CN202689592U - Auxiliary tool for electric hammer in high-place operation - Google Patents
Auxiliary tool for electric hammer in high-place operation Download PDFInfo
- Publication number
- CN202689592U CN202689592U CN 201220329239 CN201220329239U CN202689592U CN 202689592 U CN202689592 U CN 202689592U CN 201220329239 CN201220329239 CN 201220329239 CN 201220329239 U CN201220329239 U CN 201220329239U CN 202689592 U CN202689592 U CN 202689592U
- Authority
- CN
- China
- Prior art keywords
- electric hammer
- pole
- support rod
- adjustable
- rise working
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Expired - Fee Related
Links
Images
Landscapes
- Percussive Tools And Related Accessories (AREA)
Abstract
The utility model discloses an auxiliary tool for an electric hammer in high-place operation, and belongs to the technical field of building construction tools. The auxiliary tool comprises a fixing support rod (1), a movable connection support rod (2), an operation hand lever (3), an adjustable heightening support rod (5) and an electric hammer fixing bracket (6). The auxiliary tool is characterized in that a parallelogram with movable connection points is formed by upper sections of the movable connection support rod (2) and the fixing support rod (1) and the lower section of the adjustable heightening support rod (5), the operation hand lever (3) is parallel to the movable connection support rod (2), and one end and the middle of the parallelogram are hinged with the adjustable heightening support rod (5) and the fixing support rod (1) respectively. The auxiliary tool for the electric hammer in high-place operation can be used for conveniently and safely performing high-place drilling operation for a wall.
Description
Technical field
Electric hammer high-rise working aid belongs to the building operations technical field of tools.
Background technology
Traditional eminence metope electric hammer construction operation, the constructor need rely on the construction of ascending a height of ladder or scaffold.This form of construction work complicated operation relies on manpower and materials more, and ascend operation, and processing safety is poor, constructional difficulties, and efficient is low, and construction cost is high.In addition for complex structure, narrow space, can't the ascend a height high dummy section of construction of constructor can only be removed section construction, increases the space construction operation that just can get on, and has greatly increased the cost of construction.
Summary of the invention
The technical problems to be solved in the utility model is: overcome the deficiencies in the prior art, a kind of flexible operation is provided, electric hammer high-rise working aid easy to use.
The technical scheme that its technical problem that solves the utility model adopts is: this electric hammer high-rise working aid comprises fixed support, movable connection pole, operation hand lever, adjustable pole, the electric hammer precision rest of increasing.It is characterized in that: by two movable connection poles up and down, fixedly epimere and the adjustable mobilizable parallelogram of hypomere formation tie point that increases pole of pole; The operation hand lever is parallel to movable connections pole, in the middle part of parallelogram or replacement movable connection pole respectively with adjustable pole and the fixing pole active link of increasing.Adopt lever principle to operate hand lever and support bracket fastened tie point as fulcrum, regulate the height of electric hammer operation by the height of up-down adjustment operation hand lever.
Concrete, described each tie point connects with connecting bolt.
Preferably, the preparation material of described electric hammer high-rise working aid is the square material that 3 ~ 5cm is wide, 3 ~ 5cm is thick that aluminium alloys or timber are made.The density of aluminium alloys or timber is low, intensity is high, can alleviate as far as possible the weight of utility model with handled easily under the prerequisite that guarantees the utility model working strength.
Preferably, the described adjustable length of pole that increases is between 2m ~ 5m.Specifically regulate the height of pole with the height of actual job, so that operation is mobile, construction operation is main.
Preferably, the length of described operation hand lever is between 60cm ~ 120cm.The length of operation hand lever has determined the labor-saving effect of construction operation, specifically decides according to operating space and execution conditions.
Preferably, each length of side of described movable parallelogram is between 30cm ~ 50cm.Specifically decide with the construction facility according to the operating space.
The installation site of electric hammer precision rest and the length of drill bit have determined the drilling depth H of electric hammer operation.The length of operation hand lever has determined lever principle labour-saving size.
Improved mat can be installed in support bracket fastened bottom.
The installation site of the utility model electric hammer high-rise working aid electric hammer precision rest determines according to the drilling depth of electric hammer operation.
Compared with prior art, the beneficial effect of the utility model electric hammer high-rise working aid is: need not by ladder or scaffold when utilizing the utility model to carry out the operation of eminence body of wall electric hammer, can directly carry out the boring of electric hammer operation to the eminence metope on the spot, easy and simple to handle, time saving and energy saving, greatly improved the efficient of electric hammer eminence wall construction operation.Inexpensive light material is adopted in the instrument manufacturing, makes simple, easy to use.The eminence job space that can't arrive for human body in addition, by the utility model, electric hammer is easy to operate, safe and reliable.
Description of drawings
Fig. 1 is the utility model electric hammer high-rise working aid structural representation.
Wherein: 1, fixedly pole 2, movable connection pole 3, operation hand lever 4, connecting bolt 5, adjustable pole 6, electric hammer precision rest 7, electric hammer stationary rope 8, electric hammer 9, electric hammer starting switch 10, the cable of increasing.
Fig. 1 is the most preferred embodiment of the utility model electric hammer high-rise working aid, is described further below in conjunction with 1 pair of the utility model of accompanying drawing.
The specific embodiment
With reference to accompanying drawing 1: this electric hammer high-rise working aid comprises fixedly pole 1, movable connection pole 2, operation hand lever 3, connecting bolt 4, adjustable pole 5, electric hammer precision rest 6, the electric hammer stationary rope 7 of increasing.
The utility model electric hammer high-rise working aid is by the epimere of fixing pole 1, two movable connection poles 2, the adjustable hypomeres that increase pole 5 are connected to form mobilizable parallelogram with connecting bolt 4 up and down; Operation hand lever 3 with fixedly pole 1 and adjustable pole 5 usefulness connecting bolts 4 active links that increase, operates hand lever 3 parallel with two movable connection poles 2 at vertical 1/2 bisectrix place of parallelogram; The bottom of fixed support 1 is supported in ground when the utility model uses, increase pole 5 space that moves up and down is provided for adjustable; Adjustable top of increasing pole 5 is electric hammer precision rest 6, and precision rest 6 is in the adjustable position-adjustable that increases on the pole 5.
Each length of side of mobilizable parallelogram is between 30cm ~ 50cm, and the adjustable pole height of increasing is at 2m ~ 5m, operator pole length 60cm ~ 120cm.
When using, the utility model at first electric hammer 8 is fixed on firmly on the electric hammer precision rest 6 on top of electric hammer high-rise working aid, select the adjustable length that increases pole 5 according to operation height, then according to the unwrapping wire position that needs boring on the eminence body of wall, by pressing down operation hand lever 3, electric hammer 8 is highly risen and to the wall body hole operation.
Quality control during the auxiliary electric hammer eminence bore operation of the utility model.
1, determines accurately the fixedly installation site of pressure pin of electric hammer according to drilling depth.
2, select the adjustable length that increases pole according to the height of bore operation.
3, according to eminence wall body hole position operation the utility model instrument, effectively realize the eminence bore operation in the position of appointment.
The above, it only is preferred embodiment of the present utility model, be not to be the restriction of the utility model being made other form, any those skilled in the art may utilize the technology contents of above-mentioned announcement to be changed or be modified as the equivalent embodiment of equivalent variations.But every technical solutions of the utility model content that do not break away to any simple modification, equivalent variations and remodeling that above embodiment does, still belongs to the protection domain of technical solutions of the utility model according to technical spirit of the present utility model.
Claims (6)
1. electric hammer high-rise working aid, comprise fixedly pole (1), movable connection pole (2), operation hand lever (3), adjustable pole (5), the electric hammer precision rest (6) of increasing, it is characterized in that: by two movable connection poles (2) up and down, fixedly epimere and the adjustable mobilizable parallelogram of hypomere formation tie point that increases pole (5) of pole (1); Operation hand lever (3) is parallel to movable connections pole (2), in the middle part of parallelogram or replacement movable connection pole (2) respectively with adjustable pole (5) and fixing pole (1) active link of increasing.
2. electric hammer high-rise working aid according to claim 1 is characterized in that: connecting bolt (4) connection of described each tie point.
3. electric hammer high-rise working aid according to claim 1, it is characterized in that: the preparation material of described electric hammer high-rise working aid is the square material that 3 ~ 5cm is wide, 3 ~ 5cm is thick that aluminium alloys or timber are made.
4. electric hammer high-rise working aid according to claim 1, it is characterized in that: the described adjustable length of pole (5) that increases is between 2m ~ 5m.
5. electric hammer high-rise working aid according to claim 1, it is characterized in that: the length of described operation hand lever (3) is between 60cm ~ 120cm.
6. electric hammer high-rise working aid according to claim 1, it is characterized in that: each length of side of described movable parallelogram is between 30cm ~ 50cm.
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN 201220329239 CN202689592U (en) | 2012-07-09 | 2012-07-09 | Auxiliary tool for electric hammer in high-place operation |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN 201220329239 CN202689592U (en) | 2012-07-09 | 2012-07-09 | Auxiliary tool for electric hammer in high-place operation |
Publications (1)
Publication Number | Publication Date |
---|---|
CN202689592U true CN202689592U (en) | 2013-01-23 |
Family
ID=47545227
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN 201220329239 Expired - Fee Related CN202689592U (en) | 2012-07-09 | 2012-07-09 | Auxiliary tool for electric hammer in high-place operation |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN202689592U (en) |
-
2012
- 2012-07-09 CN CN 201220329239 patent/CN202689592U/en not_active Expired - Fee Related
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN201664775U (en) | Long-distance drilling device of top plate | |
CN204782062U (en) | Curtain crossbeam installation appurtenance | |
CN202517082U (en) | Ceiling drilling machine and tool with adjustable height | |
CN201544357U (en) | Portable dedicated device for suspended ceiling drilling | |
CN204643637U (en) | A kind of scissors V shape drilling rod lifting machine | |
CN201679218U (en) | Top plate drilling device for ceiling construction inside building | |
CN203495283U (en) | Drilling tool for drilling of indoor decorative suspended ceilings | |
CN201260050Y (en) | 220KV bracket for replacing bus bar column insulator | |
CN205165973U (en) | Top bar planting dowelling jig hole strutting arrangement | |
CN204108966U (en) | Boring device of top plate | |
CN202689592U (en) | Auxiliary tool for electric hammer in high-place operation | |
CN203565916U (en) | Drilling tool with rear-mounted member | |
CN207971457U (en) | Top plate drilling combines yoke at a kind of superelevation | |
CN203863076U (en) | Roof drilling device for suspended ceiling for lifting roofs | |
CN205057125U (en) | Indoor roof bar planting drilling tool | |
CN201940984U (en) | Support frame of electric hammer | |
CN204525381U (en) | A kind of lifting electric hammer combination pressure rod member for boring ceiling furred ceiling muscle hole | |
CN203412518U (en) | Indoor ceiling drilling device capable of freely adjusting drilling height | |
CN205967520U (en) | Top drilling support appurtenance | |
CN203530866U (en) | Device with bidirectional hooks for adjusting levelness of bridge angle steel bracket | |
CN105252041A (en) | Portable assistance supporting frame suitable for overhead operation | |
CN203401104U (en) | Beam slab bottom drilling tool | |
CN202921967U (en) | Ceiling faceup impacting and drilling device | |
CN203156100U (en) | Drilling instrument for suspended ceiling construction | |
CN201566053U (en) | Simple top plate drilling device |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
C14 | Grant of patent or utility model | ||
GR01 | Patent grant | ||
CF01 | Termination of patent right due to non-payment of annual fee | ||
CF01 | Termination of patent right due to non-payment of annual fee |
Granted publication date: 20130123 Termination date: 20170709 |