CN202726474U - Electron beam welding line - Google Patents

Electron beam welding line Download PDF

Info

Publication number
CN202726474U
CN202726474U CN201220414785.3U CN201220414785U CN202726474U CN 202726474 U CN202726474 U CN 202726474U CN 201220414785 U CN201220414785 U CN 201220414785U CN 202726474 U CN202726474 U CN 202726474U
Authority
CN
China
Prior art keywords
electron beam
beam welding
welding
machine
welding line
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Lifetime
Application number
CN201220414785.3U
Other languages
Chinese (zh)
Inventor
钟庆华
杨正昊
陈兵
黄平章
Original Assignee
Guilin Electrical Equipment Scientific Research Institute Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Guilin Electrical Equipment Scientific Research Institute Co Ltd filed Critical Guilin Electrical Equipment Scientific Research Institute Co Ltd
Priority to CN201220414785.3U priority Critical patent/CN202726474U/en
Application granted granted Critical
Publication of CN202726474U publication Critical patent/CN202726474U/en
Anticipated expiration legal-status Critical
Expired - Lifetime legal-status Critical Current

Links

Images

Abstract

The utility model relates to an electron beam welding line which comprises an electron beam welder, an ultrasonic cleaner and a heat treatment device. The ultrasonic cleaner, the heat treatment device and the electron beam welder are placed in sequence and are connected with one another through a conveying belt. The electron beam welding line can also be provided with an ultrasonic detector and a gear press-fitting machine. Gear rings and webs in automobile gears to be welded are cleaned and press-fitted and are then conveyed to the electron beam welder through the conveying belt in order to finish automatic electron beam welding. Welded workpieces are also subjected to ultrasonic weld inspection and heat treatment. The electron beam welding line integrates the cleaning device, the heat treatment device and the electron beam welder required by electron beam welding, and can also be provided with the detection device and the gear press-fitting machine. The devices are connected through the conveying belt to form the continuous welding line. Welding efficiency of the electron beam welding line is improved greatly, and the electron beam welding line is available for welding 90 gears per hour. The electron beam welding line is suitable for welding of various auto parts, easy for assembly, stable in performance, high in automation level and simple to operate.

Description

The electron beam welding production line
Technical field
The utility model relates to electron beam welding equipment, is specially a kind of electron beam welding production line.
Background technology
Electron beam welding can guarantee weld penetration, also the thermal deformation of weldment is treated in minimizing, therefore its use is increasingly extensive, at various auto parts machineries, in the production such as semiaxis, gearbox gear and silicon oil shock absorber etc., also adopt in a large number electron-beam welder to weld production for improving welding quality especially.
But adopt at present the separate unit electron beam welding machines in the production process more.Because workpiece before welding will clean first, welded workpiece will be eliminated welding stress and carry out surface treatment through Overheating Treatment.Working procedures cooperates, and electron-beam welder is difficult to continuous firing, and production efficiency is not high, and utilization rate of equipment and installations is not high yet.
Production technology such as the gear in the various automobile gearboxes is that gear ring and former are fitted in together, and is again that the two is integrally welded.The productivity ratio maximum of at present electron beam welding can only reach 40~60/hour.Be difficult to satisfy the needs that auto industry is produced.
The utility model content
The purpose of this utility model is a kind of electron beam welding production line of design, and it comprises electron beam welding machine, also has supersonic wave cleaning machine and Equipment for Heating Processing, connects with conveyer belt each other, to improve the production efficiency of electron beam welding machine.
The electron beam welding production line of the utility model design comprises electron beam welding machine, also has supersonic wave cleaning machine and annealing device, and supersonic wave cleaning machine, electron beam welding machine and annealing device sequentially discharge, and connect with conveyer belt each other.
Workpiece to be welded is put into supersonic wave cleaning machine and is cleaned, and the greasy dirt on the workpiece and black dirt are cleaned up, and to guarantee electron beam welding junction cleaning, improves welding quality.The welding tooling of electron beam welding machine sent into cleaned workpiece to be welded by conveyer belt, carries out the welding of autoelectrinic bundle, the workpiece that obtains welding.
Workpiece after the welding is sent into annealing device by conveyer belt, requires workpiece is heat-treated according to Technology for Heating Processing, eliminates welding stress and carries out surperficial cure process.
This production line also is furnished with ultrasonic detection device, and the conveyer belt behind the electron beam welding machine is connected to ultrasonic detection device.Workpiece after the welding carries out heads for crank detection of ultrasonic bonding lines by the conveyer belt ultrasonic detection device of packing into, and is the depth of weld is not enough, have welding pore, crackle etc. to have the workpiece of weld defect to detect, and welding personnel can carry out repair welding or scrap processing.Conveyer belt behind the ultrasonic detection device is connected to annealing device.
When being used for the automobile gearbox gear welding, this production line also is furnished with the gear press mounting machine, conveyer belt behind the supersonic wave cleaning machine is connected to the gear press mounting machine, conveyer belt is sent the gear ring and the disc that clean up into the gear press mounting machine, inside and outside workpiece is fitted in together, so that the solder side tight fit of gear ring and disc.Conveyer belt behind the gear press mounting machine is connected to electron beam welding machine.
Described gear press mounting machine is the mekydro pressing machine.
Described conveyer belt is live roll cartridge type conveyer belt.
Compared with prior art, the advantage of the utility model electron beam welding production line is: 1, made up the needed cleaning equipment of electron beam welding, annealing device and electron beam welding machine, also can be equipped with checkout equipment and gear press mounting machine, conveyer belt connects each equipment, consist of continous way welding processing streamline, its welding efficiency improves greatly, and for example gear welding can reach 90/hour, improves 50% even one times than the productivity ratio of separate unit electron beam welding machine; 2, be suitable for the welding of various auto parts machineries, comprise automobile gearbox gear, semiaxis and silicon oil shock absorber etc.; 3, be easy to assembly, stable performance, automaticity are high, easy and simple to handle.
Description of drawings
Fig. 1 is this electron beam welding production line example structure block diagram.
The specific embodiment
Describe this electron beam welding production line embodiment in detail below in conjunction with accompanying drawing, this example is for being exclusively used in the electron beam welding production line of welding of automotive gearbox gear.
The embodiment of this automobile gearbox gear electron beam welding production line as shown in Figure 1, comprise electron beam welding machine, supersonic wave cleaning machine, gear press mounting machine, ultrasonic detection device and annealing device, the said equipment sequentially discharges, and connects with conveyer belt each other.
The supersonic wave cleaning machine that this is routine can be continuous type ultrasonic ripple cleaning model, also can be to be interrupted cleaning model, the efficient that continuous cleaning machine cleans is 90/hour, being interrupted the every stove scavenging period of cleaning machine is 60 minutes, workpiece 90 covers of at every turn can packing into, and cleaning production efficiency is 90/hour.
The gear press mounting machine that this is routine is the mekydro pressing machine, and pressure is 1 ton, and press-fit process time is 20 seconds at every turn, press-fits efficient and is 120-150 spare per hour.
The vacuum electron beam welder that this is routine is accelerating potential 60kV, power 3-4kw, adopt the high-frequency inverter-type DC high-voltage power supply, the oil injection type electron gun, welding vacuum is 6-8Pa, welding tooling is single station welding, or Double-station welding, single station welding beat is to be 5 seconds the clamping workpiece time, and the pumpdown time is 30 seconds, and be 10 seconds weld interval, a weld cycle time is 45 seconds, and namely welding efficiency reaches 90/hour.The Double-station welding frock, each welding post can weld 4-6 workpiece simultaneously, and the time of finishing a weld cycle is 3-4 minute, and be 45 seconds average every workpiece weld interval, per hour can weld 90 gears.
This routine ultrasonic detection device adopts the high-frequency narrow-pulse ultrasonic probe as ultrasonic detection sensor, energy detection of gear circular weld defective, as weld penetration not, pore, crackle etc., be 20 seconds every detection time, per hour can detect workpiece 120-150 spare.
This routine annealing device adopts Electric heating, heating power 30kW-60kw, 300 ℃ of maximum heating temperatures, 6 hours heat time heating times of every stove, adopt the digital temperature control module, temperature control precision ± 2 ℃, but temperature rate of change curve Set arbitrarily, every stove can heat 600 of gears, on average per hour 100.
This routine conveyer belt is live roll cartridge type conveyer belt.
Above-described embodiment only is the specific case that the purpose of this utility model, technical scheme and beneficial effect are further described, and the utility model is not to be defined in this.All any modifications of within scope of disclosure of the present utility model, making, be equal to replacement, improvement etc., all be included within the protection domain of the present utility model.

Claims (5)

1. the electron beam welding production line comprises electron beam welding machine, it is characterized in that:
Also have supersonic wave cleaning machine and annealing device, supersonic wave cleaning machine, electron beam welding machine and annealing device sequentially discharge, and connect with conveyer belt each other.
2. electron beam welding production line according to claim 1 is characterized in that:
This production line also is furnished with ultrasonic detection device, and the conveyer belt behind the electron beam welding machine is connected to ultrasonic detection device, and the conveyer belt behind the ultrasonic detection device is connected to annealing device.
3. electron beam welding production line according to claim 1 is characterized in that:
This production line also is furnished with the gear press mounting machine, and the conveyer belt behind the supersonic wave cleaning machine is connected to the gear press mounting machine, and the conveyer belt behind the gear press mounting machine is connected to electron beam welding machine.
4. electron beam welding production line according to claim 3 is characterized in that:
Described gear press mounting machine is the mekydro pressing machine.
5. each described electron beam welding production line in 4 according to claim 1 is characterized in that:
Described conveyer belt is live roll cartridge type conveyer belt.
CN201220414785.3U 2012-08-21 2012-08-21 Electron beam welding line Expired - Lifetime CN202726474U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201220414785.3U CN202726474U (en) 2012-08-21 2012-08-21 Electron beam welding line

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201220414785.3U CN202726474U (en) 2012-08-21 2012-08-21 Electron beam welding line

Publications (1)

Publication Number Publication Date
CN202726474U true CN202726474U (en) 2013-02-13

Family

ID=47652222

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201220414785.3U Expired - Lifetime CN202726474U (en) 2012-08-21 2012-08-21 Electron beam welding line

Country Status (1)

Country Link
CN (1) CN202726474U (en)

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN109866025A (en) * 2016-12-26 2019-06-11 黄红梅 A kind of welding wire mechanism for the assembling of anode part iron hoop sleeve
CN114888420A (en) * 2022-07-14 2022-08-12 盛瑞传动股份有限公司 Assembly method of planet carrier copper sleeve assembly

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN109866025A (en) * 2016-12-26 2019-06-11 黄红梅 A kind of welding wire mechanism for the assembling of anode part iron hoop sleeve
CN114888420A (en) * 2022-07-14 2022-08-12 盛瑞传动股份有限公司 Assembly method of planet carrier copper sleeve assembly

Similar Documents

Publication Publication Date Title
CN202726474U (en) Electron beam welding line
CN103894724A (en) Steel surface roughing auxiliary stirring friction welding method for aluminum and steel dissimilar material lap connection
CN109128433B (en) Automatic welding process for aluminum alloy light-weight vehicle body
CN104191095A (en) Welding process of large-diameter annular part
CN107598406A (en) Electric four-wheeled vehicle carriage flexible automation welding production line
CN208004980U (en) Terminal plate multistation automatic charging mash welder
CN108057952A (en) A kind of electron beam soldering method of big L/D ratio thin-walled parts
CN106513972A (en) Vacuum electronic beam welding method of brush sealing ring assemblies
CN204657762U (en) The automatic welder(welding machine) of air-conditioner base plate
CN103934683B (en) Diesel engine cold trial production line
CN206010126U (en) Sheet metal component projection welding leak-proof device based on robot
CN202805462U (en) Production line of inner plastic-coated pipe fitting
CN103935717A (en) Complete machine leakage detection line for diesel engine
CN204603281U (en) A kind of dead head automatic cutting device of automobile steering device motor housing
CN207308453U (en) A kind of clamping jaw automatic cleaning apparatus
CN203804549U (en) Diesel engine cold test production line
CN103658908A (en) Method and device for braze welding of glass-Kovar combiner and oxygen-free copper
CN204565506U (en) The electron beam welding tool of clutch hub
CN104022605A (en) Motor rotor end ring-guide bar medium-frequency induction brazing verifying tooling and method
CN204315890U (en) A kind of new-type brush holder production line
CN203951327U (en) A kind of motor rotor end ring sliver medium frequency inductive brazing checking frock
CN104174960A (en) High-frequency brazing machine
CN103737138A (en) Large-size refrigeration plate accurate furnace welding method
CN208456818U (en) A kind of mini air conditioner compressor inleting pipe and frame connecting structure
CN104014961A (en) Welding fixture of electrical appliance box lower support assembly of automobile

Legal Events

Date Code Title Description
C14 Grant of patent or utility model
GR01 Patent grant
C56 Change in the name or address of the patentee

Owner name: GUILIN ELECTRICAL EQUIPMENT SCIENTIFIC RESEARCH IN

Free format text: FORMER NAME: GUILIN ELECTRICAL EQUIPMENT SCIENTIFIC RESEARCH INSTITUTE

CP01 Change in the name or title of a patent holder

Address after: 541004 the Guangxi Zhuang Autonomous Region Guilin Qixing Road, No. 1

Patentee after: GUILIN ELECTRICAL EQUIPMENT SCIENTIFIC RESEARCH INSTITUTE Co.,Ltd.

Address before: 541004 the Guangxi Zhuang Autonomous Region Guilin Qixing Road, No. 1

Patentee before: Guilin Electrical Equipment Scientific Research Institute

CX01 Expiry of patent term

Granted publication date: 20130213

CX01 Expiry of patent term