CN205057125U - Indoor roof bar planting drilling tool - Google Patents
Indoor roof bar planting drilling tool Download PDFInfo
- Publication number
- CN205057125U CN205057125U CN201520832324.1U CN201520832324U CN205057125U CN 205057125 U CN205057125 U CN 205057125U CN 201520832324 U CN201520832324 U CN 201520832324U CN 205057125 U CN205057125 U CN 205057125U
- Authority
- CN
- China
- Prior art keywords
- electric drill
- rotating shaft
- lever
- support frame
- vertical correction
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Expired - Fee Related
Links
Landscapes
- Piles And Underground Anchors (AREA)
Abstract
本实用新型公开了一种室内顶板植筋钻孔工具,包括支撑架和电钻固定支柱,电钻固定支柱垂直设置,支撑架和电钻固定支柱之间设有垂直运动结构,垂直运动结构包括施力杠杆和垂直校正杆,施力杠杆的一端通过转轴与电钻固定支柱的下方连接形成杠杆阻力点,施力杠杆的中部通过转轴与支撑架连接形成杠杆支点;垂直校正杆的一端通过转轴与电钻固定支柱连接形成校正杆第一连接点,垂直校正杆的另一端通过转轴与支撑架连接形成校正杆第二连接点,施力杠杆与垂直校正杆平行设置,杠杆阻力点与校正杆第一连接点在同一铅垂线上,杠杆支点与校正杆第二连接点在同一铅垂线上。本实用新型具有结构简单、制作成本低、操作方便、使用安全,劳动强度低等特点。
The utility model discloses a drilling tool for planting bars on an indoor roof, which comprises a support frame and an electric drill fixed support, the electric drill fixed support is arranged vertically, a vertical movement structure is arranged between the support frame and the electric drill fixed support, and the vertical movement structure includes a force applying lever And the vertical correction rod, one end of the force applying lever is connected with the lower part of the electric drill fixed pillar through the rotating shaft to form a lever resistance point, the middle part of the force applying lever is connected with the support frame through the rotating shaft to form a lever fulcrum; one end of the vertical correction rod is connected with the electric drill fixed pillar through the rotating shaft The connection forms the first connection point of the correction rod, and the other end of the vertical correction rod is connected with the support frame through the rotating shaft to form the second connection point of the correction rod. On the same plumb line, the lever fulcrum is on the same plumb line as the second connection point of the correction rod. The utility model has the characteristics of simple structure, low manufacturing cost, convenient operation, safe use, low labor intensity and the like.
Description
技术领域technical field
本实用新型涉及一种室内顶板植筋钻孔工具。The utility model relates to an indoor ceiling bar planting drilling tool.
背景技术Background technique
在建筑施工中,室内顶板植筋钻孔是一项必不可少的工作,而且工作量很大,目前室内顶板植筋钻孔步骤繁琐,没有专用工具,需人工携带钻孔工具上下梯子进行操作,不仅不太安全,而且在钻孔的过程中需要通过手臂长时间向上举顶电钻进行操作,工作不方便,费时费力。In building construction, the drilling of indoor roof reinforcement is an indispensable work, and the workload is heavy. At present, the steps of drilling indoor roof reinforcement are cumbersome, and there are no special tools. It is necessary to manually carry the drilling tool up and down the ladder for operation. , not only unsafe, but also needs to lift the electric drill upwards for a long time by the arm to operate during the drilling process, which is inconvenient and time-consuming.
实用新型内容Utility model content
本实用新型要解决的技术问题是提供一种室内顶板植筋钻孔工具,它具有结构简单、操作方便、使用安全,劳动强度低、工作效率高等特点。The technical problem to be solved by the utility model is to provide an indoor roof reinforcement drilling tool, which has the characteristics of simple structure, convenient operation, safe use, low labor intensity and high work efficiency.
为解决上述技术问题,本实用新型所采取的技术方案是:In order to solve the problems of the technologies described above, the technical solution adopted by the utility model is:
一种室内顶板植筋钻孔工具,包括支撑架和电钻固定支柱,电钻固定支柱垂直设置,支撑架和电钻固定支柱之间设有垂直运动结构,垂直运动结构包括施力杠杆和垂直校正杆,施力杠杆的一端通过转轴与电钻固定支柱的下方连接形成杠杆阻力点,施力杠杆的中部通过转轴与支撑架连接形成杠杆支点;垂直校正杆至少是一个,垂直校正杆的一端通过转轴与电钻固定支柱连接形成校正杆第一连接点,垂直校正杆的另一端通过转轴与支撑架连接形成校正杆第二连接点,施力杠杆与垂直校正杆平行设置,在电钻固定支柱上:杠杆阻力点与校正杆第一连接点在同一铅垂线上,在支撑架上:杠杆支点与校正杆第二连接点在同一铅垂线上。A drilling tool for planting bars on an indoor roof, comprising a support frame and an electric drill fixed pillar, the electric drill fixed pillar is arranged vertically, a vertical movement structure is arranged between the support frame and the electric drill fixed pillar, the vertical movement structure includes a force applying lever and a vertical correction rod, One end of the force applying lever is connected with the lower part of the fixed pillar of the electric drill through the rotating shaft to form a lever resistance point, and the middle part of the force applying lever is connected with the support frame through the rotating shaft to form a lever fulcrum; there is at least one vertical correction rod, and one end of the vertical correction rod is connected to the electric drill through the rotating shaft The fixed pillar is connected to form the first connection point of the correction rod, and the other end of the vertical correction rod is connected to the support frame through the rotating shaft to form the second connection point of the correction rod. The force lever is arranged in parallel with the vertical correction rod. On the same vertical line as the first connection point of the correction rod, on the support frame: the lever fulcrum is on the same vertical line as the second connection point of the correction rod.
本实用新型进一步改进在于:The utility model is further improved in that:
支撑架包括用于支撑地面的三角架,在三角架的顶端竖向设置转轴连接杆,杠杆支点与校正杆第二连接点均在转轴连接杆上。The support frame includes a tripod for supporting the ground, a rotating shaft connecting rod is vertically arranged on the top of the tripod, and the lever fulcrum and the second connection point of the correction rod are all on the rotating shaft connecting rod.
垂直校正杆为一个,且位于施力杠杆的上方。There is one vertical correction rod, which is located above the force applying lever.
当施力杠杆或垂直校正杆为水平位置时,支撑架与电钻固定支柱的底部平齐。When the force lever or the vertical correction rod is in the horizontal position, the support frame is flush with the bottom of the electric drill fixing post.
施力杠杆、垂直校正杆、电钻固定支柱和转轴连接杆均为长方形木板。The force applying lever, the vertical correction rod, the fixed pillar of the electric drill and the connecting rod of the rotating shaft are all rectangular planks.
电钻固定支柱高度为2.5m-2.8m。The height of the electric drill fixed pillar is 2.5m-2.8m.
采用上述技术方案所产生的有益效果在于:The beneficial effects produced by adopting the above-mentioned technical scheme are:
本实用新型包括支撑架和电钻固定支柱,电钻固定支柱垂直设置,支撑架和电钻固定支柱之间设有垂直运动结构,以通过此工具完成室内顶板植筋钻孔工作,避免携带钻孔工具上下梯子的不安全操作方式;垂直运动结构包括施力杠杆和垂直校正杆,施力杠杆的一端通过转轴与电钻固定支柱的下方连接形成杠杆阻力点,施力杠杆的中部通过转轴与支撑架连接形成杠杆支点,通过杠杆原理完成电钻钻孔时的举顶动作,避免了在钻孔的过程中需要通过手臂长时间向上举顶电钻的高强度作业方式;垂直校正杆至少是一个,垂直校正杆的一端通过转轴与电钻固定支柱连接形成校正杆第一连接点,垂直校正杆的另一端通过转轴与支撑架连接形成校正杆第二连接点,施力杠杆与垂直校正杆平行设置,在电钻固定支柱上:杠杆阻力点与校正杆第一连接点在同一铅垂线上,在支撑架上:杠杆支点与校正杆第二连接点在同一铅垂线上,在通过施力杠杆将电钻向上举顶对屋顶进行钻孔作业时,可使电钻固定支柱垂直向上运动,以保障电钻钻头垂直向上进行钻孔;支撑架包括用于支撑地面的三角架,在三角架的顶端竖向设置转轴连接杆,杠杆支点与校正杆第二连接点均在转轴连接杆上,支撑牢固,结构简单;当施力杠杆或垂直校正杆为水平位置时,支撑架与电钻固定支柱的底部平齐,在不工作时,电钻固定支柱的底部对地形成支撑,本装置可稳固的支撑在地面上;施力杠杆、垂直校正杆、电钻固定支柱和转轴连接杆均为长方形木板,重量轻,成本低;电钻固定支柱高度为2.5m-2.8m,符合房屋高度标准。本实用新型具有结构简单、制作成本低、操作方便、使用安全,劳动强度低、工作效率高等特点。The utility model includes a support frame and an electric drill fixed pillar, the electric drill fixed pillar is vertically arranged, and a vertical movement structure is arranged between the support frame and the electric drill fixed pillar, so as to complete the indoor roof planting bar drilling work through this tool, and avoid carrying drilling tools up and down The unsafe operation method of the ladder; the vertical movement structure includes the force lever and the vertical correction rod. One end of the force lever is connected to the lower part of the electric drill fixed pillar through the rotating shaft to form a lever resistance point, and the middle part of the force lever is connected to the support frame through the rotating shaft. The lever fulcrum completes the lifting action of the electric drill through the principle of leverage, avoiding the high-intensity operation method that requires the arm to lift the electric drill upward for a long time during the drilling process; there is at least one vertical correction rod, and the vertical correction rod One end is connected with the fixed support of the electric drill through the rotating shaft to form the first connection point of the correction rod, and the other end of the vertical correction rod is connected with the support frame through the rotation shaft to form the second connection point of the correction rod. The force lever is arranged in parallel with the vertical correction rod. Above: the lever resistance point and the first connection point of the correction rod are on the same plumb line, on the support frame: the lever fulcrum and the second connection point of the correction rod are on the same plumb line, and the electric drill is lifted up by the force lever When the roof is drilled, the fixed pillar of the electric drill can be moved vertically upwards to ensure that the drill bit of the electric drill is drilled vertically upwards; the support frame includes a tripod for supporting the ground, and a rotating shaft connecting rod is vertically arranged on the top of the tripod. The lever fulcrum and the second connection point of the correction rod are both on the connecting rod of the rotating shaft, which is firmly supported and simple in structure; when the force lever or the vertical correction rod is in the horizontal position, the support frame is flush with the bottom of the electric drill fixed pillar. , the bottom of the electric drill fixed pillar forms a support to the ground, and the device can be firmly supported on the ground; the force lever, the vertical correction rod, the electric drill fixed pillar and the rotating shaft connecting rod are all rectangular planks, which are light in weight and low in cost; the electric drill fixed pillar The height is 2.5m-2.8m, which meets the house height standard. The utility model has the characteristics of simple structure, low manufacturing cost, convenient operation, safe use, low labor intensity and high work efficiency.
附图说明Description of drawings
图1是本实用新型的结构示意图;Fig. 1 is a structural representation of the utility model;
图2是本实用新型使用状态的结构示意图。Fig. 2 is a schematic structural view of the utility model in use.
在附图中:1、支撑架;1-1、三角架;1-2、转轴连接杆;2、电钻固定支柱;3、施力杠杆;4、垂直校正杆;5、杠杆阻力点;6、杠杆支点;7、校正杆第一连接点;8、校正杆第二连接点;9、电钻。In the accompanying drawings: 1, support frame; 1-1, tripod; 1-2, rotating shaft connecting rod; 2, electric drill fixed pillar; 3, force application lever; 4, vertical correction rod; 5, lever resistance point; 6 , the lever fulcrum; 7, the first connection point of the correction rod; 8, the second connection point of the correction rod; 9, the electric drill.
具体实施方式detailed description
下面将结合附图和具体实施例对本实用新型进行进一步详细说明。The utility model will be further described in detail below in conjunction with the accompanying drawings and specific embodiments.
由图1-2所示的实施例可知,本实施例包括支撑架1和电钻固定支柱2,电钻固定支柱2垂直设置,支撑架1和电钻固定支柱2之间设有垂直运动结构,垂直运动结构包括施力杠杆3和垂直校正杆4,施力杠杆3的一端通过转轴与电钻固定支柱2的下方连接形成杠杆阻力点5,施力杠杆3的中部通过转轴与支撑架1连接形成杠杆支点6;垂直校正杆4至少是一个,垂直校正杆4的一端通过转轴与电钻固定支柱2连接形成校正杆第一连接点7,垂直校正杆4的另一端通过转轴与支撑架1连接形成校正杆第二连接点8,施力杠杆3与垂直校正杆4平行设置,在电钻固定支柱2上:杠杆阻力点5与校正杆第一连接点7在同一铅垂线上,在支撑架1上:杠杆支点6与校正杆第二连接点8在同一铅垂线上。It can be seen from the embodiment shown in Figure 1-2 that this embodiment includes a support frame 1 and an electric drill fixed pillar 2, the electric drill fixed pillar 2 is arranged vertically, a vertical movement structure is arranged between the support frame 1 and the electric drill fixed pillar 2, and the vertical movement The structure includes a force application lever 3 and a vertical correction rod 4. One end of the force application lever 3 is connected with the bottom of the electric drill fixed pillar 2 through a rotating shaft to form a lever resistance point 5, and the middle part of the force application lever 3 is connected with the support frame 1 through a rotation shaft to form a lever fulcrum. 6. There is at least one vertical correction rod 4, one end of the vertical correction rod 4 is connected to the electric drill fixed support 2 through a rotating shaft to form the first connection point 7 of the correction rod, and the other end of the vertical correction rod 4 is connected to the support frame 1 through a rotating shaft to form a correction rod The second connection point 8, the force lever 3 and the vertical correction rod 4 are arranged in parallel, on the electric drill fixed pillar 2: the lever resistance point 5 and the first connection point 7 of the correction rod are on the same plumb line, on the support frame 1: The lever fulcrum 6 is on the same vertical line as the second connection point 8 of the correction rod.
支撑架1包括用于支撑地面的三角架1-1,在三角架1-1的顶端竖向设置转轴连接杆1-2,杠杆支点6与校正杆第二连接点8均在转轴连接杆1-2上。The support frame 1 includes a tripod 1-1 for supporting the ground, and a rotating shaft connecting rod 1-2 is vertically arranged on the top of the tripod 1-1. -2 on.
垂直校正杆4为一个,且位于施力杠杆3的上方。There is one vertical correction rod 4, and it is located above the force applying lever 3.
当施力杠杆3或垂直校正杆4为水平位置时,支撑架1与电钻固定支柱2的底部平齐。When the force applying lever 3 or the vertical correction rod 4 are in the horizontal position, the support frame 1 is flush with the bottom of the electric drill fixing pillar 2 .
施力杠杆3、垂直校正杆4、电钻固定支柱2和转轴连接杆1-2均为长方形木板。The force applying lever 3, the vertical correction rod 4, the fixed pillar 2 of the electric drill and the connecting rod 1-2 of the rotating shaft are all rectangular planks.
电钻固定支柱2高度为2.5m-2.8m。The height of the electric drill fixed pillar 2 is 2.5m-2.8m.
使用方法:Instructions:
工作时,将电钻9固定在电钻固定支柱2的上端部,电钻钻头垂直向上,开启电钻,用手按下施力杠杆3的动力点,电钻固定支柱2即可在垂直校正杆4的作用下垂直向上动作,带动电钻钻头垂直向上进行室内顶板植筋钻孔作业。During work, the electric drill 9 is fixed on the upper end of the electric drill fixed pillar 2, the bit of the electric drill is vertically upward, the electric drill is turned on, and the power point of the force applying lever 3 is pressed by hand, the electric drill fixed pillar 2 can be adjusted under the action of the vertical correction rod 4 Move vertically upwards to drive the electric drill bit vertically upwards to drill holes for planting bars on the indoor roof.
Claims (6)
Priority Applications (1)
| Application Number | Priority Date | Filing Date | Title |
|---|---|---|---|
| CN201520832324.1U CN205057125U (en) | 2015-10-23 | 2015-10-23 | Indoor roof bar planting drilling tool |
Applications Claiming Priority (1)
| Application Number | Priority Date | Filing Date | Title |
|---|---|---|---|
| CN201520832324.1U CN205057125U (en) | 2015-10-23 | 2015-10-23 | Indoor roof bar planting drilling tool |
Publications (1)
| Publication Number | Publication Date |
|---|---|
| CN205057125U true CN205057125U (en) | 2016-03-02 |
Family
ID=55383728
Family Applications (1)
| Application Number | Title | Priority Date | Filing Date |
|---|---|---|---|
| CN201520832324.1U Expired - Fee Related CN205057125U (en) | 2015-10-23 | 2015-10-23 | Indoor roof bar planting drilling tool |
Country Status (1)
| Country | Link |
|---|---|
| CN (1) | CN205057125U (en) |
Cited By (2)
| Publication number | Priority date | Publication date | Assignee | Title |
|---|---|---|---|---|
| CN106825682A (en) * | 2017-03-01 | 2017-06-13 | 栖霞市振华实业有限责任公司 | High-altitude drilling automatic pilot |
| CN111319011A (en) * | 2020-04-14 | 2020-06-23 | 中国五冶集团有限公司 | Operation device for concrete structure bar planting and bar planting drilling method |
-
2015
- 2015-10-23 CN CN201520832324.1U patent/CN205057125U/en not_active Expired - Fee Related
Cited By (2)
| Publication number | Priority date | Publication date | Assignee | Title |
|---|---|---|---|---|
| CN106825682A (en) * | 2017-03-01 | 2017-06-13 | 栖霞市振华实业有限责任公司 | High-altitude drilling automatic pilot |
| CN111319011A (en) * | 2020-04-14 | 2020-06-23 | 中国五冶集团有限公司 | Operation device for concrete structure bar planting and bar planting drilling method |
Similar Documents
| Publication | Publication Date | Title |
|---|---|---|
| CN205527407U (en) | Building hoisting machine | |
| CN205096590U (en) | Simple and easy auxiliary device of ceiling punching operation | |
| CN204339745U (en) | Lever top plate drilling device | |
| CN205057125U (en) | Indoor roof bar planting drilling tool | |
| CN205604741U (en) | A adjusting device that is used for ball joint point rack elevation | |
| CN204209170U (en) | Portable electric drill telescope support | |
| CN204265304U (en) | A kind of Architectural Equipment lifting device | |
| CN204621156U (en) | A kind of arm extending type percussion drill | |
| CN201940984U (en) | Support frame of electric hammer | |
| CN204152417U (en) | A kind of removable hanging ladder | |
| CN110695906A (en) | A kind of quick adjustment device for dish nut of full house bracket | |
| CN2883304Y (en) | Manual quick support device | |
| CN201850744U (en) | Top plate punching support | |
| CN210937291U (en) | Electronic top drilling equipment | |
| CN206530081U (en) | A kind of novel building engineering support meanss | |
| CN216913730U (en) | Support device for upward vertical hole forming of electric drill | |
| CN202131972U (en) | Convenient tool for top slab bar planting and drilling | |
| CN207824017U (en) | A kind of packaged type high-altitude electric drill device | |
| CN219622298U (en) | Assembled building fixing device for building engineering | |
| CN206605072U (en) | Mobile roof drill | |
| CN215702975U (en) | Applicable concrete anchor drilling extension device | |
| CN204773060U (en) | A drilling equipment for concrete structure is drilling upwards | |
| CN206890457U (en) | Device for street lamp installation | |
| CN205777418U (en) | folding stand | |
| CN206769333U (en) | Wall brick paving auxiliary tool |
Legal Events
| Date | Code | Title | Description |
|---|---|---|---|
| C14 | Grant of patent or utility model | ||
| GR01 | Patent grant | ||
| CF01 | Termination of patent right due to non-payment of annual fee |
Granted publication date: 20160302 |
|
| CF01 | Termination of patent right due to non-payment of annual fee |