CN202744154U - Device for replacing mine hoisting rope - Google Patents
Device for replacing mine hoisting rope Download PDFInfo
- Publication number
- CN202744154U CN202744154U CN 201220437110 CN201220437110U CN202744154U CN 202744154 U CN202744154 U CN 202744154U CN 201220437110 CN201220437110 CN 201220437110 CN 201220437110 U CN201220437110 U CN 201220437110U CN 202744154 U CN202744154 U CN 202744154U
- Authority
- CN
- China
- Prior art keywords
- rope
- hoisting
- container
- ropes
- lifting container
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Expired - Fee Related
Links
Images
Landscapes
- Lift-Guide Devices, And Elevator Ropes And Cables (AREA)
Abstract
The utility model discloses a device for replacing a mine hoisting rope and belongs to the technical field of mine hoisting. The device comprises a rope replacing vehicle, a rope adjusting device, a rope clamper, a rope winding winch, a rope unwinding winch, a well mouth guide pulley and the like. The use method is as follows: two old hoisting ropes of a hoisting container I pass through the well mouth guide pulley, penetrate through the rope replacing vehicle and are connected with the rope unwinding winch; and two new hoisting ropes on the rope unwinding winch penetrate through the rope replacing vehicle, pass through the well mouth guide pulley, turn over an upper hoisting sheave, a hoisting machine and a lower hoisting sheave and are connected with a hoisting container II. Then the hoisting machine is started, the hoisting container I is ascended, the hoisting container II is descended, the new and old hoisting ropes are synchronously exchanged, the new hoisting ropes are released and the old hoisting ropes are recovered until the hoisting container I reaches a well mouth, the hoisting container II on the other side operates to the well bottom and two hoisting ropes are replaced. All hoisting ropes are replaced by repeatedly using the method. According to the device disclosed by the utility model, the labor force is saved, the safety is improved and the work efficiency is increased.
Description
Technical field
The utility model relates to a kind of replacing technology of mine hoisting rope, belongs to the mine hoisting technical field.
Background technology
At present, much more more and more friction winding obtains using as the important form of vertical shaft hoisting.Safe and reliable for guaranteeing friction winding, changing hoisting rope is the important process that guarantees to promote safety.Mostly conventional method of replacing rope is that four or six roots of sensation rope change simultaneously, and well head, shaft bottom all need personnel to work, so that it is more to change in the rope process potential safety hazard; Conventional method of replacing rope is received old hoisting rope and put new hoisting rope all is that substep carries out, and most work all rely on and manually finish, so that change the rope time expand, changes rope efficient lower.
The utility model content
In order to overcome above-mentioned the deficiencies in the prior art part, the utility model provides a kind of device of changing the mine hoisting rope, uses this device to receive old hoisting rope and put new hoisting rope synchronized operation changing when rope, all operates at well head, increase the safety of changing rope work, increase work efficiency.
The utility model is achieved by the following technical solution:
A kind of device of changing the mine hoisting rope, it comprises mainly by upper head sheave, gig, lower head sheave, hoisting rope, the bont that lifting container I and lifting container II form, be connected with tail rope between the tail end of lifting container I and lifting container II, it is characterized in that: the well head track adjusting wheel is equipped with in the position near described lifting container I on the well head of mine, the rear portion of well head track adjusting wheel is equipped with changes the rope car, changing rope car rear portion is equipped with the rope closing winch and puts the rope winch, hoisting rope in described lifting container I one side has rope locking machine, on the hoisting rope of described lifting container II one side adjusting rope device is arranged.
The beneficial effects of the utility model are: adopted above-mentioned method of replacing rope and device, change and remain in the rope process that at least two hoisting ropes do not break from elevator system, and all changing rope work all finishes at wellhead ground, by large-scale, multiple cooperation of changing rope equipment, newly, old hoisting rope exchanges synchronously, saved manpower, shortened and changed the rope time, greatly increase the safety of changing rope work, improved the work efficiency that changes rope.
Description of drawings
The below further specifies the utility model with embodiment with reference to the accompanying drawings.
Fig. 1 is the structural representation before the utility model replacing lifting ropes of multi-rope;
Fig. 2 is the utility model hoisting rope open position schematic diagram;
Fig. 3 is that the utility model is changed view.
Among the figure, 1, gig; 2, lower head sheave; 3, upper head sheave; 4, new hoisting rope; 5, well head track adjusting wheel; 6, change the rope car; 7, rope closing winch; 8, put the rope winch; 9, rope locking machine; 10, old hoisting rope; 11, lifting container I; 11 ', lifting container II; 12, tail rope; 13, adjusting rope device; 14, well head; 15, shaft bottom.
The specific embodiment
Below in conjunction with embodiment the utility model is further specified.
Such as Fig. 1, Fig. 2, a kind of device of changing the mine hoisting rope shown in Figure 3, it comprises mainly by upper head sheave 3, gig 1, lower head sheave 2, hoisting rope, the bont that lifting container I 11 and lifting container II 11 ' form, be connected with tail rope 12 between the tail end of lifting container I 11 and lifting container II 11 ', it is characterized in that: well head track adjusting wheel 5 is equipped with in the position near described lifting container I 11 on the well head 14 of mine, the rear portion of well head track adjusting wheel 5 is equipped with changes rope car 6, changing rope car 6 rear portions is equipped with rope closing winch 7 and puts rope winch 8, hoisting rope in described lifting container I 11 1 sides has rope locking machine 9, on the hoisting rope of described lifting container II 11 ' one side adjusting rope device 13 is arranged.
The utility model is changed the method for mine hoisting rope during use, may further comprise the steps:
Step 1: install rope closing winch 7, put rope winch 8, change rope car 6, well head track adjusting wheel 5, adjusting rope device 13 and rope locking machine 9 etc. and change rope equipment, to be parked in 15 places, shaft bottom near the lifting container I 11 of changing rope car 6 one sides, the lifting container II 11 ' of opposite side is parked in well head 14 places;
Step 2: with rope locking machine 9 hoisting ropes 10 that chucking is had been friends in the past, mention described lifting container II 11 ' in described lifting container II 11 ' one side with adjusting rope device 13 in described lifting container I 11 1 sides, old hoisting rope 10 is relaxed;
Step 3: release two new hoisting ropes 4 and pass and change rope car 6 from putting rope winch 8, and through after the well head track adjusting wheel 5, the arbitrary point of connection A place of described two new hoisting ropes 4 above rope locking machine 9 is connected with two old hoisting ropes 10;
Step 4: between described point of connection A and rope locking machine 9, select a place, hoisting rope 10 old with two that described new hoisting rope 4 is connected disconnected, the epimere of two old hoisting ropes 10 after the disconnection drew head sheave 3, gig 1 and lower head sheave 2 to new hoisting rope 4, new hoisting rope 4 is connected with described lifting container II 11 ', and the epimere of two old hoisting ropes 10 is removed;
Step 5: the hypomere end of two old hoisting ropes 10 after the disconnection through well head track adjusting wheel 5, pass and change rope car 6, be connected to rope closing winch 7;
Step 6: withdraw from described adjusting rope device 13 and rope locking machine 9;
Step 7: start rope closing winch 7, put rope winch 8, change rope car 6, make them all be in pre-mode of operation;
Step 8: start gig 1, under all the other old hoisting rope tractions that do not disconnect, make on the lifting container I 11 carry, lifting container II 11 ' transfers, then the old hoisting rope 10 of two disconnections reclaims synchronously, newly hoisting rope 4 discharges synchronously, until lifting container I 11 moves to well head, lifting container II 11 ' moves to the shaft bottom, gig 1 stops, and then the old hoisting rope 10 of two disconnections all is recycled to well head, two described new hoisting ropes 4 are released into the shaft bottom, and two replacing lifting ropes of multi-ropes are finished;
Step 9: step 1 to the operation of step 8 is repeated one to twice, all the other hoisting ropes are changed take two as one group, the final replacing finishes whole four to six roots of sensation hoisting rope.
, change the rope car and follow operation as the active force of changing stylish, the old hoisting rope folding and unfolding of rope with gig.Change and remain in the rope process that at least two hoisting ropes do not break from elevator system, and all changing rope work all finishes at wellhead ground, carry on the lifting container I, the lifting container II transfers, newly, old hoisting rope is changing rope car inter-sync exchange, saved manpower, increase the safety of changing rope work, improved work efficiency.
Claims (1)
1. device of changing the mine hoisting rope, it comprises mainly by upper head sheave (3), gig (1), lower head sheave (2), hoisting rope, the bont that lifting container I (11) and lifting container II (11 ') form, be connected with tail rope (12) between the tail end of lifting container I (11) and lifting container II (11 '), it is characterized in that: in the upper position near described lifting container I (11) of the well head (14) of mine well head track adjusting wheel (5) is housed, the rear portion of well head track adjusting wheel (5) is equipped with changes rope car (6), changing rope car (6) rear portion is equipped with rope closing winch (7) and puts rope winch (8), hoisting rope in described lifting container I (11) one sides has rope locking machine (9), and adjusting rope device (13) is arranged on the hoisting rope of described lifting container II (11 ') side.
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN 201220437110 CN202744154U (en) | 2012-08-30 | 2012-08-30 | Device for replacing mine hoisting rope |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN 201220437110 CN202744154U (en) | 2012-08-30 | 2012-08-30 | Device for replacing mine hoisting rope |
Publications (1)
Publication Number | Publication Date |
---|---|
CN202744154U true CN202744154U (en) | 2013-02-20 |
Family
ID=47703583
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN 201220437110 Expired - Fee Related CN202744154U (en) | 2012-08-30 | 2012-08-30 | Device for replacing mine hoisting rope |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN202744154U (en) |
Cited By (5)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN102849587A (en) * | 2012-08-30 | 2013-01-02 | 徐州市工大三森科技有限公司 | Method and device for replacing mine hoisting ropes |
CN104071678A (en) * | 2014-07-01 | 2014-10-01 | 南通力威机械有限公司 | Rope replacement method for friction-type hoisting winch |
CN105174004A (en) * | 2015-09-27 | 2015-12-23 | 洛阳矿山机械工程设计研究院有限责任公司 | On-load installation method for small friction winch for winding of multi-layer steel wire rope of hoister |
CN113277409A (en) * | 2021-07-21 | 2021-08-20 | 徐州市工大三森科技有限公司 | Elevator wire rope trades rope device |
CN114408714A (en) * | 2021-12-09 | 2022-04-29 | 太原理工大学 | Rope replacing device |
-
2012
- 2012-08-30 CN CN 201220437110 patent/CN202744154U/en not_active Expired - Fee Related
Cited By (8)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN102849587A (en) * | 2012-08-30 | 2013-01-02 | 徐州市工大三森科技有限公司 | Method and device for replacing mine hoisting ropes |
CN102849587B (en) * | 2012-08-30 | 2014-12-10 | 徐州市工大三森科技有限公司 | Method and device for replacing mine hoisting ropes |
CN104071678A (en) * | 2014-07-01 | 2014-10-01 | 南通力威机械有限公司 | Rope replacement method for friction-type hoisting winch |
CN104071678B (en) * | 2014-07-01 | 2015-10-28 | 南通力威机械有限公司 | A kind of friction hoisting winch method of replacing rope |
CN105174004A (en) * | 2015-09-27 | 2015-12-23 | 洛阳矿山机械工程设计研究院有限责任公司 | On-load installation method for small friction winch for winding of multi-layer steel wire rope of hoister |
CN113277409A (en) * | 2021-07-21 | 2021-08-20 | 徐州市工大三森科技有限公司 | Elevator wire rope trades rope device |
CN114408714A (en) * | 2021-12-09 | 2022-04-29 | 太原理工大学 | Rope replacing device |
CN114408714B (en) * | 2021-12-09 | 2024-05-03 | 太原理工大学 | Rope replacement device |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN102849587B (en) | Method and device for replacing mine hoisting ropes | |
CN202744154U (en) | Device for replacing mine hoisting rope | |
CN106638185B (en) | A kind of traveling process becomes automatically across track-laying machine and application method | |
CN102230364B (en) | Automatic operation device of upper drill floor and lower drill floor of drill rod | |
CN202673195U (en) | Device for connecting drill pipes with three-joint unit | |
CN105971371B (en) | Scrap electrical wires bar removes machine | |
CN202140047U (en) | Automatic operation device for moving drill rod onto or off drill floor | |
CN202997425U (en) | Hoisting device capable of replacing suspension type insulator chain under electrified state | |
CN206128745U (en) | Broach exchange formula stereo garage elevating system | |
CN202090325U (en) | Double-suspension electric hoist special for hydraulic opening/closing | |
CN203932831U (en) | The automatic rope Locking device of work high above the ground | |
CN202416098U (en) | Rail detaching device | |
CN201443309U (en) | Automatic drill stem throwing device | |
CN2914418Y (en) | Car running on the electric transmission line | |
CN201473171U (en) | Moving and lifting dual-purpose hanging device of cableway device | |
CN202700593U (en) | Zircon corundum brick crushing device | |
CN201809046U (en) | Hoisting device | |
CN202463841U (en) | Bracket equipment for lifting slope in mine | |
CN106607913B (en) | A kind of transport of climbing robot and promote platform and its method for improving | |
CN205917371U (en) | Dolly doffs | |
CN215365599U (en) | Coking tamping emergency stop protection device | |
CN217760985U (en) | Automatic vehicle receiving and picking device for battery vehicle | |
CN219013839U (en) | Sewage pump lifting device | |
CN204265375U (en) | The hanging apparatus that a kind of carbon steel cold rolling horizontal loop swing arm roller is changed | |
CN202785203U (en) | Movable pulley hook head for vertical shaft sinking and hoisting |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
C14 | Grant of patent or utility model | ||
GR01 | Patent grant | ||
CF01 | Termination of patent right due to non-payment of annual fee |
Granted publication date: 20130220 Termination date: 20150830 |
|
EXPY | Termination of patent right or utility model |