, be necessary the cross-connection system of the existing track groups that is comprised of different gauges is improved, save cost.
Summary of the invention
The utility model for the track groups that solves existing different gauges when intersecting, need to use track switch to connect, the problem of often cause damage, the cost of track switch switch blade high, manually-operated is frequent, the locomotive stop frequency is many, the track groups that provides a kind of different gauge to connect without track switch.
The utility model is to adopt following technical scheme to realize:
The track groups that a kind of different gauge connects without track switch, comprise the second track that the first track and gauge intersect less than the first track, with the first track, the part of described the second track places in the first track, another part places outside the first track, and described the first track and the second track all have at infall and make fracture that the locomotive edge can pass through during orbital motion separately and the first track and the second track be provided with guard rail with breach is relative separately track inboard.
During work, locomotive on operating in the first track is during through the infall of the first track and the second track, because guiding and the restriction effect of the guard rail of the first track inboard, cause locomotive through the incision position on the track time, wheel can be crossed fracture smoothly, make locomotive smoothly by infall and still along the first orbital motion, situation about can not derail; In like manner, locomotive on operating in the second track is during through the infall of the first track and the second track, because guiding and the restriction effect of the guard rail of the second track inboard, cause locomotive through the incision position on the track time, wheel can be crossed fracture smoothly, make locomotive smoothly by infall and still along the second orbital motion, situation about can not derail.Based on said process, because the first track does not use traditional track switch to be connected with the infall of the second track, so, also with regard to the problem of switch blade that locomotive press-bending track switch can not occur, without frequent track switch, simultaneously, reduce again the run rider and operated the track switch program, do not stopped and directly pass through, both reduced cost of production, reduce again worker's operation sequence, guaranteed carrying out smoothly of production work.
The utility model is simple in structure, reasonable in design, efficiently solves the track groups of existing different gauges when intersecting, and needs to use track switch to connect, the problem that often cause track switch damage, cost is high, manually-operated is frequent, the locomotive stop frequency is many.
Description of drawings
Fig. 1 is structural representation of the present utility model.
Fig. 2 is the partial enlarged drawing of Fig. 1.
Among the figure, 1-the first track, 2-the second track, 3-guard rail.
The specific embodiment
Below in conjunction with accompanying drawing specific embodiment of the utility model is elaborated.
As shown in Figure 1, the track groups that a kind of different gauge connects without track switch, comprise the second track 2 that the first track 1 and gauge intersect less than the first track 1, with the first track 1, the part of described the second track 2 places in the first track 1, another part places outside the first track 1, and described the first track 1 and the second track 2 all have at infall and make fracture that the locomotive edge can pass through during orbital motion separately and the first track 1 and the second track 2 be provided with guard rail 3 with breach is relative separately track inboard.
During implementation, the gauge of described the first track 1 is 900mm, turns at infall; The gauge of described the second track 2 is 600mm, keeps straight at infall.
During specific works, the first track 1 and the second track 2 can guarantee locomotive smoothly by fracture in the size of the fracture of infall, and the wheel rim that the wheel of locomotive can not occur is blocked or wheel is absorbed in the situation of incision position.
Locomotive on operating in the first track 1 is during through the infall of the first track 1 and the second track 2, because guiding and the restriction effect of the guard rail 3 of the first track 1 inboard, cause locomotive through the incision position on the track time, wheel can be crossed fracture smoothly, make locomotive smoothly by infall and still along 1 operation of the first track, situation about can not derail; In like manner, locomotive on operating in the second track 2 is during through the infall of the first track 1 and the second track 2, because guiding and the restriction effect of the guard rail of the second track 2 inboards, cause locomotive through the incision position on the track time, wheel can be crossed fracture smoothly, make locomotive smoothly by infall and still along 2 operations of the second track, situation about can not derail.

Claims (3)

1. the track groups that connects without track switch of different gauges, it is characterized in that: comprise that the first track (1) and gauge are less than the first track (1), the second track (2) that intersects with the first track (1), the part of described the second track (2) places in the first track (1), another part places outside the first track (1), and described the first track (1) and the second track (2) all have the fracture that can pass through when making locomotive along orbital motion separately at infall, and the first track (1) and the second track (2) are being provided with guard rail (3) with fracture is relative separately track inboard.
2. different gauge according to claim 1 is without the track groups of track switch connection, and it is characterized in that: the gauge of described the first track (1) is 900mm, and the gauge of described the second track (2) is 600mm.
3. different gauge according to claim 1 and 2 is characterized in that without the track groups that track switch connects: described the first track (1) is turned at infall, and described the second track (2) is kept straight at infall.
CN201220485527.4U 2012-09-22 2012-09-22 Turnout-free connected track group with different track gauges Expired - Lifetime CN202766929U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201220485527.4U CN202766929U (en) 2012-09-22 2012-09-22 Turnout-free connected track group with different track gauges

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201220485527.4U CN202766929U (en) 2012-09-22 2012-09-22 Turnout-free connected track group with different track gauges

Publications (1)

Publication Number Publication Date
CN202766929U true CN202766929U (en) 2013-03-06

Family

ID=47773512

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201220485527.4U Expired - Lifetime CN202766929U (en) 2012-09-22 2012-09-22 Turnout-free connected track group with different track gauges

Country Status (1)

Country Link
CN (1) CN202766929U (en)

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN105951539A (en) * 2016-06-17 2016-09-21 广州中车轨道交通装备有限公司 Train turnout protection device
CN112298277A (en) * 2020-11-12 2021-02-02 西南交通大学 Turnout system for road-rail dual-purpose vehicle

Cited By (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN105951539A (en) * 2016-06-17 2016-09-21 广州中车轨道交通装备有限公司 Train turnout protection device
CN105951539B (en) * 2016-06-17 2017-12-12 广州中车轨道交通装备有限公司 A kind of train track switch protection device
CN112298277A (en) * 2020-11-12 2021-02-02 西南交通大学 Turnout system for road-rail dual-purpose vehicle

Similar Documents

Publication Publication Date Title
CN104859686B (en) Intermittent train control system and its control method under CBTC fault modes
CN104442443B (en) A kind of permanent magnetism magnetic suspension locomotive system integrating suspension, leading, advance and brake
CN204915727U (en) It closes a nodal pattern no. 5 trouble of clearing way to stride a formula monorail transit
CN202766929U (en) Turnout-free connected track group with different track gauges
CN203812078U (en) Circular railway multiple crashproof control intelligent dollies
CN102852055B (en) Single turnout for urban rail transit
CN202880754U (en) Automatic automatic aligment control device of unwheeling machine compatible with two types of bullet trains of eight marshaling or sixteen marshaling
CN201372394Y (en) Dual-gauge combined single turnout
CN201305797Y (en) Narrow gauge symmetrical turnout device
CN104652264A (en) Steel truss girder suspension type detector car
CN104652186A (en) Turnout grinding control system and control method of metro rail grinding train
CN201614526U (en) Scissors crossover type narrow railway turnout of narrow space
CN203568714U (en) Gantry crane flat car for changing rail
CN102963400B (en) Method and device for realizing graphical display of inlet route instructions
CN203144846U (en) Lateral turnout trip switch for urban rail transportation
CN102381339B (en) Interlock protective route trigger method for metrovehicle
CN203602971U (en) Semi-linear type split switch
CN104631226B (en) Flatcar track cross arranging method
CN210766200U (en) Groove rail with surfacing structure for rhombic crossed turnout
CN202416088U (en) Endless rope winch turnout
CN204236493U (en) A kind of new mine product track double rail device
CN103508169A (en) Cross-shaped track transition device
CN203904781U (en) Rail system
CN202012025U (en) Fixed turnout and rail vehicle
CN202607524U (en) Roof skeleton composition device

Legal Events

Date Code Title Description
C14 Grant of patent or utility model
GR01 Patent grant
CX01 Expiry of patent term
CX01 Expiry of patent term

Granted publication date: 20130306