CN202745058U - Clay cleaning tool in prestressed pipe pile - Google Patents

Clay cleaning tool in prestressed pipe pile Download PDF

Info

Publication number
CN202745058U
CN202745058U CN 201220418978 CN201220418978U CN202745058U CN 202745058 U CN202745058 U CN 202745058U CN 201220418978 CN201220418978 CN 201220418978 CN 201220418978 U CN201220418978 U CN 201220418978U CN 202745058 U CN202745058 U CN 202745058U
Authority
CN
China
Prior art keywords
cleaning tool
prestressed pipe
pile
steel plates
pieces
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Fee Related
Application number
CN 201220418978
Other languages
Chinese (zh)
Inventor
赵连仲
曹振田
吕飞
何建波
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
China Construction Sixth Engineering Division Co Ltd
Original Assignee
China Construction Sixth Engineering Division Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by China Construction Sixth Engineering Division Co Ltd filed Critical China Construction Sixth Engineering Division Co Ltd
Priority to CN 201220418978 priority Critical patent/CN202745058U/en
Application granted granted Critical
Publication of CN202745058U publication Critical patent/CN202745058U/en
Anticipated expiration legal-status Critical
Expired - Fee Related legal-status Critical Current

Links

Images

Landscapes

  • Piles And Underground Anchors (AREA)

Abstract

The utility model discloses a clay cleaning tool in a prestressed pipe pile. The clay cleaning tool comprises a horizontal rod and a vertical rod. The horizontal rod and the vertical rod are arranged in a T shape. A plurality of pieces of steel plates are sequentially welded on the vertical rod at intervals from bottom to top, two adjacent pieces of steel plates are arranged and form an inclined angle, two pieces of steel plates are separated from and parallel to the other two pieces of steel plates, and each steel plate is in a semi-ring shape. By means of the adoption of the clay cleaning tool, clay including dry soil and wet soil inside the pipe pile can be effectively cleaned out, manpower input is reduced, construction difficulty is reduced, construction progress and construction speed are quickened, construction quality is ensured, and resources are saved. The tool is easy to manufacture, convenient to operate, and suitable for quick production, and has a good significance for popularization.

Description

Earth cleaning tool in a kind of pile for prestressed pipe
Technical field
The utility model relates to cleaning tool, relates in particular to earth cleaning tool in a kind of pile for prestressed pipe.
Background technology
The engineering of using pile for prestressed pipe is arranged in most of city of China, pile for prestressed pipe is in work progress and in the operation such as soil excavation, the capital enters a large amount of earth, and according to the node requirement in the 10G409 atlas, supporting plate reinforcing bar (compressive pile is the large person among the dark and 3D of 1.5m, and uplift pile will be definite according to designing requirement) will be set in pile tube be connected with base plate or cushion cap, a large amount of earth must be cleared up, and the pile tube mouth is less, and difficulty of construction is larger.Present way, great majority are to use that the artificially made is long outwards to draw spoon clearly, time-consuming, effort, and operation is very difficult, if meet earth when hard, construction is difficulty especially.
Summary of the invention
The purpose of this utility model is to overcome the deficiency of prior art, provides a kind of making simple, and is easy to operate, uses earth cleaning tool in a kind of pile for prestressed pipe that small-sized earth cleanout tool can clean out the designing requirement degree of depth with interior earth.
Earth cleaning tool in a kind of pile for prestressed pipe of the present utility model, it comprises horizon bar and the vertical bar of setting in T shape, on vertical bar from bottom to top successively the interval be welded with plurality of steel plates, two adjacent block plates are the angle setting, and be arranged in parallel between two block plates that the interval arranges, each described steel plate is semi-circular.
This instrument of employing can effectively clean out earth in the pile tube, comprises dry ground and wet soil, reduces artificial input, reduces difficulty of construction, accelerating construction progress, saving resource.
This tool making is simple, and is easy to operate, is fit to produce fast; Adopt this instrument to improve speed of application, guaranteed construction quality, have good dissemination.
Description of drawings
Fig. 1 is the structural representation of earth cleaning tool in a kind of pile for prestressed pipe of the present utility model;
Fig. 2 is the steel plate structure schematic diagram in the instrument shown in Figure 1.
The specific embodiment
Below in conjunction with the drawings and specific embodiments the utility model is done to describe in detail.
Earth cleaning tool in a kind of pile for prestressed pipe of the present utility model as shown in drawings, it comprises horizon bar 1 and the vertical bar 2 of setting in T shape, on vertical bar from bottom to top successively the interval be welded with plurality of steel plates 3, two adjacent block plates are the angle setting, and be arranged in parallel between two block plates that the interval arranges, each described steel plate is semi-circular.
The angle of preferred each steel plate and horizontal plane is about 13 °-17 ° is advisable.Most preferred among the figure is 15 °, so, can effectively guarantee the steel plate easy degree of burying, and can guarantee that again the steel plate upside can be with the earth of some.
The higher-end than low side and the first block plate of preferred the second block plate differs 20mm-30mm and is advisable.Can guarantee that the first block plate and the second block plate enter the effective of earth and be connected.
Preferred vertically bar 2 bottoms are taper, are beneficial to insert in the soil smoothly.
Preferred horizon bar length is that 300~400mm is advisable, and is advisable so that two people can use with joint efforts, and vertically bar 2 length are that earth need be cleared up the degree of depth+500mm and is advisable in the pile tube.
The using method of this instrument is:
1. it is stand-by this clear soil working tool vertically to be put into a hole, if when soil is more dried in the pile tube, can water into first the mud shape.2.2 the people cooperates, and holds horizon bar, along instrument being rotated into the earth direction, rotation is buried.3. when clear soil working tool rotates in the soil 20cm left and right sides, with joint efforts instrument is extracted.4. with the earth of taking out of on the steel plate, complete liquidation is fallen, and just instrument can be taken out of part earth and clean out.5. repetition above-mentioned steps, to clear up qualified till.

Claims (4)

1. earth cleaning tool in the pile for prestressed pipe, it is characterized in that: it comprises horizon bar and the vertical bar of setting in T shape, on vertical bar from bottom to top successively the interval be welded with plurality of steel plates, two adjacent block plates are the angle setting, and be arranged in parallel between two block plates that the interval arranges, each described steel plate is semi-circular.
2. earth cleaning tool in the pile for prestressed pipe according to claim 1, it is characterized in that: the angle of each steel plate and horizontal plane is 13 °-17 °.
3. earth cleaning tool in the pile for prestressed pipe according to claim 1 and 2, it is characterized in that: the higher-end than low side and the first block plate of the second block plate differs 20mm-30mm.
4. earth cleaning tool in the pile for prestressed pipe according to claim 3 is characterized in that: be taper bottom the described vertical bar.
CN 201220418978 2012-08-22 2012-08-22 Clay cleaning tool in prestressed pipe pile Expired - Fee Related CN202745058U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN 201220418978 CN202745058U (en) 2012-08-22 2012-08-22 Clay cleaning tool in prestressed pipe pile

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN 201220418978 CN202745058U (en) 2012-08-22 2012-08-22 Clay cleaning tool in prestressed pipe pile

Publications (1)

Publication Number Publication Date
CN202745058U true CN202745058U (en) 2013-02-20

Family

ID=47704481

Family Applications (1)

Application Number Title Priority Date Filing Date
CN 201220418978 Expired - Fee Related CN202745058U (en) 2012-08-22 2012-08-22 Clay cleaning tool in prestressed pipe pile

Country Status (1)

Country Link
CN (1) CN202745058U (en)

Cited By (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN105839641A (en) * 2015-12-28 2016-08-10 上海建工七建集团有限公司 Spiral type soil dig-out device
CN105862864A (en) * 2015-12-28 2016-08-17 上海建工七建集团有限公司 Construction method for clearing soil on pile top of pre-stressed concrete pipe pile
CN107964956A (en) * 2018-01-16 2018-04-27 中建五局华东建设有限公司 Device and dredging method for hollow pile dredging

Cited By (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN105839641A (en) * 2015-12-28 2016-08-10 上海建工七建集团有限公司 Spiral type soil dig-out device
CN105862864A (en) * 2015-12-28 2016-08-17 上海建工七建集团有限公司 Construction method for clearing soil on pile top of pre-stressed concrete pipe pile
CN107964956A (en) * 2018-01-16 2018-04-27 中建五局华东建设有限公司 Device and dredging method for hollow pile dredging

Similar Documents

Publication Publication Date Title
CN102561402B (en) Treatment method for construction joint between top plate and wall of individual underground civil air defense project constructed by covered top-down excavation method
CN103215946A (en) Electroosmosis electrode and electroosmosis draining system thereof
CN205120386U (en) A analog system for simulating coal seam exploitation
CN206348169U (en) A kind of sampler used for geological prospecting
CN203684230U (en) Prefabricated double-row pile structure
CN202745058U (en) Clay cleaning tool in prestressed pipe pile
CN105181372B (en) It is a kind of for simulating the simulation system and simulation experiment method of seam mining
CN209509554U (en) Increase basement underpinning structure under existing building newly
CN203270856U (en) Building wall
CN102720136B (en) Island and cofferdam construction method for roads, bridges and bearing platforms
CN104265298A (en) Downward drift filling mining method
CN203347801U (en) Large-section tunnel cross section structure
CN104405060A (en) Masonry structure with longitudinal reinforcing rib and construction method thereof
CN204875811U (en) Combined type multirow stake underground structure
CN205954618U (en) Double -walled bellows precast tubular pile pile extension structure
CN203848836U (en) Column type marking pier
CN203284789U (en) Pile foundation construction system for common karst cave
CN207110586U (en) A kind of component plate of low layer multi-storied garage
CN204940201U (en) A kind of constructing structure of long piled wharf
CN204298990U (en) Join the masonry structure of longitudinal reinforced rib
CN206279534U (en) A kind of subway foundation pit building enclosure
CN205296849U (en) Letter storehouse concrete funnel structure
CN204940265U (en) A kind of pile for prestressed pipe
CN204919636U (en) Handy luoyang shovel
CN204626449U (en) A kind of steel reinforced concrete Cantilever Retaining Wall for high roadbed district

Legal Events

Date Code Title Description
C14 Grant of patent or utility model
GR01 Patent grant
CF01 Termination of patent right due to non-payment of annual fee
CF01 Termination of patent right due to non-payment of annual fee

Granted publication date: 20130220

Termination date: 20180822