Mobile wall-mounted cart for construction of storage tanks Download PDF

Info

Publication number
CN202718379U
CN202718379U CN 201220343499 CN201220343499U CN202718379U CN 202718379 U CN202718379 U CN 202718379U CN 201220343499 CN201220343499 CN 201220343499 CN 201220343499 U CN201220343499 U CN 201220343499U CN 202718379 U CN202718379 U CN 202718379U
Authority
CN
China
Prior art keywords
storage tank
mobile wall
construction
dolly
location
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Fee Related
Application number
CN 201220343499
Other languages
Chinese (zh)
Inventor
郝冠男
上官知春
谢上冬
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
China Construction Industrial and Energy Engineering Group Co Ltd
Original Assignee
China Construction Industrial Equipment Installation Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by China Construction Industrial Equipment Installation Co Ltd filed Critical China Construction Industrial Equipment Installation Co Ltd
Priority to CN 201220343499 priority Critical patent/CN202718379U/en
Application granted granted Critical
Publication of CN202718379U publication Critical patent/CN202718379U/en
Anticipated expiration legal-status Critical
Expired - Fee Related legal-status Critical Current

Links

Images

Landscapes

  • Movable Scaffolding (AREA)

Abstract

The utility model discloses a mobile wall-mounted cart for construction of storage tanks, and belongs to the technical field of construction equipment for large tanks. According to the technical scheme, the mobile wall-mounted cart comprises an operating rack, wherein the height of the operating rack is matched with that of a storage tank to be constructed; a positioning cantilever is arranged on the top of the operating rack; a positioning stop block is arranged at a free end of the positioning cantilever; and rollers which are matched with the top of the tank wall of the storage tank to be constructed are arranged at the bottom of the positioning cantilever. The mobile wall-mounted cart for construction of the storage tanks is simple in structure, convenient to use and time-saving and labor-saving in assembly and disassembly; the labor intensity of workers can be greatly reduced; and the mobile wall-mounted cart is used for construction of the large tanks.

Description

The mobile wall built-up dolly that is used for Storage Tank Construction
Technical field
The utility model relates to a kind of large-scale storage tank mounting auxiliary, more particularly, relates in particular to a kind of mobile wall built-up dolly for Storage Tank Construction.
Background technology
In the petrochemical industry construction project, volume is huger engineerings greater than the fabrication and installation of the large-scale storage tank of 5 ten thousand steres, when the annex that carries out the storage tank tank body is installed, because the tank body height is about 20 meters, traditional job practices is landed scaffold for setting up.But assembling and disassembling is time-consuming, cost is high, labour intensity reaches greatly the safety aspect some problems that this method exists.
The utility model content
The purpose of this utility model is for above-mentioned the deficiencies in the prior art, provide a kind of simple in structure, easy to use, assembling and disassembling is time saving and energy saving and can greatly reduce the mobile wall built-up dolly that is used for Storage Tank Construction of labor strength.
The technical solution of the utility model is achieved in that a kind of mobile wall built-up dolly for Storage Tank Construction, comprise the handling frame that the height with storage tank to be onstructed adapts, wherein said handling frame top is provided with the location cantilever, free end at the location cantilever is provided with position block, is provided with the roller that the tank skin top with storage tank to be onstructed adapts in cantilever bottom, location.
The above-mentioned mobile wall built-up dolly that is used for Storage Tank Construction, the surface that described handling frame is relative with storage tank to be onstructed is provided with directive wheel.
The above-mentioned mobile wall built-up dolly that is used for Storage Tank Construction, described handling frame by four pillars, be disposed on two L brackets that four supporting and location frame, correspondences between the pillar are arranged on four post top portion along the pillar length direction and form; Described location cantilever is fixed on the top of L bracket, is provided with the first inclined support bar between location cantilever and L bracket.
The above-mentioned mobile wall built-up dolly that is used for Storage Tank Construction, described supporting and location frame is provided with gripper shoe.
The above-mentioned mobile wall built-up dolly that is used for Storage Tank Construction, described L bracket is provided with the second inclined support bar.
The above-mentioned mobile wall built-up dolly that is used for Storage Tank Construction is provided with the climbing ladder between the described L bracket.
After the utility model adopted said structure, handling frame can be along the tank skin top along circumferentially mobile by cooperating location cantilever and roller, and operating personnel may stand on the gripper shoe of handling frame, from playing the support function the same with scaffold.And, compare with scaffold, have advantages of following:
(1) set up speed fast, save a large amount of scaffoldings, save the labour, easy to operate, flexible, technical economic benefit is better;
(2) peace is torn open conveniently, does not account for the place, and is economic and practical.The construction trend is oversimplified, made the job site become succinctly civilization, safety;
(3) effectively solved the vertical transport of material, instrument, personnel are easy for going up and down, saved required value of machinery and the installation fee of anticorrosive construction;
(4) reasonable in design, structure is advanced, operation is mobile flexible, safe and reliable, easy to maintenance;
(5) by force analysis, and carry out contacting of safe and reasonable by directive wheel and tank body and fix, effectively guarantee construction safety;
(6) lightweight, assembly and disassembly convenience;
(7) cheap, easy to maintenance, labour intensity is low, failure rate is low.
Description of drawings
The utility model is described in further detail below in conjunction with the embodiment in the accompanying drawing, but do not consist of any restriction of the present utility model.
Fig. 1 is structural representation of the present utility model;
Fig. 2 is use view of the present utility model.
Among the figure: handling frame 1, pillar 1a, supporting and location frame 1b, L bracket 1c, location cantilever 2, position block 3, roller 4, directive wheel 5, the first inclined support bar 6, gripper shoe 7, the second inclined support bar 8, climbing ladder 9.
The specific embodiment
Consult shown in Figure 1, a kind of mobile wall built-up dolly for Storage Tank Construction of the present utility model, comprise the handling frame 1 that the height with storage tank to be onstructed adapts, handling frame 1 by four pillar 1a, be disposed on two L bracket 1c that four supporting and location frame 1b, correspondences between the pillar 1a are arranged on four pillar 1a tops along pillar 1a length direction and form; Be provided with the second inclined support bar 8 at L bracket 1c, be used for strengthening the intensity of L bracket 1c, simultaneously, between L bracket 1c and corresponding pillar 1a, be provided with too oblique fulcrum bar; In addition, 1b is provided with gripper shoe 7 at the supporting and location frame, like this can the handled easily personnel stands to operate, and both can reduce labor strength, can guarantee again workman's safety; Be provided with location cantilever 2 at L bracket 1c top, between location cantilever 2 and L bracket 1c, be provided with the first inclined support bar 6, free end at location cantilever 2 is provided with position block 3, is provided with the roller 4 that the tank skin top with storage tank to be onstructed adapts in cantilever 2 bottoms, location.Further, the surface relative with storage tank to be onstructed at handling frame 1 is provided with directive wheel 5, can guarantee that so whole handling frame 1 can be mobile swimmingly along tank wall; And, for handling frame 1 about the handled easily personnel, between L bracket 1c, be provided with climbing ladder 9.
Consult shown in Figure 2ly, when specifically using, according to the prefabricated mobile wall built-up dolly of the present utility model of the height of tank body to be onstructed, roller 4 is placed on the top of tank body tank skin, the directive wheel 5 on the handling frame 1 is contacted with tank wall.Namely finish installation, the workman can carry out constructing operation to tank body on handling frame, and use very flexibly, operation is very easy, and can greatly save construction cost, economic benefit highly significant.

Claims (6)

1. mobile wall built-up dolly that is used for Storage Tank Construction, comprise the handling frame (1) that the height with storage tank to be onstructed adapts, it is characterized in that, described handling frame (1) top is provided with location cantilever (2), free end at location cantilever (2) is provided with position block (3), is provided with the roller (4) that the tank skin top with storage tank to be onstructed adapts in location cantilever (2) bottom.
2. the mobile wall built-up dolly for Storage Tank Construction according to claim 1 is characterized in that, the surface that described handling frame (1) is relative with storage tank to be onstructed is provided with directive wheel (5).
3. the mobile wall built-up dolly for Storage Tank Construction according to claim 1 and 2, it is characterized in that, described handling frame (1) by four pillars (1a), be disposed on two L brackets (1c) that supporting and location frame (1b), correspondence between four pillars (1a) be arranged on four pillars (1a) top along pillar (1a) length direction and form; Described location cantilever (2) is fixed on the top of L bracket (1c), is provided with the first inclined support bar (6) between location cantilever (2) and L bracket (1c).
4. the mobile wall built-up dolly for Storage Tank Construction according to claim 3 is characterized in that, described supporting and location frame (1b) is provided with gripper shoe (7).
5. the mobile wall built-up dolly for Storage Tank Construction according to claim 3 is characterized in that, described L bracket (1c) is provided with the second inclined support bar (8).
6. the mobile wall built-up dolly for Storage Tank Construction according to claim 3 is characterized in that, is provided with climbing ladder (9) between the described L bracket (1c).
CN 201220343499 2012-07-16 2012-07-16 Mobile wall-mounted cart for construction of storage tanks Expired - Fee Related CN202718379U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN 201220343499 CN202718379U (en) 2012-07-16 2012-07-16 Mobile wall-mounted cart for construction of storage tanks

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN 201220343499 CN202718379U (en) 2012-07-16 2012-07-16 Mobile wall-mounted cart for construction of storage tanks

Publications (1)

Publication Number Publication Date
CN202718379U true CN202718379U (en) 2013-02-06

Family

ID=47620205

Family Applications (1)

Application Number Title Priority Date Filing Date
CN 201220343499 Expired - Fee Related CN202718379U (en) 2012-07-16 2012-07-16 Mobile wall-mounted cart for construction of storage tanks

Country Status (1)

Country Link
CN (1) CN202718379U (en)

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN103352559A (en) * 2013-07-18 2013-10-16 江维安 Hanging type movable working platform for storage tank maintenance
CN105598936A (en) * 2016-03-23 2016-05-25 中国十九冶集团有限公司 Movable welding suspension cage

Cited By (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN103352559A (en) * 2013-07-18 2013-10-16 江维安 Hanging type movable working platform for storage tank maintenance
CN105598936A (en) * 2016-03-23 2016-05-25 中国十九冶集团有限公司 Movable welding suspension cage
CN105598936B (en) * 2016-03-23 2018-11-09 中国十九冶集团有限公司 Movable welding suspension cage

Similar Documents

Publication Publication Date Title
CN103669885A (en) Segmental hoisting process of ultra-large-span steel truss
CN201417657Y (en) Installation device of indoor transformer
CN204024676U (en) A kind of novel tunnel concrete steel form carrier
CN202718379U (en) Mobile wall-mounted cart for construction of storage tanks
CN202509754U (en) High-altitude steel structure node construction working platform
CN203856186U (en) Suspension type manned pulley trolley for mounting large-scaled storage tank subsidiary facilities
CN204609266U (en) A kind of Mobile operating platform for the construction of piping lane comprehensive pipeline
CN101818563A (en) Jack-up integral lifting mobile platform and using method
CN204238537U (en) A kind of elevated hoistway operation platform
CN202925871U (en) Movable operating platform for aloft work
CN203497150U (en) Scaffold for hatch coaming of ship
CN201702544U (en) Variable-paddle bearing installing walking table of wind power generator
CN103486330B (en) Either inside high-altitude pipeline mounting construction method
CN202000268U (en) Foldable front outrigger for bridge girder erection machine
CN205293909U (en) Mobilizable assembled transport auxiliary device
CN202055496U (en) Easy-to-adjust moving operation platform
CN207110418U (en) Railway pier top surrounding hanging basket safe operation platform
CN203361596U (en) Auxiliary support of integrated lifting operation platform
CN202990392U (en) Steel tube guide rail and multifunctional ring rail combined mechanism for overall lifting scaffold
CN201924585U (en) Fixed device for reinforcing bottom of upright rod of suspension scaffold for building
CN203394053U (en) Big steel formwork demounting device used for double-layer plate wall construction
CN205730031U (en) A kind of hanging rack for safety belt
CN201962930U (en) Translational scaffold
CN204558921U (en) A kind of power distribution cabinet of electric machine controller
CN109514507A (en) A kind of motor shaft protection mechanism

Legal Events

Date Code Title Description
C14 Grant of patent or utility model
GR01 Patent grant
C56 Change in the name or address of the patentee

Owner name: CCEED INDUSTRIAL EQUIPMENT INSTALLATION CO., LTD.

Free format text: FORMER NAME: CHINA CONSTRUCTION INDUSTRIAL EQUIPMENT INSTALLATION CO., LTD.

CP03 Change of name, title or address

Address after: Yaohuamen Yao Jia Lu Qixia District of Nanjing City, Jiangsu Province, No. 9 210046

Patentee after: China Construction Industrial Equipment Installation Co., Ltd.

Address before: Yaohuamen Yao Qixia District of Nanjing City, Jiangsu province 210046 New Village

Patentee before: China Construction Industrial Equipment Installation Co., Ltd.

CP01 Change in the name or title of a patent holder

Address after: Yaohuamen Yao Jia Lu Qixia District of Nanjing City, Jiangsu Province, No. 9 210046

Patentee after: China Construction Installation Group Co., Ltd.

Address before: Yaohuamen Yao Jia Lu Qixia District of Nanjing City, Jiangsu Province, No. 9 210046

Patentee before: China Construction Installation Engineering Co., Ltd.

CP01 Change in the name or title of a patent holder
CF01 Termination of patent right due to non-payment of annual fee

Granted publication date: 20130206

Termination date: 20200716

CF01 Termination of patent right due to non-payment of annual fee