CN202658068U - Hanging bridge brick for tin bath top cover brick structure and hanging bridge brick hot brick - Google Patents

Hanging bridge brick for tin bath top cover brick structure and hanging bridge brick hot brick Download PDF

Info

Publication number
CN202658068U
CN202658068U CN 201220256390 CN201220256390U CN202658068U CN 202658068 U CN202658068 U CN 202658068U CN 201220256390 CN201220256390 CN 201220256390 CN 201220256390 U CN201220256390 U CN 201220256390U CN 202658068 U CN202658068 U CN 202658068U
Authority
CN
China
Prior art keywords
brick
hanging
bridges
column
hang
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Withdrawn - After Issue
Application number
CN 201220256390
Other languages
Chinese (zh)
Inventor
刘联合
张宪岭
孙留群
周晓强
张孝俊
郑松旺
吕瑞芳
申松霞
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Henan Zhongyuan Special Refractory Co Ltd
Original Assignee
Henan Zhongyuan Special Refractory Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Henan Zhongyuan Special Refractory Co Ltd filed Critical Henan Zhongyuan Special Refractory Co Ltd
Priority to CN 201220256390 priority Critical patent/CN202658068U/en
Application granted granted Critical
Publication of CN202658068U publication Critical patent/CN202658068U/en
Anticipated expiration legal-status Critical
Withdrawn - After Issue legal-status Critical Current

Links

Images

Classifications

    • CCHEMISTRY; METALLURGY
    • C03GLASS; MINERAL OR SLAG WOOL
    • C03BMANUFACTURE, SHAPING, OR SUPPLEMENTARY PROCESSES
    • C03B18/00Shaping glass in contact with the surface of a liquid
    • C03B18/02Forming sheets
    • C03B18/16Construction of the float tank; Use of material for the float tank; Coating or protection of the tank wall

Landscapes

  • Chemical & Material Sciences (AREA)
  • Engineering & Computer Science (AREA)
  • Materials Engineering (AREA)
  • Organic Chemistry (AREA)
  • Furnace Housings, Linings, Walls, And Ceilings (AREA)

Abstract

The utility model relates to a hanging bridge brick for a tin bath top cover brick structure. The hanging bridge brick for the tin bath top cover brick structure comprises a hanging bridge brick hot brick, wherein the main body of the hanging bridge brick hot brick is a U-shaped brick body, protuberant parts which are arranged on the left and the right ends of the U-shaped brick body are provided with hanging stand columns, hanging structures which are used to be matched with hangers are arranged on the upper end portions of the two hanging stand columns, hanging bridge brick insulating bricks which are connected and arranged on a table top which is arranged on the bottom portion of the hanging bridge brick hot brick in parallel are arranged between the two hanging stand columns, a bearing structure which is used to bear a plug brick is arranged on the front side surface and/or the rear side surface of the bottom portion of the hanging bridge brick hot brick, and butt interfaces are respectively arranged on the bottom portions of the left and the right end surfaces of the hanging bridge brick hot brick. Because the hanging structures of the hanging stand columns are arranged near a cold surface of a top brick structure when being used, the hangers which use common metal materials or low use temperature heat resistance alloy steel materials can be used, the total weight of the top brick structure also obviously reduced at the same time, and the thermal insulation property is excellent. The utility model further relates to a hanging bridge brick hot brick at the same time.

Description

Be used for hanging bridges and hanging bridges hot side brick of tin groove roof brick structure
Technical field
The utility model relates to the float tin groove technical field, particularly a kind of hanging bridges and hanging bridges hot side brick for the tin groove roof brick structure.
Background technology
Molten tin bath is the core heat construction equipment of float glass, molten tin bath mainly is made of molten tin bath bottom and tin groove roof, tin groove roof adopts integrated structure mostly at present, Combined type tin groove roof mainly comprises Combined type tin groove roof brick and metal hanging spare, and Combined type tin groove roof brick is by metal hanging spare and molten tin bath overhead guard steel structure connection.
Chinese patent ZL02245922.8 discloses a kind of Combined type tin groove roof brick, hang laterally two rows with certain pitch arrangement that support has vertical bridges between the bridges, vertically bridges with laterally hang bridges and formed " well " word structure, the built-in plate brick that is placed with in the space of well word structure, groove around the plate brick bottom fastens mutually with the boss of horizontal, vertical bridges two bottom sides, the plate brick is played the support effect, perisporium and corresponding horizontal stroke, vertical bridges snug fit around the plate brick; Plate brick and vertical bridges are all laterally hung bridges to two rows and are played a supporting role, with prevent that two rows from hanging laterally that bridges close in the process of slinging or outside open, make the top cover brick form a stable one-piece construction, horizontal, vertical bridges and plate brick have been together to form the smooth tin groove roof brick structure of lower surface, the lower surface of tin groove roof brick structure is hot side, and upper surface is huyashi-chuuka (cold chinese-style noodles).
In order to guarantee that tin groove roof brick has certain intensity and heat-insulating property simultaneously, three kinds of brick bodies in the top cover brick all adopt by the light-weight insulating brick with respective shapes and size and hard refractory brick and consist of in the mode that stacks up and down.Wherein, laterally hang in the bridges, the main body of its hard refractory brick is the rectangular tiles body, be stacked below at an upper portion thereof light-weight insulating brick covers fully, because it is hung bearing position and must be arranged on the hard refractory brick, so be arranged on adjacent the hanging groove and just must be extended downwardly into by the end face of light-weight insulating brick on the hard refractory brick on the bridges binding surface of hanging always, so so that metal hanging spare from the hot side of top cover brick close to, the position is in high-temperature area, for the reliability that ensures production safety and use with prevent the suspender member high temperature ablation, suspender member just must adopt the high temperature heat-resisting of costliness to make.
In addition, in the said structure, in order to make metal hanging spare as much as possible away from hot side, can only be by increasing the height of hard refractory brick, the height that reduces light-weight insulating brick is realized, and being the overall weight of tin groove roof, the consequence of bringing so greatly increases, simultaneously also require metal hanging spare to possess higher intensity, and the integral heat insulation performance of tin groove roof also can descend, so that improve production security and reliability and the target that reduces production costs and pursue light-duty, the target of the tin groove roof of good heat insulating is contradiction each other, also seeks less than a comparatively desirable technical scheme that addresses this problem at present.And at present, for the safety and reliability of producing, often the height setting of hard refractory brick in the scope of a higher safety, this target with the tin groove roof of pursuing light-duty, good heat preservation performance is runed counter to.
Moreover the light-weight insulating brick in the said structure all adopts the typing insulating brick at present, because the density of typing insulating brick is larger, its heat retaining property is also relatively poor, thereby has affected the integral heat insulation performance of tin groove roof brick structure.
The utility model content
The purpose of this utility model provides a kind of bridges of hanging for the Combined type tin groove roof brick structure, the tin groove roof brick structure that adopts this brick to be combined into, can be under the prerequisite that does not increase tin groove roof brick structure collectivity weight, do not reduce its heat-insulating property, guarantees simultaneously the safety and reliability produced, can adopt the suspender member of plain metal material or low use temperature heat-resisting alloy steel material to realize that tin groove roof hangs being connected of bridges and molten tin bath overhead guard steel construction.The utility model also provides a kind of bridges hot side brick of hanging simultaneously.
For achieving the above object, a kind of bridges of hanging for the tin groove roof brick structure of the utility model adopt following technical scheme:
The bridges of hanging that are used for the tin groove roof brick structure, comprise main body be U-shaped brick body hang bridges hot side brick; The jut of the left and right end of U-shaped brick body is for hanging column, and two upper ends of hanging column are equipped with for the hanging structure adaptive with suspender member; Hang that having between the column joins and exist side by side to be arranged on to hang for two and hang the bridges insulating brick on the table top of bridges hot side brick bottom; Hang bridges hot side brick bottom leading flank and or trailing flank be provided with support structure for support chock brick; The bottom of hanging the left and right end face of bridges hot side brick has respectively mating interface.
Hang bridges insulating brick and two and hang the identical applying of column.
The forward and backward side that column is hung in described forward and backward side and two of hanging the bridges insulating brick is corresponding concordant.
The described bridges insulating brick and two of hanging is hung column and is bonded into an integral body or is combined into a molectron, forms rectangular structure.
Described two hanging structures of hanging on the column are the draw-in groove of hanging that is arranged on the forward and backward side of hanging separately column top, or for centering be arranged on hang separately on the column upper end deeply or run through the hole clipping structure of hanging column.
The described bridges insulating brick of hanging is made by light heat insulation material.
Described light heat insulation material is sal tapetum fibrosum, sal fibrefelt or sal fiberboard or typing light heat insulation material or unsetting light heat insulation material.
A kind of bridges hot side brick of hanging of the present utility model adopts following technical scheme:
Hang bridges hot side brick, comprise hot side brick body, hot side brick body is the U-shaped brick laying structure; The left and right end of U-shaped brick body respectively has a jut for hanging column, and two upper ends of hanging column are equipped with for the hanging structure adaptive with suspender member; Left and right bottom of hanging the U-shaped brick body between the column has the table top that is higher than bottom surface, described bottom, and the top of this table top has the space of hanging the bridges insulating brick for setting; The leading flank of the bottom of U-shaped brick body and or trailing flank be provided with support structure for support chock brick; The bottom of the left and right both ends of the surface of U-shaped brick body has respectively mating interface.
Described two hanging structures of hanging on the column are the draw-in groove of hanging that is arranged on the forward and backward side of hanging separately column top, or for centering be arranged on hang separately on the column upper end deeply or run through the hole clipping structure of hanging column.
Described two hang the isometry position that hanging structure on the column is in relatively hot face brick body bottom surface.
In the utility model, that hangs that bridges have adopted that main body takes the shape of the letter U brick laying structure hangs bridges hot side brick, so just hanging structure can be arranged on the upper end of hanging column, to hang the bridges insulating brick is arranged on two and hangs between the column, hang the bridges insulating brick and hang column and be the state of existing side by side that joins, this structure is so that hang any restriction that the height of column can not be subjected to insulating brick, when using, the upper end of hanging column can extend near the huyashi-chuuka (cold chinese-style noodles) of tin groove roof brick structure, compared with prior art, hang the hanging structure present position of column upper end greatly away from the hot side of top cover brick structure, envrionment temperature significantly reduces, therefore can substitute existing high temperature heat-resisting suspender member with the metal hanging spare of plain metal material or low use temperature heat-resisting alloy steel material, not only reduced the material cost of suspender member, and reduced the suspender member degree of deterioration of in use being heated, thus prolonged the work-ing life of metal hanging spare, reduced use cost; Simultaneously, only have hook portion to stretch in the hanging structure of hanging bridges in the metal hanging spare, and outside its main part is exposed to, be conducive to the heat radiation of metal hanging spare itself, further prolonged the work-ing life of suspender member, strong assurance the security of producing and the reliability of use.In addition, after hanging bridges hot side brick employing U-shaped structure, the height that only has the jut at its two ends namely to hang column increases, part in the middle of its bottom then can reduce its height, thereby height that can corresponding increase insulating brick, can not only reduce on the whole like this overall weight of tin groove roof brick structure, and do not lose or improved its integral heat insulation performance, solved well and improved production security and reliability in the prior art and reduce production costs and this technical problem of contradiction each other of the tin groove roof brick structure of pursuing light-duty, good heat insulating.
In the utility model, owing to light heat insulation materials such as hanging bridges insulating brick employing sal fiberboard is made, relatively the finalize the design density of lagging material of such material significantly reduces, heat retaining property significantly improves, this insulating brick lightweight more for typing insulating brick of the prior art, heat insulation effect is better, therefore can the height relative reduce of hot side brick of support insulating brick will be used for, correspondingly increase simultaneously the height (keeping in the constant situation of height overall) of insulating brick, further obviously alleviated on the whole the overall weight of tin groove roof brick structure, improved its integral heat insulation performance, also reduced simultaneously the requirement to metal hanging spare intensity, to also having made contribution the work-ing life that prolongs metal hanging spare.
Description of drawings
Fig. 1 is the structural representation that the utility model is hung an embodiment of bridges hot side brick;
Fig. 2 is the structural representation of hanging an embodiment of bridges that the utility model is used for the tin groove roof brick structure;
Fig. 3 is that Fig. 1, structure applications shown in Figure 2 are in a kind of structural representation of tin groove roof brick structure.
Embodiment
Shown in Figure 1 is the embodiment that the utility model is hung bridges hot side brick, and it comprises hot side brick body; Hot side brick body is the U-shaped brick laying structure; The bottom surface of hanging bridges hot side brick U-shaped brick body bottom is a complete plane; The left and right two ends of hanging bridges hot side brick U-shaped brick body respectively have a jut to hang column and be rectangular structure for hanging column 46, two; Two upper ends of hanging column are equipped with for the hanging structure 43 adaptive with suspender member, hang the hanging structure 43 of column upper end for being arranged on the draw-in groove of hanging of hanging on the forward and backward side of column; Hang draw-in groove be arranged near the forward and backward side of hanging separately the column head and go deep into its outside end face of hanging column or even can run through it and hang the column inner side end; Two hang the isometry position that draw-in groove is in relatively hot face brick body bottom surface of hanging on the column; The hanging portion of hanging the structure of draw-in groove and suspender member is suitable; For the ease of inserting of convenient installation suspender member in the middle of using, hang column in the head of hanging more than the draw-in groove, its gauge reduces to some extent than the gauge of hanging the following position of draw-in groove, hangs between the head of column and the chock brick and has just formed a little space; The left and right bottom attenuate of hanging the U-shaped brick body between the column of hanging bridges hot side brick U-shaped brick body is the table top of certain altitude, and the space on its table top top is used for arranging hangs the bridges insulating brick; In addition, left and right two rectangular structure of hanging column also can adopt some other distressed structure, as on the side end face protuberance or recess being set within it, as long as be convenient to and hang accordingly the combination of bridges insulating brick.
Describe and understanding for ease of clear, above-mentioned U-shaped is hung bridges hot side brick be defined as end face perpendicular to the left and right end face of its length direction, the forward and backward side that is parallel to accordingly its length direction is defined as the side, and same definition also is applicable to hang the uprights of hanging of bridges.
Be arranged with the support structure for support chock brick on the forward and backward two sides of above-mentioned bottom of hanging bridges hot side brick U-shaped brick body, this support structure is the support flange 44 that the forward and backward two sides of U-shaped brick body bottom extend outward along the bottom surface symmetry of U-shaped brick body, make the bottom of hanging bridges hot side brick form a base structure, accordingly, the holder structure that is subjected to of bottom, the forward and backward two ends of chock brick hot side brick is groove, when both dock, flange coincide with groove and cooperates, and hangs bridges hot side brick chock hot side brick is played the support effect.When using, this support structure also can be only in leading flank or the trailing flank setting of the bottom of hanging bridges hot side brick U-shaped brick body, and the supporting beam of hanging that the brick body of this structure is applicable to tin groove roof outermost one side uses.
An above-mentioned left side of hanging bridges hot side brick U-shaped brick body, the bottom of right both ends of the surface has mating interface, this mating interface can adopt plane docking form, also can adopt complementary convex-concave docking form, a kind of docking structure after present embodiment adopts, as shown in Figure 1, on a left side of hanging bridges hot side brick U-shaped brick body, be respectively equipped with mating interface 45 near the bottom of right side, this mating interface is complementary convex-concave docking structure, be used for cooperating adjacent coincideing when hanging the docking of bridges hot side brick, not fragile in order to guarantee the convex part of hanging in the bridges hot side brick convex-concave docking structure, this convex-concave docking structure is arranged on the spatial altitude position that is higher than support flange 44; As be the convex-concave docking structure of the complementation of staggered step type, particularly, the mating interface that is an end is the flange of the step type that stretched out to the end face extension by the bottom surface, the mating interface of the other end is arranged on the groove of the step type of bottom surface and end face intersection, and the flange of this step type and groove are complementary.
The utility model hang bridges hot side brick other embodiment in, the hanging structure of hanging the column upper end is to be arranged on to hang on the column end face, with the suitable hole clipping structure of suspender member, this hole clipping structure be along the length direction axis centering of hanging bridges be arranged on hang separately near the column top and go deep into its outside end face of hanging column or even can run through the hole clipping that it hangs the column inner side end, and two hang the isometry position that hole clipping on the column is in relatively hot face brick body bottom surface, the structure of hole clipping and shape are as long as be complementary with corresponding suspender member structure and shape, in this case, the gauge of hanging the column head is consistent with the gauge of hanging upright post main, does not just need to be the convenient head of hanging column that suspender member reserves and the little space between the chock brick of installing.Similarly, hanging bridges hot side brick body is the U-shaped brick laying structure; The support structure of hanging on the two sides of bridges hot side brick U-shaped brick body bottom is flange, accordingly, the holder structure that is subjected to of bottom, the forward and backward two ends of chock brick hot side brick is groove, when both dock, flange coincide with groove and cooperates, and hangs bridges hot side brick chock brick hot side brick is played the support effect; The bottom of hanging the left and right both ends of the surface of bridges hot side brick U-shaped brick body can be concordant plane, also can have respectively complementary convex-concave mating interface.
The utility model is as follows for the embodiment that hangs bridges of tin groove roof brick structure:
Shown in Figure 2 is a kind of embodiment that hangs bridges for the tin groove roof brick structure, it forms by hanging bridges hot side brick 42 and hanging bridges insulating brick 41 by hanging bridges 4, it is identical with above-mentioned structure shown in Figure 1 to hang bridges hot side brick, hanging bridges insulating brick 41 joins to existing side by side to be arranged on and hangs 42 liang of bridges hot side bricks and hang on the bottom table top between the column, for better heat insulation effect is arranged, hang bridges insulating brick and two and hang column and coincide to fit and put.Hang bridges insulating brick and two hang column be bonded into an integral body or be combined into a molectron all can, and form rectangular structure.
In the present embodiment, the hanging structure 43 of hanging column 46 upper ends for be arranged on hang column before, hang draw-in groove on the trailing flank, hang draw-in groove be arranged on hang separately near the column head before, on the trailing flank and go deep into its outside end face of hanging column or even can run through it and hang the column inner side end, two hang the isometry position that draw-in groove is in relatively hot face brick body bottom surface of hanging on the column, the hanging portion of hanging the structure of draw-in groove and suspender member is suitable, for the ease of inserting of convenient installation metal hanging spare in the middle of using, hang column in the head of hanging more than the draw-in groove, its gauge reduces to some extent than the gauge of hanging the following position of draw-in groove, hangs between the head of column and the chock brick and has just formed a little space.Certainly, the hanging structure of hanging the column upper end also can be taked the distressed structure of other type, as for be arranged on along the length direction axis centering of hanging bridges hang separately near the column top and go deep into its outside end face of hanging column or even can run through the hole clipping structure that it hangs the column inner side end, as long as be complementary with corresponding metal hanging spare structure and shape, and two this hole clipping structure of hanging on the column also be the isometry position that is in relatively hot face brick body bottom surface, in this case, the gauge of hanging the column head is consistent with the gauge of hanging upright post main, does not just need to be the convenient head of hanging column that metal hanging spare reserves and the little space between the chock brick of installing; And above-mentioned rectangular structure of hanging column also can adopt some other distressed structure, as on the side end face protuberance or recess being set within it, as long as be convenient to and hang accordingly the combination of bridges insulating brick.In addition, hang bridges insulating brick 41 and two and hang column 46 and join and exist side by side and put, it is corresponding concordant that the forward and backward side of column is hung in the forward and backward side and two of hanging the bridges insulating brick, and the two is combined into rectangular structure; The one, be convenient to adjacently hang bridges docking and hang cooperating of bridges and chock brick, the 2nd, can obtain preferably heat-insulating property.When implementing, hang the bridges insulating brick and allow an amount of difference with the thickness of hanging column, hang bridges insulating brick and the forward and backward side of hanging column and also allow not concordantly, both height also can difference as required.
The above-mentioned bridges insulating brick 41 of hanging can be arranged to monoblock type insulating brick body as required, also can be by folded two of establishing or two above insulating brick bodies combine up and down.Hanging the bridges insulating brick is light-weight insulating brick, can adopt sal tapetum fibrosum, sal fibrefelt or sal fiberboard, perhaps other light heat insulation materials such as typing light heat insulation material or unsetting light heat insulation material are made, and also can adopt several combinations in the previous materials or are composited.Hang bridges hot side brick 42 and be hard refractory brick, form modular structure with the insulating brick employing on its top mode compound or combination.
The utility model is used for other embodiment that hang bridges of tin groove roof brick structure, the hanging structure of hanging the column upper end is to be arranged on to hang on the column end face, with the suitable hole clipping structure of suspender member, this hole clipping structure be along the length direction axis centering of hanging bridges be arranged on hang separately near the column top and go deep into its outside end face of hanging column or even can run through the hole clipping that it hangs the column inner side end, and two hang the isometry position that hole clipping on the column is in relatively hot face brick body bottom surface, the structure of hole clipping and shape are as long as be complementary with corresponding suspender member structure and shape, in this case, the gauge of hanging the column head is consistent with the gauge of hanging upright post main, does not just need to be the convenient head of hanging column that suspender member reserves and the little space between the chock brick of installing.Similarly, hanging bridges hot side brick body is the U-shaped brick laying structure; The support structure of hanging on the two sides of bridges hot side brick U-shaped brick body bottom is flange, accordingly, the holder structure that is subjected to of bottom, the forward and backward two ends of chock brick hot side brick is groove, when both dock, flange coincide with groove and cooperates, and hangs bridges hot side brick chock brick hot side brick is played the support effect; The bottom of hanging the left and right both ends of the surface of bridges hot side brick U-shaped brick body can be concordant plane, also can have respectively complementary convex-concave mating interface.
Embodiment of the present utility model is not limited to the structure formation in the various embodiments described above, in the specific implementation, hanging structure in above-described embodiment, support structure and mating interface structure, can new be combined to form new embodiment by what these three kinds of structures are different from above-described embodiment, describe in detail no longer one by one herein.
Shown in Figure 3 is the application of the utility model in the Combined type tin groove roof brick structure, this structure adopts full integrated structure, be combined into the smooth tin groove roof brick structure of lower surface by hanging 1 liang of generic module of bridges 4 and chock brick, this structure can be by the metal hanging spare and molten tin bath overhead guard steel structure connection of plain metal material or low use temperature heat-resisting alloy steel material, the upper surface of this tin groove roof brick structure is huyashi-chuuka (cold chinese-style noodles), and lower surface is hot side.Among Fig. 3, two rows with certain arranged with interval, be arranged in parallel hang supporting beam, every row hangs supporting beam and is spliced by hanging the mode of bridges 4 with the end face docking; Hanging bridges forms by hanging bridges hot side brick 42 and hanging bridges insulating brick 41.Be placed with successively chock brick 1 in every adjacent hanging between the supporting beam along the length direction of hanging supporting beam.Form same row and hang the adjacent bridges of hanging of supporting beam by the identical docking of the left and right sides both ends of the surface of hanging bridges hot side brick, and hang the bridges insulating brick and hang column and exist side by side and arrange and join continuously, the forward and backward side of respectively hanging bridges has formed the forward and backward side of hanging supporting beam, the forward and backward both ends of the surface of each chock brick all cooperate with process gap with the corresponding front and back sides of hanging supporting beam, same row's chock brick 1 by hang two rows that bridges 4 form adjacent hang the supporting beam support.Chock brick 1 is comprised of chock hot side brick 13 and chock insulating brick 12, and the chock brick is arranged with two handles 7 at a diagonal lines of its end face, uses so that install or change the chock brick.

Claims (10)

1. be used for the bridges of hanging of tin groove roof brick structure, it is characterized in that: comprise main body be U-shaped brick body hang bridges hot side brick; The jut of the left and right end of U-shaped brick body is for hanging column, and two upper ends of hanging column are equipped with for the hanging structure adaptive with suspender member; Hang that having between the column joins and exist side by side to be arranged on to hang for two and hang the bridges insulating brick on the table top of bridges hot side brick bottom; Hang bridges hot side brick bottom leading flank and or trailing flank be provided with support structure for support chock brick; The bottom of hanging the left and right end face of bridges hot side brick has respectively mating interface.
2. the bridges of hanging for the tin groove roof brick structure according to claim 1 is characterized in that: hang bridges insulating brick and two and hang the identical applying of column.
3. bridges of hanging for the tin groove roof brick structure according to claim 2, it is characterized in that: the forward and backward side that column is hung in described forward and backward side and two of hanging the bridges insulating brick is corresponding concordant.
4. according to claim 2 or the 3 described bridges of hanging for the tin groove roof brick structure, it is characterized in that: the described bridges insulating brick and two of hanging is hung column and is bonded into an integral body or is combined into a molectron, forms rectangular structure.
5. the described bridges of hanging for the tin groove roof brick structure of arbitrary claim according to claim 1-3, it is characterized in that: described two hanging structures of hanging on the column are the draw-in groove of hanging that is arranged on the forward and backward side of hanging separately column top, or for centering be arranged on hang separately on the column upper end deeply or run through the hole clipping structure of hanging column.
6. the described bridges of hanging for the tin groove roof brick structure of arbitrary claim according to claim 1-3, it is characterized in that: the described bridges insulating brick of hanging is made by light heat insulation material.
7. bridges of hanging for the tin groove roof brick structure according to claim 6 is characterized in that: described light heat insulation material is sal tapetum fibrosum, sal fibrefelt or sal fiberboard or typing light heat insulation material or unsetting light heat insulation material.
8. hang bridges hot side brick, it is characterized in that: comprise hot side brick body, hot side brick body is the U-shaped brick laying structure; The left and right end of U-shaped brick body respectively has a jut for hanging column, and two upper ends of hanging column are equipped with for the hanging structure adaptive with suspender member; Left and right bottom of hanging the U-shaped brick body between the column has the table top that is higher than bottom surface, described bottom, and the top of this table top has the space of hanging the bridges insulating brick for setting; The leading flank of the bottom of U-shaped brick body and or trailing flank be provided with support structure for support chock brick; The bottom of the left and right both ends of the surface of U-shaped brick body has respectively mating interface.
9. the bridges hot side brick of hanging according to claim 8, it is characterized in that: described two hanging structures of hanging on the column are the draw-in groove of hanging that is arranged on the forward and backward side of hanging separately column top, or for centering be arranged on hang separately on the column upper end deeply or run through the hole clipping structure of hanging column.
According to claim 8 with the 9 described bridges hot side bricks of hanging, it is characterized in that: described two hang the isometry position that hanging structure on the column is in relatively hot face brick body bottom surface.
CN 201220256390 2012-05-31 2012-06-01 Hanging bridge brick for tin bath top cover brick structure and hanging bridge brick hot brick Withdrawn - After Issue CN202658068U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN 201220256390 CN202658068U (en) 2012-05-31 2012-06-01 Hanging bridge brick for tin bath top cover brick structure and hanging bridge brick hot brick

Applications Claiming Priority (3)

Application Number Priority Date Filing Date Title
CN201210176250.1 2012-05-31
CN201210176250 2012-05-31
CN 201220256390 CN202658068U (en) 2012-05-31 2012-06-01 Hanging bridge brick for tin bath top cover brick structure and hanging bridge brick hot brick

Publications (1)

Publication Number Publication Date
CN202658068U true CN202658068U (en) 2013-01-09

Family

ID=46944300

Family Applications (2)

Application Number Title Priority Date Filing Date
CN201210178497.7A Active CN102718391B (en) 2012-05-31 2012-06-01 Hanging bridge brick for tin bath roof brick structure and hanging bridge brick thermal brick
CN 201220256390 Withdrawn - After Issue CN202658068U (en) 2012-05-31 2012-06-01 Hanging bridge brick for tin bath top cover brick structure and hanging bridge brick hot brick

Family Applications Before (1)

Application Number Title Priority Date Filing Date
CN201210178497.7A Active CN102718391B (en) 2012-05-31 2012-06-01 Hanging bridge brick for tin bath roof brick structure and hanging bridge brick thermal brick

Country Status (1)

Country Link
CN (2) CN102718391B (en)

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN102718391A (en) * 2012-05-31 2012-10-10 河南中原特种耐火材料有限公司 Hanging bridge brick for tin bath roof brick structure and hanging bridge brick thermal brick

Family Cites Families (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JPH0653581B2 (en) * 1989-07-04 1994-07-20 日本板硝子株式会社 Glass manufacturing method by float bath
DE19540944C2 (en) * 1995-11-03 2003-02-27 Hans Petschauer Zinnbadbodenstein
DE19542700C2 (en) * 1995-11-16 1999-10-14 Vgt Industriekeramik Gmbh Large-format firebrick, in particular tin bath flooring brick, and method for its manufacture
CN202046991U (en) * 2011-05-04 2011-11-23 信义电子玻璃(芜湖)有限公司 Lining fixing structure for glass melting furnace tin bath
CN102718391B (en) * 2012-05-31 2014-09-17 河南中原特种耐火材料有限公司 Hanging bridge brick for tin bath roof brick structure and hanging bridge brick thermal brick

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN102718391A (en) * 2012-05-31 2012-10-10 河南中原特种耐火材料有限公司 Hanging bridge brick for tin bath roof brick structure and hanging bridge brick thermal brick
CN102718391B (en) * 2012-05-31 2014-09-17 河南中原特种耐火材料有限公司 Hanging bridge brick for tin bath roof brick structure and hanging bridge brick thermal brick

Also Published As

Publication number Publication date
CN102718391B (en) 2014-09-17
CN102718391A (en) 2012-10-10

Similar Documents

Publication Publication Date Title
CN202658068U (en) Hanging bridge brick for tin bath top cover brick structure and hanging bridge brick hot brick
CN202658066U (en) Hanging bridge bricks for combined bath roof brick structure, and hanging bridge brick hot face bricks
CN202658065U (en) Bath roof brick structure
CN202658067U (en) Combined brick structure for tin bath top cover
CN111021609B (en) Inclined plane unit type curtain wall
CN102718390B (en) Combined tin bath cover brick structure
CN102718392B (en) Suspension bridge brick and hot side brick of suspension bridge brick for combined type tin bath top cover brick structure
CN208581181U (en) A kind of photovoltaic double-glass assembly fixture
CN102718393B (en) Tin bath top cover brick structure
CN202658064U (en) Combined type molten tin bath top cover brick structure and plug brick and plug brick hot brick thereof
CN205722988U (en) A kind of bus casting mold
CN211447458U (en) Anti-cracking device for gypsum board suspended ceiling
CN203870885U (en) Double-L-shaped architectural structure fire experimental platform
CN217896989U (en) Polyphenyl granule thermal insulation wall
CN210685783U (en) Security door convenient to change door plant
CN207880681U (en) A kind of integrated photovoltaic street lamp
CN206177043U (en) A ceramic corundum casket -like bowl for producing resistant firebrick
CN221277118U (en) Assembled heat preservation ground structure
CN217896876U (en) Building heat preservation curtain wall board
CN205904635U (en) Car board welding fine positioning piece anchor clamps
CN213015099U (en) Interior decoration and finishing heat insulating board
CN203582680U (en) Inclined hanging wall of sheet glass melter
CN214498189U (en) Impact-resistant porcelain steel plate
CN210374643U (en) Low power consumption kiln is decking support for burning
CN217500677U (en) Heat-proof heat-preservation light steel keel partition wall

Legal Events

Date Code Title Description
C14 Grant of patent or utility model
GR01 Patent grant
AV01 Patent right actively abandoned

Granted publication date: 20130109

Effective date of abandoning: 20140917