CN202658067U - Combined brick structure for tin bath top cover - Google Patents

Combined brick structure for tin bath top cover Download PDF

Info

Publication number
CN202658067U
CN202658067U CN 201220253440 CN201220253440U CN202658067U CN 202658067 U CN202658067 U CN 202658067U CN 201220253440 CN201220253440 CN 201220253440 CN 201220253440 U CN201220253440 U CN 201220253440U CN 202658067 U CN202658067 U CN 202658067U
Authority
CN
China
Prior art keywords
brick
hanging
bridges
hang
suspension
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Withdrawn - After Issue
Application number
CN 201220253440
Other languages
Chinese (zh)
Inventor
张宪岭
刘联合
郑松旺
郑银龙
王伟高
孙留群
周晓强
张孝俊
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Henan Zhongyuan Special Refractory Co Ltd
Original Assignee
Henan Zhongyuan Special Refractory Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Henan Zhongyuan Special Refractory Co Ltd filed Critical Henan Zhongyuan Special Refractory Co Ltd
Priority to CN 201220253440 priority Critical patent/CN202658067U/en
Application granted granted Critical
Publication of CN202658067U publication Critical patent/CN202658067U/en
Anticipated expiration legal-status Critical
Withdrawn - After Issue legal-status Critical Current

Links

Images

Landscapes

  • Roof Covering Using Slabs Or Stiff Sheets (AREA)

Abstract

The utility model relates to a combined brick structure for a tin bath top cover. The combined brick structure comprises at least two rows of suspension supporting beams which are arranged in parallel, wherein each suspension supporting beam is formed by butting suspension bridge bricks sequentially; an insertion block brick is arranged between every two adjacent suspension supporting beams; each suspension bridge brick comprises a suspension bridge hot surface brick of which the main body is an inverted T-shaped brick body; a bulged part in the middle of each inverted T-shaped brick body is a suspension vertical column; the upper end of each suspension vertical column is provided with a suspension structure which is used to be matched with a suspension piece; table surfaces at the bottoms of the suspension bridge hot surface bricks, which are extended from the suspension vertical columns to the left and right ends of the suspension bridge hot surface bricks, are provided with a suspension bridge heat preservation brick respectively; the suspension bridge heat preservation bricks are connected with the suspension vertical columns side by side; supporting structures for supporting the insertion block bricks are arranged on the front side surfaces and/or the rear side surfaces of the bottoms of the suspension bridge hot surface bricks; and the left end surface and the right end surface of the bottom of each suspension bridge hot surface brick are provided with a butt joint interface respectively.

Description

The Combined type tin groove roof brick structure
Technical field
The utility model relates to the float tin groove technical field, particularly a kind of Combined type tin groove roof brick structure.
Background technology
Molten tin bath is the core heat construction equipment of float glass, molten tin bath mainly is made of molten tin bath bottom and tin groove roof, tin groove roof adopts integrated structure mostly at present, Combined type tin groove roof mainly comprises Combined type tin groove roof brick and metal hanging spare, and Combined type tin groove roof brick is by metal hanging spare and molten tin bath overhead guard steel structure connection.
Chinese patent ZL02245922.8 discloses a kind of Combined type tin groove roof brick, hang laterally two rows with certain pitch arrangement that support has vertical bridges between the bridges, vertically bridges with laterally hang bridges and formed " well " word structure, the built-in plate brick that is placed with in the space of well word structure, groove around the plate brick bottom fastens mutually with the boss of horizontal, vertical bridges two bottom sides, the plate brick is played the support effect, perisporium and corresponding horizontal stroke, vertical bridges snug fit around the plate brick; Plate brick and vertical bridges are all laterally hung bridges to two rows and are played a supporting role, with prevent that two rows from hanging laterally that bridges close in the process of slinging or outside open, make the top cover brick form a stable one-piece construction, horizontal, vertical bridges and plate brick have been together to form the smooth tin groove roof brick structure of lower surface, the lower surface of tin groove roof brick structure is hot side, and upper surface is huyashi-chuuka (cold chinese-style noodles).
In order to guarantee that tin groove roof brick has certain intensity and heat-insulating property simultaneously, three kinds of brick bodies in the top cover brick all adopt by the light-weight insulating brick with respective shapes and size and hard refractory brick and consist of in the mode that stacks up and down.Wherein, laterally hang in the bridges, the main body of its hard refractory brick is the rectangular tiles body, be stacked below at an upper portion thereof light-weight insulating brick covers fully, because it is hung bearing position and must be arranged on the hard refractory brick, so be arranged on adjacent the hanging groove and just must be extended downwardly into by the end face of light-weight insulating brick on the hard refractory brick on the bridges binding surface of hanging always, so so that metal hanging spare from the hot side of top cover brick close to, the position is in high-temperature area, for the reliability that ensures production safety and use with prevent the suspender member high temperature ablation, suspender member just must adopt the high temperature heat-resisting of costliness to make.
In addition, in the said structure, in order to make metal hanging spare as much as possible away from hot side, can only be by increasing the height of hard refractory brick, the height that reduces light-weight insulating brick is realized, and being the overall weight of tin groove roof, the consequence of bringing so greatly increases, simultaneously also require metal hanging spare to possess higher intensity, and the integral heat insulation performance of tin groove roof also can descend, so that improve production security and reliability and the target that reduces production costs and pursue light-duty, the target of the tin groove roof of good heat insulating is contradiction each other, also seeks less than a comparatively desirable technical scheme that addresses this problem at present.And at present, for the safety and reliability of producing, often the height setting of hard refractory brick in the scope of a higher safety, this target with the tin groove roof of pursuing light-duty, good heat preservation performance is runed counter to.
Moreover the light-weight insulating brick in the said structure all adopts the typing insulating brick at present, because the density of typing insulating brick is larger, its heat retaining property is also relatively poor, thereby has affected the integral heat insulation performance of tin groove roof brick structure.
The utility model content
The purpose of this utility model provides a kind of Combined type tin groove roof brick structure, under the prerequisite that does not increase tin groove roof brick structure collectivity weight, do not reduce its heat-insulating property, guarantees simultaneously the safety and reliability produced, can adopt the metal hanging spare of plain metal material or low use temperature heat-resisting alloy steel material to realize that tin groove roof hangs being connected of bridges and molten tin bath overhead guard steel construction.
For achieving the above object, the utility model adopts following technical scheme: the Combined type tin groove roof brick structure, the supporting beam of hanging that comprises the parallel laying of at least two rows, hanging supporting beam docks successively and forms by hanging bridges, adjacent hanging is equipped with the chock brick between the supporting beam, described hang bridges comprise main body be inverted T-shaped brick body hang bridges hot side brick; The center protrusion of inverted T-shaped brick body is partly for hanging column, and the upper end of hanging column is provided with for the hanging structure adaptive with suspender member; Be respectively arranged with at the table top that stretches to left and right two ends from hanging column of hanging bridges hot side brick bottom and hang the bridges insulating brick, hang the bridges insulating brick and hang column and join and exist side by side; Hang bridges hot side brick bottom leading flank and or trailing flank be provided with support structure for support chock brick; Hang on the left and right end face of bridges hot side brick bottom and have respectively mating interface.
The described bridges insulating brick face relative with hanging column of hanging coincide to be fitted, and the forward and backward side of hanging the bridges insulating brick is corresponding concordant with the forward and backward side of hanging column.
Described both ends of the surface of hanging bridges hot side brick bottom are concordant with the corresponding corresponding end face of hanging the bridges insulating brick, perhaps hang the outstanding or corresponding corresponding end face formation cross structure of hanging the bridges insulating brick of indentation of the both ends of the surface of bridges hot side brick bottom.
Described each hang the bridges insulating brick away from having on the end face of hanging column for the docking structure that coincide and cooperate with adjacent corresponding section of hanging bridges.
Described hanging structure is the draw-in groove of hanging that is symmetricly set on the left and right end face of hanging column or on the forward and backward side.
The described bridges insulating brick of hanging is made by light heat insulation material.
Described light heat insulation material is sal tapetum fibrosum, sal fibrefelt or sal fiberboard or typing light heat insulation material or unsetting light heat insulation material.
In the utility model, form hang supporting beam hang bridges adopted main body be the inverted T-shaped brick laying structure hang bridges hot side brick, so just hanging structure can be arranged on the upper end of hanging column, be arranged on the both sides of hanging column with hanging the bridges insulating brick, hang the bridges insulating brick and hang column and be the state of existing side by side that joins, this structure is so that hang any restriction that the height of column can not be subjected to insulating brick, the upper end of hanging column can extend near the huyashi-chuuka (cold chinese-style noodles) of tin groove roof brick structure, compared with prior art, be arranged on hang the column upper end hanging structure just greatly away from the hot side of top cover brick structure, envrionment temperature significantly reduces, therefore can substitute existing high temperature heat-resisting suspender member with the metal hanging spare of plain metal material or low use temperature heat-resisting alloy steel material, not only reduced the material cost of suspender member, and reduced in use the be heated degree of deterioration of suspender member, thereby prolonged the work-ing life of metal hanging spare, reduced use cost; Simultaneously, only have hook portion to stretch in the hanging structure of hanging bridges in the metal hanging spare, and outside its main part is exposed to, be conducive to the heat radiation of metal hanging spare itself, further prolonged the work-ing life of suspender member, strong assurance the security of producing and the reliability of use.In addition, after hanging bridges hot side brick employing inverted T-shaped structure, the height that jut in the middle of only having is namely hung column increases, the extension on both sides, bottom then can reduce its height, thereby height that can corresponding increase insulating brick, can not only reduce on the whole like this overall weight of tin groove roof brick structure, and do not lose or improved its integral heat insulation performance, solved well improve production security and reliability in the prior art and reduce production costs with pursue light-duty, this technical problem of contradiction each other of the tin groove roof brick structure of good heat insulating.
In the utility model, owing to hanging the bridges insulating brick, the light heat insulation materials such as the insulating brick employing sal fiberboard of chock brick are made, relatively the finalize the design density of lagging material of such material significantly reduces, heat retaining property significantly improves, this insulating brick lightweight more for typing insulating brick of the prior art, heat insulation effect is better, therefore can the height relative reduce of hot side brick of support insulating brick will be used for, correspondingly increase simultaneously the height (in the situation that the maintenance height overall is constant) of insulating brick, further obviously alleviated on the whole the overall weight of tin groove roof brick structure, improved its integral heat insulation performance, also reduced simultaneously the requirement to metal hanging spare intensity, to also having made contribution the work-ing life that prolongs metal hanging spare.
Description of drawings
Fig. 1 is the structural representation of a kind of Combined type tin groove roof brick structure of the utility model embodiment 1;
Fig. 2 is the structural representation of hanging bridges among Fig. 1;
Fig. 3 is the structural representation of a kind of Combined type tin groove roof brick structure of the utility model embodiment 2.
Embodiment
Embodiment 1:
Illustrated in figures 1 and 2 is a kind of embodiment of the utility model Combined type tin groove roof brick structure, it adopts integrated structure, be combined into the smooth tin groove roof brick structure of lower surface by hanging 1 liang of generic module of bridges 3 and chock brick, this structure can be by metal hanging spare and molten tin bath overhead guard steel structure connection.The upper surface of this tin groove roof brick structure is huyashi-chuuka (cold chinese-style noodles), and lower surface is hot side.
Among Fig. 1, have two rows with certain arranged with interval, be arranged in parallel hang supporting beam, every row hangs supporting beam and is spliced by hanging the mode of bridges 3 with the end face docking, is placed with successively chock brick 1 in adjacent hanging between the supporting beam along the length direction of hanging supporting beam.
Above-mentioned chock brick 1 is formed by the chock brick hot side brick 13 of bottom and chock brick insulating brick 12 folded the establishing on top; Chock brick insulating brick can adopt whole brick structure or as required by some insulating brick bodies stacked forming up and down; The bottom surface of chock brick hot side brick 13 is planes; The forward and backward two ends of chock brick hot side brick are arranged with for the holder structure that is subjected to that docks with the support structure of the front and back sides of hanging the bridges bottom, this is subjected to holder structure is to be symmetricly set in the forward and backward two ends of chock brick hot side brick and the groove of being commissioned of its intersection, bottom surface, and this groove of being commissioned cooperates with the support flange docking of hanging bridges hot side brick; The end face of chock brick hot side brick is used for the folded chock brick insulating brick of establishing; Offer loss of weight groove 14 on the end face of chock brick hot side brick, the loss of weight groove is arranged symmetrically in the centre of described end face, and the sidewall of loss of weight groove is the wall of a sealing; When concrete the application, the shape of loss of weight groove can be diversified, as be made as square or rectangular shape etc., but in force, for making this hot side brick section structure optimization and being convenient to moulding, the loss of weight groove of foregoing " rectangular shape " can be deformed into the truncated rectangular pyramids shape of handstand usually; The quantity of loss of weight groove can be set according to practical situation; Be provided with chock brick light thermal-insulation block filler 15 in the loss of weight groove, this light thermal-insulation block filler is by sal tapetum fibrosum, sal fibrefelt or sal fiberboard, and perhaps the light heat insulation materials such as other typing light heat insulation materials or unsetting light heat insulation material are made; Chock brick light thermal-insulation block filler can adopt bonding mode compound or combination to be arranged in the loss of weight groove, and its end face is not higher than the end face of hot side brick body is advisable, preferably concordant; Chock brick light thermal-insulation block filler 15 also can be with chock brick insulating brick 12 and is wholely set; Chock brick hot side brick is hard refractory brick; The chock brick is arranged with two handles 7 at a diagonal lines of its end face, uses so that install or change the chock brick.
The above-mentioned bridges 3 of hanging, form by hanging bridges hot side brick 32 and hanging bridges insulating brick 31, the main body of hanging bridges hot side brick is the inverted T-shaped brick laying structure, the center protrusion of inverted T-shaped is partly for hanging column 33, the upper end of hanging column is provided with for the hanging structure 37 adaptive with suspender member, hanging bridges insulating brick 31 joins to existing side by side and is arranged on that to hang bridges hot side brick in-line bottom left, right-hand member stretches out on the table top of hanging column, for preferably heat insulation effect is arranged, hang bridges insulating brick 31 and hang column 33 and coincide and fit and put, hang column 33 and hang between the bridges insulating brick 31 exist side by side the interface hang part more than the draw-in groove also be provided be convenient to install metal hanging spare insert space 36.
The above-mentioned space 36 that inserts is to realize by dwindling the size of hanging column 33 upper end heads, hang column in the head of hanging more than the draw-in groove, its gauge reduces to some extent than the gauge of hanging the following position of draw-in groove; Certainly, during implementation, insert space 36 and a recess also can be set by the corresponding position at insulating brick realize.The purpose that inserts the space that setting is convenient to install suspender member is in order to make things convenient for suspender member to insert when connecting and to make things convenient for suspender member rationally stressed.And when the position that hang the column top and hang draw-in groove was higher than the insulating brick end face, this inserted the space with regard to unnecessary setting.
Describe and understanding for ease of clear, the left and right end face perpendicular to its length direction of above-mentioned inverted T-shaped being hung bridges hot side brick in-line bottom is defined as end face, the forward and backward side that is parallel to accordingly its length direction is defined as the side, and same definition also is applicable to hang the uprights of hanging of bridges.
In the present embodiment, hang the bridges insulating brick and hang column and join and exist side by side and put, the forward and backward side of hanging the bridges insulating brick is corresponding concordant with the forward and backward side of hanging column; The both ends of the surface of hanging bridges hot side brick bottom are concordant with the corresponding corresponding end face of hanging the bridges insulating brick, can certainly be to hang the outstanding or corresponding corresponding end face formation cross structure of hanging the bridges insulating brick of indentation of the both ends of the surface of bridges hot side brick bottom; Each hangs the bridges insulating brick away from having on the end face of hanging column for the docking structure that coincide and cooperate with adjacent corresponding section of hanging bridges, and this docking structure can be plane docking structure or complementary convex-concave docking structure; Such purpose one is to be convenient to the adjacent bridges docking of hanging, the 2nd, can obtain preferably heat-insulating property.When implementing, hang the bridges insulating brick and allow an amount of difference with the thickness of hanging column, hanging the bridges insulating brick also allows not concordant with the forward and backward side of hanging column, both height also can be different as required, and both relative faces also can have less fit-up gap or both, and both are bonding.
In the present embodiment, the hanging structure 37 of hanging the column upper end for be symmetricly set on the left and right both ends of the surface of hanging column, connect the draw-in groove of hanging of front and back sides simultaneously, this hanging portion of hanging the structure of draw-in groove and suspender member is suitable, certainly above-mentioned hang draw-in groove and also can be opened on former and later two sides of hanging column.The above-mentioned column of hanging is rectangular structure, and certainly, the rectangular structure of hanging column also can adopt some other distressed structure, as at its left and right sides end face protuberance or recess being set, as long as be convenient to and hang accordingly the combination of bridges insulating brick.Such purpose is to be convenient to hang cooperating of bridges and chock brick, can obtain preferably heat-insulating property.
Above-mentioned hang bridges hot side brick bottom before, be arranged with the support structure for support chock brick on the rear two sides, this support structure be hang bridges hot side brick inverted T-shaped brick body in-line bottom before, the support flange 34 that extends outward along the bottom surface symmetry of brick body on the rear two sides, make its in-line bottom form a base structure, hang bridges and by the support flange that this is positioned at its bottom chock brick hot side brick is played the support effect, when practical application, above-mentioned support structure also can be only leading flank or trailing flank in the in-line bottom arrange, the supporting beam of hanging that the brick body of this structure is applicable to tin groove roof outermost one side uses.
Has respectively mating interface on the above-mentioned both ends of the surface of hanging bridges hot side brick bottom, this mating interface can adopt plane docking form, also can adopt complementary convex-concave docking form, a kind of docking structure after the present embodiment adopts, as depicted in figs. 1 and 2, be respectively equipped with mating interface 35 in the both ends of the surface of hanging bridges hot side brick in-line bottom, this mating interface is complementary convex-concave docking structure, be used for cooperating in the adjacent docking that coincide when hanging the docking of bridges hot side brick end face, not fragile in order to guarantee the convex part of hanging in the bridges hot side brick convex-concave docking structure, this convex-concave docking structure is arranged on the spatial altitude position that is higher than the support flange.Certainly, the mating interface of the convex-concave docking structure of this complementation also can be some other structure formation; As be the convex-concave docking structure of the complementation of staggered step type, particularly, the mating interface that is an end is the flange of the step type that stretched out to the end face extension by the bottom surface, the mating interface of the other end is arranged on the groove of the step type of bottom surface and end face intersection, and the flange of this step type and groove are complementary.
In the present embodiment, form same row and hang the adjacent bridges of hanging of supporting beam by the end face of hanging bridges hot side brick bottom and the identical docking of end face of hanging the bridges insulating brick, and hang the bridges insulating brick and hang column and exist side by side and arrange and join continuously, the forward and backward side of respectively hanging bridges has formed the forward and backward side of hanging supporting beam, the forward and backward both ends of the surface of each chock brick all cooperate with process gap with the corresponding front and back sides of hanging supporting beam, same row's chock brick 1 by hang two rows that bridges 3 form adjacent hang the supporting beam support.
Embodiment 2:
Combined type tin groove roof brick structure shown in Figure 3 is combined into the smooth tin groove roof brick structure of lower surface by hanging bridges 3, chock brick 1 and supporting brick 2 three generic modules, and supporting brick plays the effect of rock steady structure and supplemental support.The difference of itself and embodiment 1 is: with the chock brick 1 alternate supporting brick 2 that also is provided with; Each supporting brick is hung the corresponding bridges support of hanging in the supporting beam by two adjacent rows, the forward and backward two ends support of supporting brick is hung the ad hoc support structure place at bridges hot side brick middle part in correspondence, this support structure support flange that the forward and backward two sides that hang bridges hot side brick bottom extend outward along its bottom surface of serving as reasons; The two sides of supporting brick are by pasting adjacent chock brick.The chock brick is just pressed and is put the seam crossing of hanging bridges 3 adjacent like this, can improve the resistance to overturning of top cover brick structure.
In the present embodiment, above-mentioned supporting brick 2 is formed by the supporting brick insulating brick 22 on top and supporting brick hot side brick 21 folded the establishing of bottom, and both can adopt mode compound or combination to form one.Wherein, the bottom surface of supporting brick hot side brick 21 is planes; The forward and backward two ends of hot side brick body are arranged with for the holder structure that is subjected to that docks with the support structure of the front and back sides of hanging the bridges bottom; This is subjected to holder structure is the groove of being commissioned that is symmetricly set in forward and backward two ends and its intersection, bottom surface of hot side brick body; This groove of being commissioned cooperates with corresponding support flange docking of hanging the front and back sides of bridges bottom; The arranged on left and right sides face symmetry of the bottom of hot side brick body is provided with the supporting structure that docked by holder structure for the left and right side bottom chock brick hot side brick; The supporting flang 25 that this supporting structure extends outward along its bottom surface symmetry for the arranged on left and right sides face by the bottom of hot side brick body; This supporting flang cooperates with the holder structure docking that is subjected to of the left and right side that is arranged on adjacent chock brick hot side brick bottom, and the chock brick is played auxiliary supporting role; The end face of hot side brick body is used for stacking the supporting brick insulating brick; Offer loss of weight groove 23 on the end face of supporting brick hot side brick, the loss of weight groove is arranged symmetrically in the centre of supporting brick hot side brick end face, and the sidewall of loss of weight groove is the wall of a sealing; When concrete the application, the shape of loss of weight groove 23 can be diversified, as be made as square or rectangular shape etc., but in force, for making this hot side brick section structure optimization and being convenient to moulding, the loss of weight groove of foregoing " rectangular shape " can be deformed into the truncated rectangular pyramids shape of handstand usually; The quantity of loss of weight groove also can be set as required; Fill out in the loss of weight groove and be provided with supporting brick light thermal-insulation block filler 24, this light thermal-insulation block filler is by sal tapetum fibrosum, sal fibrefelt or sal fiberboard, and perhaps the light heat insulation materials such as other typing light heat insulation material or unsetting light heat insulation material are made; Supporting brick light thermal-insulation block filler can adopt bonding mode compound or combination to be arranged in the loss of weight groove, and its end face is not higher than the end face of hot side brick body is advisable, preferably concordant; Supporting brick hot side brick is hard refractory brick.Wherein, supporting brick insulating brick 22 is light-weight insulating brick, can adopt sal tapetum fibrosum, sal fibrefelt or sal fiberboard, perhaps the light heat insulation materials such as other typing light heat insulation material or unsetting light heat insulation material are made, also can adopt several combinations in the previous materials or be composited, the supporting brick insulating brick can be arranged to monoblock type insulating brick body and also can or combine by folded insulating brick volume recombination more than two or two of establishing up and down as required.Supporting brick hot side brick and supporting brick insulating brick adopt mode compound or combination to form modular structure.This supporting brick is when implementing, and supporting brick light thermal-insulation block filler 24 also can be with chock brick insulating brick 22 and is wholely set.
In the present embodiment, above-mentioned chock brick, not only the forward and backward two ends of its chock brick hot side brick are arranged with for the holder structure that is subjected to that docks with the support structure of the front and back sides of hanging the bridges bottom; And, the arranged on left and right sides face of the bottom of its chock brick hot side brick also is arranged with for the holder structure that is subjected to that docks with the supporting structure of the left and right side of supporting brick bottom, this is subjected to holder structure is to be symmetricly set in the arranged on left and right sides face of chock brick hot side brick and the groove of being commissioned of its intersection, bottom surface, and this groove of being commissioned cooperates with the supporting flang docking of the left and right side of supporting brick hot side brick.
In the present embodiment, the above-mentioned bridges of hanging, not only it hangs the support structure that is arranged with on the forward and backward two sides of bridges hot side brick for support chock brick; And, also be arranged with the ad hoc support structure for the support supporting brick at the middle part of the support flange of this support structure.
In the various embodiments described above, hang bridges insulating brick and chock brick insulating brick or be light-weight insulating brick with the supporting brick insulating brick, can adopt sal tapetum fibrosum, sal fibrefelt or sal fiberboard, perhaps other light heat insulation materials such as typing light heat insulation material or unsetting light heat insulation material are made, and also can adopt several combinations in the previous materials or are composited.The insulating brick of three generic module bricks can be arranged to monoblock type insulating brick body as required, also can be by folding up and down the insulating brick volume recombination more than two or two of establishing or combining.And hang bridges hot side brick, chock brick hot side brick or and supporting brick hot side brick be hard refractory brick, the insulating brick corresponding with its top adopts mode compound or combination to form modular structure.
Among other embodiment of the utility model Combined type tin groove roof brick structure, the hanging structure of hanging the column upper end is to be arranged on the edge of hanging on the forward and backward side of column to hang the axis, front and back of column and run through and hang column, perhaps hang column for being arranged on to run through in the axis, the left and right sides of hanging edge on the left and right end face of column and hang column, and with the suitable hole clipping structure of metal hanging spare.Similarly, the support structure of hanging on the forward and backward two sides of in-line bottom of bridges hot side brick inverted T-shaped brick body is flange, and when using, the holder structure that is subjected at the forward and backward two ends of chock brick hot side brick bottom is groove accordingly, when both docked, flange coincide with groove and cooperates; The left and right both ends of the surface of hanging the in-line bottom of bridges hot side brick inverted T-shaped brick body can be concordant plane, also can have respectively complementary convex-concave mating interface.
The utility model in the specific implementation, hanging structure in above-described embodiment, support and be subjected to holder structure or and support and be subjected to holder structure and mating interface structure, can new be combined to form new embodiment by what these three kinds of structures are different from above-described embodiment, describe in detail no longer one by one herein.In addition, adopted in above-described embodiment and hung supporting beam, in the middle of practical application, more rows' the supporting beam of hanging has been set as required, every adjacent hang all arrange between the supporting beam chock brick or and supporting brick, be combined into the tin groove roof brick structure of desired shape and size.

Claims (7)

1. Combined type tin groove roof brick structure, the supporting beam of hanging that comprises the parallel laying of at least two rows, hanging supporting beam docks successively and forms by hanging bridges, adjacent hanging is equipped with the chock brick between the supporting beam, it is characterized in that: described hang bridges comprise main body be inverted T-shaped brick body hang bridges hot side brick; The center protrusion of inverted T-shaped brick body is partly for hanging column, and the upper end of hanging column is provided with for the hanging structure adaptive with suspender member; Be respectively arranged with at the table top that stretches to left and right two ends from hanging column of hanging bridges hot side brick bottom and hang the bridges insulating brick, hang the bridges insulating brick and hang column and join and exist side by side; Hang bridges hot side brick bottom leading flank and or trailing flank be provided with support structure for support chock brick; Hang on the left and right end face of bridges hot side brick bottom and have respectively mating interface.
2. Combined type tin groove roof brick structure according to claim 1 is characterized in that: the described bridges insulating brick face relative with hanging column of hanging coincide and fits, and the forward and backward side of hanging the bridges insulating brick is corresponding concordant with the forward and backward side of hanging column.
3. Combined type tin groove roof brick structure according to claim 2, it is characterized in that: described both ends of the surface of hanging bridges hot side brick bottom are concordant with the corresponding corresponding end face of hanging the bridges insulating brick, perhaps hang the outstanding or corresponding corresponding end face formation cross structure of hanging the bridges insulating brick of indentation of the both ends of the surface of bridges hot side brick bottom.
4. it is characterized in that according to claim 2 or 3 described Combined type tin groove roof brick structures: described each hang the bridges insulating brick away from having on the end face of hanging column for the docking structure that coincide and cooperate with adjacent corresponding section of hanging bridges.
5. the described Combined type tin groove roof brick structure of arbitrary claim according to claim 1-3 is characterized in that: described hanging structure is the draw-in groove of hanging that is symmetricly set on the left and right end face of hanging column or on the forward and backward side.
6. the described Combined type tin groove roof brick structure of arbitrary claim according to claim 1-3 is characterized in that: the described bridges insulating brick of hanging is made by light heat insulation material.
7. Combined type tin groove roof brick structure according to claim 6 is characterized in that: described light heat insulation material is sal tapetum fibrosum, sal fibrefelt or sal fiberboard or typing light heat insulation material or unsetting light heat insulation material.
CN 201220253440 2012-05-31 2012-05-31 Combined brick structure for tin bath top cover Withdrawn - After Issue CN202658067U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN 201220253440 CN202658067U (en) 2012-05-31 2012-05-31 Combined brick structure for tin bath top cover

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN 201220253440 CN202658067U (en) 2012-05-31 2012-05-31 Combined brick structure for tin bath top cover

Publications (1)

Publication Number Publication Date
CN202658067U true CN202658067U (en) 2013-01-09

Family

ID=47452987

Family Applications (1)

Application Number Title Priority Date Filing Date
CN 201220253440 Withdrawn - After Issue CN202658067U (en) 2012-05-31 2012-05-31 Combined brick structure for tin bath top cover

Country Status (1)

Country Link
CN (1) CN202658067U (en)

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN102718390A (en) * 2012-05-31 2012-10-10 河南中原特种耐火材料有限公司 Combined tin bath cover brick structure

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN102718390A (en) * 2012-05-31 2012-10-10 河南中原特种耐火材料有限公司 Combined tin bath cover brick structure
CN102718390B (en) * 2012-05-31 2014-09-24 河南中原特种耐火材料有限公司 Combined tin bath cover brick structure

Similar Documents

Publication Publication Date Title
CN204252378U (en) Light cement foam inner partition plate
CN202658067U (en) Combined brick structure for tin bath top cover
CN102718390B (en) Combined tin bath cover brick structure
CN202658065U (en) Bath roof brick structure
CN202658066U (en) Hanging bridge bricks for combined bath roof brick structure, and hanging bridge brick hot face bricks
CN202658068U (en) Hanging bridge brick for tin bath top cover brick structure and hanging bridge brick hot brick
CN102718393B (en) Tin bath top cover brick structure
CN202658064U (en) Combined type molten tin bath top cover brick structure and plug brick and plug brick hot brick thereof
CN202658063U (en) Combined bath roof brick structure and support bricks thereof, and support brick hot face bricks
CN102718392B (en) Suspension bridge brick and hot side brick of suspension bridge brick for combined type tin bath top cover brick structure
CN107401223A (en) A kind of attachment structure for steel structural upright column and crossbeam
CN207660137U (en) Assembled wall body structure
CN217079287U (en) Bare concrete curtain wall hanging plate
CN202648412U (en) Fireproofing-material lining anchorage nail
CN105507490B (en) A kind of fast-assembling environmental protection assembled wall board and preparation method thereof
CN212859858U (en) Combined shed plate for high-temperature firing mold
CN204958711U (en) Molten tin bath top cap brick and molten tin bath top cap
CN217896989U (en) Polyphenyl granule thermal insulation wall
CN203612178U (en) Ceiling of fire-retarding cabin of ship
CN207098502U (en) A kind of Novel cable bridge
CN203769149U (en) Decorative curtain wall system with cast aluminum splicing structure
CN217680810U (en) Box type steel structure integrated house
CN104894584A (en) Tank body of PPH pickling tank
CN204211347U (en) Cell wall lamellar body stacks hoisting tooling
CN209620306U (en) A kind of construction wall with self-insurance temperature function

Legal Events

Date Code Title Description
C14 Grant of patent or utility model
GR01 Patent grant
AV01 Patent right actively abandoned

Granted publication date: 20130109

Effective date of abandoning: 20140924

RGAV Abandon patent right to avoid regrant