CN202687820U - Constructional tower crane - Google Patents

Constructional tower crane Download PDF

Info

Publication number
CN202687820U
CN202687820U CN 201220406036 CN201220406036U CN202687820U CN 202687820 U CN202687820 U CN 202687820U CN 201220406036 CN201220406036 CN 201220406036 CN 201220406036 U CN201220406036 U CN 201220406036U CN 202687820 U CN202687820 U CN 202687820U
Authority
CN
China
Prior art keywords
lifting body
jack
tower crane
lifting
pawl
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Fee Related
Application number
CN 201220406036
Other languages
Chinese (zh)
Inventor
左芳清
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
WENZHOU DONGOU CONSTRUCTION GROUP CO Ltd
Original Assignee
WENZHOU DONGOU CONSTRUCTION GROUP CO Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by WENZHOU DONGOU CONSTRUCTION GROUP CO Ltd filed Critical WENZHOU DONGOU CONSTRUCTION GROUP CO Ltd
Priority to CN 201220406036 priority Critical patent/CN202687820U/en
Application granted granted Critical
Publication of CN202687820U publication Critical patent/CN202687820U/en
Anticipated expiration legal-status Critical
Expired - Fee Related legal-status Critical Current

Links

Images

Landscapes

  • Jib Cranes (AREA)

Abstract

The utility model discloses a constructional tower crane which comprises a main rack body and a lifting body, wherein the lifting body comprises a control chamber, a lifting arm and a balance arm. The lifting body is assembled with a climbing mechanism which comprises a sleeve rack, an operation platform, creeping jaws, jacks, a hydraulic mechanism and a mounting platform. The jacks eject the lifting body with the sleeve rack as a support platform, and the lifting body is assembled with the creeping jaws and is fixed through the creeping jaws. The jacks are respectively arranged on two sides of the main rack body in symmetrical mode, and the hydraulic mechanism integrally supplies oil to the jacks to control the lifting. A standard knot of the tower crane is synchronously assembled with at least four creeping jaws, and the creeping jaws are arranged on two sides of the standard knot of the tower crane. Safety coefficient of the climbing mechanism of the constructional tower crane is greatly improved.

Description

Tower crane for building
Technical field
The utility model relates to a kind of tower crane for building.
Background technology
The tradition tower crane generally comprises main frame body and lifting body, lifting body comprises control cabin, crane arm and equilibrium arm, lifting body disposes lifting body, lifting body comprises stock, service platform, climb pawl, jack, hydraulic gear and erecting stage, jack withstands lifting body take stock as support platform, lifting body disposes climbs pawl to fix its position, wherein jack generally only arranges one, be in the rear side of main frame body, therefore climb pawl and only arranging two with the absolute altitude sync bit, in operation, in case jack or climb a damage in the pawl, be easy to cause upper mechanism moment downslide, so its lifting body safety factor is weak.
Summary of the invention
Technical problem to be solved in the utility model provides a kind of tower crane for building, and the safety factor of its lifting body greatly improves.
For this reason, the tower crane for building that the utility model provides comprises main frame body and lifting body, lifting body comprises control cabin, crane arm and equilibrium arm, lifting body disposes lifting body, lifting body comprises stock, service platform, climb pawl, jack, hydraulic gear and erecting stage, jack withstands lifting body take stock as support platform, lifting body disposes climbs pawl to fix its position, the main frame body both sides arrange and are symmetrically arranged with respectively jack, jack is unified fuel feeding with the control lifting by same hydraulic gear, described lifting body disposes synchronously at least 4 at column crane mast section and climbs pawl, climbs the both sides that pawl is located at column crane mast section.
The main frame body both sides respectively have been symmetrical arranged a jack in the utility model, and lifting body has also configured 4 and climbed pawl, owing to climbing the increase of pawl, jack, have greatly reduced local steel supporting power ,Hoisting crane becomes a line to be supported, and compares a bit supporting of a jack of tradition, and its safety improves greatly, and the tower machine has reduced potential safety hazard in jacking and unloading process.
Description of drawings
The structural representation of the tower crane for building that Fig. 1 the utility model provides.
The specific embodiment
As shown in Figure 1, the tower crane for building that the utility model provides comprises main frame body 1 and lifting body, lifting body comprises control cabin, crane arm and equilibrium arm, lifting body disposes lifting body, lifting body comprises stock 5, service platform 6, climb pawl 7, jack 8, hydraulic gear 9 and erecting stage 10, jack 8 withstands lifting body take stock 5 as support platform, lifting body disposes climbs pawl 7 to fix its position, described main frame body 1 both sides arrange and are symmetrically arranged with respectively jack 8, jack 8 is unified fuel feeding with the control lifting by same hydraulic gear 9, the turnover oil place of jack 8 all is equipped with oil mass limiter, lifting body disposes synchronously at least 4 at column crane mast section and climbs pawl 7, climbs the both sides that pawl 7 is located at column crane mast section.
With reference to shown in Figure 1, in order further to improve safety factor, four feet 11 bottoms of main frame body 1 bottom are provided with resistance strain gage, resistance strain gage is connected with central process unit on being arranged at main frame body 1, central process unit connects audible alarm unit, the pressure value that records when the resistance strain gage at each feet 11 place occur indivedual feet pressure surpass another feet pressure 50% the time, central process unit sends signal to audible alarm unit, audible alarm unit sends alarm sound.When indivedual feet 11 pressures far surpass another feet 11, often be exactly the omen that the tower machine topples through test, especially exceed 50% when above, above-mentioned setting can be got rid of the chance of hidden danger or escape to the field staff.

Claims (3)

1. tower crane for building, comprise main frame body (1) and lifting body, lifting body comprises control cabin, crane arm and equilibrium arm, described lifting body disposes lifting body, lifting body comprises stock (5), service platform (6), climb pawl (7), jack (8), hydraulic gear (9) and erecting stage (10), described jack (8) withstands lifting body take stock (5) as support platform, described lifting body disposes climbs pawl (7) to fix its position, it is characterized in that: described main frame body (1) both sides arrange and are symmetrically arranged with respectively jack (8), jack (8) is unified fuel feeding with the control lifting by same hydraulic gear (9), described lifting body disposes synchronously at least 4 at column crane mast section and climbs pawl (7), describedly climbs the both sides that pawl (7) is located at column crane mast section.
2. tower crane for building according to claim 1 is characterized in that: the turnover oil place of described jack (8) all is equipped with oil mass limiter.
3. tower crane for building according to claim 1 and 2, it is characterized in that: four feets (11) bottom of described main frame body (1) bottom is provided with resistance strain gage, resistance strain gage is connected with central process unit on being arranged at main frame body (1), central process unit connects audible alarm unit, the pressure value that the resistance strain gage of locating when each feet (11) records occur indivedual feet pressure surpass another feet pressure 50% the time, central process unit sends signal to audible alarm unit, and audible alarm unit sends alarm sound.
CN 201220406036 2012-08-16 2012-08-16 Constructional tower crane Expired - Fee Related CN202687820U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN 201220406036 CN202687820U (en) 2012-08-16 2012-08-16 Constructional tower crane

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN 201220406036 CN202687820U (en) 2012-08-16 2012-08-16 Constructional tower crane

Publications (1)

Publication Number Publication Date
CN202687820U true CN202687820U (en) 2013-01-23

Family

ID=47543468

Family Applications (1)

Application Number Title Priority Date Filing Date
CN 201220406036 Expired - Fee Related CN202687820U (en) 2012-08-16 2012-08-16 Constructional tower crane

Country Status (1)

Country Link
CN (1) CN202687820U (en)

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN102807167A (en) * 2012-08-16 2012-12-05 温州东瓯建设集团有限公司 Building tower crane
CN103935916A (en) * 2014-04-25 2014-07-23 中联重科股份有限公司 Anti-over-inclination early warning method and anti-over-inclination early warning device for tower crane

Cited By (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN102807167A (en) * 2012-08-16 2012-12-05 温州东瓯建设集团有限公司 Building tower crane
CN103935916A (en) * 2014-04-25 2014-07-23 中联重科股份有限公司 Anti-over-inclination early warning method and anti-over-inclination early warning device for tower crane
CN103935916B (en) * 2014-04-25 2016-07-27 中联重科股份有限公司 Anti-over-inclination early warning method and anti-over-inclination early warning device for tower crane

Similar Documents

Publication Publication Date Title
CN102807167A (en) Building tower crane
CN202687820U (en) Constructional tower crane
CN201439598U (en) Lowering device for reinforcing cage of drilled pile
CN203998770U (en) A kind of movable pulley falling proof device
CN104237010A (en) Multifunctional concrete electric pole mechanical property detection platform
CN203639008U (en) Cantilever steel column back tensioning device for hydraulic lifting construction
CN203959697U (en) The equalizing bar of hoisting platform truss
CN102704666B (en) Lifting elevation difference control device for attached lift scaffold
CN204661033U (en) The receipts aluminium lever apparatus of the direct check weighing of a kind of energy
CN201963185U (en) Double A-shaped combination insulation ladder
CN203795318U (en) Integral hoisting system for rebar cage for large members
CN204569238U (en) Omnipotent bracing or strutting arrangement bottom a kind of tower crane
CN203373954U (en) Attached type lifting canopy frame or scaffold
CN103266777A (en) Large-span prestress double-arch frame hoisting process
CN203321544U (en) Hydraulic support
CN202348255U (en) Frame-type calibration device of double-attitude induction logging instrument
CN202518903U (en) Novel motor-room-free speed limiter and car rope head board composite structure
CN205204691U (en) Integrative safe tower crane of reputation
CN205170219U (en) Go up gyration hydraulic ram lift -type hoist
CN203308138U (en) Safety improvement structure of parking system
CN201666123U (en) Drill stem fall-protection rescue device of rotary drilling rig
CN205786142U (en) A kind of pipeline coagulation soil weight coating impact test device
CN102797348A (en) Front-support suspension mechanism for parapet walls
CN201092521Y (en) Inner-climbing tower crane hydraulic supporting arrangement
CN207296346U (en) The mounting bracket of steel-structure factory building wall watt

Legal Events

Date Code Title Description
C14 Grant of patent or utility model
GR01 Patent grant
CF01 Termination of patent right due to non-payment of annual fee
CF01 Termination of patent right due to non-payment of annual fee

Granted publication date: 20130123

Termination date: 20160816