CN202745029U - Covering body for shielding wind and protecting sand - Google Patents
Covering body for shielding wind and protecting sand Download PDFInfo
- Publication number
- CN202745029U CN202745029U CN 201220417931 CN201220417931U CN202745029U CN 202745029 U CN202745029 U CN 202745029U CN 201220417931 CN201220417931 CN 201220417931 CN 201220417931 U CN201220417931 U CN 201220417931U CN 202745029 U CN202745029 U CN 202745029U
- Authority
- CN
- China
- Prior art keywords
- sand
- foundation pile
- pile wall
- wind
- protecting
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Expired - Fee Related
Links
Images
Landscapes
- Foundations (AREA)
Abstract
Provided is a covering body for shielding wind and protecting sand. The covering body for shielding the wind and protecting the sand comprises a sand protection pad and a foundation pile wall, wherein the sand protection pad is a rectangular body and surface bodies are covered in the outside of a framework. The foundation pile wall is a strip body, the cross-section of the strip body is T-shaped, and surface bodies are covered in the outside of the framework. The framework of the sand protection pad and the foundation pile wall is a construction member shaped like a Chinese character 'mi', the gaps of the framework of the sand protection pad and the foundation pile wall are filled with sand, the foundation pile wall is arranged in a butt joint gap between two sand protection pads, a pile body portion of the foundation pile wall extends downward to exceed the thickness of the sand protection pad, flanges at two sides of the upper portion of the foundation pile wall are pressed on the sides of the sand protection pad, and outside surfaces of the flanges in the upper portion of the foundation pile wall are in circular arc shape. The covering body for shielding the wind and protecting the sand is used for controlling the desert, preventing slopes and embankments from water loss and soil erosion and protecting the land desertification. The covering body for shielding the wind and protecting the sand has the advantages of being simple in structure, convenient to construct, and good in effect of shielding wind and protecting sand.
Description
Technical field
The utility model relates to and a kind ofly protects the scrim body every wind, is used for the Afforestation desert, prevents that sloping dike water and soil sandstone landslide runs off the soil that protection is desertified.
Background technology
At present the Afforestation desert, prevent that the way that the soil that runs off in sloping dike water and soil sandstone landslide, protection is desertified adopts from being to plant or seeding technique; have following defective: (1) as you know the existence of plant is that the fixing water and soil sand of needs is taken root growth; the basic reason of Desert Control failure is exactly not sand and dust all standing, sealing and fixing; the sand and dust that rolled by wind of plant of cultivation are buried and dead; sand and dust constantly move forward, and have caused the people to move back the vicious circle that sand advances.(2) prevent that sloping dike water and soil sandstone landslide runs off, plant takes root existence at Po Dishang more needs the water and soil sandstone fixed, but fixing the sealing of water and soil sandstone, cures the symptoms, not the disease.When (3) protecting the soil that desertifies; the soil of lack of water has lost fixing basis; even taking root, each Plants grown; also can be dead because the water and soil sandstone run off; formed the situation of " the windproof wind of not controlling; the tree of every year planting trees is rare is planted grass and loseed grass ", finally caused water and soil and fine sand to be blown up and formed abominable sandstorm.
Summary of the invention
The purpose of this utility model provides a kind ofly protects the scrim body every wind, solves the Afforestation desert, the bad difficult problem of effect when preventing the soil that runs off in sloping dike water and soil sandstone landslide, protection is desertified.
The purpose of this utility model realizes as follows: should protect the scrim body every wind, comprise and protect sand cushion and foundation pile wall, protecting sand cushion is the rectangular body that skeleton is covered with the face body, the foundation pile wall is that to be covered with the cross section that the face body consists of be T-shaped elongate body to skeleton, protect in the skeleton gap of sand cushion and foundation pile wall and be full of sand and dust, the foundation pile wall is in the butt joint that protects between the sand cushion, and the pile body of foundation pile wall part extends beyond downwards protects sand cushion thickness, and the flange of both sides, foundation pile wall top is pressed on the side that protects sand cushion.Protect sand cushion on the spot equably bedding on the soil of the soil of the soil in desert or sloping dike and desertification, foundation pile wall lower end is inserted in the soil, open foundation pile wall and the mouth that protects sand cushion, get on the spot pack into foundation pile wall and protecting in the skeleton gap of sand cushion of sand, the foundation pile wall is pushed down and is protected the sand cushion side, and the face body can adopt braid.
The skeleton that protects sand cushion and foundation pile wall is rice font member, and the ability of bearing downforce and oblique pulling force is strong.
The external surface of foundation pile wall upper flange part is circular arc, reduces windage.
The utility model is used for Desert Control, prevents sloping dike soil erosion, protects desertification of land, and is simple in structure, convenient construction, and it is effective to check winds and fix drifting sand.
Description of drawings
Fig. 1 is structural representation of the present utility model.
The specific embodiment
With reference to Fig. 1; the utility model comprises and protects sand cushion 2 and foundation pile wall 1; protecting sand cushion 2 is rectangular bodies that skeleton 3 is covered with face body 4; foundation pile wall 1 is that to be covered with the cross section that face body 4 consists of be T-shaped elongate body to skeleton 3; the skeleton 3 that protects sand cushion 2 and foundation pile wall 1 is rice font member; protect in skeleton 3 gaps of sand cushion 2 and foundation pile wall 1 and be full of sand and dust; so fixedly sand and dust can protect again the greening on ground more can prevent erosion; foundation pile wall 1 is in the butt joint that protects between the sand cushion 2; the pile body part of foundation pile wall 1 extends beyond downwards protects sand cushion 2 thickness; the flange of both sides, foundation pile wall 1 top is pressed on the side that protects sand cushion 2, and the external surface of foundation pile wall 1 upper flange part is circular arc.Face body 4 can adopt woven cloth, and material can be selected plastics, nylon, collodion silk, resin or various metal manufacturing.
Claims (3)
1. one kind is protected the scrim body every wind, comprise and protect sand cushion and foundation pile wall, it is characterized in that: protecting sand cushion (2) is the rectangular body that skeleton (3) is covered with face body (4), foundation pile wall (1) is that to be covered with the cross section that face body (4) consists of be T-shaped elongate body to skeleton (3), protect in skeleton (3) gap of sand cushion (2) and foundation pile wall (1) and be full of sand and dust, foundation pile wall (1) is in the butt joint that protects between the sand cushion (2), the pile body part of foundation pile wall (1) extends beyond downwards protects sand cushion (2) thickness, and the flange of foundation pile wall (1) both sides, top is pressed on the side that protects sand cushion (2).
2. according to claim 1ly protect the scrim body every wind, it is characterized in that: the skeleton (3) that protects sand cushion (2) and foundation pile wall (1) is a rice font member.
3. according to claim 1 and 2ly protect the scrim body every wind, it is characterized in that: the external surface of foundation pile wall (1) upper flange part is circular arc.
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN 201220417931 CN202745029U (en) | 2012-08-22 | 2012-08-22 | Covering body for shielding wind and protecting sand |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN 201220417931 CN202745029U (en) | 2012-08-22 | 2012-08-22 | Covering body for shielding wind and protecting sand |
Publications (1)
Publication Number | Publication Date |
---|---|
CN202745029U true CN202745029U (en) | 2013-02-20 |
Family
ID=47704452
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN 201220417931 Expired - Fee Related CN202745029U (en) | 2012-08-22 | 2012-08-22 | Covering body for shielding wind and protecting sand |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN202745029U (en) |
Cited By (1)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN105862705A (en) * | 2016-04-25 | 2016-08-17 | 胡月明 | Windproof sand-fixing hood applied to land desertification |
-
2012
- 2012-08-22 CN CN 201220417931 patent/CN202745029U/en not_active Expired - Fee Related
Cited By (1)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN105862705A (en) * | 2016-04-25 | 2016-08-17 | 胡月明 | Windproof sand-fixing hood applied to land desertification |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN206512678U (en) | A kind of ecological revetment | |
CN205305532U (en) | Living check fix sand to plant | |
CN204443323U (en) | Steep high rock slope pocket-type is from seeping water tape planting | |
CN207619967U (en) | Restoration of the ecosystem side slope surface construction on a kind of mine | |
CN204825784U (en) | Slope ecological protection system | |
CN103362135B (en) | Fang Beng hilllock, protect water and soil net grass bank protection | |
CN204059376U (en) | The slope protection greening structure of the steep exposed rock side slope of a kind of urgency | |
CN205305500U (en) | Vegetation carpet capable of preventing washout of surface soil | |
CN204919521U (en) | Integrated control structure suitable for moving dunes | |
CN205617393U (en) | Ecological slope protection structure with stake of orientable root | |
CN105200972B (en) | Method for comprehensive treatment of moving dune through top sealing, slope fixing and side locking | |
CN202745029U (en) | Covering body for shielding wind and protecting sand | |
CN211006532U (en) | Ecological slope protection structure of hydraulic engineering | |
CN204540076U (en) | A kind of energy-conservation cliff greening system | |
CN204132060U (en) | A kind of domatic three dimensional network plants raw groove structure | |
CN208056074U (en) | A kind of protecting slope ecology device | |
CN110710414A (en) | Windproof fixing device for building roof greening | |
CN102071696A (en) | Steep slope protective soft frame and construction method thereof | |
CN201660819U (en) | Three-dimensional vegetation mattress | |
CN213773415U (en) | High and steep slope soil protection and protection structure applying geocell | |
CN214628687U (en) | Straw curtain for lawn cultivation | |
CN104320057A (en) | Steel rope photovoltaic component overhead device for farmlands, lakes and barren mountains | |
CN104234060A (en) | Novel slope protection afforesting layer | |
CN210928905U (en) | Windproof fixing device for building roof greening | |
CN2846507Y (en) | Vegetation slope protective net |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
C14 | Grant of patent or utility model | ||
GR01 | Patent grant | ||
CF01 | Termination of patent right due to non-payment of annual fee |
Granted publication date: 20130220 Termination date: 20160822 |
|