CN202649051U - 手压式管道试压装置 - Google Patents
手压式管道试压装置 Download PDFInfo
- Publication number
- CN202649051U CN202649051U CN 201220307746 CN201220307746U CN202649051U CN 202649051 U CN202649051 U CN 202649051U CN 201220307746 CN201220307746 CN 201220307746 CN 201220307746 U CN201220307746 U CN 201220307746U CN 202649051 U CN202649051 U CN 202649051U
- Authority
- CN
- China
- Prior art keywords
- pipeline
- pressure
- water inlet
- pressure testing
- hand
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Expired - Lifetime
Links
Images
Landscapes
- Examining Or Testing Airtightness (AREA)
Abstract
一种手压式管道试压装置,在试压管道7的前端接有试压管接3,在试压管接3的另一端接有后背和进水管线后段,进水管线后段连接有前端压力表2、手压泵4的出水端及溢流管1,手压泵4的进水端连接压泵进水口5和进水管线前段6;在试压管道7的后端接有出水管线、后背11和排水口10,在出水管线另一端接有尾端压力表8和排气口9。本实用新型是一种通过对试压管道布局,利用控制开启和关闭不同位置管线上的阀门,完成试压过程,以此来优化和满足试压的装置,成本低廉、操作简单、稳压性能好、施工快捷、安全可靠、可以重复使用。同时受外界条件影响小,无需电源,只要能满足试压用水,即可完成试压过程,在管道安装和试压中可以广泛使用。
Description
技术领域
本实用新型属于管道试压装置,尤其适用于供水和供气管道试压领域。
背景技术
目前,管道安装试压的方法,一般都采用水压和气压两种试压方法,但是无论采用哪一种试压装置,都比较复杂,成本也都较高。
发明内容
本实用新型的目的就是要解决以上问题,提供一种简单易行、成本低廉的手压式管道试压装置,基本可以满足多重管道施压要求。
本发明的技术方案是这样得以实现的:一种手压式管道试压装置,其特点是:在需要进行试压的试压管道7的前端接有试压管接3,在试压管接3的另一端接有后背和进水管线后段,进水管线后段连接有前端压力表2、手压泵4的出水端及溢流管1,手压泵4的进水端连接压泵进水口5和进水管线前段6;在试压管道7的后端接有出水管线、后背11和排水口10,在出水管线另一端接有尾端压力表8和排气口9。
本实用新型是一种通过对试压管道布局,利用控制开启和关闭不同位置管线上的阀门,完成试压过程,以此来优化和满足试压的装置,成本低廉、操作简单、稳压性能好、施工快捷、安全可靠、可以重复使用。同时受外界条件影响小,无需电源,只要能满足试压用水,即可完成试压过程,在管道安装和试压中可以广泛使用。
附图说明
图1是本实用新型结构的示意图。
图中:1——溢流管;2——前端压力表;3——试压管接;4——手压泵;5——压泵进水口;6——进水管线前段;7——试压管道;8——尾端压力表;9——排气口;10——排水口;11——后背。
具体实施方式
从图1可见,本实用新型是采用管道、阀门和管件,将试压泵和试压管道连接起来,通过阀门控制,完成试压过程。本实用新型主要包括溢流管1、前端压力表2、试压管接3、手压泵4、压泵进水口5、进水管线前段6、试压管道7、尾端压力表8、排气管9、排水口10、后背11。
在需要进行试压的试压管道7的前端接有试压管接3,在试压管接3的另一端接有后背和进水管线后段,进水管线后段连接有前端压力表2、手压泵4的出水端及溢流管1,手压泵4的进水端连接压泵进水口5和进水管线前段6;在试压管道7的后端接有出水管线、后背11和排水口10,在出水管线另一端接有尾端压力表8和排气口9。
溢流管1主要是用于手压泵和前端压力表的放水和溢流,也可以作为试压管道释放压力的管道口;前端压力表2主要是观察试压过程中的压力;试压管接3作用是在试压过程中,完成试压管件与被试压管道的连接件,并且阻挡和封闭试压管头;手压泵4用于往试压管道加注压力,完成试压目的;压泵进水口5,由于压泵是采用通过往管道中注水,完成压力实验,因此需要不断通过压泵进水口往压泵箱体内注水;进水管线6一般采用直径20mm-25mm的镀锌管道,组成试压系列管线;试压管道7是需要试压的管线;尾端压力表8用于观察试压管道内部压力是否平稳一致;排气管9的作用:由于试压时候需要从管道一端往内部注水或气体,由于管道内部存有大量的空气,在试压过程中必须将空气排出,在试压的过程中根据情况做出适度的排气,也利于试压过程中的稳压;排水口10的结构是内丝孔,作用就是排除试压管道内的存水,也可以作为排污口使用;后背11的作用是支撑管道两端试压管帽和试压管件、防止脱落,其可以使用木质架构制造,能满足使用即可。
本实用新型通过进水管线6往试压管道内注满试压用水,并将试压泵箱体注满加压用水;当水注满到一定程度时,会从溢流管1中流出,这时候关闭进水阀门和溢流管1的阀门,开启排气口9的阀门,直至将管道内部的空气从排气口全部排出、试压水从排气口9流出为止,此时关闭排气口9的阀门,开启压力表下端考克阀门的排气口,直至空气和水流出,管壁考克阀门,开始注压。加压时注入压力要均匀,注意观察前后压力表的位置是否同位,当试压管道内部压力不平稳时,前后压力表波动较大时,可以适时在尾端排气口放水泄压,以保持管道内部压力平稳,试压时都会产生稳压过程,因此可以分为五个阶段1.注水,2.排气,3.加压,4.稳压,5.再次加压等过程。
开始加压时候,压力不宜太高,分几次、分阶段加压。管道大小、长度不一样,稳压的时间也就不一样,要能区别认识是稳压还是泄漏,由于试压管道材质不同、用途不同,试压的压力也就不同。水压升至试压压力后开始计时,每当压力下降,应及时向管内补水,但是降压不得大于0.03MPa,是管道试验压力始终保持恒定延续时间,并要计算出恒压时间内补入试验管段内的水量,要根据施工要求和技术规范,选择试压的压力和范围。
Claims (1)
1.一种手压式管道试压装置,其特征在于:在需要进行试压的试压管道(7)的前端接有试压管接(3),在试压管接(3)的另一端接有后背和进水管线后段,进水管线后段连接有前端压力表(2)、手压泵(4)的出水端及溢流管(1),手压泵(4)的进水端连接压泵进水口(5)和进水管线前段(6);在试压管道(7)的后端接有出水管线、后背(11)和排水口(10),在出水管线另一端接有尾端压力表(8)和排气口(9)。
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN 201220307746 CN202649051U (zh) | 2012-06-28 | 2012-06-28 | 手压式管道试压装置 |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN 201220307746 CN202649051U (zh) | 2012-06-28 | 2012-06-28 | 手压式管道试压装置 |
Publications (1)
Publication Number | Publication Date |
---|---|
CN202649051U true CN202649051U (zh) | 2013-01-02 |
Family
ID=47418143
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN 201220307746 Expired - Lifetime CN202649051U (zh) | 2012-06-28 | 2012-06-28 | 手压式管道试压装置 |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN202649051U (zh) |
Cited By (2)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN103471930A (zh) * | 2013-09-27 | 2013-12-25 | 杜培文 | 一种山丘区输水管道试压方法及试压装置 |
CN103994930A (zh) * | 2014-04-22 | 2014-08-20 | 张卫社 | 用于圆柱形压力气瓶或压力管道进行压力试验的方法 |
-
2012
- 2012-06-28 CN CN 201220307746 patent/CN202649051U/zh not_active Expired - Lifetime
Cited By (3)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN103471930A (zh) * | 2013-09-27 | 2013-12-25 | 杜培文 | 一种山丘区输水管道试压方法及试压装置 |
CN103994930A (zh) * | 2014-04-22 | 2014-08-20 | 张卫社 | 用于圆柱形压力气瓶或压力管道进行压力试验的方法 |
CN103994930B (zh) * | 2014-04-22 | 2016-05-18 | 张卫社 | 用于圆柱形压力气瓶或压力管道进行压力试验的方法 |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN202453152U (zh) | 多通道多用途电动型移动式水压试验系统 | |
MY155890A (en) | Apparatus for and method of drilling a subterranean borehole | |
CN208653742U (zh) | 一种密封及脉冲压力测试一体机 | |
CN202649051U (zh) | 手压式管道试压装置 | |
CN203758705U (zh) | 地下管道试压检测装置 | |
WO2011042755A3 (en) | Observation cell arrangement | |
CN202831091U (zh) | 一种高层供水二次加压的引射器装置 | |
CN203657991U (zh) | 一种管材耐压爆破试验机 | |
CN204003688U (zh) | 气动控制液压系统 | |
CN205133136U (zh) | 气力自动加液装置 | |
CN202522370U (zh) | 用于压力表校验台的压力表接口拓展装置 | |
CN205136714U (zh) | 顶杆式回压系统 | |
CN204718744U (zh) | 一种u型换热管的试压工装设备 | |
CN204025017U (zh) | 一种高压水泵性能测试平台 | |
CN204326167U (zh) | 带有射流装置的无负压供水设备 | |
CN108548665B (zh) | 气压驱动式夹持的异型阀门爆破压力测试系统及测试方法 | |
CN209278233U (zh) | 一种被动式自动阻力施加机构 | |
CN215333379U (zh) | 一种密封试验增压系统 | |
CN203614831U (zh) | 一种叠加式直动型减压阀 | |
CN202629291U (zh) | 气控膜片式高压大流量减压阀出口压力控制系统 | |
CN204458599U (zh) | 交替单向阀及增压系统 | |
CN103645019B (zh) | 一种带有气液增压泵的高压炮筒测试系统 | |
CN104100513A (zh) | 一种高压水泵性能测试平台 | |
CN204901014U (zh) | 水轮机管路系统的液压阀操作油管路结构 | |
CN205027485U (zh) | 水力锚检测装置和水力锚检测设备 |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
C14 | Grant of patent or utility model | ||
GR01 | Patent grant | ||
CX01 | Expiry of patent term |
Granted publication date: 20130102 |
|
CX01 | Expiry of patent term |