CN102718391A - Hanging bridge brick for tin bath roof brick structure and hanging bridge brick thermal brick - Google Patents
Hanging bridge brick for tin bath roof brick structure and hanging bridge brick thermal brick Download PDFInfo
- Publication number
- CN102718391A CN102718391A CN2012101784977A CN201210178497A CN102718391A CN 102718391 A CN102718391 A CN 102718391A CN 2012101784977 A CN2012101784977 A CN 2012101784977A CN 201210178497 A CN201210178497 A CN 201210178497A CN 102718391 A CN102718391 A CN 102718391A
- Authority
- CN
- China
- Prior art keywords
- brick
- hanging
- bridges
- column
- hang
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Granted
Links
Images
Classifications
-
- C—CHEMISTRY; METALLURGY
- C03—GLASS; MINERAL OR SLAG WOOL
- C03B—MANUFACTURE, SHAPING, OR SUPPLEMENTARY PROCESSES
- C03B18/00—Shaping glass in contact with the surface of a liquid
- C03B18/02—Forming sheets
- C03B18/16—Construction of the float tank; Use of material for the float tank; Coating or protection of the tank wall
Abstract
The invention relates to a hanging bridge brick for a tin bath roof brick structure, which comprises a hanging bridge brick thermal brick of which a main body is a U-shaped brick body; bulges at the left end and the right end of the U-shaped brick body are hanging upright posts; hanging structures matched with hangers are arranged at the upper end parts of the two hanging upright posts; the hanging bridge brick thermal brick connected with and erected on a tabletop of the bottom part of the hanging bridge brick thermal brick is arranged between the hanging upright posts; a supporting structure (s) for supporting plug bricks is arranged on the front side surface and/or the rear side surface of the bottom of the hanging bridge brick thermal brick; and abutting ports are respectively arranged in the bottom of the left end surface and the right end surface of the hanging bridge brick thermal brick. The hanging bridge brick has the beneficial effects that as the hanging structures of the hanging upright posts are positioned nearby a cold surface of the roof brick structure when in use, the hangers made of ordinary metal or heat-resistant alloy steel with lower usage temperature can be adopted; and meanwhile, the total weight of the brick structure is remarkably reduced, and the heat insulation performance is good. The invention simultaneously relates to the hanging bridge brick thermal brick.
Description
Technical field
The present invention relates to the float tin groove technical field, particularly a kind ofly be used for hanging bridges and hanging bridges hot side brick of molten tin bath top cover brick structure.
Background technology
Molten tin bath is the core heat construction equipment of float glass; Molten tin bath mainly is made up of molten tin bath bottom land and molten tin bath top cover; The molten tin bath top cover adopts integrated structure mostly at present; Built-up type molten tin bath top cover mainly comprises built-up type molten tin bath top cover brick and metal suspender member, and built-up type molten tin bath top cover brick is connected with molten tin bath overhead guard steelwork through the metal suspender member.
Chinese patent ZL02245922.8 discloses a kind of built-up type molten tin bath top cover brick; Support has vertical bridges between the bridges to hanging at two horizontal rows with certain pitch arrangement; Vertically bridges with laterally hang bridges and formed " well " word structure, the built-in plate brick that is placed with in the space of well word structure, the groove around the plate brick bottom fastens with the boss of horizontal, vertical bridges two bottom sides each other; The plate brick is played the support effect, perisporium and corresponding horizontal stroke, vertical bridges snug fit around the plate brick; The plate brick is all played a supporting role to hanging bridges to two horizontal rows with vertical bridges; With prevent two horizontal rows to hang that bridges close in slinging in the process or outside open; Make the top cover brick form a stable whole structure; Horizontal, vertical bridges and plate brick have been together to form the smooth molten tin bath top cover brick structure of lower surface, and the lower surface of molten tin bath top cover brick structure is a hot side, and upper surface is a huyashi-chuuka (cold chinese-style noodles).
In order to guarantee that molten tin bath top cover brick has certain intensity and heat-insulating property simultaneously, three kinds of brick bodies in the top cover brick all adopt by light-weight insulating brick with respective shapes and size and hard refractory brick and constitute with the mode that stacks up and down.Wherein, Laterally hang in the bridges, the main body of its hard refractory brick is the rectangular tiles body, below the light-weight insulating brick that is stacked in its top covers fully; Because it is hung bearing position and must be arranged on the hard refractory brick; So be arranged on adjacent the hanging groove and just must extend downwardly on the hard refractory brick on the bridges opposed end of hanging always by the end face of light-weight insulating brick, so just make the metal suspender member nearer from the hot side of top cover brick, the position is in high-temperature area; For the safety that ensures production safety and use with prevent the suspender member high temperature ablation, suspender member just must adopt the high temperature heat-resisting of costliness to process.
In addition; In the said structure; In order to make the metal suspender member as much as possible away from hot side, can only realize through the height that increases hard refractory brick, the height that reduces light-weight insulating brick, and the consequence of bringing like this to be the overall weight of molten tin bath top cover increase greatly; Simultaneously also require the metal suspender member to possess higher intensity; And the integral heat insulation performance of molten tin bath top cover also can descend, and make to improve production security and safety and the target of the target that reduces production costs and the molten tin bath top cover of pursuing light-duty, good heat insulating contradiction each other, present also seeking less than the technical scheme that addresses this problem of ideal comparatively.And at present, for the security and the safety of producing, often the height setting of hard refractory brick in the scope of a higher safety, this target with the molten tin bath top cover of pursuing light-duty, good heat preservation performance is runed counter to.
Moreover the light-weight insulating brick in the said structure all adopts the typing insulating brick at present, because the density of typing insulating brick is bigger, its heat retaining property is also relatively poor, thereby has influenced the integral heat insulation performance of molten tin bath top cover brick structure.
Summary of the invention
The purpose of this invention is to provide a kind of bridges of hanging that are used for built-up type molten tin bath top cover brick structure; The molten tin bath top cover brick structure that adopts this brick to be combined into; Can be under the prerequisite of security that does not increase molten tin bath top cover brick structure overall weight, do not reduce its heat-insulating property, guarantees simultaneously to produce and safety, can adopt the suspender member of plain metal material or low use temperature heat-resisting alloy steel material to realize that the molten tin bath top cover hangs being connected of bridges and molten tin bath overhead guard steelwork.The present invention also provides a kind of bridges hot side brick of hanging simultaneously.
For realizing above-mentioned purpose, a kind of bridges of hanging that are used for molten tin bath top cover brick structure of the present invention adopt following technical scheme:
A kind of bridges of hanging that are used for molten tin bath top cover brick structure, comprise main body be U-shaped brick body hang bridges hot side brick; The jut of the left and right end of U-shaped brick body is for hanging column, two hang column the upper end be equipped with and be used for the hanging structure adaptive with suspender member; Hang that having between the column joins and exist side by side to be arranged on to hang for two and hang the bridges insulating brick on the table top of bridges hot side brick bottom; The leading flank of hanging bridges hot side brick bottom with or trailing flank be provided with the support structure that is used for support chock brick; The bottom of hanging the left and right end face of bridges hot side brick has mating interface respectively.
Hang bridges insulating brick and two and hang the identical applying of column.
The forward and backward side that column is hung in said forward and backward side and two of hanging the bridges insulating brick is corresponding concordant.
The said bridges insulating brick and two of hanging is hung column and is bonded into an integral body or is combined into a molectron, forms rectangular structure.
Said two hanging structures hung on the column are the draw-in groove of hanging that is arranged on the forward and backward side of hanging column top separately, or for centering be arranged on hang separately on the column upper end deeply or run through the hole clipping structure of hanging column.
The said bridges insulating brick of hanging is processed by light heat insulation material.
Said light heat insulation material is sal tapetum fibrosum, sal fibre felt or sal wad or finalize the design light heat insulation material or unsetting light heat insulation material.
A kind of bridges hot side brick of hanging of the present invention adopts following technical scheme:
A kind of bridges hot side brick of hanging comprises hot side brick body, and hot side brick body is the U-shaped brick laying structure; The left and right end of U-shaped brick body respectively has a jut for hanging column, two hang column the upper end be equipped with and be used for the hanging structure adaptive with suspender member; Left and right bottom of hanging the U-shaped brick body between the column has the table top that is higher than bottom surface, said bottom, and the top of this table top has and is used to be provided with the space of hanging the bridges insulating brick; The leading flank of the bottom of U-shaped brick body with or trailing flank be provided with the support structure that is used for support chock brick; The bottom of the left and right both ends of the surface of U-shaped brick body has mating interface respectively.
Said two hanging structures hung on the column are the draw-in groove of hanging that is arranged on the forward and backward side of hanging column top separately, or for centering be arranged on hang separately on the column upper end deeply or run through the hole clipping structure of hanging column.
Said two hang the isometry position that hanging structure on the column is in relatively hot face brick body bottom surface.
Among the present invention, that hangs that bridges have adopted that main body takes the shape of the letter U brick laying structure hangs bridges hot side brick, so just can hanging structure be arranged on the upper end of hanging column; To hang the bridges insulating brick and be arranged on two and hang between the column, and hang the bridges insulating brick and hang column and be the state of existing side by side that joins, this structure makes the height of hanging column can not receive any restriction of insulating brick; When using; The upper end of hanging column can extend near the huyashi-chuuka (cold chinese-style noodles) of molten tin bath top cover brick structure, and compared with prior art, the hanging structure present position of hanging the column upper end is greatly away from the hot side of top cover brick structure; Envrionment temperature significantly reduces; Therefore can use the metal suspender member of plain metal material or low use temperature heat-resisting alloy steel material to substitute existing high temperature heat-resisting suspender member, not only reduced the material cost of suspender member, and reduce in use the be heated degree of deterioration of suspender member; Thereby prolonged the work-ing life of metal suspender member, reduced use cost; Simultaneously; Have only hook part to stretch in the hanging structure of hanging bridges in the metal suspender member, and outside its main part is exposed to, help the heat radiation of metal suspender member itself; Further prolonged the work-ing life of suspender member, strong assurance the security of producing and the safety of use.In addition; After hanging bridges hot side brick employing U-shaped structure; The height that only has the jut at its two ends promptly to hang column increases; Its bottom intermediary part then can reduce its height, thereby height that can corresponding increase insulating brick can not only reduce the overall weight of molten tin bath top cover brick structure so on the whole; And do not lose or improved its integral heat insulation performance, solved well and improved production security and safety in the prior art and reduce production costs and pursue this technical problem of contradiction each other of molten tin bath top cover brick structure of light-duty, good heat insulating.
Among the present invention; Owing to light heat insulation materials such as hanging bridges insulating brick employing sal wad is processed; Said material is finalized the design relatively, and the density of lagging material significantly reduces, heat retaining property significantly improves; More lightweight, heat insulation effect are better for typing insulating brick of the prior art for this insulating brick, therefore can reduce relatively being used for the height of hot side brick of support insulating brick, correspondingly increase the height (keeping under the constant situation of height overall) of insulating brick simultaneously; Further obviously alleviated the overall weight of molten tin bath top cover brick structure on the whole; Improved its integral heat insulation performance, also reduced requirement simultaneously, to also having made contribution the work-ing life that prolongs the metal suspender member metal suspender member intensity.
Description of drawings
Fig. 1 is a kind of structural representation of hanging an embodiment of bridges hot side brick of the present invention;
Fig. 2 is a kind of structural representation of hanging an embodiment of bridges that is used for molten tin bath top cover brick structure of the present invention;
Fig. 3 is that Fig. 1, structure applications shown in Figure 2 are in a kind of structural representation of molten tin bath top cover brick structure.
Embodiment
An a kind of embodiment who hangs bridges hot side brick of the present invention of being shown in Figure 1, it comprises hot side brick body; Hot side brick body is the U-shaped brick laying structure; The bottom surface of hanging bridges hot side brick U-shaped brick body bottom is a complete plane; The left and right two ends of hanging bridges hot side brick U-shaped brick body respectively have a jut to hang column and be rectangular structure for hanging column 46, two; Two hang column the upper end be equipped with and be used for the hanging structure 43 adaptive with suspender member, the hanging structure 43 of hanging the column upper end is for being arranged on the draw-in groove of hanging on the forward and backward side of column of hanging; Hang draw-in groove be arranged near the forward and backward side of hanging separately the column head and go deep into its outside end face of hanging column or even can run through it and hang the column inner side end; Two hang the isometry position that draw-in groove is in relatively hot face brick body bottom surface of hanging on the column; The hanging portion of structure and suspender member of hanging draw-in groove is suitable; For the ease of inserting of convenient installation suspender member in the middle of using; Hang column in the head of hanging more than the draw-in groove; Its gauge reduces than the gauge of hanging the following position of draw-in groove to some extent, hangs between head and the chock brick of column and has just formed a little space; The left and right bottom attenuate of hanging the U-shaped brick body between the column of hanging bridges hot side brick U-shaped brick body is the table top of certain altitude, and the space on its table top top is used for being provided with hangs the bridges insulating brick; In addition, left and right two hang column rectangular structure also can adopt some other distressed structure, as on the side end face protuberance or recess being set within it, as long as be convenient to and hang the combination of bridges insulating brick accordingly.
Describe and understanding for ease of clear; Above-mentioned U-shaped is hung bridges hot side brick be defined as end face perpendicular to the left and right end face of its length direction; The forward and backward side that is parallel to its length direction accordingly is defined as the side, and same definition also is applicable to the uprights of hanging of hanging bridges.
Be arranged with the support structure that is used for support chock brick on the forward and backward two sides of above-mentioned bottom of hanging bridges hot side brick U-shaped brick body; This support structure is the support flange 44 that the forward and backward two sides of U-shaped brick body bottom extend outward along the bottom surface symmetry of U-shaped brick body; Make the bottom of hanging bridges hot side brick form a base structure; Accordingly, the holder structure that receives of bottom, the forward and backward two ends of chock brick hot side brick is a groove, when both dock; Flange coincide with groove and cooperates, and hangs bridges hot side brick chock hot side brick is played the support effect.When using, this support structure also can be only in the leading flank or the trailing flank setting of the bottom of hanging bridges hot side brick U-shaped brick body, and the brick body of this structure is applicable to that the supporting beam of hanging of molten tin bath top cover outermost one side uses.
Above-mentioned bottom of hanging the left and right both ends of the surface of bridges hot side brick U-shaped brick body has mating interface; This mating interface can adopt plane butt joint form, also can adopt complementary convex-concave butt joint form, and present embodiment adopts a kind of docking structure in back; As shown in Figure 1; Near the bottom of the left and right end face of hanging bridges hot side brick U-shaped brick body, be respectively equipped with mating interface 45, this mating interface is a complementary convex-concave docking structure, is used for hanging bridges hot side brick when butt joint and coincideing and cooperate adjacent; Not fragile in order to guarantee the convex part of hanging in the bridges hot side brick convex-concave docking structure, this convex-concave docking structure is arranged on the spatial altitude position that is higher than support flange 44; As be the complementary convex-concave docking structure of staggered step type; Particularly; The mating interface that is an end is the flange of the step type that outside end face, extended by the bottom surface; The mating interface of the other end is arranged on the groove of the step type of bottom surface and end face intersection, and the flange of this step type and groove are complementary.
The present invention hang bridges hot side brick other embodiment in; The hanging structure of hanging the column upper end be arranged on hang on the column end face, with the suitable hole clipping structure of suspender member; This hole clipping structure be along the length direction axis centering of hanging bridges be arranged on hang separately near the column top and go deep into its outside end face of hanging column or even can run through the hole clipping that it hangs the column inner side end; And two hang the isometry position that hole clipping on the column is in relatively hot face brick body bottom surface; The structure of hole clipping and shape are as long as be complementary with corresponding suspender member structure and shape; In this case, the gauge of hanging the column head is consistent with the gauge of hanging upright post main, just need not be a convenient head of hanging column that suspender member reserves and the little space between the chock brick of installing.Likewise, hanging bridges hot side brick body is the U-shaped brick laying structure; The support structure of hanging on the two sides of bridges hot side brick U-shaped brick body bottom is a flange; Accordingly, the holder structure that receives of bottom, the forward and backward two ends of chock brick hot side brick is a groove, when both dock; Flange coincide with groove and cooperates, and hangs bridges hot side brick chock brick hot side brick is played the support effect; The bottom of hanging the left and right both ends of the surface of bridges hot side brick U-shaped brick body can be concordant plane, also can have complementary convex-concave mating interface respectively.
A kind of embodiment that hangs bridges that is used for molten tin bath top cover brick structure is following among the present invention:
Shown in Figure 2 is a kind of embodiment that hangs bridges that is used for molten tin bath top cover brick structure; It is by hanging bridges 4 by hanging bridges hot side brick 42 and hanging bridges insulating brick 41 and form; It is identical with above-mentioned structure shown in Figure 1 to hang bridges hot side brick; Hang bridges insulating brick 41 and join to existing side by side to be arranged on and hang 42 liang of bridges hot side bricks and hang on the bottom table top between the column,, hang bridges insulating brick and two and hang column and coincide and fit and put for better heat insulation effect is arranged.Hang bridges insulating brick and two hang column be bonded into an integral body or be combined into a molectron all can, and form rectangular structure.
In the present embodiment; The hanging structure 43 of hanging column 46 upper ends is for being arranged on the draw-in groove of hanging on the forward and backward side of column of hanging; Hang draw-in groove be arranged near the forward and backward side of hanging separately the column head and go deep into its outside end face of hanging column or even can run through it and hang the column inner side end; Two hang the isometry position that draw-in groove is in relatively hot face brick body bottom surface of hanging on the column; The hanging portion of structure and suspender member of hanging draw-in groove is suitable, for the ease of convenient in the middle of using inserting of metal suspender member is installed, hang column in the head of hanging more than the draw-in groove; Its gauge reduces than the gauge of hanging the following position of draw-in groove to some extent, hangs between head and the chock brick of column and has just formed a little space.Certainly; The hanging structure of hanging the column upper end also can be taked the distressed structure of other type; As for be arranged on along the length direction axis centering of hanging bridges hang separately near the column top and go deep into its outside end face of hanging column or even can run through the hole clipping structure that it hangs the column inner side end; As long as be complementary with corresponding metal suspender member structure and shape; And two this hole clipping structure of hanging on the column also be the isometry position that is in relatively hot face brick body bottom surface; In this case, the gauge of hanging the column head is consistent with the gauge of hanging upright post main, just need not be a convenient head of hanging column that the metal suspender member reserves and the little space between the chock brick of installing; And above-mentioned rectangular structure of hanging column also can adopt some other distressed structure, as on the side end face protuberance or recess being set within it, as long as be convenient to and hang the combination of bridges insulating brick accordingly.In addition, hang bridges insulating brick 41 and two and hang column 46 and join and exist side by side and put, it is corresponding concordant that the forward and backward side of column is hung in the forward and backward side and two of hanging the bridges insulating brick, and the two is combined into rectangular structure; The one, be convenient to adjacently hang bridges butt joints and hang cooperating of bridges and chock brick, the 2nd, can obtain heat-insulating property preferably.When implementing, hang the bridges insulating brick and allow an amount of difference with the thickness of hanging column, hang bridges insulating brick and the forward and backward side of hanging column and also allow not concordantly, both height also can difference as required.
The above-mentioned bridges insulating brick 41 of hanging can be arranged to monobloc(k)type insulating brick body as required, also can be by folded two of establishing or two above insulating brick bodies combine up and down.Hanging the bridges insulating brick is light-weight insulating brick; Can adopt sal tapetum fibrosum, sal fibre felt or sal wad; Perhaps light heat insulation materials such as other typing light heat insulation material or unsetting light heat insulation material are processed, and also can adopt several kinds of combinations in the previous materials perhaps to be composited.Hang bridges hot side brick 42 and be hard refractory brick, form modular structure with the insulating brick employing on its top mode compound or combination.
The present invention is used for other embodiment that hang bridges of molten tin bath top cover brick structure; The hanging structure of hanging the column upper end be arranged on hang on the column end face, with the suitable hole clipping structure of suspender member; This hole clipping structure be along the length direction axis centering of hanging bridges be arranged on hang separately near the column top and go deep into its outside end face of hanging column or even can run through the hole clipping that it hangs the column inner side end; And two hang the isometry position that hole clipping on the column is in relatively hot face brick body bottom surface; The structure of hole clipping and shape are as long as be complementary with corresponding suspender member structure and shape; In this case; The gauge of hanging the column head is consistent with the gauge of hanging upright post main, just need not be a convenient head of hanging column that suspender member reserves and the little space between the chock brick of installing.Likewise, hanging bridges hot side brick body is the U-shaped brick laying structure; The support structure of hanging on the two sides of bridges hot side brick U-shaped brick body bottom is a flange; Accordingly, the holder structure that receives of bottom, the forward and backward two ends of chock brick hot side brick is a groove, when both dock; Flange coincide with groove and cooperates, and hangs bridges hot side brick chock brick hot side brick is played the support effect; The bottom of hanging the left and right both ends of the surface of bridges hot side brick U-shaped brick body can be concordant plane, also can have complementary convex-concave mating interface respectively.
Embodiments of the invention are not limited to the structure formation among above-mentioned each embodiment; In the specific implementation; Hanging structure in the foregoing description, support structure and mating interface structure; Can new be combined to form new embodiment through what these three kinds of structures are different from the foregoing description, detail no longer one by one here.
Shown in Figure 3 is the application of the present invention in built-up type molten tin bath top cover brick structure; This structure adopts full integrated structure; Be combined into the smooth molten tin bath top cover brick structure of lower surface by hanging bridges 4 with 1 liang of generic module of chock brick; This structure can be connected with molten tin bath overhead guard steelwork through the metal suspender member of plain metal material or low use temperature heat-resisting alloy steel material, and the upper surface of this molten tin bath top cover brick structure is a huyashi-chuuka (cold chinese-style noodles), and lower surface is a hot side.Among Fig. 3, that two rows arrange with a determining deviation, be arranged in parallel hang supporting beam, every row hangs supporting beam and is spliced by hanging the mode of bridges 4 with the end face butt joint; Hang bridges by hanging bridges hot side brick 42 and hanging bridges insulating brick 41 and form.Be placed with chock brick 1 in every adjacent hanging between the supporting beam successively along the length direction of hanging supporting beam.The adjacent bridges of hanging of forming that same row hangs supporting beam are through the butt joint that coincide of the right ends face of hanging bridges hot side brick; And hang the bridges insulating brick and hang column and exist side by side and be provided with and join continuously; Respectively hang the forward and backward side of bridges and formed the forward and backward side of hanging supporting beam; The forward and backward both ends of the surface of each chock brick all with the corresponding front and back sides of hanging supporting beam with the technology running fit, same row's chock brick 1 by hang two rows that bridges 4 form adjacent hang the supporting beam support.Chock brick 1 is made up of chock hot side brick 13 and chock insulating brick 12, and the chock brick is arranged with two handles 7 on a diagonal lines of its end face, uses so that install or change the chock brick.
Claims (10)
1. bridges of hanging that are used for molten tin bath top cover brick structure is characterized in that: comprise main body be U-shaped brick body hang bridges hot side brick; The jut of the left and right end of U-shaped brick body is for hanging column, two hang column the upper end be equipped with and be used for the hanging structure adaptive with suspender member; Hang that having between the column joins and exist side by side to be arranged on to hang for two and hang the bridges insulating brick on the table top of bridges hot side brick bottom; The leading flank of hanging bridges hot side brick bottom with or trailing flank be provided with the support structure that is used for support chock brick; The bottom of hanging the left and right end face of bridges hot side brick has mating interface respectively.
2. the bridges of hanging that are used for molten tin bath top cover brick structure according to claim 1 is characterized in that: hang bridges insulating brick and two and hang the identical applying of column.
3. the bridges of hanging that are used for molten tin bath top cover brick structure according to claim 2 is characterized in that: the forward and backward side that column is hung in said forward and backward side and two of hanging the bridges insulating brick is corresponding concordant.
4. according to claim 2 or the 3 described bridges of hanging that are used for molten tin bath top cover brick structure, it is characterized in that: the said bridges insulating brick and two of hanging is hung column and is bonded into an integral body or is combined into a molectron, forms rectangular structure.
5. according to the described bridges of hanging that are used for molten tin bath top cover brick structure of arbitrary claim among the claim 1-3; It is characterized in that: said two hanging structures hung on the column are the draw-in groove of hanging that is arranged on the forward and backward side of hanging column top separately, or for centering be arranged on hang separately on the column upper end deeply or run through the hole clipping structure of hanging column.
6. according to the described bridges of hanging that are used for molten tin bath top cover brick structure of arbitrary claim among the claim 1-3, it is characterized in that: the said bridges insulating brick of hanging is processed by light heat insulation material.
7. the bridges of hanging that are used for molten tin bath top cover brick structure according to claim 6 is characterized in that: said light heat insulation material is sal tapetum fibrosum, sal fibre felt or sal wad or finalize the design light heat insulation material or unsetting light heat insulation material.
8. hang bridges hot side brick for one kind, it is characterized in that: comprise hot side brick body, hot side brick body is the U-shaped brick laying structure; The left and right end of U-shaped brick body respectively has a jut for hanging column, two hang column the upper end be equipped with and be used for the hanging structure adaptive with suspender member; Left and right bottom of hanging the U-shaped brick body between the column has the table top that is higher than bottom surface, said bottom, and the top of this table top has and is used to be provided with the space of hanging the bridges insulating brick; The leading flank of the bottom of U-shaped brick body with or trailing flank be provided with the support structure that is used for support chock brick; The bottom of the left and right both ends of the surface of U-shaped brick body has mating interface respectively.
9. the bridges hot side brick of hanging according to claim 8; It is characterized in that: said two hanging structures hung on the column are the draw-in groove of hanging that is arranged on the forward and backward side of hanging column top separately, or for centering be arranged on hang separately on the column upper end deeply or run through the hole clipping structure of hanging column.
According to Claim 8 with the 9 described bridges hot side bricks of hanging, it is characterized in that: said two hang the isometry position that hanging structure on the column is in relatively hot face brick body bottom surface.
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201210178497.7A CN102718391B (en) | 2012-05-31 | 2012-06-01 | Hanging bridge brick for tin bath roof brick structure and hanging bridge brick thermal brick |
Applications Claiming Priority (3)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201210176250.1 | 2012-05-31 | ||
CN201210176250 | 2012-05-31 | ||
CN201210178497.7A CN102718391B (en) | 2012-05-31 | 2012-06-01 | Hanging bridge brick for tin bath roof brick structure and hanging bridge brick thermal brick |
Publications (2)
Publication Number | Publication Date |
---|---|
CN102718391A true CN102718391A (en) | 2012-10-10 |
CN102718391B CN102718391B (en) | 2014-09-17 |
Family
ID=46944300
Family Applications (2)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN 201220256390 Withdrawn - After Issue CN202658068U (en) | 2012-05-31 | 2012-06-01 | Hanging bridge brick for tin bath top cover brick structure and hanging bridge brick hot brick |
CN201210178497.7A Active CN102718391B (en) | 2012-05-31 | 2012-06-01 | Hanging bridge brick for tin bath roof brick structure and hanging bridge brick thermal brick |
Family Applications Before (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN 201220256390 Withdrawn - After Issue CN202658068U (en) | 2012-05-31 | 2012-06-01 | Hanging bridge brick for tin bath top cover brick structure and hanging bridge brick hot brick |
Country Status (1)
Country | Link |
---|---|
CN (2) | CN202658068U (en) |
Families Citing this family (1)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN202658068U (en) * | 2012-05-31 | 2013-01-09 | 河南中原特种耐火材料有限公司 | Hanging bridge brick for tin bath top cover brick structure and hanging bridge brick hot brick |
Citations (5)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
JPH0653581B2 (en) * | 1989-07-04 | 1994-07-20 | 日本板硝子株式会社 | Glass manufacturing method by float bath |
EP0774447A1 (en) * | 1995-11-16 | 1997-05-21 | VGT Industriekeramik GmbH | Large size chamotte brick, in particular a hearth block in a tin bath |
US5827601A (en) * | 1995-11-03 | 1998-10-27 | Vgt Industriekeramik Gmbh | Large-format fireclay refractory brick, in particular bottom block in a tin bath |
CN202046991U (en) * | 2011-05-04 | 2011-11-23 | 信义电子玻璃(芜湖)有限公司 | Lining fixing structure for glass melting furnace tin bath |
CN202658068U (en) * | 2012-05-31 | 2013-01-09 | 河南中原特种耐火材料有限公司 | Hanging bridge brick for tin bath top cover brick structure and hanging bridge brick hot brick |
-
2012
- 2012-06-01 CN CN 201220256390 patent/CN202658068U/en not_active Withdrawn - After Issue
- 2012-06-01 CN CN201210178497.7A patent/CN102718391B/en active Active
Patent Citations (5)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
JPH0653581B2 (en) * | 1989-07-04 | 1994-07-20 | 日本板硝子株式会社 | Glass manufacturing method by float bath |
US5827601A (en) * | 1995-11-03 | 1998-10-27 | Vgt Industriekeramik Gmbh | Large-format fireclay refractory brick, in particular bottom block in a tin bath |
EP0774447A1 (en) * | 1995-11-16 | 1997-05-21 | VGT Industriekeramik GmbH | Large size chamotte brick, in particular a hearth block in a tin bath |
CN202046991U (en) * | 2011-05-04 | 2011-11-23 | 信义电子玻璃(芜湖)有限公司 | Lining fixing structure for glass melting furnace tin bath |
CN202658068U (en) * | 2012-05-31 | 2013-01-09 | 河南中原特种耐火材料有限公司 | Hanging bridge brick for tin bath top cover brick structure and hanging bridge brick hot brick |
Non-Patent Citations (1)
Title |
---|
刘建国: "超薄浮法玻璃生产线的设计、生产基本概况及特点", 《国外建材科技》, vol. 29, no. 4, 30 April 2008 (2008-04-30), pages 81 - 85 * |
Also Published As
Publication number | Publication date |
---|---|
CN102718391B (en) | 2014-09-17 |
CN202658068U (en) | 2013-01-09 |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN201867074U (en) | Quick firing energy-saving kiln car | |
JP2019509971A (en) | Glass tank kiln with high solubility | |
CN208280403U (en) | A kind of thin plate stone material sticks formula component | |
CN102718391A (en) | Hanging bridge brick for tin bath roof brick structure and hanging bridge brick thermal brick | |
CN202658066U (en) | Hanging bridge bricks for combined bath roof brick structure, and hanging bridge brick hot face bricks | |
CN202658065U (en) | Bath roof brick structure | |
CN202658067U (en) | Combined brick structure for tin bath top cover | |
CN102718390A (en) | Combined tin bath cover brick structure | |
CN102718392B (en) | Suspension bridge brick and hot side brick of suspension bridge brick for combined type tin bath top cover brick structure | |
CN107401223A (en) | A kind of attachment structure for steel structural upright column and crossbeam | |
CN102718393A (en) | Tin bath top cover brick structure | |
CN207660137U (en) | Assembled wall body structure | |
CN103629936B (en) | Cement kiln top cover is with hanging brick | |
CN202658064U (en) | Combined type molten tin bath top cover brick structure and plug brick and plug brick hot brick thereof | |
CN204958711U (en) | Molten tin bath top cap brick and molten tin bath top cap | |
CN212859858U (en) | Combined shed plate for high-temperature firing mold | |
CN202658063U (en) | Combined bath roof brick structure and support bricks thereof, and support brick hot face bricks | |
CN204007155U (en) | A kind of improved kiln car for firing ceramics platform basin | |
CN206514689U (en) | A kind of herringbone anchored brick | |
CN110835768A (en) | Unequal-distance asymmetric carbon block for aluminum electrolysis | |
CN217896989U (en) | Polyphenyl granule thermal insulation wall | |
CN105110608A (en) | Tin bath top cover brick | |
CN104894584A (en) | Tank body of PPH pickling tank | |
CN213543191U (en) | Tunnel kiln roasting transport vehicle | |
CN209027290U (en) | A kind of anti-fracture hanging structure |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
C06 | Publication | ||
PB01 | Publication | ||
C10 | Entry into substantive examination | ||
SE01 | Entry into force of request for substantive examination | ||
C14 | Grant of patent or utility model | ||
GR01 | Patent grant |