CN202668726U - Firework paper tube muddy bottom molding machine - Google Patents

Firework paper tube muddy bottom molding machine Download PDF

Info

Publication number
CN202668726U
CN202668726U CN 201220321870 CN201220321870U CN202668726U CN 202668726 U CN202668726 U CN 202668726U CN 201220321870 CN201220321870 CN 201220321870 CN 201220321870 U CN201220321870 U CN 201220321870U CN 202668726 U CN202668726 U CN 202668726U
Authority
CN
China
Prior art keywords
paper tube
firework paper
molding machine
walking beam
oil cylinder
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Fee Related
Application number
CN 201220321870
Other languages
Chinese (zh)
Inventor
彭涛
李震宇
陈磊
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
PENG KUIJIU
Original Assignee
PENG KUIJIU
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by PENG KUIJIU filed Critical PENG KUIJIU
Priority to CN 201220321870 priority Critical patent/CN202668726U/en
Application granted granted Critical
Publication of CN202668726U publication Critical patent/CN202668726U/en
Anticipated expiration legal-status Critical
Expired - Fee Related legal-status Critical Current

Links

Landscapes

  • Press-Shaping Or Shaping Using Conveyers (AREA)

Abstract

The utility model discloses a firework paper tube muddy bottom molding machine. The firework paper tube muddy bottom molding machine comprises a working host (4), an electric control box (2) and a hydraulic station (12), wherein the working host comprises a molding oil cylinder (15), a walking beam (6) connected with a plunger (5) on the molding oil cylinder and a stamping mold (7) connected with the walking beam (6); a moving mold frame (11) is arranged below the stamping mold; firework paper tubes (3) are arranged in the moving mold frame; the stamping mold consists of punching heads (14) with corresponding number and positions as those of the firework paper tubes; and the punching heads can extend into the firework paper tubes. The firework paper tube muddy bottom molding machine has a simple structure, and is attractive in appearance, safe, reliable, convenient to operate, high in speed, high in efficiency, and easy to maintain. Dozens to hundreds of muddy bottoms can be pressed by the molds in different sizes at one time, uniform consistency of the density of the muddy bottoms is ensured, the work efficiency is improved, and the labor intensity is greatly reduced.

Description

Forming machine at the bottom of the fireworks paper tube mud
Technical field
The utility model relates to a kind of hydraulic forming machine, especially relates to a kind of hydraulic forming machine for moulding at the bottom of the fireworks paper tube mud.
Background technology
Fireworks are a kind of products common in our daily life; in various occasions and Festival celebration Festival; bright and colourful fireworks give Beautiful treat; and at the bottom of fireworks tube bottom is used for sealing the material of powder column and is mud; at the bottom of this mud original manufacturing process be first will be one by one fireworks tube arrange in certain sequence; again a kind of special earth is poured into one by one in the fireworks tube; adopt artificial mode to make at the bottom of the mud; process is more loaded down with trivial details; not only labour intensity is larger, and production efficiency is low, can not form scale; and the intensity uniformity is not high at the bottom of the mud, affects powder column quality and firework display effect.
The utility model content
For the problem that processing and forming at the bottom of the fireworks paper tube mud in the above-mentioned prior art exists, it is compressing at the bottom of a kind of double mud that the utility model provides, and not only Forming Quality is good at the bottom of the mud, and forming machine at the bottom of the high fireworks paper tube mud of shaping efficiency.
The technical scheme that the technical problems to be solved in the utility model is taked is: forming machine comprises working host, electric cabinet and Hydraulic Station at the bottom of the described fireworks paper tube mud, described working host comprises the moulding oil cylinder, the walking beam that links to each other with plunger on the moulding oil cylinder, the punch die that links to each other with walking beam, below punch die, be provided with mobile formwork, in mobile formwork, be placed with fireworks paper tube, described punch die by with fireworks paper tube quantity and position all corresponding drift form, described drift can extend in the fireworks paper tube.
The utility model is simple in structure, handsome in appearance, safe and reliable, easy to operate, shaping speed is fast, shaping efficiency is high, for ease of maintenaince.The moulds of mixing different sizes are once suppressed and can be suppressed at the bottom of tens to up to a hundred mud, have not only guaranteed the uniformity consistency of density at the bottom of the mud, and have improved operating efficiency, have greatly alleviated labour intensity.
Description of drawings
Fig. 1 is structural representation of the present utility model.
In the drawings, 1, at the bottom of workbench 2, electric cabinet 3, fireworks paper tube 4, working host 5, plunger 6, walking beam 7, punch die 8, guide pillar 9, mould bases seat 10, reversal valve 11, mobile formwork 12, Hydraulic Station 13, the mud 14, drift 15, moulding oil cylinder.
The specific embodiment
In Fig. 1, the forming machine model is Y32-60ND at the bottom of the described fireworks paper tube mud, it comprises working host 4, electric cabinet 2 and Hydraulic Station 12, described working host comprises guide pillar 8, moulding oil cylinder 15, walking beam 6 and workbench 1, plunger 5 on the moulding oil cylinder links to each other with walking beam 6, the moulding oil cylinder links to each other with Hydraulic Station 12 by reversal valve 10 usefulness oil pipes, walking beam is arranged on four guide pillars 8, the guide pillar lower end links to each other with workbench, be movably set with punch die 7 at walking beam, be provided with the mobile formwork 11 that is supported on the workbench 1 below the punch die, also mould bases seat 9 can be set on mobile formwork, fireworks paper tube 3 is put into that mobile formwork can be located and is fixing, described punch die by with fireworks paper tube quantity and position all corresponding drift 14 form, described punch die can carry out quick change, with moulding at the bottom of the mud of the fireworks paper tube of applicable different size.Described punch diameter is slightly less than the paper web internal diameter, and drift can be extend in the fireworks paper tube.The operator is in respectively two sides, press front and back, by the motion of manual operating valve control walking beam, drives walking beam and moves up and down.Four columns are the walking beam guiding, and walking beam is linked to be an integral installation on workbench.Working host 4 provides product molding required press power, electric cabinet 2 button control Hydraulic Stations 12 provide hydraulic power, reversal valve 10 control actions by pipe-line system and double are passed to oil cylinder with hydraulic coupling, plunger 5 drives walking beam 6 and down moves together with punch die 7, suppress at the bottom of the rear formation mud 13 to being contained in advance on the workbench 1 pug in the fireworks paper tube in the mobile formwork, after reaching the needed setting pressure of moulding or stroke, compressing at the bottom of the mud, after having pressed, mobile formwork shifts out, the mobile formwork of next fireworks paper tube of only packing into enters suppression process, owing to taking double, each operating personnel before and after the machine, the rear operator can operate when the operator got base forwardly, guaranteed not intermittently work of machine.

Claims (1)

1. forming machine at the bottom of the fireworks paper tube mud, it comprises working host (4), electric cabinet (2) and Hydraulic Station (12), it is characterized in that: described working host comprises moulding oil cylinder (15), the walking beam (6) that links to each other with plunger (5) on the moulding oil cylinder, the punch die that links to each other with walking beam (7), below punch die, be provided with mobile formwork (11), in mobile formwork, be placed with fireworks paper tube (3), described punch die by with fireworks paper tube quantity and position all corresponding drift (14) form, described drift can extend in the fireworks paper tube.
CN 201220321870 2012-07-05 2012-07-05 Firework paper tube muddy bottom molding machine Expired - Fee Related CN202668726U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN 201220321870 CN202668726U (en) 2012-07-05 2012-07-05 Firework paper tube muddy bottom molding machine

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN 201220321870 CN202668726U (en) 2012-07-05 2012-07-05 Firework paper tube muddy bottom molding machine

Publications (1)

Publication Number Publication Date
CN202668726U true CN202668726U (en) 2013-01-16

Family

ID=47489657

Family Applications (1)

Application Number Title Priority Date Filing Date
CN 201220321870 Expired - Fee Related CN202668726U (en) 2012-07-05 2012-07-05 Firework paper tube muddy bottom molding machine

Country Status (1)

Country Link
CN (1) CN202668726U (en)

Cited By (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN103217074A (en) * 2013-01-21 2013-07-24 浏阳市颐和隆烟花制造有限公司 Automatic paper scrap-pressing cutter for combined fireworks
CN110749244A (en) * 2019-11-07 2020-02-04 余庆县吉盛烟花爆竹有限责任公司 Raw materials filling device of fireworks production and processing usefulness
CN110749246A (en) * 2019-12-10 2020-02-04 上栗县花多其花炮有限公司 Machine for making mud bottom on firework paper tube

Cited By (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN103217074A (en) * 2013-01-21 2013-07-24 浏阳市颐和隆烟花制造有限公司 Automatic paper scrap-pressing cutter for combined fireworks
CN103217074B (en) * 2013-01-21 2014-12-10 浏阳市颐和隆烟花集团有限公司 Automatic paper scrap-pressing cutter for combined fireworks
CN110749244A (en) * 2019-11-07 2020-02-04 余庆县吉盛烟花爆竹有限责任公司 Raw materials filling device of fireworks production and processing usefulness
CN110749246A (en) * 2019-12-10 2020-02-04 上栗县花多其花炮有限公司 Machine for making mud bottom on firework paper tube
CN110749246B (en) * 2019-12-10 2022-06-07 上栗县花多其花炮有限公司 Machine for making mud bottom on firework paper tube

Similar Documents

Publication Publication Date Title
CN202668726U (en) Firework paper tube muddy bottom molding machine
CN203448519U (en) Multistage stamping device
CN203167916U (en) Stuffing injection mechanism for dumpling machine
CN202048852U (en) Handle and grain forming machine
CN204487951U (en) A kind of elbow member injection mold
CN203391345U (en) Overhead dual-cylinder tablet press
CN204123580U (en) A kind of forming machine with upper die station
CN204276910U (en) duplicate gear mould
CN203040649U (en) Mould mechanism of cake pressing machine
CN104512048A (en) Die for powder forming clutch linkage device
CN205238176U (en) A finished product clicker that after is used for sheet or panel shaping
CN204834336U (en) A double -cylinder briquetting machine for multipolar magnetic ring one shot forming of neodymium iron boron anisotropic
CN203357935U (en) Liquid powder forming machine
CN204182767U (en) The disposable mould at angle steel upper punch different pore size
CN103736858B (en) In a kind of, external pressure rises general module formula shaping shock absorber bracket mould
CN203356233U (en) Functional plunger cylinder of metal plastic extrusion forming main machine
CN202239265U (en) Die for quickly manufacturing mixing blades
CN203028082U (en) Extruding mechanism of cake pressing machine
CN202155988U (en) Juicer shell molding equipment
CN202062682U (en) Powder forming machine
CN203830536U (en) Round pipe forming and punching die and equipment all-in-one machine
CN203972716U (en) A kind of wall calendar bar forming machine
CN203888122U (en) Gantry type pressing and clamping device of rear molding foaming polyphenyl sandwiched composite heat insulation building block
CN202087649U (en) Bent pipe forming device
CN203391074U (en) High pressure forming machine

Legal Events

Date Code Title Description
C14 Grant of patent or utility model
GR01 Patent grant
EE01 Entry into force of recordation of patent licensing contract

Assignee: PINGXIANG JIUZHOU PRECISION PRESS CO., LTD.

Assignor: Peng Kuijiu|Peng Tao

Contract record no.: 2013360000002

Denomination of utility model: Firework paper tube muddy bottom molding machine

Granted publication date: 20130116

License type: Exclusive License

Record date: 20130313

LICC Enforcement, change and cancellation of record of contracts on the licence for exploitation of a patent or utility model
CF01 Termination of patent right due to non-payment of annual fee
CF01 Termination of patent right due to non-payment of annual fee

Granted publication date: 20130116

Termination date: 20170705